CN207553191U - A kind of earth moving equipment in Deep Excavation - Google Patents

A kind of earth moving equipment in Deep Excavation Download PDF

Info

Publication number
CN207553191U
CN207553191U CN201721671680.5U CN201721671680U CN207553191U CN 207553191 U CN207553191 U CN 207553191U CN 201721671680 U CN201721671680 U CN 201721671680U CN 207553191 U CN207553191 U CN 207553191U
Authority
CN
China
Prior art keywords
storage bin
bin hopper
sliding rail
wire rope
earth moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721671680.5U
Other languages
Chinese (zh)
Inventor
徐建发
蒋安安
陈尚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Priority to CN201721671680.5U priority Critical patent/CN207553191U/en
Application granted granted Critical
Publication of CN207553191U publication Critical patent/CN207553191U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides the earth moving equipment in a kind of Deep Excavation.Earth moving equipment in the Deep Excavation includes storage bin hopper;Catch bar, the catch bar are rotationally connected with the side of the storage bin hopper;Traveling wheel, the traveling wheel are connected to the bottom of the storage bin hopper;Sliding equipment, the sliding equipment include electric pushrod, sliding block, the first sliding rail and the second sliding rail;Elevator bucket, the elevator bucket are set on the side of the storage bin hopper;Rotary drive mechanism, the rotary drive mechanism include rotational handle, rotating cylinder, wire rope handling ear, steel wire rope and first rotating shaft;The first rotating shaft is rotationally connected with the sliding block, and the wire rope handling ear is fixed on the top of the storage bin hopper;The wirerope-winding is in the outside of the rotating cylinder;Pulley, the pulley are set on the top of the storage bin hopper.Earth moving equipment in the Deep Excavation of the utility model, can effectively realize the promotion and conveying of soil inside foundation pit, and integral structure is laborsaving time saving.

Description

A kind of earth moving equipment in Deep Excavation
Technical field
The utility model is related to the muck haulage dresses in technical field of building construction more particularly to a kind of Deep Excavation It puts.
Background technology
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size, and foundation pit belongs to interim Property engineering, effect is to provide a space, the operation of building by laying bricks or stones on basis enable to be carried out according to the specified position of design, deep base Hole is the foundation pit that cutting depth is about 5 meters, and the construction quality of deep basal pit is the effect of foundation stone in architectural engineering.
The soil that deep basal pit is generated when excavating is more, and traditional deep basal pit is sling soil using boom hoisting when excavating Or manually shoveled soil to outside foundation pit using scoop, this mode labor intensive is needed to pass again on trolley and be transported, consumption Duration, efficiency are low.
Therefore, it is necessary to the earth moving equipment provided in a kind of new Deep Excavation solves above-mentioned technical problem.
Utility model content
The technical issues of the utility model solves is to provide the earth moving equipment in a kind of Deep Excavation, can be effective Realize the promotion and conveying of soil inside foundation pit, integral structure is laborsaving time saving.
In order to solve the above technical problems, the earth moving equipment in Deep Excavation provided by the utility model, including:Storage Hopper;Catch bar, the catch bar are rotationally connected with the side of the storage bin hopper;Traveling wheel, the traveling wheel are connected to described The bottom of storage bin hopper;Sliding equipment, the sliding equipment include electric pushrod, sliding block, the first sliding rail and the second sliding rail, and described the One sliding rail is opened in the side of the storage bin hopper, and the lower rotation of first sliding rail connects second sliding rail;Described One sliding rail and second sliding rail are rotatablely connected the sliding block, and the bottom of first sliding rail passes through the electric pushrod and institute State sliding block connection;Elevator bucket, the elevator bucket are set on the side of the storage bin hopper;Rotary drive mechanism, the rotary driving machine Structure includes rotational handle, rotating cylinder, wire rope handling ear, steel wire rope and first rotating shaft;The first rotating shaft is rotationally connected with the sliding block, institute The top that wire rope handling ear is fixed on the storage bin hopper is stated, and the steel wire rope is run through in the inside of the wire rope handling ear;The steel wire rope twines The outside of the rotating cylinder is around in, and one end of the rotating cylinder connects the rotational handle;Pulley, the pulley are set on the storing The top of bucket, and the pulley is slidably connected the steel wire rope.
Preferably, the side of the storage bin hopper is equipped with side protection mechanism, and the side protection mechanism includes side shield, first Magnetic patch and the second shaft;The side shield is inserted into the both sides of the storage bin hopper, and the bottom of the side shield fixes described the Two shafts;First magnetic patch is fixed at the top of the side shield.
Preferably, the side shield is equipped with symmetrical two, and rotational angle between the side shield and the storage bin hopper It is 0 ° -90 °.
Preferably, the side rotation connection dodge gate of the storage bin hopper, and between the dodge gate and the storage bin hopper Rotational angle is 0 ° -180 °.
Preferably, lock tube, and the lock are fixed in one end rotation connection locking bar of the dodge gate, the side of the storage bin hopper The bar mating connection lock tube.
Preferably, the outside of the sliding block is equipped with the second magnetic patch, turns between second sliding rail and first sliding rail Dynamic angle is 0 ° -180 °, the second magnetic patch mating connection second sliding rail.
Preferably, the rotational angle of the catch bar and the storage bin hopper is 0 ° -90 °, and the length of the catch bar with The spacing of the catch bar to the traveling wheel bottom is identical.
Preferably, the wire rope handling ear, and institute are fixed with the side of the storage bin hopper at the outer ledge of the elevator bucket Wire rope handling ear and the pulley are stated on a horizontal line.
Preferably, the section of the elevator bucket uses arcuate structure, and the back of the elevator bucket and the storage bin hopper are tight Closely connected conjunction.
Compared with the relevant technologies, the earth moving equipment in Deep Excavation provided by the utility model has and has as follows Beneficial effect:
The utility model provides the earth moving equipment in a kind of Deep Excavation, using the form of the storage bin hopper to mud Soil is transported, and the sliding block is pushed to be slided on sliding rail by the electric pushrod, is dropped to the position of the elevator bucket The splicing of soil is carried out at foundation pit;Avoid manually carrying out the promotion of soil using scoop when excavating, it is time saving and energy saving, lead in soil After crossing the electric pushrod promotion, locking the steel wire rope using the rotating cylinder is toppled over the elevator bucket rotation, then Recycled, can greatly accelerate deep pit digging, muck haulage process, it is convenient flexibly.
Description of the drawings
Fig. 1 is a kind of structure of preferred embodiment of the earth moving equipment in Deep Excavation provided by the utility model Schematic diagram;
Fig. 2 is structure enlargement diagram at A shown in FIG. 1;
Fig. 3 is side protection mechanism shown in FIG. 1, storage bin hopper connection diagram.
Figure label:1st, rotary drive mechanism, 11, rotational handle, 12, rotating cylinder, 13, wire rope handling ear, 14, steel wire rope, 15, One shaft, 2, side protection mechanism, 21, side shield, the 22, first magnetic patch, the 23, second shaft, 3, dodge gate, 4, pulley, 5, slide Mechanism, 51, electric pushrod, 52, sliding block, the 521, second magnetic patch, the 53, first sliding rail, the 54, second sliding rail, 6, elevator bucket, 7, walking Wheel, 8, storage bin hopper, 9, catch bar, 9a, locking bar, 9b, lock tube.
Specific embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Fig. 1, Fig. 2 and Fig. 3 are please referred to, wherein, Fig. 1 is the fortune in Deep Excavation provided by the utility model A kind of structure diagram of preferred embodiment of native device;Fig. 2 is structure enlargement diagram at A shown in FIG. 1;Fig. 3 is Fig. 1 institutes The side protection mechanism that shows, storage bin hopper connection diagram.Earth moving equipment in Deep Excavation includes:Storage bin hopper 8;Catch bar 9, the catch bar 9 is rotationally connected with the side of the storage bin hopper 8;Traveling wheel 7, the traveling wheel 7 are connected to the storage bin hopper 8 Bottom;Sliding equipment 5, the sliding equipment 5 include electric pushrod 51, sliding block 52, the first sliding rail 53 and the second sliding rail 54, institute The side that the first sliding rail 53 is opened in the storage bin hopper 8 is stated, and the lower rotation connection described second of first sliding rail 53 is slided Rail 54;First sliding rail 53 and second sliding rail 54 are rotatablely connected the sliding block 52, and the bottom of first sliding rail 53 It is connect by the electric pushrod 51 with the sliding block 52;Elevator bucket 6, the elevator bucket 6 are set on the side of the storage bin hopper 8; Rotary drive mechanism 1, the rotary drive mechanism 1 include rotational handle 11, rotating cylinder 12, wire rope handling ear 13, steel wire rope 14 and first Shaft 15;The first rotating shaft 15 is rotationally connected with the sliding block 52, and the wire rope handling ear 13 is fixed on the top of the storage bin hopper 8 Portion, and the steel wire rope 14 is run through in the inside of the wire rope handling ear 13;The steel wire rope 14 is wound in the outside of the rotating cylinder 12, and One end of the rotating cylinder 12 connects the rotational handle 11;Pulley 4, the pulley 4 are set on the top of the storage bin hopper 8, and institute Pulley 4 is stated to be slidably connected the steel wire rope 14.
It is native in transportational process in order to prevent to fall as a kind of preferred embodiment of the utility model, the storage bin hopper 8 Side is equipped with side protection mechanism 2, and the side protection mechanism 2 includes side shield 21, the first magnetic patch 22 and the second shaft 23;It is described Side shield 21 is inserted into the both sides of the storage bin hopper 8, and second shaft 23 is fixed in the bottom of the side shield 21;The side First magnetic patch 22 is fixed at the top of baffle 21.
As a kind of preferred embodiment of the utility model, for the ease of the folding and unfolding of the side shield 21, the side shield 21 Equipped with symmetrical two, and rotational angle is 0 ° -90 ° between the side shield 21 and the storage bin hopper 8.
As a kind of preferred embodiment of the utility model, for the ease of unloading the soil of transport, the side of the storage bin hopper 8 turns Dynamic connection dodge gate 3, and the rotational angle between the dodge gate 3 and the storage bin hopper 8 is 0 ° -180 °.
As a kind of preferred embodiment of the utility model, it is locked to realize to the dodge gate 3, the work Lock tube 9b, and the locking bar 9a mating connections institute are fixed in one end rotation connection locking bar 9a of dynamic door 3, the side of the storage bin hopper 8 State lock tube 9b.
As a kind of preferred embodiment of the utility model, second sliding rail 54 is stored in order to realize, the cunning The outside of block 52 is equipped with the second magnetic patch 521, rotational angle between second sliding rail 54 and first sliding rail 53 for 0 °- 180 °, second magnetic patch 521 is connected second sliding rail 54.
As a kind of preferred embodiment of the utility model, in order to realize the double action of the catch bar 9, can be drawn It is dynamic, can realize support after rotation, the rotational angle of the catch bar 9 and the storage bin hopper 8 is 0 ° -90 °, and the catch bar 9 Length and the catch bar 9 to 7 bottom of traveling wheel spacing it is identical.
As a kind of preferred embodiment of the utility model, in order to realize the rotation of the elevator bucket 6, the elevator bucket 6 The wire rope handling ear 13 is fixed at outer ledge with the side of the storage bin hopper 8, and the wire rope handling ear 13 and the pulley 4 are one On horizontal line.
As a kind of preferred embodiment of the utility model, in order to avoid soil is promoted, rotation is fallen, the elevator bucket 6 section uses arcuate structure, and the back of the elevator bucket 6 is fitted closely with the storage bin hopper 8.
When the utility model is used, transport vehicle is transported at excavation of foundation pit, the catch bar 9 is rotated, is allowed to institute It states storage bin hopper 8 to be supported, the elevator bucket 6 is made to be located at the side of excavation of foundation pit, the electric pushrod 51 is driven to stretch downwards, The sliding block 52 is driven to slide down at excavation of foundation pit, the soil of excavation of foundation pit is placed in the inside of the elevator bucket 6, then The electric pushrod 51 is resetted, when the elevator bucket 6 rises to top, the hand rotational handle 11, to the steel Cord 14 is wound, and the elevator bucket 6 is driven to rotate with the locking of the steel wire rope 14, will be in the elevator bucket 6 The clod in portion is poured into the inside of the storage bin hopper 8, rotatable to make described second to slide when soil block piles in the storage bin hopper 8 Rail 54 attracts with second magnetic patch 521 is fixed second sliding rail 54, and the catch bar 9 is taken out in rotation, drags institute It states catch bar 9 and is moved to discharge pit, the locking bar 9a is taken out in rotation, opens the dodge gate 3 and carries out discharging to inside, completes soil Conveying.
Compared with the relevant technologies, the earth moving equipment in Deep Excavation provided by the utility model has and has as follows Beneficial effect:
The utility model provides the earth moving equipment in a kind of Deep Excavation, using the form pair of the storage bin hopper 8 Soil is transported, and the sliding block 52 is pushed to be slided on sliding rail by the electric pushrod 51, is made the position of the elevator bucket 6 It drops at foundation pit and carries out the splicing of soil;Avoid manually carrying out the promotion of soil using scoop when excavating, it is time saving and energy saving, After soil is promoted by the electric pushrod 51, locking the steel wire rope 14 using the rotating cylinder 12 rotates the elevator bucket 6 Toppled over, then recycled, can greatly accelerate deep pit digging, muck haulage process, it is convenient flexibly.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly used in Other relevant technical fields, are equally included in the patent within the scope of the utility model.

Claims (9)

1. a kind of earth moving equipment in Deep Excavation, which is characterized in that including:
Storage bin hopper;
Catch bar, the catch bar are rotationally connected with the side of the storage bin hopper;
Traveling wheel, the traveling wheel are connected to the bottom of the storage bin hopper;
Sliding equipment, the sliding equipment include electric pushrod, sliding block, the first sliding rail and the second sliding rail, and first sliding rail is opened Set on the side of the storage bin hopper, and the lower rotation of first sliding rail connects second sliding rail;First sliding rail and Second sliding rail is rotatablely connected the sliding block, and the bottom of first sliding rail is connected by the electric pushrod and the sliding block It connects;
Elevator bucket, the elevator bucket are set on the side of the storage bin hopper;
Rotary drive mechanism, the rotary drive mechanism include rotational handle, rotating cylinder, wire rope handling ear, steel wire rope and first rotating shaft;Institute It states first rotating shaft and is rotationally connected with the sliding block, the wire rope handling ear is fixed on the top of the storage bin hopper, and the wire rope handling ear The steel wire rope is run through in inside;The wirerope-winding turns in the outside of the rotating cylinder described in one end connection of the rotating cylinder Fixed handle;
Pulley, the pulley are set on the top of the storage bin hopper, and the pulley is slidably connected the steel wire rope.
2. the earth moving equipment in Deep Excavation according to claim 1, which is characterized in that the side of the storage bin hopper Portion is equipped with side protection mechanism, and the side protection mechanism includes side shield, the first magnetic patch and the second shaft;The side shield is inserted into To the both sides of the storage bin hopper, and second shaft is fixed in the bottom of the side shield;Institute is fixed at the top of the side shield State the first magnetic patch.
3. the earth moving equipment in Deep Excavation according to claim 2, which is characterized in that the side shield is equipped with Symmetrical two, and rotational angle is 0 ° -90 ° between the side shield and the storage bin hopper.
4. the earth moving equipment in Deep Excavation according to claim 1, which is characterized in that the side of the storage bin hopper Portion is rotatablely connected dodge gate, and the rotational angle between the dodge gate and the storage bin hopper is 0 ° -180 °.
5. the earth moving equipment in Deep Excavation according to claim 4, which is characterized in that the one of the dodge gate Lock tube, and the locking bar mating connection lock tube are fixed in end rotation connection locking bar, the side of the storage bin hopper.
6. the earth moving equipment in Deep Excavation according to claim 1, which is characterized in that the outside of the sliding block Equipped with the second magnetic patch, the rotational angle between second sliding rail and first sliding rail is 0 ° -180 °, and second magnetic patch is matched It closes and connects second sliding rail.
7. the earth moving equipment in Deep Excavation according to claim 1, which is characterized in that the catch bar and institute The rotational angle for stating storage bin hopper is 0 ° -90 °, and the length of the catch bar and the catch bar are between the traveling wheel bottom Away from identical.
8. the earth moving equipment in Deep Excavation according to claim 1, which is characterized in that outside the elevator bucket The wire rope handling ear is fixed at lateral edges with the side of the storage bin hopper, and the wire rope handling ear and the pulley are in a horizontal line On.
9. the earth moving equipment in Deep Excavation according to claim 1, which is characterized in that the elevator bucket is cut Face uses arcuate structure, and the back of the elevator bucket is fitted closely with the storage bin hopper.
CN201721671680.5U 2017-12-05 2017-12-05 A kind of earth moving equipment in Deep Excavation Active CN207553191U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721671680.5U CN207553191U (en) 2017-12-05 2017-12-05 A kind of earth moving equipment in Deep Excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721671680.5U CN207553191U (en) 2017-12-05 2017-12-05 A kind of earth moving equipment in Deep Excavation

Publications (1)

Publication Number Publication Date
CN207553191U true CN207553191U (en) 2018-06-29

Family

ID=62664817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721671680.5U Active CN207553191U (en) 2017-12-05 2017-12-05 A kind of earth moving equipment in Deep Excavation

Country Status (1)

Country Link
CN (1) CN207553191U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114671199A (en) * 2022-03-02 2022-06-28 浙江振升建设有限公司 Building construction is with promotion conveyer of deep basal pit excavation earth

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114671199A (en) * 2022-03-02 2022-06-28 浙江振升建设有限公司 Building construction is with promotion conveyer of deep basal pit excavation earth
CN114671199B (en) * 2022-03-02 2024-05-10 浙江振升建设有限公司 Lifting and transporting device for deep foundation pit excavation soil for building construction

Similar Documents

Publication Publication Date Title
CN201225153Y (en) Rock lane digging and supporting construction drill
CN107155804A (en) Plant tree machine
CN104912376B (en) An automatic electric pole standing device
CN106276056B (en) Multi-segmental combined type earthwork perpendicular lifting apparatus
CN207553191U (en) A kind of earth moving equipment in Deep Excavation
CN207934087U (en) A kind of water mill bores the constructing structure of cooperation manually digging hole
CN204738595U (en) Automatic found pole device
CN106315118A (en) Single chain type earthwork vertical lifting device
CN205894083U (en) A material promotion transfer device for foundation ditch excavation dregs
CN112502209A (en) A foundation ditch excavating gear for construction
CN205742318U (en) A kind of milling digging machine of automatic material-absorbing
CN206829145U (en) Deep Foundation Pit Excavation vertical-lift goes out indigenous equipment
CN104564067A (en) Shoveling and transporting device for large-width simultaneous drifting coal roadway integrated digging and anchoring machine
CN205259240U (en) Power shovel of automatic sieve material of auger formula
CN206957581U (en) A kind of excavation of foundation pit device
CN211444939U (en) Foundation pit earthwork outward transportation equipment
CN207361186U (en) Mine conveyer
CN110980504A (en) A turn over sediment soil collecting box for super deep shaft construction vertical transport system
CN209618711U (en) A kind of grab bucket transporting equipment
CN209483357U (en) A kind of opened type shield machine for jacking construction
CN214784328U (en) Deep basal pit earthwork transfer device
CN209797333U (en) semi-automatic lifting equipment for manual hole digging pile
CN219009729U (en) Material lifting device for earthwork
KR100975089B1 (en) Agitating rod for ground excavation
JP6694840B2 (en) Buried method of tubular body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant