CN207582230U - A kind of silicon PU courts - Google Patents

A kind of silicon PU courts Download PDF

Info

Publication number
CN207582230U
CN207582230U CN201721718964.5U CN201721718964U CN207582230U CN 207582230 U CN207582230 U CN 207582230U CN 201721718964 U CN201721718964 U CN 201721718964U CN 207582230 U CN207582230 U CN 207582230U
Authority
CN
China
Prior art keywords
layer
court
main body
silicon
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721718964.5U
Other languages
Chinese (zh)
Inventor
王传娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Good Run Sports Industry Group Co Ltd
Original Assignee
Shenzhen Good Run Sports Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Good Run Sports Industry Group Co Ltd filed Critical Shenzhen Good Run Sports Industry Group Co Ltd
Priority to CN201721718964.5U priority Critical patent/CN207582230U/en
Application granted granted Critical
Publication of CN207582230U publication Critical patent/CN207582230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model is related to court field, more specifically, it relates to a kind of silicon PU courts.Solving silicon PU courts of the prior art does not have water-proofing treatment, easily blistering, it is caused to wear no resistance, so that the technical issues of service life is short, its key points of the technical solution are that including court main body, the court main body includes the face set gradually from top to bottom layer, waterproof layer, enhancement layer, elastic layer, priming coat and basal layer, the basal layer is cement layer or bitumen layer, the setting of waterproof layer between face layer and enhancement layer, ensure the water proofing property of court body surfaces, it is effectively prevented from water and enters enhancement layer and elastic layer, so that enhancement layer and elastic layer foaming, influence the intensity and elasticity of court main body, and then lead to the generation of court service life decline problem, reach with water-proofing treatment, it avoids blistering, improve wearability and then the purpose effectively to prolong the service life.

Description

A kind of silicon PU courts
Technical field
The utility model is related to court field, more specifically, it relates to a kind of silicon PU courts.
Background technology
Court such as basketball court and tennis court are the athletic grounds of numerous sports enthusiasts, other weight of the construction in court Syllabus, be to provide profession, safe and healthy agonistic sports condition for movement.Place rich in hardness speciality can just be brought specially The movement texture of industry, and elastic motion ground can effectively increase movement buffering, reduce the movement meaning of players Outer injury.Outdoor court is broadly divided into concrete court, acrylic acid court, PU courts etc., wherein concrete court and acrylic acid Court cost is low, and due to not having elasticity easily to split, when movement is easily injured, therefore is difficult popularization.
The Chinese utility model patent that line retrieval is CN205804089U to a notification number, entitled silicon PU courts. Technical solution disclosed in the patent, including being set on the lower concrete layer of the bottom and being laid on upper mixed at the top of lower concrete layer Solidifying soil layer, the top coating of upper concrete layer have graded broken stone layer, fine sand layer are equipped at the top of graded broken stone layer, fine sand layer Top, which is scraped, is coated with silicon PU prime coats, is scraped at the top of silicon PU prime coats and is coated with silicon PU floating coats, scraped and be coated at the top of silicon PU floating coats Silicon PU finishing coats.
Although being equipped with multilayer silicon PU in the program, without water-proofing treatment, easily blister, it is caused to wear no resistance, into And so that service life is short.
Utility model content
The purpose of this utility model is to provide a kind of silicon PU courts, reaches with water-proofing treatment, avoids blistering, and improves wear-resisting Property and then the purpose effectively to prolong the service life.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of silicon PU courts, packet Court main body is included, the court main body includes the face layer, waterproof layer, enhancement layer, elastic layer, the priming coat that set gradually from top to bottom And basal layer, the basal layer are cement layer or bitumen layer.
By using above-mentioned technical proposal, basal layer is in direct contact with ground, and basal layer ensures whole most basic firm Property and support;For primer-layer-coated on basal layer, priming coat has preferable viscosity so that elastic layer and basal layer are preferably bonded Together;Elastic layer has preferable elasticity, ensures that court main body has enough elasticity so as to basketball or tennis during movement It is least more preferable;Enhancement layer is profession rebound and soft and hard transition so that court main body has certain intensity, and causes The elasticity of court main body meets the requirements;Face layer has superpower wearability and durability and rational sliding friction so that ball Field body surfaces can be more robust, effectively extends the service life of court main body;The setting of waterproof layer between face layer and enhancement layer, Ensure the water proofing property of court body surfaces, be effectively prevented from water and enter enhancement layer and elastic layer so that enhancement layer and elastic layer Foaming, influences the intensity and elasticity of court main body, and then court service life is caused to decline the generation of problem, has reached with anti- Water process avoids blistering, and improves wearability and then the purpose effectively to prolong the service life.
Preferably, water barrier is equipped between the elastic layer and the priming coat.
By using above-mentioned technical proposal, priming coat has certain waterproof effect, but the setting of water barrier, further Ensure the water proofing property of court bottom part body, effectively barrier underground water, prevents underground water reverse osmosis or capillarity is to elastic layer And enhancement layer, it is further ensured that enhancement layer and elastic layer provide satisfactory intensity and elasticity for court main body.
Preferably, the court main body length direction relative tilt setting meets the requirement of draining smoothness to be formed The gradient.
By using above-mentioned technical proposal, the setting of the court main body gradient so that in rainy day or sprinkling cleaning court During surface, water is fallen can quickly flow away discharge in court body surfaces, and then further avoid flowing into enhancement layer and elastic layer.
Preferably, the gradient of the court main body is 7/5000ths to thousand/1000ths.
By using above-mentioned technical proposal, the gradient of court main body is 7/5000ths to thousand/1000ths so that court main body Both meet the requirement of draining smoothness, while avoid the gradient too greatly so that court body surfaces are moved with apparent obliquity effects.
Preferably, both sides are equipped with the first ditch, first ditch bottom angled to the court main body along its length Setting, and it is identical with the court main body inclined direction.
By using above-mentioned technical proposal, the first ditch bottom angled setting so that the first ditch more block by the first water Water discharge in ditch avoids accumulating in the smelly environment for influencing court attachment in the first ditch.
Preferably, the gradient in first ditch is 2 percent to 5 percent.
By using above-mentioned technical proposal, the gradient in the first ditch is 2 percent to 5 percent so that the gradient meets Related request, and excavate and be more convenient when opening up.
Preferably, the face layer, the waterproof layer, the enhancement layer, the elastic layer, the water barrier, the primary coat The thickness ratio of layer and the basal layer is 1: 1: 5: 5: 1: 1: 10.
By using above-mentioned technical proposal, to ensure that court main body has better stability, intensity and elasticity.
In conclusion the utility model has the advantages that:
First, face layer and enhancement layer between waterproof layer setting, ensure court body surfaces water proofing property, be effectively prevented from water Enter enhancement layer and elastic layer so that enhancement layer and elastic layer foaming influence the intensity and elasticity of court main body, and then cause Court service life declines the generation of problem, has reached with water-proofing treatment, has avoided blistering, and improves wearability and then effectively extends The purpose of service life;
2nd, the setting of water barrier is further ensured that the water proofing property of court bottom part body, effectively barrier underground water, prevents Underground water is reverse osmosis or capillarity is to elastic layer and enhancement layer, is further ensured that enhancement layer and elastic layer are provided for court main body Satisfactory intensity and elasticity;
3rd, the setting of the court main body gradient so that at rainy day or sprinkling cleaning court surfaces, water is fallen in court master Body surface face can quickly flow away discharge, and then further avoid flowing into enhancement layer and elastic layer;;
4th, the first ditch bottom angled setting so that the first ditch more block the water in the first ditch is discharged, avoids accumulating There are the smelly environment for influencing court attachment in the first ditch.
Description of the drawings
Fig. 1 is the structure diagram of court main body in the utility model embodiment;
Fig. 2 is the structure diagram after the utility model embodiment biopsy cavity marker devices.
In figure:1st, court main body;11st, face layer;12nd, waterproof layer;13rd, enhancement layer;14th, elastic layer;15th, priming coat;16th, base Plinth layer;17th, water barrier;2nd, the first ditch.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of silicon PU courts, as depicted in figs. 1 and 2, including court main body 1, court main body 1 includes setting successively under upper Face layer 11, waterproof layer 12, enhancement layer 13, elastic layer 14, priming coat 15 and the basal layer 16 put, basal layer 16 are cement or pitch Layer.Basal layer 16 is in direct contact with ground, and basal layer 16 ensures whole most basic stability and support.Priming coat 15 is coated in On basal layer 16, priming coat 15 has preferable viscosity so that elastic layer 14 and basal layer 16 preferably bond together.Elastic layer 14 have preferable elasticity, ensure that court main body 1 has enough elasticity so that during movement to basketball or tennis it is least more It is good.Enhancement layer 13 is profession rebound and soft and hard transition so that court main body 1 has certain intensity, and causes court master The elasticity of body 1 meets the requirements.Face layer 11 has superpower wearability and durability and rational sliding friction so that court master 1 surface of body can be more robust, effectively extends the service life of court main body 1.Waterproof layer 12 between face layer 11 and enhancement layer 13 Setting ensures the water proofing property on 1 surface of court main body, is effectively prevented from water and enters enhancement layer 13 and elastic layer 14 so that strengthens Layer 13 and elastic layer 14 foam, and influence the intensity and elasticity of court main body 1, and then court service life is caused to decline.
Between elastic layer 14 and priming coat 15 be equipped with water barrier 17, priming coat 15 have certain waterproof effect, but every The setting of water layer 17 is further ensured that the water proofing property of 1 bottom of court main body, effectively barrier underground water, prevents underground water reverse osmosis Thoroughly or capillarity is to elastic layer 14 and enhancement layer 13, is further ensured that enhancement layer 13 and elastic layer 14 are provided for court main body 1 Satisfactory intensity and elasticity.
Main body 1 length direction relative tilt in court is set so that the both ends of 1 length direction of court main body, which are formed, meets draining The gradient of smoothness requirement.The setting of 1 gradient of court main body so that at rainy day or sprinkling cleaning court surfaces, water is fallen In court, 1 surface of main body can quickly flow away discharge, and then further avoid flowing into enhancement layer 13 and elastic layer 14.Court master The gradient of body 1 is 7/5000ths to thousand/1000ths so that court main body 1 had both met the requirement of draining smoothness, while avoided the gradient Too greatly so that main body 1 surface in court is moved with apparent obliquity effects.
The both sides of court main body 1 along its length are equipped with the first ditch 2, the setting of 2 bottom angled of the first ditch, and and ball The inclined direction of field main body 1 is identical.The setting of first ditch 2 bottom angled so that the first more block of ditch 2 will be in the first ditch 2 Water discharge, avoid accumulating in the 2 smelly environment for influencing court attachment of the first ditch.The gradient in the first ditch 2 is 2 percent To 5 percent so that the gradient meets related request, and excavates and be more convenient when opening up.
Face layer 11, waterproof layer 12, enhancement layer 13, elastic layer 14, water barrier 17, priming coat 15 in 1 structure of court main body Thickness ratio with basal layer 16 is 1: 1: 5: 5: 1: 1: 10, to ensure that court main body 1 has better stability, intensity and elasticity.
Operation principle:Water is fallen at court 1 surface of main body, since the gradient of court main body 1 causes water to flow into quickly In first ditch 2,2 gradient of the first ditch is set so that the first draining as quickly as possible of ditch 2.The setting of waterproof layer 12, effectively Ground prevents the water of court surfaces from flowing into enhancement layer 13 and elastic layer 14.The setting of water barrier 17, barrier prevent underground water from entering To elastic layer 14 and enhancement layer 13.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model by Patent Law.

Claims (7)

1. a kind of silicon PU courts, including court main body (1), it is characterized in that:The court main body (1) including setting successively from top to bottom Face layer (11), waterproof layer (12), enhancement layer (13), elastic layer (14), priming coat (15) and the basal layer (16) put, the basis Layer (16) is cement layer or bitumen layer.
2. a kind of silicon PU courts according to claim 1, it is characterized in that:The elastic layer (14) and the priming coat (15) Between be equipped with water barrier (17).
3. a kind of silicon PU courts according to claim 2, it is characterized in that:Court main body (1) length direction is opposite to incline Tiltedly setting meets the gradient that draining smoothness requires to be formed.
4. a kind of silicon PU courts according to claim 3, it is characterized in that:The gradient of the court main body (1) for thousand/ 7/5000ths to thousand.
5. a kind of silicon PU courts according to claim 4, it is characterized in that:The court main body (1) both sides along its length Be equipped with the first ditch (2), the first ditch (2) bottom angled setting, and with court main body (1) the inclined direction phase Together.
6. a kind of silicon PU courts according to claim 5, it is characterized in that:The gradient of first ditch (2) is percent Two to 5 percent.
7. a kind of silicon PU courts according to claim 2-6 any one, it is characterized in that:It is face layer (11), described anti- Water layer (12), the enhancement layer (13), the elastic layer (14), the water barrier (17), the priming coat (15) and the base The thickness ratio of plinth layer (16) is 1: 1: 5: 5: 1: 1: 10.
CN201721718964.5U 2017-12-11 2017-12-11 A kind of silicon PU courts Active CN207582230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721718964.5U CN207582230U (en) 2017-12-11 2017-12-11 A kind of silicon PU courts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721718964.5U CN207582230U (en) 2017-12-11 2017-12-11 A kind of silicon PU courts

Publications (1)

Publication Number Publication Date
CN207582230U true CN207582230U (en) 2018-07-06

Family

ID=62736854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721718964.5U Active CN207582230U (en) 2017-12-11 2017-12-11 A kind of silicon PU courts

Country Status (1)

Country Link
CN (1) CN207582230U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824127A (en) * 2018-08-29 2018-11-16 山东乐动体育产业有限公司 A kind of court silicon PU

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824127A (en) * 2018-08-29 2018-11-16 山东乐动体育产业有限公司 A kind of court silicon PU
CN108824127B (en) * 2018-08-29 2023-08-18 山东乐动体育产业有限公司 Silicon PU court

Similar Documents

Publication Publication Date Title
KR101325024B1 (en) A construction process of non-slip pavement of tennis court and its top coating composition
CN207582230U (en) A kind of silicon PU courts
CN203890831U (en) High elasticity wear-resistant ball park
CN208023354U (en) A kind of new type compound plastic cement race track structure
NO145044B (en) COVER FOR SPORTS, SPECIAL TENNIS COURSES.
JP3253204B2 (en) Athletic stadium made of artificial grass
CN206752247U (en) A kind of wear resistant plastic runway
CN203007772U (en) Red clay tennis court
CN102852070A (en) Clay court and construction method thereof
CN109667208A (en) A kind of environment-friendly water-based plastic track suitable for campus playground
CN206843900U (en) A kind of wear-resisting full-plastic plastic cement race track
CN205934653U (en) Garden art step moving walkways board
US2024158A (en) Playing court
CN206986664U (en) A kind of elastic wear-resisting court
CN205295861U (en) Plastic course lamellar structure
CN205416577U (en) Asphalt coiled material with anti isolation layer that splits
KR100953167B1 (en) Constructing method of turf for athletic facilities
CN215051772U (en) Antiskid PU runway
CN215252099U (en) Silicon PU court material surface course structure
CN209260480U (en) A kind of environment-friendly water-based plastic track suitable for campus playground
CN212000461U (en) Synthetic sports surface layer with excellent buffer performance
CN203890832U (en) Elastic acrylic playing court
CN219808201U (en) 3D air runway system based on foaming prefabricated elastic layer
CN213417471U (en) Novel runway
NL2030565B1 (en) A method for installing an outdoor gravel-based playing surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant