CN207609199U - A kind of steel construction top discharge reinforcing steel processing shed - Google Patents

A kind of steel construction top discharge reinforcing steel processing shed Download PDF

Info

Publication number
CN207609199U
CN207609199U CN201720849864.XU CN201720849864U CN207609199U CN 207609199 U CN207609199 U CN 207609199U CN 201720849864 U CN201720849864 U CN 201720849864U CN 207609199 U CN207609199 U CN 207609199U
Authority
CN
China
Prior art keywords
truss
ceiling
transport box
bottom plate
shed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720849864.XU
Other languages
Chinese (zh)
Inventor
于宗菊
向礼毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shehong County Cailun Building Materials LLC
Original Assignee
Shehong County Cailun Building Materials LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shehong County Cailun Building Materials LLC filed Critical Shehong County Cailun Building Materials LLC
Priority to CN201720849864.XU priority Critical patent/CN207609199U/en
Application granted granted Critical
Publication of CN207609199U publication Critical patent/CN207609199U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to reinforcing steel processing shed technical fields, specifically disclose a kind of steel construction top discharge reinforcing steel processing shed, including bottom plate (1), truss (2), ceiling (3), the truss (2) connect with bottom plate (1), the ceiling (3) connect with the upper end of truss (2), the top door (4) for discharging is further opened on the ceiling (3), the flexible awning (5) for rain-proof is additionally provided on the outside of the top door (4), it is described top door (4) underface be also placed with for accommodates process after reinforcing bar transport box (6);The transport box (6) includes babinet (6.1) and hangers (6.2), and the hangers (6.2) is distributed on babinet (6.1) surrounding.The present apparatus directly can export the reinforcing bar processed from top, convenience and high-efficiency after the completion of steel bar meter, without being transported through.

Description

A kind of steel construction top discharge reinforcing steel processing shed
Technical field
The utility model is related to reinforcing steel processing shed technical fields, and in particular to a kind of steel construction top discharge steel bar meter Canopy.
Background technology
In construction industry, reinforcing bar is the essential basic material of building, thus, each construction site is required for Build the live processing operation that different demands are carried out to reinforcing bar of reinforcing steel processing shed.Since reinforcement shed is in construction site, to it It is required that also higher, for example, (1) reinforcing steel processing shed is all within the scope of the handling of tower crane, otherwise reinforcing bar hangs inconvenience.(2) prevent The top of shield canopy has two layers, uppermost interlayer upper berth template, below one layer spread two layers of bamboo fragrant plant slice, thin piece.Spacing 500 between two layers mm.There is going along with sb. to guard him for 500 height in most top surface.It is set up as column using double steel pipe.(3) internal to have fire extinguisher, steel bar processing equipment, have Lighting system.(4) doorway has famous brand, machinery side to have operating instruction, points for attention.Currently, traditional reinforcing steel processing shed is general It builds on the ground of hardening, and mostly uses greatly and be welded to connect between all parts of reinforcing steel processing shed.In use, need by The reinforcing bar processed is first transported out reinforcing steel processing shed, then lift etc. transhipment operation, and is being transported out machining shed this process In, since big machinery cannot be introduced into, mostly use the transhipment of artificial or fork truck, time and effort consuming, inefficiency.
Utility model content
The purpose of this utility model is that:For existing reinforcing steel processing shed, after the completion of to steel bar meter, need steel Muscle man-handling of materials, which goes out machining shed, the operations such as could carry out subsequently lifting, there are time and effort consuming, the problem of inefficiency;It provides a kind of Steel construction top discharge reinforcing steel processing shed, can after the completion of steel bar meter, without being transported through, directly by the reinforcing bar processed from Top exports, and convenience and high-efficiency has saved cost of labor.
The technical solution adopted in the utility model is as follows:
A kind of steel construction top discharge reinforcing steel processing shed, including bottom plate, truss, ceiling, the truss are connect with bottom plate, institute The upper end for stating ceiling and truss connects, and the top door for discharging is further opened on the ceiling, the outside of the top door is also Be provided with the flexible awning for rain-proof, the underface of the top door be also placed with for accommodates process after reinforcing bar transhipment Case;The transport box includes babinet and hangers, and the hangers is distributed on babinet surrounding.
Preferably, being additionally provided with the locating groove for positioning transport box on the bottom plate.
Preferably, the truss is T-shaped truss.
Preferably, the outer surface of the ceiling is also laid with one layer of buffer layer for reducing falling object from high altitude impact force.
In conclusion by adopting the above-described technical solution, the utility model has the beneficial effects that:
1, traditional reinforcing steel processing shed is in use, need the reinforcing bar processed being first transported out reinforcing steel processing shed, then carry out The transhipment operation such as lifting, and be transported out machining shed this during, since big machinery cannot be introduced into, mostly use it is artificial or Fork truck is transported, time and effort consuming, inefficiency.The steel construction top discharge reinforcing steel processing shed of the utility model, changes traditional steel The discharge method of muscle machining shed is discharged by the ceiling of this machining shed, facilitates tower crane directly to lift, substantially increase reinforcement shed Processing efficiency saves cost of labor.
2, it when lifting multiple steel bar meter parts with multiple components, needs respectively to lift multiple components, leads to tower Lift heavy does work again, inefficiency;In order to improve lifting efficiency, the transport box of this machining shed by multiple components containings to together, one Secondary property is assembled again after being lifted into required floor, is not necessarily to tower crane operation back and forth, is improved the efficiency of lifting.
3, it when placing transport box every time, is required for manually positioning transport box, it is ensured that it is being located at top door just Lower section is easy to cause transport box in lifting and collides with the accident of ceiling, when serious, it is also possible to destroy whole once positioning is inaccurate A machining shed;In order to ensure that the placement location of transport box is located at the underface of top door at any time, the present apparatus devises on bottom plate Locating groove, locating groove are located at the underface of top door so that when placing transport box every time, can conveniently be determined Position avoids error caused by being positioned manually and security risk.
4, traditional truss is " inverted u-shaped ", and the leg contacted with ground is two, not only occupied space, also big Type lorry causes to stop, influences to unload efficiency when unloading reinforcing bar, in order to further increase the unloading loading efficiency of machining shed, this dress Set and be arranged to truss " T-shaped ", the truss of the shape uses intermediate stress, only in the middle part of bottom plate there are one tie point, this Both sides have just been liberated in use, are had no effect on the ground to unloading, have been widened the operating space of machining shed indirectly, it is excellent The unloading flow of reinforcing bar is changed.
5, since reinforcing steel processing shed is located at construction site, there are the risks of falling object from high altitude, and in order to reduce this risk, this adds Builder's temporary shed has laid one layer of buffer layer for reducing falling object from high altitude impact force in the outside of ceiling, can effectively offset falling object from high altitude institute The impact force brought ensures the safety of the present apparatus.
Description of the drawings
Fig. 1 is the structure chart of the utility model steel construction top discharge reinforcing steel processing shed;
Fig. 2 is the working state figure of the utility model steel construction top discharge reinforcing steel processing shed;
Fig. 3 is the sectional view of the utility model steel construction top discharge reinforcing steel processing shed;
It is marked in figure:1- bottom plates;2- truss;3- ceilings;4- pushes up door;5- stretches awning;6- transport boxes;6.1- babinet; 6.2- hangers.
Specific implementation mode
All features disclosed in this specification can be with any other than mutually exclusive feature and/or step Mode combines.
It elaborates to the utility model with reference to Fig. 1, Fig. 2, Fig. 3.
Embodiment 1, a kind of steel construction top discharge reinforcing steel processing shed, including bottom plate 1, truss 2, ceiling 3, the truss 2 It being connect with bottom plate 1, the ceiling 3 is connect with the upper end of truss 2, and the top door 4 for discharging is further opened on the ceiling 3, The size of door 4 is pushed up according to field demand adjustable size, the outside of the top door 4 is additionally provided with the flexible rain for rain-proof The material of canopy 5, the awning 5 that stretches is stainless steel, and the underface of the top door 4 is also placed with for reinforcing bar after receiving processing Multiple transport boxes 6, further, the transport box 6 of the present embodiment is 4;The transport box 6 includes babinet 6.1 and hangers 6.2, the hangers 6.2 is distributed on 6.1 surrounding of babinet by welding.Further, the truss 2 of this implementation is parallel sets 3 truss set, the screw hole location and installation that 2 bottom of truss is reserved by bolt and bottom plate, the top of truss 2 is reserved with installation Hole, the lower part of ceiling 3 is provided with the installation part coordinated with mounting hole, and is working in coordination, and realizes the installation of ceiling 3.
When the present embodiment works, bar bender carries out steel bar meter operation in the present apparatus, when after processing is completed, it would be desirable to turn The reinforcement component of fortune is put into transport box 6;At this point, opening the control switch for the awning 5 that stretches, expose top door 4, tower crane operation Member turns to suspension hook right over top door 4, puts down suspension hook, is affiliated to the hangers 6.2 on transport box 6 securely with lifting rope, then use Suspension hook slings transport box 6, transports out machining shed, is transported to the floor of needs, convenient and efficient, improves the output effect of machining shed Rate.
Embodiment 2, a kind of steel construction top discharge reinforcing steel processing shed, including bottom plate 1, truss 2, ceiling 3, the truss 2 It being connect with bottom plate 1, the ceiling 3 is connect with the upper end of truss 2, and the top door 4 for discharging is further opened on the ceiling 3, The size of door 4 is pushed up according to field demand adjustable size, the outside of the top door 4 is additionally provided with the flexible rain for rain-proof The material of canopy 5, the awning 5 that stretches is stainless steel, and the underface of the top door 4 is also placed with for reinforcing bar after receiving processing Multiple transport boxes 6, further, the transport box 6 of the present embodiment is 4;The transport box 6 includes babinet 6.1 and hangers 6.2, the hangers 6.2 is distributed on 6.1 surrounding of babinet by welding.Further, the truss 2 of this implementation is parallel sets 3 truss set, the screw hole location and installation that 2 bottom of truss is reserved by bolt and bottom plate, the top of truss 2 is reserved with installation Hole, the lower part of ceiling 3 is provided with the installation part coordinated with mounting hole, and is working in coordination, and realizes the installation of ceiling 3.Further , the locating groove for positioning transport box 6 is additionally provided on the present embodiment bottom plate 1.When placing transport box 6 every time, all need Manually transport box 6 is positioned, it is ensured that it is located at the underface of top door 4, once positioning is inaccurate, is easy to lead in lifting Transport box 6 is caused to collide with the accident of ceiling, when serious, it is also possible to destroy entire machining shed;In order to ensure the placement position of transport box 6 The underface for being located at top door 4 at any time is set, the present apparatus devises locating groove on bottom plate 1, and locating groove is located at top door 4 Underface so that when placing transport box every time, can conveniently be positioned, avoid error caused by being positioned manually and peace Full hidden danger.
Embodiment 3, a kind of steel construction top discharge reinforcing steel processing shed, including bottom plate 1, truss 2, ceiling 3, the truss 2 It being connect with bottom plate 1, the ceiling 3 is connect with the upper end of truss 2, and the top door 4 for discharging is further opened on the ceiling 3, The size of door 4 is pushed up according to field demand adjustable size, the outside of the top door 4 is additionally provided with the flexible rain for rain-proof The material of canopy 5, the awning 5 that stretches is stainless steel, and the underface of the top door 4 is also placed with for reinforcing bar after receiving processing Multiple transport boxes 6, further, the transport box 6 of the present embodiment is 4;The transport box 6 includes babinet 6.1 and hangers 6.2, the hangers 6.2 is distributed on 6.1 surrounding of babinet by welding.Further, the truss 2 of this implementation is parallel sets 3 truss set, the screw hole location and installation that 2 bottom of truss is reserved by bolt and bottom plate, the top of truss 2 is reserved with installation Hole, the lower part of ceiling 3 is provided with the installation part coordinated with mounting hole, and is working in coordination, and realizes the installation of ceiling 3.This implementation The truss 2 of example is T-shaped truss.Traditional truss is " inverted u-shaped ", and the leg contacted with ground is two, is not only accounted for It with space, also causes to stop when high capacity waggon unloads reinforcing bar, influences to unload efficiency, in order to further increase the unloading of machining shed Truss has been arranged to " T-shaped " by loading efficiency, the present apparatus, and the truss of the shape uses intermediate stress, only has with bottom plate middle part As soon as tie point, this has liberated both sides in use, has no effect on the ground to unloading, has widened machining shed indirectly Operating space, optimize the unloading flow of reinforcing bar.
Embodiment 4, a kind of steel construction top discharge reinforcing steel processing shed, including bottom plate 1, truss 2, ceiling 3, the truss 2 It being connect with bottom plate 1, the ceiling 3 is connect with the upper end of truss 2, and the top door 4 for discharging is further opened on the ceiling 3, The size of door 4 is pushed up according to field demand adjustable size, the outside of the top door 4 is additionally provided with the flexible rain for rain-proof The material of canopy 5, the awning 5 that stretches is stainless steel, and the underface of the top door 4 is also placed with for reinforcing bar after receiving processing Multiple transport boxes 6, further, the transport box 6 of the present embodiment is 4;The transport box 6 includes babinet 6.1 and hangers 6.2, the hangers 6.2 is distributed on 6.1 surrounding of babinet by welding.Further, the truss 2 of this implementation is parallel sets 3 truss set, the screw hole location and installation that 2 bottom of truss is reserved by bolt and bottom plate, the top of truss 2 is reserved with installation Hole, the lower part of ceiling 3 is provided with the installation part coordinated with mounting hole, and is working in coordination, and realizes the installation of ceiling 3.This implementation The outer surface of the ceiling 3 of example is also laid with one layer of buffer layer for reducing falling object from high altitude impact force.Due to reinforcing steel processing shed position In construction site, there are the risks of falling object from high altitude, and in order to reduce this risk, this machining shed has laid one layer in the outside of ceiling Buffer layer for reducing falling object from high altitude impact force can effectively offset impact force caused by falling object from high altitude, ensure the present apparatus Safety.
It is the embodiments of the present invention as described above.The utility model is not limited to the above embodiment, anyone It should learn the structure change made under the enlightenment of the utility model, it is every that there is same or similar skill with the utility model Art scheme, each falls within the scope of protection of the utility model.

Claims (4)

1. a kind of steel construction top discharge reinforcing steel processing shed, including bottom plate (1), truss (2), ceiling (3), the truss (2) with Bottom plate (1) connects, and the ceiling (3) connect with the upper end of truss (2), it is characterised in that:It is further opened with use on the ceiling (3) The flexible awning (5) for rain-proof, the top door are additionally provided on the outside of the top door (4) of discharging, the top door (4) (4) underface be also placed with for accommodate processing after reinforcing bar transport box (6);The transport box (6) include babinet (6.1) and Hangers (6.2), the hangers (6.2) are distributed on babinet (6.1) surrounding.
2. steel construction top discharge reinforcing steel processing shed as described in claim 1, it is characterised in that:It is also set on the bottom plate (1) It is equipped with the locating groove for positioning transport box (6).
3. steel construction top discharge reinforcing steel processing shed as described in claim 1, it is characterised in that:The truss (2) is " T " word Shape truss.
4. steel construction top discharge reinforcing steel processing shed as described in any one of claims 1-3, it is characterised in that:The ceiling (3) Outer surface be also laid with one layer for reducing the buffer layer of falling object from high altitude impact force.
CN201720849864.XU 2017-07-13 2017-07-13 A kind of steel construction top discharge reinforcing steel processing shed Active CN207609199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720849864.XU CN207609199U (en) 2017-07-13 2017-07-13 A kind of steel construction top discharge reinforcing steel processing shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720849864.XU CN207609199U (en) 2017-07-13 2017-07-13 A kind of steel construction top discharge reinforcing steel processing shed

Publications (1)

Publication Number Publication Date
CN207609199U true CN207609199U (en) 2018-07-13

Family

ID=62792012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720849864.XU Active CN207609199U (en) 2017-07-13 2017-07-13 A kind of steel construction top discharge reinforcing steel processing shed

Country Status (1)

Country Link
CN (1) CN207609199U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019183946A1 (en) * 2018-03-30 2019-10-03 深圳市君盈建筑科技有限公司 Steel bar prefabrication system
WO2019183945A1 (en) * 2018-03-30 2019-10-03 深圳市君盈建筑科技有限公司 Steel bar prefabrication method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019183946A1 (en) * 2018-03-30 2019-10-03 深圳市君盈建筑科技有限公司 Steel bar prefabrication system
WO2019183945A1 (en) * 2018-03-30 2019-10-03 深圳市君盈建筑科技有限公司 Steel bar prefabrication method

Similar Documents

Publication Publication Date Title
CN107100358A (en) Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method
CN207609199U (en) A kind of steel construction top discharge reinforcing steel processing shed
CN105174072B (en) Solve handling method and the gantry crane that automated container terminal AGV mutually waits with gantry crane
CN205955237U (en) Plug -type platform of unloading of encorbelmenting
CN207030727U (en) A kind of hanging device
CN206942109U (en) One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN206467994U (en) A kind of novel hanging basket support
CN105442866A (en) Protective dismantle and assembly method for large-scale towering steel structures
CN107083843A (en) It is a kind of to be used for the mobile platform of high-rise building equipment and material fast transportation
CN202483180U (en) Movable building material loading and unloading platform
CN204626998U (en) A kind of attached lift scaffold discharging platform
CN208267438U (en) A kind of new reinforcing steel bar machining shed
CN207361124U (en) A kind of reinforcing bar cage body is reached the standard grade system
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN106351454A (en) Method for combined installation of steel structure roof with steel plant
CN106223625B (en) The upright handling method of reinforcing bar in small space based on integral platform
CN205935691U (en) Storehouse face concrete placement system
CN103206076B (en) A kind of packaged type building loading/unloading platform and moving method
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN206158207U (en) Construction is with platform of unloading
CN205369875U (en) A operation protection platform collet for in shaft
CN109594697A (en) Super High built-in type unit glass curtain wall construction method and its structure
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN107265036A (en) A kind of reinforcing bar cage body is reached the standard grade system and method
CN210594973U (en) Multilayer indoor type arranges hoist and mount isolated plant who pulls pavilion dish cabinet of electric substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Steel construction top discharge reinforcing bar adds builder's temporary shed

Effective date of registration: 20200324

Granted publication date: 20180713

Pledgee: Sichuan Shehong Rural Commercial Bank Co., Ltd.

Pledgor: SHEHONG CAILUN BUILDING MATERIALS Co.,Ltd.

Registration number: Y2020980000986

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210319

Granted publication date: 20180713

Pledgee: Sichuan Shehong Rural Commercial Bank Co.,Ltd.

Pledgor: SHEHONG CAILUN BUILDING MATERIALS Co.,Ltd.

Registration number: Y2020980000986

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A steel structure top discharge steel processing shed

Effective date of registration: 20210319

Granted publication date: 20180713

Pledgee: Sichuan Shehong Rural Commercial Bank Co.,Ltd.

Pledgor: SHEHONG CAILUN BUILDING MATERIALS Co.,Ltd.

Registration number: Y2021990000244

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220322

Granted publication date: 20180713

Pledgee: Sichuan Shehong Rural Commercial Bank Co.,Ltd.

Pledgor: SHEHONG CAILUN BUILDING MATERIALS CO.,LTD.

Registration number: Y2021990000244