CN207673123U - A kind of project installation protection fence - Google Patents

A kind of project installation protection fence Download PDF

Info

Publication number
CN207673123U
CN207673123U CN201721908986.8U CN201721908986U CN207673123U CN 207673123 U CN207673123 U CN 207673123U CN 201721908986 U CN201721908986 U CN 201721908986U CN 207673123 U CN207673123 U CN 207673123U
Authority
CN
China
Prior art keywords
fence
column
left column
foundation
mounting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721908986.8U
Other languages
Chinese (zh)
Inventor
康士伟
刘少丰
张勇军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jingcheng Electromechanical Equipment Engineering Co Ltd
Original Assignee
Guangzhou Jingcheng Electromechanical Equipment Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jingcheng Electromechanical Equipment Engineering Co Ltd filed Critical Guangzhou Jingcheng Electromechanical Equipment Engineering Co Ltd
Priority to CN201721908986.8U priority Critical patent/CN207673123U/en
Application granted granted Critical
Publication of CN207673123U publication Critical patent/CN207673123U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a kind of project installation protection fences, including pedestal, foundation is installed above the pedestal, fence left column and fence right column are separately installed with above the foundation, the upper end of the fence left column and fence right column is mounted on tarpaulin, the lower end of the fence left column and fence left column is both provided with bolt hole, the fence left column and fence right column are connect by bolt column with foundation, it is both provided with mortise on the inside of the fence left column and fence right column, and it is connect by tenon with fence mounting rod, the front surface of the fence mounting rod is equipped with LED light, fence cross bar and fence mesh are installed on the inside of the fence mounting rod.The utility model reduces installation difficulty, while can be played a warning role at night, and using effect is more obvious.And the adjusting of this kind of project installation protection fence height is facilitated, it is more convenient to use.

Description

A kind of project installation protection fence
Technical field
The utility model is related to environmental protection and energy saving product technique field, specifically a kind of project installation protection fence.
Background technology
Project installation is made of a kind of iron pipe with protection fence, by seamless iron pipe bending, welding, sanding and polishing, high pressure Baking vanish, pad pasting etc. layer by layer be processed by technique.The general isolation and warning for being widely used in construction site.Guardrail of constructing is general It is usually used in ordinary road, highway also has road cross at different levels, charge station, bridge, parking lot, station, harbour.One As be mounted on dangerous area and road construction location, the places such as temporarily isolating column of rendezvous are enclosed as road shunting, region covers Security isolation, shunting, guiding or the order used in the sports performance occasion such as some celebration occasion or sports and amusements for carrying book Safeguard, can also make protection in the occasions such as factory, workshop, warehouse, parking lot, shopping centre, public place to equipment and facilities with Protection etc..Sticking on simultaneously for black in the construction guardrail ontology played a warning role has obvious reflective membrane, has obviously to driver Warning function, can reduce accident when people's vehicle injures and deaths degree, form safer effect.It is played for different kinds of roads construction main Effect is to prevent people from turning over, creeping out, and improves safety.At present to protecting the use of fence more and more frequently in terms of engineering construction It is numerous, but there is also some shortcomingss installing at present, such as:Installation process is complicated, and the amount of labour is big, and is dismantled not in structure Just etc., we provide a kind of project installation protection fence thus.
Utility model content
The purpose of this utility model is to provide a kind of project installation protection fences, to solve installation in the prior art Process is complicated, and the amount of labour is big, and the problems such as inconvenient is dismantled in structure.
To achieve the above object, the utility model provides the following technical solutions:A kind of project installation protection fence, including Pedestal is equipped with foundation above the pedestal, fence left column and fence right column is separately installed with above the foundation, The upper end of the fence left column and fence right column is mounted on tarpaulin, under the fence left column and fence left column End is both provided with bolt hole, and the fence left column and fence right column are connect by bolt column with foundation, and bolt column End is equipped with nut, and the first connection hook and the second connection hook, the fence are equipped on the left of the fence left column First connection hook slot and the second connection hook slot are installed on the right side of right column, the fence left column and fence right column Inside is both provided with mortise, and is connect by tenon with fence mounting rod, and the front surface of the fence mounting rod is equipped with LED Lamp is equipped with fence cross bar and fence mesh on the inside of the fence mounting rod, and fence mesh is mounted between fence cross bar.
Preferably, the fence left column and fence right column all extend to the inside of foundation.
Preferably, there are two the foundation and pedestal are respectively provided with, and positioned at the left and right sides of fence mesh.
Preferably, the inside of the fence left column and fence right column is cavity body structure, and with the connection of tarpaulin Place is equipped with marine glue.
Preferably, the fence mesh is welded to connect with fence mounting rod and column cross bar.
Compared with prior art, the utility model has the beneficial effects that:The utility model only need to pass through tenon in structure It is combined with mortise, installation difficulty can be reduced so that fence mesh is connect with fence left column and fence right column, while Fence mounting rod front surface is additionally provided with LED light, and LED light can play a warning role at night, can at a distance be prompted at night Toward vehicle and crossing personnel, using effect is more obvious.And kind project installation is equipped with bolt hole with protection fence on foundation, leads to Crossing bolt hole can stretch to fence left column and fence right column, and fence is protected to facilitate this kind of project installation The adjusting of height, it is more convenient to use.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model fence left column.
In figure:1- fences cross bar, 2- fence meshs, 3- fences mounting rod, 4- tarpaulins, the connections of 5- first hook, 6- fences Left column, 7- tenons, 8-LED lamps, the connections of 9- second hook, 10- bolts hole, 11- bolt columns, 12- foundation, 13- pedestals, 14- Nut, the connection hooks of 15- first slot, the connection hooks of 16- second slot, 17- fences right column, 61- mortises.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1~2, in the utility model embodiment, a kind of project installation protection fence, including pedestal 13, bottom The top of seat 13 is equipped with foundation 12, and supporting rack of the foundation 12 as protection fence, the top of foundation 12 is separately installed with fence Left column 6 and fence right column 17, fence left column 6 and fence right column 17 are for connecting fence mesh 3,6 He of fence left column The upper end of fence right column 17 is mounted on tarpaulin 4, tarpaulin 4 can effective waterproof, avoid fence left column 6 and fence right The lower end of the internal rust of column 17, fence left column 6 and fence left column 6 is both provided with bolt hole 10,6 He of fence left column Fence right column 17 is connect by bolt column 11 with foundation 12, and the end of bolt column 11 is equipped with nut 14, and nut 14 rises To fastening effect, keep foundation 12 and the connection of fence left column 6 and fence right column 17 more secured, a left side for fence left column 6 Side is equipped with the first connection hook 5 and second connection hook 9, when carrying out using the protection fence, passes through a protection fence The first connection hook 5 and second connect hook 9 and protect the fence of fence first to connect hook slot 15 and second with another The 16 phase mounting of hook slot is connected, connection is completed to extend, right side is equipped with the connection hook of the first connection hook slot 15 and second The inside of slot 16, fence left column 6 and fence right column 17 is both provided with mortise 61, and is connected by tenon 7 with fence mounting rod 3 It connects, the front surface of fence mounting rod 3 is equipped with LED light 8, and LED light 8 enables at night, can effectively prompt vehicular traffic personnel, enclose The inside of column mounting rod 3 is equipped with fence cross bar 1 and fence mesh 2, and fence mesh 2 is mounted between fence cross bar 1.A fence left side is vertical Column 6 and fence right column 17 all extend to the inside of foundation 12.There are two foundation 12 and pedestal 13 are respectively provided with, and it is located at fence mesh 2 left and right sides.The inside of fence left column 6 and fence right column 17 is cavity body structure, and is set with the junction of tarpaulin 4 There is marine glue.Fence mesh 2 is welded to connect with fence mounting rod 3 and column cross bar 1.
The operation principle of the utility model is:The equipment when in use, is distinguished by the tenon 7 in 3 outside of fence mounting rod It is connected with fence left column 6 and fence right column 17, to form an overall structure, while before fence mounting rod 3 Surface is equipped with LED light, and LED light can play illumination and warning function at night, remind the personnel of vehicular traffic, notices that front is applied Work, while this kind of project installation can be stretched with the foundation 12 of protection fence with fence left column 6 and fence right column 17, So as to adjust the height that this kind of project installation protects fence, keep its more convenient to use.And this kind of project installation is protected Guard fence can by first connection hook 5 and second connect hook 9 with another protect fence first connect hook slot 15 and Second connection hook slot, 16 phase mounting, to complete to extend connection.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of project installation protection fence, including pedestal (13), it is characterised in that:It is equipped with above the pedestal (13) Foundation (12), fence left column (6) and fence right column (17) are separately installed with above the foundation (12), and the fence is left The upper end of column (6) and fence right column (17) is mounted on tarpaulin (4), the fence left column (6) and fence left column (6) lower end is both provided with bolt hole (10), and the fence left column (6) and fence right column (17) pass through with foundation (12) Bolt column (11) connects, and the end of bolt column (11) is equipped with nut (14), is equipped on the left of the fence left column (6) First connection hook (5) and second connects hook (9), and the first connection hook slot is equipped on the right side of the fence right column (17) (15) and second connects hook slot (16), and mortise is both provided on the inside of the fence left column (6) and fence right column (17) (61), it and with fence mounting rod (3) by tenon (7) connect, the front surface of the fence mounting rod (3) is equipped with LED light (8), fence cross bar (1) and fence mesh (2) are installed, and fence mesh (2) is mounted on fence on the inside of the fence mounting rod (3) Between cross bar (1).
2. a kind of project installation according to claim 1 protection fence, it is characterised in that:The fence left column (6) The inside of foundation (12) is all extended to fence right column (17).
3. a kind of project installation according to claim 1 protection fence, it is characterised in that:The foundation (12) and pedestal (13) there are two being respectively provided with, and positioned at the left and right sides of fence mesh (2).
4. a kind of project installation according to claim 1 protection fence, it is characterised in that:The fence left column (6) Inside with fence right column (17) is cavity body structure, and is equipped with marine glue with the junction of tarpaulin (4).
5. a kind of project installation according to claim 1 protection fence, it is characterised in that:The fence mesh (2) with enclose Column mounting rod (3) and column cross bar (1) are welded to connect.
CN201721908986.8U 2017-12-30 2017-12-30 A kind of project installation protection fence Expired - Fee Related CN207673123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721908986.8U CN207673123U (en) 2017-12-30 2017-12-30 A kind of project installation protection fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721908986.8U CN207673123U (en) 2017-12-30 2017-12-30 A kind of project installation protection fence

Publications (1)

Publication Number Publication Date
CN207673123U true CN207673123U (en) 2018-07-31

Family

ID=62972965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721908986.8U Expired - Fee Related CN207673123U (en) 2017-12-30 2017-12-30 A kind of project installation protection fence

Country Status (1)

Country Link
CN (1) CN207673123U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541872A (en) * 2022-03-28 2022-05-27 国网新疆电力有限公司经济技术研究院 Electric power protection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541872A (en) * 2022-03-28 2022-05-27 国网新疆电力有限公司经济技术研究院 Electric power protection device

Similar Documents

Publication Publication Date Title
CN206545179U (en) Road and bridge construction alarming device
CN207793966U (en) A kind of municipal administration multifunction guard rail
CN207673123U (en) A kind of project installation protection fence
CN206173850U (en) Prevent crossing multifunctional road rail guard
CN207295537U (en) A kind of steel construction vehicle height limiter
CN207092692U (en) A kind of road construction safety barrier for building
CN205223919U (en) Road guardrail
CN200996136Y (en) Road isolated guardrail device against glare interference
CN203755800U (en) Power construction fence used at night
CN210458831U (en) Foot base for intelligent luminous brick
CN206143675U (en) Limit for height frame warning pendulum
CN204609463U (en) Power engineering Fast Installation protection fence
CN210459050U (en) Guardrail that can splice
CN206722532U (en) A kind of power equipment maintaining safety barrier with alarm function
CN215165029U (en) Safety warning device for highway guardrail
CN214463242U (en) Warning fence for building construction site
CN205223922U (en) Warning road traffic keeps apart guardrail
CN206591471U (en) A kind of road guard
CN211446724U (en) Road guardrail
CN203456058U (en) Line channel warning board
CN213063215U (en) Warning rail for hydraulic engineering safety
CN218622016U (en) Separate area structure protector in road
CN105844930A (en) Photovoltaic traffic conducting equipment used for intelligent traffic
CN107119605A (en) Can be stopped roadside guardrail
CN213625368U (en) Anti-collision protection fence for road and bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20191230