CN207582440U - A kind of preposition power station of forebay trash rack - Google Patents

A kind of preposition power station of forebay trash rack Download PDF

Info

Publication number
CN207582440U
CN207582440U CN201721610750.6U CN201721610750U CN207582440U CN 207582440 U CN207582440 U CN 207582440U CN 201721610750 U CN201721610750 U CN 201721610750U CN 207582440 U CN207582440 U CN 207582440U
Authority
CN
China
Prior art keywords
forebay
trash rack
water
power station
penstock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721610750.6U
Other languages
Chinese (zh)
Inventor
肖文君
徐增辉
杨鹏隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huadian Engineering Group Co Ltd
Original Assignee
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering Group Co Ltd filed Critical China Huadian Engineering Group Co Ltd
Priority to CN201721610750.6U priority Critical patent/CN207582440U/en
Application granted granted Critical
Publication of CN207582440U publication Critical patent/CN207582440U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

The utility model discloses a kind of preposition power stations of forebay trash rack, and including water-drawing channel, forebay, penstock and the hydraulic turbine, the water-drawing channel, forebay, penstock and the hydraulic turbine are sequentially communicated;The water inlet of the penstock is equipped with main gate;Power station further includes trash rack, and trash rack is located at forebay close to one end of water-drawing channel.The utility model can reduce the floor space of power station diversion entrance, so as to reduce project cost, simplify intake pipe pressure arrangement and improve the safety of the structures.Trash rack is located at forebay close to one end of water-drawing channel, and the width of forebay herein is small, depth as shallow, reduces the keying depth of trash rack, promotion and maintenance difficulty is reduced, and the specification of trash rack is smaller, so as to further reduce project cost.

Description

A kind of preposition power station of forebay trash rack
Technical field
The utility model is related to power station, more particularly to a kind of preposition power station of forebay trash rack.
Background technology
Power station is the integration engineering facility that water can be converted to electric energy.It generally comprises by water blocking, discharge structure shape Into reservoir and Diversion system of hydropower station, power plant building, electromechanical equipment etc..The high water level water of reservoir flows into workshop through diversion system Turbine-generator units is pushed to send out electric energy, then boosted transformer, switchyard and transmission line of electricity input power grid.Under normal conditions, Trash rack, bulkhead gate and the main gate of the forebay water inlet in power station be it is compact be arranged together, Ke Yifang Just Operation, Administration and Maintenance.But the arrangement of this compact needs to occupy larger space, cause project cost compared with It is high.
Utility model content
The purpose of the utility model is to provide a kind of preposition power stations of forebay trash rack, can reduce power generation Stand diversion import structures floor space and improve the structures force-bearing situation, so as to reach reduce project cost, simplification The purpose of the structures safety is arranged and improved to intake pipe pressure.
In order to solve the above technical problems, the utility model adopts the following technical scheme:
The preposition power station of a kind of forebay trash rack, including water-drawing channel, forebay, penstock and water wheels Machine, the water-drawing channel, forebay, penstock and the hydraulic turbine are sequentially communicated;The water inlet of the penstock is equipped with Main gate;Power station further includes trash rack, and trash rack is located at forebay close to one end of water-drawing channel.
As one of which embodiment, in a kind of preposition power station of aforementioned forebay trash rack, the pressure Power forebay is equipped with trash rack grid slot close to one end of water-drawing channel, and trash rack is fixed in the trash rack grid slot.
It is described to block dirt in a kind of preposition power station of aforementioned forebay trash rack in order to improve trash rack reliability Side of the grid far from water-drawing channel is equipped with service bridge, and the trash rack grid slot contradicts the bridge pier of the service bridge.
In a kind of preposition power station of aforementioned forebay trash rack, the side of the forebay is equipped with downflow weir.
In a kind of preposition power station of aforementioned forebay trash rack, the side of the downflow weir is equipped with flood discharge sand surfing Lock.
In order to improve the fixation reliability of penstock and reduce floor space, before a kind of aforementioned forebay trash rack In the power station put, the both ends of the penstock are located in pedestal, and penstock is located at earth's surface close to one end of forebay Below.
Compared with prior art, the utility model can reduce the floor space of power station diversion import structures, so as to Hydropower Project cost is reduced, simplify the arrangement of intake pipe pressure and improves the safety of the structures.Trash rack position In forebay close to one end of water-drawing channel, the width of forebay herein is small, depth as shallow, reduces the keying of trash rack Depth reduces promotion and maintenance difficulty, and the specification of trash rack is smaller, so as to further reduce project cost.
Description of the drawings
Fig. 1 is a kind of sectional view of embodiment of the utility model;
Fig. 2 is a kind of structure diagram of embodiment of the utility model.
Reference numeral:1- water-drawing channels, 2- trash racks, 3- trash rack grid slots, 4- service bridges, 5- forebays, 6- water inlets Mouthful, 7- main gates, 8- pedestals, 9- penstocks, 10- downflow weirs, 11- flood discharge scouring sluices.
The utility model is further described with reference to the accompanying drawings and detailed description.
Specific embodiment
The embodiment 1 of the utility model:As depicted in figs. 1 and 2, the preposition power station of a kind of trash rack 2, including flume Road 1, forebay 5, penstock 9 and the hydraulic turbine, the water-drawing channel 1, forebay 5, penstock 9 and the hydraulic turbine are successively Connection;Main gate 7 is equipped at the water inlet 6 of the penstock 9;Power station further includes trash rack 2, and trash rack 2 is located at pressure Power forebay 5 is close to one end of water-drawing channel 1.
Since 5 depth as shallow of forebay, width are narrow at trash rack 2, so flow is more anxious, in order to improve the steady of trash rack 2 Gu degree, the forebay 5 is equipped with trash rack grid slot 3 close to one end of water-drawing channel 1, and trash rack 2, which is fixed on, described blocks dirt In grid grid slot 3.The side of the trash rack 2 far from water-drawing channel 1 is equipped with service bridge 4, and the trash rack grid slot 3 contradicts the work Make the bridge pier of bridge 4.
The embodiment 2 of the utility model:As depicted in figs. 1 and 2, the preposition power station of a kind of trash rack 2, including flume Road 1, forebay 5, penstock 9 and the hydraulic turbine, the water-drawing channel 1, forebay 5, penstock 9 and the hydraulic turbine are successively Connection;Main gate 7 is equipped at the water inlet 6 of the penstock 9;Power station further includes trash rack 2, and trash rack 2 is located at pressure Power forebay 5 is close to one end of water-drawing channel 1.
The forebay 5 is equipped with trash rack grid slot 3 close to one end of water-drawing channel 1, and trash rack 2, which is fixed on, described blocks dirt In grid grid slot 3.The side of the trash rack 2 far from water-drawing channel 1 is equipped with service bridge 4, and the trash rack grid slot 3 contradicts the work Make the bridge pier of bridge 4.The side of the forebay 5 is equipped with downflow weir 10.The side of the downflow weir 10 is equipped with flood discharge scouring sluice 11.The both ends of the penstock 9 are located in pedestal 8, and penstock 9 is located at earth's surface hereinafter, both close to one end of forebay 5 Land used can be saved, it can also be ensured that the safety of penstock 9.

Claims (6)

1. a kind of preposition power station of forebay trash rack, which is characterized in that including water-drawing channel (1), forebay (5), Penstock (9) and the hydraulic turbine, the water-drawing channel (1), forebay (5), penstock (9) and the hydraulic turbine are sequentially communicated; Main gate (7) is equipped at the water inlet (6) of the penstock (9);Power station further includes trash rack (2), trash rack (2) position In forebay (5) close to one end of water-drawing channel (1).
2. the preposition power station of a kind of forebay trash rack according to claim 1, which is characterized in that before the pressure Pond (5) is equipped with trash rack grid slot (3) close to one end of water-drawing channel (1), and trash rack (2) is fixed on the trash rack grid slot (3) It is interior.
A kind of 3. preposition power station of forebay trash rack according to claim 2, which is characterized in that the trash rack (2) side far from water-drawing channel (1) is equipped with service bridge (4), and the trash rack grid slot (3) contradicts the bridge of the service bridge (4) Pier.
4. a kind of preposition power station of forebay trash rack according to any one of claims 1 to 3, which is characterized in that The side of the forebay (5) is equipped with downflow weir (10).
A kind of 5. preposition power station of forebay trash rack according to claim 4, which is characterized in that the downflow weir (10) side is equipped with flood discharge scouring sluice (11).
A kind of 6. preposition power station of forebay trash rack according to claim 5, which is characterized in that the pressure steel The both ends of pipe (9) are located in pedestal (8), and penstock (9) is located at close to one end of forebay (5) below earth's surface.
CN201721610750.6U 2017-11-27 2017-11-27 A kind of preposition power station of forebay trash rack Active CN207582440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721610750.6U CN207582440U (en) 2017-11-27 2017-11-27 A kind of preposition power station of forebay trash rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721610750.6U CN207582440U (en) 2017-11-27 2017-11-27 A kind of preposition power station of forebay trash rack

Publications (1)

Publication Number Publication Date
CN207582440U true CN207582440U (en) 2018-07-06

Family

ID=62733787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721610750.6U Active CN207582440U (en) 2017-11-27 2017-11-27 A kind of preposition power station of forebay trash rack

Country Status (1)

Country Link
CN (1) CN207582440U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258471A (en) * 2019-06-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Riverbed water intaking mouth structure for the water intaking of power station forward direction
CN110593226A (en) * 2019-10-11 2019-12-20 中国电建集团成都勘测设计研究院有限公司 Flood discharge drainage channel structure
CN112727667A (en) * 2021-01-04 2021-04-30 中国电建集团华东勘测设计研究院有限公司 Intelligent adjustment type water delivery power generation device and monitoring feedback method thereof
CN114032856A (en) * 2021-12-18 2022-02-11 河南省水利第二工程局 Construction method of channel and pressure forebay connecting part reinforcing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258471A (en) * 2019-06-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Riverbed water intaking mouth structure for the water intaking of power station forward direction
CN110593226A (en) * 2019-10-11 2019-12-20 中国电建集团成都勘测设计研究院有限公司 Flood discharge drainage channel structure
CN112727667A (en) * 2021-01-04 2021-04-30 中国电建集团华东勘测设计研究院有限公司 Intelligent adjustment type water delivery power generation device and monitoring feedback method thereof
CN114032856A (en) * 2021-12-18 2022-02-11 河南省水利第二工程局 Construction method of channel and pressure forebay connecting part reinforcing device

Similar Documents

Publication Publication Date Title
CN207582440U (en) A kind of preposition power station of forebay trash rack
WO2011146348A1 (en) River high pressure energy conversion machine
CN114017241A (en) Mixed arrangement structure of pumping unit and conventional unit of pumping power station
CN109267549A (en) Diversion tunnel structure
CN103556611A (en) Plunge pool water filling and discharging system capable of generating electricity
KR101577723B1 (en) Power generating apparatus used in water passage
CN104099909B (en) Based on the flood discharge generating sync energy dissipater of flood-discharge tunnel
JPS5862378A (en) Hydraulic power generating system in multistage dam
CN101846030A (en) Pipeline hydraulic cluster half-cycle power generation station
CN110468810B (en) Multi-water-inlet diversion tunnel device and construction method
CN208899441U (en) Power plant building arragement construction for hydro-electric power project
CN221398890U (en) Arrangement structure for combining power generation tail water hole and diversion tunnel
CN215715057U (en) Water-storage power station inlet outlet cable pit drainage canal structure
CN219887111U (en) Drainage well with energy dissipation function suitable for direct current circulating power plant
CN219011141U (en) Dual-power tunnel hydroelectric generation structure in water-rich area
CN217300755U (en) Side-inclined dam hydroelectric generation system, multistage system and new energy system
CN206986862U (en) Hydroelectric engineering pipeline under pressure hole group arrangement structure
CN202390814U (en) Hydroelectric power plant with power water lifting function
RU2002888C1 (en) Pressure derivation cascade for hydro-electric power station
RU2566210C1 (en) Hpp-hpspp power complex
JP2012145090A (en) Power generation method by artificial water channel type water-wheel generator, power generation method by sea-water tide type water-wheel generator, artificial water channel type water-wheel generator, sea-water tide type water-wheel generator, artificial water channel for undershot water-wheel generator, and artificial water channel type irrigation water-wheel
RU101461U1 (en) HYDRAULIC POWER PLANT
CN105863932A (en) New energy pipeline type hydropower station
RU2017885C1 (en) River power station
CN204401580U (en) A kind of power station waterborne

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant