CN207595188U - A kind of ship fabrication hole temporary blocking device - Google Patents

A kind of ship fabrication hole temporary blocking device Download PDF

Info

Publication number
CN207595188U
CN207595188U CN201721415107.8U CN201721415107U CN207595188U CN 207595188 U CN207595188 U CN 207595188U CN 201721415107 U CN201721415107 U CN 201721415107U CN 207595188 U CN207595188 U CN 207595188U
Authority
CN
China
Prior art keywords
connecting rod
fastening bolt
fabrication hole
ship
reinforcing prop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721415107.8U
Other languages
Chinese (zh)
Inventor
刘冠南
刘先容
宋飞金
张笑天
吴海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Shipbuilding Co Ltd filed Critical Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Priority to CN201721415107.8U priority Critical patent/CN207595188U/en
Application granted granted Critical
Publication of CN207595188U publication Critical patent/CN207595188U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of ship fabrication hole temporary blocking devices, belong to shipbuilding technical field.The device includes main body cover plate, connecting rod and horizontal connection arm, the lower surface of the main body cover plate is equipped with sealing rubber ring, the upper end of the connecting rod is connect with main body cover plate, the upper end of the connecting rod is in sealing rubber ring, the lower end of the connecting rod is equipped with the first vertical threaded hole, the first fastening bolt is equipped in the first vertical threaded hole, one end of the horizontal connection arm is hinged with the first fastening bolt, the other end of the horizontal connection arm is equipped with the second vertical threaded hole, and the second fastening bolt is equipped in the second vertical threaded hole.Pass through the first fastening bolt and the second fastening bolt, sealing rubber ring can be made to be tightly attached to the surrounding of ship fabrication hole, so as to form temporary plugging to ship fabrication hole, avoid the method that fabrication hole is carried out interim soldering and sealing and reopened again, save manpower, construction speed is accelerated, improves the efficiency of shipbuilding.

