CN207598259U CN201721808093.6U CN201721808093U CN207598259U CN 207598259 U CN207598259 U CN 207598259U CN 201721808093 U CN201721808093 U CN 201721808093U CN 207598259 U CN207598259 U CN 207598259U
Authority
CN
China
Prior art keywords
arc panel
inner template
exterior sheathing
lining
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721808093.6U
Other languages
Chinese (zh)
Inventor
贺显林
徐顺利
熊婷
樊帅
孟卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN ENGINEERING MACHINERY Co Ltd OF CR20G
Original Assignee
XI'AN ENGINEERING MACHINERY Co Ltd OF CR20G
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN ENGINEERING MACHINERY Co Ltd OF CR20G filed Critical XI'AN ENGINEERING MACHINERY Co Ltd OF CR20G
Priority to CN201721808093.6U priority Critical patent/CN207598259U/en
Application granted granted Critical
Publication of CN207598259U publication Critical patent/CN207598259U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of end molding block apparatus for lining trolley filling concrete, hold-down mechanism including the punching block mechanism being arranged on lining cutting end face and for punching block mechanism to be pressed on to lining cutting end face, punching block mechanism includes the inner template being mounted on trolley formwork, the exterior sheathing being connect with inner template and multiple steel forms on exterior sheathing, multiple steel forms are laid along the circumferential direction of tunnel cross-section, the waist-shaped hole passed through for the first fastener is offered on steel form vertically, the top of inner template is vertically installed with the first arc panel, the bottom end of exterior sheathing is vertically installed with the second arc panel, there are the gaps that buried water stop in confession is installed between first arc panel and the second arc panel.Installation site of the utility model by adjusting steel form on exterior sheathing can adapt to the amount of backbreaking in tunnel excavation section or deficient digging amount, and seam crossing is tightly close between multiple steel forms, under strong vibrations, it the phenomenon that spillage will not occur, is convenient to mount and dismount, it being capable of Reusability.

Description

A kind of end molding block apparatus for lining trolley filling concrete
Technical field
The utility model belongs to technical field of tunnel construction, more particularly, to a kind of for lining trolley filling concrete Hold molding block apparatus.
Background technology
Safety stock of the secondary lining as composite lining of tunnel structure, self waterproofing effect are the weights of tunnel water handling Want component part.But the symmetrical problem placed in the middle of buried water stop in can not being met using traditional wooden model in two lining work progress, may Middle buried water stop waterproof effect is caused to fail, so as to cause the insoluble problems such as two lining percolating waters.Tradition two serves as a contrast end It is processed using pure wooden model form, there are following items shortcomings:1st, construction speed is slow, during practice of construction, preliminary bracing Section may be less smoother, and end head formwork width differs when causing the end to construct, more so as to cause end wooden model block number, cutting Wooden model heavy workload, construction are more slow;2nd, labor intensity is big, and wooden model at least needs 6 people that could complete for 6 hours when blocking, and And every piece of wooden model securely must just can guarantee and not run the quick-fried mould of mould in reinforcing process, reinforce particularly cumbersome;3rd, material circulation profit Low with rate, wooden model is cut when blocking according to section configuration, and construction next time utilization rate is quite low after form removal, leads to wood consumption Greatly, construction cost is increased.Accordingly, it is desirable to provide a kind of end molding block apparatus for lining trolley filling concrete.
Utility model content
The technical problem to be solved by the utility model is to the deficiencies in for the above-mentioned prior art, provide one kind and are used for The end molding block apparatus of lining trolley filling concrete, simple in structure, reasonable design, by adjusting steel form on exterior sheathing Installation site, can adapt to the amount of backbreaking in tunnel excavation section or deficient digging amount, seam crossing is tightly close between multiple steel forms, During casting concrete is carried out, under strong vibrations, the phenomenon that spillage will not occur, and the intensity of steel form, It is better than existing can to bear issuable items load in the weight, lateral pressure and construction of concrete for rigidity and stability Plank sheathing in technology, is convenient to mount and dismount, steel form can Reusability, service life is long, energy conservation and environmental protection.
In order to solve the above technical problems, the technical solution adopted in the utility model is:One kind is used for lining trolley concrete The end molding block apparatus of perfusion, it is characterised in that:Including the punching block mechanism that is arranged on lining cutting end face and for by the punching block Mechanism is pressed on the hold-down mechanism of lining cutting end face, the punching block mechanism include the inner template being mounted on trolley formwork, with it is described The exterior sheathing and multiple steel forms on the exterior sheathing of inner template connection, circumferential direction of multiple steel forms along tunnel cross-section It lays, the steel form is fixedly mounted on exterior sheathing by the first fastener, is offered vertically described in confession on the steel form The waist-shaped hole that first fastener passes through, the top of the inner template are vertically installed with the first arc panel, the bottom end of the exterior sheathing The second arc panel is vertically installed with, there are between buried water stop installation in confession between first arc panel and the second arc panel Gap, the hold-down mechanism include the multiple compressor arms circumferentially laid along tunnel cross-section, the hoop for being sleeved on the compressor arm bottom It muscle, the briquetting being arranged between steel form end face and compressor arm outer circle and is arranged on oblique between trolley formwork and compressor arm outer circle Wedge.
A kind of above-mentioned end molding block apparatus for lining trolley filling concrete, it is characterised in that:The inner template And first be provided with multiple connecting plates between arc panel, is located on the trolley formwork immediately below inner template and is provided with installation Plate is provided with multipair first hinge ear on the installing plate, multipair second hinge ear, the connecting plate is set on second arc panel One end with first hinge ear be hinged by the first articulated shaft, the other end of the connecting plate with second cut with scissors ear pass through the second articulated shaft Hinged, the inner template and installing plate are mounted on by the second fastener on trolley formwork.
A kind of above-mentioned end molding block apparatus for lining trolley filling concrete, it is characterised in that:The connecting plate It is square steel plate with the described second hinge ear, the arc-shaped slot passed through for the second articulated shaft, institute is offered on the connecting plate State the arc edge for having on connecting plate and matching with the arc-shaped slot.
A kind of above-mentioned end molding block apparatus for lining trolley filling concrete, it is characterised in that:The inclined wedge and The quantity of briquetting is multiple.
The utility model has the following advantages compared with prior art:
1st, the utility model on lining cutting end face by being laid with Die cast machine structure, and utilizes hold-down mechanism by the punching block mechanism It is pressed on lining cutting end face, the punching block mechanism includes inner template, exterior sheathing and multiple steel forms, by being installed on exterior sheathing Multiple steel forms, and the waist-shaped hole passed through for first fastener is offered on steel form vertically, exist by adjusting steel form Installation site on exterior sheathing, can adapt to the amount of backbreaking in tunnel excavation section or deficient digging amount, seam crossing between multiple steel forms It is tight close, during casting concrete is carried out, under strong vibrations, the phenomenon that spillage will not occur, and punching block Intensity, rigidity and the stability of plate, can bear in the weight, lateral pressure and construction of concrete it is issuable items load all Better than plank sheathing of the prior art, be convenient to mount and dismount, steel form can Reusability, service life is long, energy conservation and environmental protection.
2nd, the utility model is set on a mounting board by setting multiple connecting plates between inner template and the first arc panel Multipair first hinge ear, sets multipair second hinge ear on the second arc panel, and one end of connecting plate passes through the first hinge with the first hinge ear Spindle is hinged, and the other end of connecting plate is hinged with the second hinge ear by the second articulated shaft, easy to disassemble, improves dismounting and transport Speed, convenient for being used in turn for construction site.
3rd, the utility model lays multiple compressor arms by the circumferential direction in tunnel cross-section, outside steel form end face and compressor arm Briquetting is set between circle, and operating personnel install inclined wedge between trolley formwork and compressor arm outer circle, and tap inclined wedge and make its extruding The periphery of compressor arm, since the bottom of compressor arm is set with stirrup, under the active force of inclined wedge, the upper end of compressor arm It is tilted to close to the side of lining cutting end face, and constantly squeezes briquetting, make briquetting being pressed on the end face of steel form tightly, so as to Realize the purpose entire punching block mechanism being pressed on lining cutting end face, easy to operate, pressing force is big, and using effect is good.
4th, the utility model is simple in structure, reasonable design, low manufacture cost, and versatility is good, wide adaptation range.
In conclusion the utility model is simple in structure, reasonable design, by adjusting installation position of the steel form on exterior sheathing It puts, can adapt to the amount of backbreaking in tunnel excavation section or deficient digging amount, seam crossing is tightly close between multiple steel forms, when being poured During building concrete, under strong vibrations, the phenomenon that spillage will not occur, and the intensity of steel form, rigidity and steady It is qualitative, it is better than of the prior art that issuable items load in the weight, lateral pressure and construction of concrete can be born Plank sheathing is convenient to mount and dismount, steel form can Reusability, service life is long, energy conservation and environmental protection.
Below by drawings and examples, the utility model is further described in detail.
Description of the drawings
Fig. 1 is the usage state diagram of the utility model.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the schematic diagram that the utility model exterior sheathing is in disassembly status.
Fig. 4 is the schematic diagram that the utility model inner template and exterior sheathing are in disassembly status.
Reference sign:
1-trolley formwork;2-1-installing plate;2-2-first cuts with scissors ear;
3-1-inner template;The arc panels of 3-2-first;3-3-connecting plate;
4-1-exterior sheathing;The arc panels of 4-2-second;4-3-first cuts with scissors ear;
The articulated shafts of 5-1-first;The articulated shafts of 5-2-second;6-steel form;
7-bolt;8-nut;9-back-adhering waterstop;
10-middle buried water stop;11-compressor arm;12-stirrup;
13-inclined wedge;14-briquetting;15-pour building lining.
Specific embodiment
As depicted in figs. 1 and 2, the utility model includes being arranged on punching block mechanism on lining cutting end face and for by the steel Mold mechanism is pressed on the hold-down mechanism of lining cutting end face, the punching block mechanism include the inner template 3-1 being mounted on trolley formwork 1, With the inner template 3-1 exterior sheathing 4-1 connecting and multiple steel forms 6 on the exterior sheathing 4-1, multiple steel forms 6 lay along the circumferential direction of tunnel cross-section, and the steel form 6 is fixedly mounted on by the first fastener on exterior sheathing 4-1, the punching block The waist-shaped hole 6-1 passed through for first fastener is offered on plate 6 vertically, the top of the inner template 3-1 is vertically installed with The bottom end of first arc panel 3-2, the exterior sheathing 4-1 be vertically installed with the second arc panel 4-2, the first arc panel 3-2 and There are the gaps that buried water stop in confession 10 is installed, the hold-down mechanism between second arc panel 4-2 to be included along tunnel cross-section Multiple compressor arms 11 for circumferentially laying, the stirrup 12 for being sleeved on 11 bottom of compressor arm are arranged on 6 end face of steel form with compressing Briquetting 14 between 11 outer circle of bar and the inclined wedge 13 being arranged between 11 outer circle of trolley formwork 1 and compressor arm.
In the present embodiment, by being laid with Die cast machine structure on lining cutting end face, and hold-down mechanism is utilized by the punching block mechanism It is pressed on lining cutting end face, the punching block mechanism includes inner template 3-1, exterior sheathing 4-1 and multiple on exterior sheathing 4-1 Steel form 6 is more by being installed on exterior sheathing 4-1 in the present embodiment compared with the mode of supporting plank sheathing in the prior art A steel form 6, and the waist-shaped hole 6-1 passed through for first fastener is offered on steel form 6 vertically, in actual use, lead to Installation site of the adjustment steel form 6 on exterior sheathing 4-1 is crossed, can adapt to the amount of backbreaking in tunnel excavation section or deficient digging amount, it is more Seam crossing is tightly close between a steel form 6, during casting concrete is carried out, under strong vibrations, will not occur It the phenomenon that spillage, and the intensity of steel form 6, rigidity and stability, can bear in the weight, lateral pressure and construction of concrete It is issuable items load be better than plank sheathing of the prior art, be convenient to mount and dismount, steel form 6 can Reusability, use Long lifespan, energy conservation and environmental protection.
In the present embodiment, between middle buried water stop 10 is mounted between the first arc panel 3-2 and the second arc panel 4-2 In gap, buried water stop 10 is installed straight and is not shifted in Concrete of constructing, buried water stop 10 in guarantee in guarantee It is symmetrical placed in the middle in concreting process.
In actual use, the end of steel form 6 is equipped with back-adhering waterstop 9, can adapt to tunnel excavation section part Irregularity degree.
In the present embodiment, multiple compressor arms 11 are laid by the circumferential direction in tunnel cross-section, in 6 end face of steel form and compressor arm Briquetting 14 is set between 11 outer circles, and in actual use, operating personnel install inclined wedge between 11 outer circle of trolley formwork 1 and compressor arm 13, and tapping inclined wedge 13 makes it squeeze the periphery of compressor arm 11, since the bottom of compressor arm 11 is set with stirrup 12, Under the active force of inclined wedge 13, the upper end of compressor arm 11 is tilted to close to the side of lining cutting end face, and constantly squeezes briquetting 14, is made Being pressed on the end face of steel form 6 tightly of briquetting 14, so as to fulfill entire punching block mechanism to be pressed on to the mesh on lining cutting end face , easy to operate, pressing force is big, and using effect is good.
In the present embodiment, it is provided with multiple connecting plate 3-3 between the inner template 3-1 and the first arc panel 3-2, described It is located at immediately below inner template 3-1 to be provided on installing plate 2-1, the installing plate 2-1 in vehicle template 1 and is provided with multipair first hinge Multipair second hinge ear 4-3, one end of the connecting plate 3-3 and the first hinge ear are provided on ear 2-2, the second arc panel 4-2 2-2 is hinged by the first articulated shaft 5-1, and the other end of the connecting plate 3-3 and the second hinge ear 4-3 pass through the second articulated shaft 5-2 Hinged, the inner template 3-1 and installing plate 2-1 are mounted on by the second fastener on trolley formwork 1.
In the present embodiment, first fastener and second fastener are bolt 7 and nut 8.
In the present embodiment, the inner template 3-1 and installing plate 2-1 are fixedly mounted on trolley formwork by the second fastener On 1, in the present embodiment, installing plate 2-1 is set, and in installing plate 2- by the underface for being located at inner template 3-1 in trolley formwork 1 Multipair first hinge ear 2-2 is set on 1, due to being provided with multiple connecting plate 3-3 between inner template 3-1 and the first arc panel 3-2, because This, after one end of connecting plate 3-3 is hinged by the first articulated shaft 5-1 with the first hinge ear 2-2, in dismounting inner template 3-1 When, it is only necessary to the second disassembly of fastener is got off, inner template 3-1 is rotated around the first articulated shaft 5-1, inner template can be completed 3-1 is separated with having poured the lining cutting end face of completion, when needing completely to remove inner template 3-1 from trolley formwork 1, then Multiple first articulated shaft 5-1 are removed one by one, during entire inner template 3-1 is removed, ensure that the safety of construction.
In the present embodiment, one end of the connecting plate 3-3 is hinged with the first hinge ear 2-2 by the first articulated shaft 5-1, described The other end of connecting plate 3-3 is hinged with the second hinge ear 4-3 by the second articulated shaft 5-2, improves the speed of dismounting and transport, just In being used in turn for construction site.
In the present embodiment, the connecting plate 3-3 and the second hinge ear 4-3 are square steel plate, the connecting plate 3-3 On offer on the arc-shaped slot 3-3-1, the connecting plate 3-3 passed through for the second articulated shaft 5-2 have and the arc-shaped slot The arc edge that 3-3-1 matches.
In the present embodiment, the connecting plate 3-3 is that the purpose of square steel plate is:Connecting plate 3-3 is not only acted as and the One hinge ear 2-2 and the effect of the second hinge ear 4-3 connections, can simultaneously serve as gusset and play enhancing inner template 3-1 and the first arc The effect of strength and stability between plate 3-2.
As shown in figure 3, in the present embodiment, by offering the arc passed through for the second articulated shaft 5-2 on connecting plate 3-3 Slot 3-3-1, and there is the arc edge to match with the arc-shaped slot 3-3-1 on connecting plate 3-3, in actual use, When dismantling exterior sheathing 4-1, the second articulated shaft 5-2 can be slided in arc-shaped slot 3-3-1, drive outer template 4-1 and the second arc Shape plate 4-2 is rotated, due to having the arc edge to match with the arc-shaped slot 3-3-1 on connecting plate 3-3, second The phenomenon that arc panel 4-2 will not collide with connecting plate 3-3, be not in stuck.
In the present embodiment, the quantity of the inclined wedge 13 and briquetting 14 is multiple, in actual use, is needed according to lining cutting end The end face diameter in face determines the quantity of steel form 6, and the quantity of briquetting 14 and inclined wedge 13 is determined according to the quantity of steel form 6, this In embodiment, the quantity of steel form 6 is 108, and the quantity of compressor arm 11 is 32, and the quantity of briquetting 14 is 32, inclined wedge 13 Quantity be 32.
In actual use, it under tunnel double-lining trolley walking states, needs to pack up inner template 3-1 and exterior sheathing 4-1, complete After the walking positioning of tunnel double-lining trolley, from positive vault, wall is symmetrically installed middle buried water stop 10 and back sticking type sealing to the left and right sides Band 9, middle buried water stop 10 are fixed between the first arc panel 3-2 and the second arc panel 4-2, treat middle buried water stop 10 and the back of the body After pasting type waterstop 9 installs, poured in place concrete is carried out, building lining 15 is poured in formation, after building lining 15 to be poured solidifies, such as Shown in Fig. 3 and Fig. 4, first, multiple steel forms 6 are disassembled from exterior sheathing 4-1 one by one;Secondly, exterior sheathing 4-1 is dismantled, only It needs to rotate outer template 4-1 around the second articulated shaft 5-2, and the second articulated shaft 5-2 can be slided in arc-shaped slot 3-3-1 It is dynamic;Then, dismounting inner template 3-1, it is only necessary to multiple second fasteners be disassembled one by one, revolved around the first articulated shaft 5-1 Turn inner template 3-1, inner template 3-1 can be completed and be separated with having poured the lining cutting end face of completion, convenient disassembly, using effect It is good.
The above is only the preferred embodiment of the utility model, not the utility model imposed any restrictions, every Any simple modification, change and the equivalent structure made according to the utility model technical spirit to above example change, still Belong in the protection domain of technical solutions of the utility model.

Claims (4)

1. a kind of end molding block apparatus for lining trolley filling concrete, it is characterised in that:Including being arranged on lining cutting end face On punching block mechanism and hold-down mechanism for the punching block mechanism to be pressed on to lining cutting end face, the punching block mechanism include installation Inner template (3-1) on trolley formwork (1), the exterior sheathing (4-1) being connect with the inner template (3-1) and mounted on described outer Multiple steel forms (6) in template (4-1), multiple steel forms (6) are laid along the circumferential direction of tunnel cross-section, and the steel form (6) is logical It crosses the first fastener to be fixedly mounted on exterior sheathing (4-1), be offered vertically on the steel form (6) for first fastener The waist-shaped hole (6-1) passed through, the top of the inner template (3-1) are vertically installed with the first arc panel (3-2), the exterior sheathing The bottom end of (4-1) is vertically installed with the second arc panel (4-2), between first arc panel (3-2) and the second arc panel (4-2) There are the gap of buried water stop in confession (10) installation, the hold-down mechanism includes the multiple pressures circumferentially laid along tunnel cross-section Tight bar (11), is arranged on steel form (6) end face and compressor arm (11) outside at the stirrup (12) for being sleeved on the compressor arm (11) bottom Briquetting (14) between circle and the inclined wedge (13) being arranged between trolley formwork (1) and compressor arm (11) outer circle.
2. a kind of end molding block apparatus for lining trolley filling concrete described in accordance with the claim 1, it is characterised in that: Multiple connecting plates (3-3) are provided between the inner template (3-1) and the first arc panel (3-2), the trolley formwork (1) is upper Installing plate (2-1) is provided with immediately below inner template (3-1), multipair first hinge ear (2- is provided on the installing plate (2-1) 2), multipair second hinge ear (4-3), one end of the connecting plate (3-3) and the first hinge ear are set on second arc panel (4-2) (2-2) is hinged by the first articulated shaft (5-1), and the other end of the connecting plate (3-3) and the second hinge ear (4-3) pass through the second hinge Spindle (5-2) is hinged, and the inner template (3-1) and installing plate (2-1) are mounted on trolley formwork (1) by the second fastener On.
3. a kind of end molding block apparatus for lining trolley filling concrete described in accordance with the claim 2, it is characterised in that: The connecting plate (3-3) and the second hinge ear (4-3) are square steel plate, are offered on the connecting plate (3-3) for the The arc-shaped slot (3-3-1) that two articulated shafts (5-2) pass through, has on the connecting plate (3-3) and the arc-shaped slot (3-3-1) The arc edge to match.
4. a kind of end molding block apparatus for lining trolley filling concrete described in accordance with the claim 1, it is characterised in that: The quantity of the inclined wedge (13) and briquetting (14) is multiple.
CN201721808093.6U 2017-12-21 2017-12-21 A kind of end molding block apparatus for lining trolley filling concrete Active CN207598259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721808093.6U CN207598259U (en) 2017-12-21 2017-12-21 A kind of end molding block apparatus for lining trolley filling concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721808093.6U CN207598259U (en) 2017-12-21 2017-12-21 A kind of end molding block apparatus for lining trolley filling concrete

Publications (1)

Publication Number Publication Date
CN207598259U true CN207598259U (en) 2018-07-10

Family

ID=62767631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721808093.6U Active CN207598259U (en) 2017-12-21 2017-12-21 A kind of end molding block apparatus for lining trolley filling concrete

Country Status (1)

Country Link
CN (1) CN207598259U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764936A (en) * 2020-07-08 2020-10-13 中铁二十局集团有限公司 Plugging and reinforcing device for lining end die
CN112031828A (en) * 2020-09-24 2020-12-04 湖南五新隧道智能装备股份有限公司 Combined type plugging device for tunnel lining
CN112901216A (en) * 2021-04-22 2021-06-04 中铁北京工程局集团有限公司 Lining cutting platform truck is used in highway tunnel construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764936A (en) * 2020-07-08 2020-10-13 中铁二十局集团有限公司 Plugging and reinforcing device for lining end die
CN112031828A (en) * 2020-09-24 2020-12-04 湖南五新隧道智能装备股份有限公司 Combined type plugging device for tunnel lining
CN112901216A (en) * 2021-04-22 2021-06-04 中铁北京工程局集团有限公司 Lining cutting platform truck is used in highway tunnel construction
CN112901216B (en) * 2021-04-22 2023-09-15 中铁北京工程局集团有限公司 Lining trolley for expressway tunnel construction

Similar Documents

Publication Publication Date Title
WO2021228189A1 (en) Reusable post-cast strip support replacement force transfer device and construction method therefor
CN207598259U (en) A kind of end molding block apparatus for lining trolley filling concrete
CN106381926A (en) Detachable assembly type splicing node for reinforced concrete columns
CN208072950U (en) A kind of combination set shaped steel formwork
CN203080911U (en) Inner formwork for concrete walls at deformation joint
CN209682482U (en) A kind of fabricated shear wall mold
CN109184189A (en) A kind of diameter Silo conical shell silo roof construction method
CN109610708A (en) A kind of the bidirectional laminated slab bottom plate and construction method of close piece connection
CN202831643U (en) Combined type concrete chute
CN208380099U (en) Concrete casting device
CN207525755U (en) A kind of composite material piled anchor suspension device
CN109763571A (en) It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method
CN209113353U (en) A kind of novel compositions beam lifting lug device
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN207846469U (en) One kind pre-buried C-shaped channel steel device on piping lane internal model trolley formwork
CN104453235B (en) Current conversion station fire wall construction technology
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN215563552U (en) Vertical joint construction of prefabricated wallboard based on ultra high performance concrete form
CN104790353A (en) Sluice pier construction method for small and medium size sluices
CN213742260U (en) Pull-up type cantilever frame beam convenient to mount and dismount
CN209179537U (en) A kind of concrete chimney transformation reinforcing column construction formwork
CN209308699U (en) A kind of tunnel double-lining hydraulic lifting Integral Steel end mould
CN209353705U (en) What a kind of quick peace was torn open blocks up hole device to pull-type exterior wall
CN208619124U (en) The tunnel lining trolley end mould of fixed waterstop
CN203514341U (en) Mold supporting structure for concrete foundation hole of large device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant