CN207556261U - A kind of Metal Melting device - Google Patents

A kind of Metal Melting device Download PDF

Info

Publication number
CN207556261U
CN207556261U CN201721671046.1U CN201721671046U CN207556261U CN 207556261 U CN207556261 U CN 207556261U CN 201721671046 U CN201721671046 U CN 201721671046U CN 207556261 U CN207556261 U CN 207556261U
Authority
CN
China
Prior art keywords
water
furnace
furnace shell
induction coil
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721671046.1U
Other languages
Chinese (zh)
Inventor
胡玉军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Normal College
Jiangxi Normal University
Original Assignee
Jiangxi Normal College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Normal College filed Critical Jiangxi Normal College
Priority to CN201721671046.1U priority Critical patent/CN207556261U/en
Application granted granted Critical
Publication of CN207556261U publication Critical patent/CN207556261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses a kind of Metal Melting devices, including furnace shell, induction coil, stir support arm, decelerating motor, water-cooled cable, intermediate frequency power cabinet, preheat bucket, cooling pond, the furnace shell and decelerating motor transmission shaft are spirally connected, the stirring support arm is connected on furnace shell, furnace lining is socketed in the furnace shell, induction coil is socketed on the outside of the furnace lining, the induction coil is connected by copper bar with water-cooled cable, the water-cooled cable is connected by the power output end in intermediate frequency power cabinet with hot outlet pipe with cold water inlet pipe respectively, the hot outlet pipe is connected with hot water pipeloop water inlet end in preheating bucket, the water outlet of the hot water pipeloop is connected with cooling pond, water pump output terminal is socketed in the cold water inlet pipe and cooling pond.The smelting apparatus makes full use of a large amount of remaining thermal energy that cooling water carries, and solves in fusion process the several reasons for being susceptible to " bridge formation ", improves the service life of smelting furnace, energy conservation and environmental protection.

Description

A kind of Metal Melting device
Technical field
The utility model is related to Metal Melting technical field, specially a kind of Metal Melting device.
Background technology
Smelting furnace carries out sensing heating using 200~2500Hz intermediate frequency power supplies, and power bracket is 20~2500KW, according to it Feature is also referred to as middle frequency furnace.Be mainly used for noble metal such as gold, platinum gold, silver, copper, iron, stainless steel, aluminium alloy, aluminium etc. its The melting and temperature raising of its metal, are laboratories in colleges and universities, research institute, jewelry processing, the ideal equipment of precision castings processing.Power supply uses IGBT import power devices, more integrated miniaturization, effective output reach more than 90%, and power and energy saving can than tradition Control silicon intermediate frequency energy saving 60%.
Common smelting furnace furnace lining and furnace shell are integrated, this causes, furnace lining larger to the cleaning difficulty of smelting furnace furnace lining Interior accumulated slag is too many, and smelting furnace can be caused to wear.In addition, the problem of fryer, often occurs for present smelting furnace, all it is because of melting In the process, the clinker of liquid metal surface and furnace lining inner wall adhesion condense to form " bridge formation " phenomenon in stove, lead to furnace high-temperature height Pressure, explodes.The furnace charge supercooling or moist that another reason for forming " bridge formation " is added when being exactly melting, furnace charge enters high temperature furnace In lining, a large amount of steam are generated, solution is made to splash, the solution of splashing easily makes not melting furnace charge and furnace lining wall adhesion, causes " to build bridge ", easily Smelting furnace explosion occurs.
Utility model content
The purpose of this utility model is to provide a kind of Metal Melting devices, detach furnace lining and furnace shell, in furnace lining internal frame If stirring support arm, in needs, installation stirring support arm avoids the clinker of solution upper surface and furnace lining inner wall adhesion, utilizes The cooling water of smelting furnace carries amount of heat, designs preheating bucket, and preheating and drying before melting are carried out to furnace charge, above-mentioned to solve The problem of being proposed in background technology.
To achieve the above object, the utility model provides following technical solution:A kind of Metal Melting device, including furnace shell, Induction coil, stirring support arm, decelerating motor, water-cooled cable, intermediate frequency power cabinet, preheating bucket, cooling pond, the furnace shell and deceleration Motor transmission shaft is spirally connected, and the stirring support arm is connected on furnace shell, and furnace lining is socketed in the furnace shell, is socketed on the outside of the furnace lining There is induction coil, the induction coil is connected by copper bar with water-cooled cable, and the water-cooled cable passes through in intermediate frequency power cabinet Power output end connects respectively with hot outlet pipe with cold water inlet pipe, and hot water pipeloop water inlet end connects in the hot outlet pipe and preheating bucket Logical, the water outlet of the hot water pipeloop is connected with cooling pond, and water pump output terminal is socketed in the cold water inlet pipe and cooling pond.
Preferably, the card slot that support arm is clamped is set there are two and stirred on the furnace shell.
Preferably, the furnace lining is equipped with a pair of of carrying handle, and the furnace lining, carrying handle and stirring support arm are all quartzy sand material Matter.
Preferably, the hot water pipeloop is close to preheat bucket inner wall.
Compared with prior art, the beneficial effects of the utility model are:
1st, furnace lining can be dismantled and equipped with carrying handle, convenient for clearing up melting in-furnace slag, reduce the attrition of smelting furnace;
2nd, clinker in stove is suitably stirred using stirring support arm, it is therefore prevented that itself and the adhesion of furnace lining inner wall condense, and are formed " bridge formation " phenomenon;
3rd, a large amount of thermal energy that cooling water is made full use of to carry, preheat furnace charge and drying dehumidification, both avoid " frame Bridge " phenomenon, and energy conservation and environmental protection.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the vertical view of the utility model smelting furnace.
In figure:1 furnace shell, 2 furnace linings, 201 carrying handles, 3 induction coils, 4 stirring support arms, 5 decelerating motors, 6 water-cooled cables, 7 bronze medals Row, 8 intermediate frequency power cabinets, 9 hot outlet pipes, 10 preheating buckets, 11 hot water pipeloops, 12 cooling ponds, 13 cold water inlet pipes.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of Metal Melting device, including furnace shell 1, sense Answer coil 3, stirring support arm 4, decelerating motor 5, water-cooled cable 6, intermediate frequency power cabinet 8, preheating bucket 10, cooling pond 12, the stove Shell 1 and 5 transmission shaft of decelerating motor are spirally connected, and are steadily toppled over the molten metal that melting is completed as in mold using decelerating motor 5, described Stirring support arm 4 is connected on furnace shell 1, and furnace lining 2 is socketed in the furnace shell 1, and 2 outside of furnace lining is socketed with induction coil 3, institute It states induction coil 3 to connect with water-cooled cable 6 by copper bar 7, the water-cooled cable 6 is defeated by the power supply in intermediate frequency power cabinet (8) Outlet connects respectively with hot outlet pipe 9 with cold water inlet pipe 13, and induction coil 3 is made to be powered, and cooling water cools down it, institute It states hot outlet pipe 9 to connect with 11 water inlet end of hot water pipeloop in preheating bucket 10, realizes the pre-heating drying to clammy furnace charge, the hot water The water outlet and cooling pond 12 of pipeloop 11 connect, and water pump output terminal is socketed in the cold water inlet pipe 13 and cooling pond 13, is Smelting furnace provides recirculated cooling water.
Specifically, the card slot that support arm 4 is clamped is set there are two and stirred on the furnace shell 1, installation stirring support arm 4 prevents Clinker condenses and 2 inner wall adhesion of furnace lining.
Specifically, the furnace lining 2 is equipped with a pair of of carrying handle 201, dismantles and clear up convenient for furnace lining 2, and the furnace lining 2, carry All it is quartz sand material 201 and stirring support arm 4, is a kind of fire resisting non-magnetic material.
Specifically, the hot water pipeloop 11 is close to preheat 10 inner wall of bucket, 10 inside of preheating bucket is made to form high-temperature space.
Operation principle:Before use, the first batch of furnace charge for being derusted and being dehumidified is put into furnace lining 2, intermediate frequency power supply is opened Cabinet 8 switchs, smelting furnace work, starting mode of pump in cooling pond 12,3 energization water flowing of induction coil, and the energization of induction coil 3 makes furnace lining Furnace charge generates inductive loop so as to heating and melting in 2, and the liquid furnace charge after thawing rotates under the drive of inductive loop, reaches certainly The effect of dynamic stirring adds clinker in liquid furnace charge upper surface, the impurity in furnace charge is purged, and completes to refine effect, stir It mixes support arm 4 and stretches into 2 inside points of furnace lining and be just inserted into molten metal upper strata so that the molten metal upper strata rotated automatically, which is obstructed to be formed, to be stirred It is dynamic, 2 inner wall of clinker condensation adhesion furnace lining is avoided, forms " bridge formation " phenomenon;Water pump in cooling pond 12 is provided for smelting furnace Cooling water, cooling water enter water-cooled cable 6 by cold water inlet pipe 13 from 8 power output end of intermediate frequency power cabinet, then by copper bar 7 into Enter induction coil 3, play cooling down effect, the cooling water circulation then with a large amount of thermal energy flows to the hot water in preheating bucket 10 In pipeloop 11 so that preheating bucket 10 heat up, by the furnace charge for subsequently needing melting be put into preheating bucket 10, to furnace charge carry out preheating and After dehumidifying drying, then melting in furnace lining 2 is added to, after completing melting, closes intermediate frequency power cabinet 8 and switch, cut off pump power, open Decelerating motor 5 is opened, melted molten metal is steadily poured into mold, Metal Melting work is completed.
Periodically furnace lining 2 is disassembled and carries out slagging-off cleaning, prevents accumulated slag in stove from smelting furnace being caused to damage.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of Metal Melting device, including furnace shell (1), induction coil (3), stirring support arm (4), decelerating motor (5), water cooling electricity Cable (6), intermediate frequency power cabinet (8), preheating bucket (10) and cooling pond (12), it is characterised in that:The furnace shell (1) and decelerating motor (5) transmission shaft is spirally connected, and the stirring support arm (4) is connected on furnace shell (1), and furnace lining (2) is socketed in the furnace shell (1), described Induction coil (3) is socketed on the outside of furnace lining (2), the induction coil (3) is connected by copper bar (7) with water-cooled cable (6), described Water-cooled cable (6) is connected by the power output end in intermediate frequency power cabinet (8) with hot outlet pipe (9) and cold water inlet pipe (13) respectively Logical, the hot outlet pipe (9) connects with preheating bucket (10) interior hot water pipeloop (11) water inlet end, the water outlet of the hot water pipeloop (11) End and cooling pond (12) connection, the cold water inlet pipe (13) and cooling pond (12) interior water pump output terminal socket.
2. a kind of Metal Melting device according to claim 1, it is characterised in that:Set on the furnace shell (1) there are two and The card slot that stirring support arm (4) is clamped.
3. a kind of Metal Melting device according to claim 1, it is characterised in that:The furnace lining (2) carries equipped with a pair (201).
4. a kind of Metal Melting device according to claim 1, it is characterised in that:The hot water pipeloop (11) is close to preheat Bucket (10) inner wall.
CN201721671046.1U 2017-12-05 2017-12-05 A kind of Metal Melting device Expired - Fee Related CN207556261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721671046.1U CN207556261U (en) 2017-12-05 2017-12-05 A kind of Metal Melting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721671046.1U CN207556261U (en) 2017-12-05 2017-12-05 A kind of Metal Melting device

Publications (1)

Publication Number Publication Date
CN207556261U true CN207556261U (en) 2018-06-29

Family

ID=62665947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721671046.1U Expired - Fee Related CN207556261U (en) 2017-12-05 2017-12-05 A kind of Metal Melting device

Country Status (1)

Country Link
CN (1) CN207556261U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737743A (en) * 2019-01-14 2019-05-10 陶水芳 A kind of vacuum induction melting furnace bridge formation is automatic to abolish device
CN110982990A (en) * 2019-12-17 2020-04-10 广德因达电炉成套设备有限公司 Molten metal heating stirring and argon blowing treatment device
CN113008026A (en) * 2021-02-20 2021-06-22 青岛正大重工有限公司 Copper alloy smelting device and process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737743A (en) * 2019-01-14 2019-05-10 陶水芳 A kind of vacuum induction melting furnace bridge formation is automatic to abolish device
CN109737743B (en) * 2019-01-14 2020-04-14 杨智萍 Automatic bridging breaking device for vacuum induction smelting furnace
CN110982990A (en) * 2019-12-17 2020-04-10 广德因达电炉成套设备有限公司 Molten metal heating stirring and argon blowing treatment device
CN113008026A (en) * 2021-02-20 2021-06-22 青岛正大重工有限公司 Copper alloy smelting device and process
CN113008026B (en) * 2021-02-20 2022-06-24 青岛正大重工有限公司 Copper alloy smelting device and process

Similar Documents

Publication Publication Date Title
CN207556261U (en) A kind of Metal Melting device
CN101586912B (en) Aluminum and aluminum alloy isothermal smelting furnace
JP2000130948A (en) Molten holding furnace for aluminum ingot, or the like
CN208520200U (en) A kind of alloy smelting furnace
CN201787812U (en) Hydraulic tilting type circular aluminum liquid smelting thermal insulation furnace
CN205119794U (en) Vacuum medium frequency induction fur nace is used in metal melting
CN110425873B (en) Quantitative heat-preservation aluminum liquid melting furnace
CN204301488U (en) For the cleaning plant of smelting furnace
CN204301511U (en) Smelting furnace
CN108840082A (en) A kind of quantitative molten metal material fetching mechanism
CN104344726B (en) Vanadium goods raw material preheating system
CN107660264B (en) For melting and handling the furnace and method of metal and scrap metal
CN204301491U (en) For the feeding device of smelting furnace
CN104232934A (en) Natural gas holding furnace for casting aluminum pistons
CN203928693U (en) A kind of electric arc furnaces
CN2641557Y (en) Submerged current type industrial frequency cored combined electric furnace
CN209706556U (en) In one kind, iron alloy with low carbon and chromium production use raw material smelting furnace
CN107138012A (en) A kind of high-effective dust-removing annealing device
CN206316366U (en) A kind of big furnace structure of aluminium alloy smelting
CN206803769U (en) A kind of furnace device of full water cooling structure
CN207407693U (en) A kind of bath smelting furnace top furnace wall structure
CN211438082U (en) Metal ladle refining device capable of preserving heat or heating
CN109014154A (en) A kind of water-cooling structure for ferroalloy casting
CN215063763U (en) Water cooling system of ferronickel submerged arc furnace
CN204301525U (en) For the cooling device of smelting furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629

Termination date: 20181205