Description

A kind of ship fabrication hole temporary blocking device
Technical field
The utility model belongs to shipbuilding technical field, more particularly to a kind of ship fabrication hole temporary blocking device.
Background technology
Ship is under construction at present, and particularly dock carrying closes up the stage greatly, in order to which site operation is convenient, needs in hull Upper to increase a large amount of interim fabrication hole, these fabrication holes need interim soldering and sealing when doing cabin air seal test, when air seal test knot Shu Yihou again reopens these fabrication holes.The method that the interim soldering and sealing of fabrication hole is taken to reopen again not only wastes big That measures is artificial, has dragged slowly the progress of shipbuilding, and also result in damage to Ship Structure particularly hull surface.
Invention content
For the deficiencies in the prior art, the purpose of this utility model is to provide a kind of ship fabrication hole temporary plugging Device can carry out temporary plugging to ship fabrication hole using the device, avoid traditional work that soldering and sealing is carried out to fabrication hole Industry method.
The purpose of this utility model is achieved through the following technical solutions:
A kind of ship fabrication hole temporary blocking device, including main body cover plate, connecting rod and horizontal connection arm, the body cover The lower surface of plate is equipped with sealing rubber ring, and the upper end of the connecting rod is connect with main body cover plate, and the upper end of the connecting rod is in In sealing rubber ring, the lower end of the connecting rod is equipped with the first vertical threaded hole, and the is equipped in the first vertical threaded hole One fastening bolt, one end and the first fastening bolt of the horizontal connection arm are hinged, and the other end of the horizontal connection arm is equipped with Second vertical threaded hole is equipped with the second fastening bolt in the second vertical threaded hole.
Sealing rubber ring is used for ship fabrication hole surrounding and is sealed, and the first fastening bolt is used for horizontal connection arm It is adjusted, and horizontal connection arm is locked;Second fastening bolt is for withstanding on ship fabrication hole surrounding, by tightening the Two fastening bolts can make sealing rubber ring be tightly attached to the surrounding of ship fabrication hole, improve the sealing performance of the device.
Preferably, which further includes connecting rod socket cover, and the connecting rod socket cover is equipped with middle through-hole, and described first Fastening bolt passes through the middle through-hole of connecting rod socket cover to be threadedly coupled with connecting rod.
The lower end of connecting rod is equipped with connecting rod socket cover, and horizontal connection arm is between connecting rod and connecting rod socket cover, The fastening ability of the first fastening bolt is improved, improves the stability of horizontal connection arm.
Preferably, the top of second fastening bolt is equipped with rubber pad.
The top of second fastening bolt is equipped with rubber pad, reduces damage of second fastening bolt to hull surface, favorably In the skin of paint of protection hull surface.
Preferably, the top of second fastening bolt, which is equipped with, strengthens transition part, and the reinforcement transition part includes first and adds Strong column and the second reinforcing prop, first reinforcing prop are connect with the top of the second fastening bolt, second reinforcing prop and first The top surface connection of reinforcing prop, the diameter of second reinforcing prop are more than the diameter of the first reinforcing prop, first reinforcing prop it is straight Diameter is more than the diameter of the second fastening bolt, and the rubber pad is located at the top surface of the second reinforcing prop.
First reinforcing prop and the second reinforcing prop be set at the top of the second fastening bolt, and the second fastening bolt, first plus The diameter of strong column and the second reinforcing prop is sequentially increased, and convenient for mounting rubber pad at the top of the second reinforcing prop, while is reduced again Act on the pressure of hull surface unit area.
Preferably, the lower end of second fastening bolt is equipped with bolt and drives column.
The lower end of second fastening bolt is equipped with bolt and drives column, convenient for rotating the second fastening bolt, convenient for tearing open for the device Dress.
Preferably, the lower surface of the connecting rod and main body cover plate is perpendicular.
Preferably, there are four the connecting rods, the connecting rod is symmetrically set two-by-two centered on the central point of main body cover plate It puts.
The beneficial effects of the utility model are:The apparatus structure is simple, and may be reused, and passes through the first fastening bolt With the second fastening bolt, sealing rubber ring can be made to be tightly attached to the surrounding of ship fabrication hole, so as to face the formation of ship fabrication hole When block, avoid the method that fabrication hole is carried out interim soldering and sealing and reopened again, save manpower and electric energy, reduce hull Structural damage accelerates construction speed, improves the efficiency of shipbuilding, reduces the cost of shipbuilding.
Description of the drawings
Fig. 1 is one of the utility model ship fabrication hole temporary blocking device overall structure diagram.
Fig. 2 is the two of the utility model ship fabrication hole temporary blocking device overall structure diagram.
Fig. 3 is the utility model ship fabrication hole temporary blocking device connecting rod, the first fastening bolt and connection rod sleeve Lid structure diagram.
Fig. 4 is the utility model the second fastening bolt of ship fabrication hole temporary blocking device and rubber gasket structure schematic diagram.
Fig. 5 is the utility model ship fabrication hole temporary blocking device horizontal connection arm configuration schematic diagram.
Fig. 6 is the utility model embodiment China and foreign countries plate structure schematic diagram.
Fig. 7 is the utility model ship fabrication hole temporary blocking device use state diagram.
Fig. 8 is the utility model ship fabrication hole temporary blocking device use state left view.
In Fig. 1 to Fig. 8:Cover board based on 1,2 be connecting rod, and 21 be the first vertical threaded hole, and 3 be horizontal connection arm, 31 It is linking arm through-hole for the second vertical threaded hole, 32,4 be sealing rubber ring, and 5 be the first fastening bolt, and 6 be the second fastening spiral shell Bolt, 7 be connecting rod socket cover, and 8 be rubber pad, and 91 be the first reinforcing prop, and 92 be the second reinforcing prop, and 10 drive column for bolt, 11 It is fabrication hole for ship plank, 12.
Specific embodiment
Below in conjunction with the accompanying drawings with specific case study on implementation come the utility model ship fabrication hole temporary blocking device is done into One step elaborates, and in the hope of being more fully apparent from expresses the structure feature and concrete application of the utility model, but cannot be with This limits the scope of protection of the utility model.
Embodiment:As shown in Figures 1 to 5, a kind of ship fabrication hole temporary blocking device, including main body cover plate 1, connecting rod 2 and horizontal connection arm 3, the lower surface of the main body cover plate 1 is equipped with sealing rubber ring 4, the upper end of the connecting rod 2 and body cover Plate 1 connects, and the upper end of the connecting rod 2 is in sealing rubber ring 4, and the lower end of the connecting rod 2 is equipped with the first vertical screw thread Hole 21, the first fastening bolt 5 is equipped in the first vertical threaded hole 21, and one end of the horizontal connection arm 3 is equipped with connection Arm through-hole 32, the horizontal connection arm 3 is set in the lower end of the first fastening bolt 5 by linking arm through-hole 32, so as to fulfill water Flushconnection arm 3 is hinged with the first fastening spiral shell 5, and the other end of the horizontal connection arm 3 is equipped with the second vertical threaded hole 31, described The second fastening bolt 6 is equipped in second vertical threaded hole 31.
In the present embodiment, which further includes connecting rod socket cover 7, and the connecting rod socket cover 7 is equipped with middle through-hole, institute The middle through-hole for stating the first fastening bolt 5 across connecting rod socket cover 7 is threadedly coupled with connecting rod 2;Second fastening bolt 6 Top be equipped with rubber pad 8;The top of second fastening bolt 6, which is equipped with, strengthens transition part, and the reinforcement transition part includes the One reinforcing prop 91 and the second reinforcing prop 92, first reinforcing prop 91 are connect with the top of the second fastening bolt 6, and described second adds Strong column 92 is connect with the top surface of the first reinforcing prop 91, and the diameter of second reinforcing prop 92 is more than the diameter of the first reinforcing prop 91, The diameter of first reinforcing prop 91 is more than the diameter of the second fastening bolt 6, and the rubber pad 8 is located at the top of the second reinforcing prop 92 Face;The lower end of second fastening bolt 6 is equipped with bolt and drives column 10;It mutually hangs down the lower surface of the connecting rod 2 and main body cover plate 1 Directly;There are four the connecting rods 2, and the connecting rod 2 is symmetrical arranged two-by-two centered on the central point of main body cover plate 1, four companies Extension bar 2 is distributed on rectangular four vertex centered on 1 central point of main body cover plate.
Below for carrying out temporary plugging to the fabrication hole 12 on ship plank 11, the application method of the present apparatus is carried out It introduces, as shown in Figure 6 to 8, loosens the first fastening bolt 5 first, horizontal connection arm 3 is taken in the lower section of main body cover plate 1, so Main body cover plate 1 is placed on to the upper surface of ship plank 11 afterwards, and connecting rod 2 and horizontal connection arm 3 reach ship from fabrication hole 12 The lower section of oceangoing ship outside plate 11, rotation horizontal connection arm 3, makes the second fastening bolt 6 be adjusted in place against the lower surface of ship plank 11 Afterwards, the first fastening bolt 5 is rotated, the position of horizontal connection arm 3 is fixed, rotates the second fastening bolt 6 so that rubber pad 8 are tightly attached to the lower surface of ship plank 11, and sealing rubber ring 4 is made to be tightly attached to the upper surface of ship plank 11.In order to improve the dress The sealing performance put can also brush silica gel in advance on sealing rubber ring 4, main body cover plate 1 then is placed on ship plank 11 upper surface, then sealing rubber ring 4 is made to be tightly attached to the upper surface of ship plank 11 by above step.

Claims (7)

1. a kind of ship fabrication hole temporary blocking device, which is characterized in that the device includes main body cover plate(1), connecting rod(2)With Horizontal connection arm(3), the main body cover plate(1)Lower surface be equipped with sealing rubber ring(4), the connecting rod(2)Upper end with Main body cover plate(1)Connection, the connecting rod(2)Upper end be in sealing rubber ring(4)It is interior, the connecting rod(2)Lower end set There is the first vertical threaded hole(21), the first vertical threaded hole(21)Inside it is equipped with the first fastening bolt(5), the level is even Connect arm(3)One end and the first fastening bolt(5)It is hinged, the horizontal connection arm(3)The other end be equipped with the second vertical screw thread Hole(31), the second vertical threaded hole(31)Inside it is equipped with the second fastening bolt(6).
2. a kind of ship fabrication hole temporary blocking device according to claim 1, which is characterized in that the device further includes company Extension bar socket cover(7), the connecting rod socket cover(7)Equipped with middle through-hole, first fastening bolt(5)Across connection rod set Cover(7)Middle through-hole and connecting rod(2)It is threadedly coupled.
A kind of 3. ship fabrication hole temporary blocking device according to claim 1, which is characterized in that the second fastening spiral shell Bolt(6)Top be equipped with rubber pad(8).
A kind of 4. ship fabrication hole temporary blocking device according to claim 3, which is characterized in that the second fastening spiral shell Bolt(6)Top be equipped with strengthen transition part, it is described reinforcement transition part include the first reinforcing prop(91)With the second reinforcing prop(92), institute State the first reinforcing prop(91)With the second fastening bolt(6)Top connection, second reinforcing prop(92)With the first reinforcing prop (91)Top surface connection, second reinforcing prop(92)Diameter be more than the first reinforcing prop(91)Diameter, it is described first strengthen Column(91)Diameter be more than the second fastening bolt(6)Diameter, the rubber pad(8)It is located at the second reinforcing prop(92)Top surface.
A kind of 5. ship fabrication hole temporary blocking device according to claim 1, which is characterized in that the second fastening spiral shell Bolt(6)Lower end be equipped with bolt drive column(10).
A kind of 6. ship fabrication hole temporary blocking device according to claim 1, which is characterized in that the connecting rod(2) With main body cover plate(1)Lower surface it is perpendicular.
A kind of 7. ship fabrication hole temporary blocking device according to claim 1, which is characterized in that the connecting rod(2) There are four, the connecting rod(2)With main body cover plate(1)Central point centered on be symmetrical arranged two-by-two.
CN201721415107.8U 2017-10-30 2017-10-30 A kind of ship fabrication hole temporary blocking device Active CN207595188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721415107.8U CN207595188U (en) 2017-10-30 2017-10-30 A kind of ship fabrication hole temporary blocking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721415107.8U CN207595188U (en) 2017-10-30 2017-10-30 A kind of ship fabrication hole temporary blocking device

Publications (1)

Publication Number Publication Date
CN207595188U true CN207595188U (en) 2018-07-10

Family

ID=62757437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721415107.8U Active CN207595188U (en) 2017-10-30 2017-10-30 A kind of ship fabrication hole temporary blocking device

Country Status (1)

Country Link
CN (1) CN207595188U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173564A (en) * 2019-06-27 2019-08-27 中船黄埔文冲船舶有限公司 A kind of sealing device and encapsulating method of deck board fabrication hole
CN110254614A (en) * 2019-06-27 2019-09-20 广船国际有限公司 A kind of closing plate device of half ship floating end face

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173564A (en) * 2019-06-27 2019-08-27 中船黄埔文冲船舶有限公司 A kind of sealing device and encapsulating method of deck board fabrication hole
CN110254614A (en) * 2019-06-27 2019-09-20 广船国际有限公司 A kind of closing plate device of half ship floating end face

Similar Documents

Publication Publication Date Title
CN207595188U (en) A kind of ship fabrication hole temporary blocking device
CN205888935U (en) Waterproof material inspection jig
CN206487496U (en) A kind of shield tunnel knocker anti-seep water structure
CN207193979U (en) Build cast-in-situ bored pile stake holes slag cleaning device
CN107354876A (en) Underwater pier column reinforcing steel bar rust removal and concrete surface repair device
CN204474271U (en) A kind of high wind resistance nacelle device
CN210140998U (en) Pull rod is worn to reuse of wall body concrete form is built in room
CN109167309B (en) Bracket for plugging cable
CN207862786U (en) A kind of steel arch-shelf closing device
CN207047721U (en) Movable underwater concrete damage repairing machine
CN109571758A (en) A kind of cement stirring device conveying cement for eminence
CN215168312U (en) Civil air defense engineering roof hole-opening repairing structure
CN108625812A (en) A kind of hydraulic oil pipe self-packer
CN211902046U (en) Pipeline repairing device
CN210368656U (en) Staple bolt device is adhered to pier construction bridge type scaffold lift platform
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN207047705U (en) A kind of head tower circumferential weld work job platform of torsion section form
CN206572183U (en) The comprehensive detecting system of submerged structure
CN214394026U (en) Simple tool suitable for dismantling grouting nozzle of chemical grouting water-stopping needle head
CN209692316U (en) A kind of buried solidus mechanism of power engineering
CN203160568U (en) Sunken siphonic rainwater hopper
CN205777551U (en) A kind of precast concrete material distributing machine
CN206386135U (en) It is a kind of can electric tightening Water slop injector
CN215621891U (en) Green is machineshop car desilt device for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant