CN207537870U - A kind of precast beam unit of cantilevered shape of a hoof bent cap - Google Patents

A kind of precast beam unit of cantilevered shape of a hoof bent cap Download PDF

Info

Publication number
CN207537870U
CN207537870U CN201721280583.3U CN201721280583U CN207537870U CN 207537870 U CN207537870 U CN 207537870U CN 201721280583 U CN201721280583 U CN 201721280583U CN 207537870 U CN207537870 U CN 207537870U
Authority
CN
China
Prior art keywords
hoof
bent cap
precast beam
beam unit
cantilevered shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721280583.3U
Other languages
Chinese (zh)
Inventor
姚玲玲
陈猛
李凯章
毛登峰
白冰
霍省伟
赵洁
王雪
于文静
李长军
禹沛
谷艳蕊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Transportation Planning Survey Design And Research Institute Co ltd
Original Assignee
Zhengzhou Communications Planning Survey & Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Communications Planning Survey & Design Institute filed Critical Zhengzhou Communications Planning Survey & Design Institute
Priority to CN201721280583.3U priority Critical patent/CN207537870U/en
Application granted granted Critical
Publication of CN207537870U publication Critical patent/CN207537870U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of precast beam units of cantilevered shape of a hoof bent cap, precast beam unit is the beam of horseshoe-shaped structure, it is provided with that surrounding is totally enclosed to pour groove on beam, the bottom middle position of beam is equipped with service sleeve, tensioning has first prestressed strand on beam, and the perforation installed for second batch prestressed strand is arranged on the side wall of the opposite end of the beam.Realize the construction production of shape of a hoof bent cap, efficiency is higher, cost is relatively low, live hauling operation is simple.

Description

A kind of precast beam unit of cantilevered shape of a hoof bent cap
Technical field
The utility model is related to a kind of precast beam units of cantilevered shape of a hoof bent cap.
Background technology
With the construction of modern city, municipal works also rapidly develop therewith, and the requirement to construction quality and efficiency is got over Come higher, the traffic impact brought therewith is also increasingly severe.It is generally constructed for cantilevered bent cap using prefabrication and lifting, still Due to the features such as its weight is big and the component scale of construction is big, the requirement to lifting machine and Transport Machinery is high, while to operation side It is also higher with the requirement of the accuracy of lifting positioning, it is affected to traffic, therefore inconvenient and efficiency of constructing is low.The prior art In have using erection construction bent cap stent at the scene, Coping Construction template on stent is installed, is poured in external mold later Concrete, and carry out curing concrete to design strength, then completes installation by external mold, stent dismounting, but this applies Work technique needs manually to carry out the installation of external mold, erection construction stent, this results in the effect of production in practical operating process Rate is relatively low, and construction quality is not easy to ensure, and cost is higher, and live hauling operation is more numerous and diverse, is brought centainly to work progress Influence.
Utility model content
The purpose of this utility model is to provide a kind of precast beam unit of cantilevered shape of a hoof bent cap, to solve existing skill Less efficient during cantilevered Coping Construction in art, the problem of cost is higher, live hauling operation is more numerous and diverse.
To achieve the above object, the precast beam unit technical solution of the cantilevered shape of a hoof bent cap of the utility model is:
Scheme 1:The precast beam unit of cantilevered shape of a hoof bent cap, the precast beam unit are the beam of horseshoe-shaped structure, It is provided with that surrounding is totally enclosed to pour groove on beam, the bottom middle position of beam is equipped with service sleeve, beam structure Tensioning has first prestressed strand on part, is disposed on the side wall of the opposite end of the beam for second batch prestress steel The perforation that beam installs.
Scheme 2:On the basis of scheme 1, the cross section for pouring groove of the precast beam unit is trapezoidal.
Scheme 3:On the basis of scheme 1 or 2, the height in the centre position of the prestressed strand in the precast beam unit Higher than the height at both ends.
Scheme 4:On the basis of scheme 1 or 2, first prestressed strand has at least 6, wherein one end of beam At least eight is perforated on side wall.
The beneficial effects of the utility model are:Compared with the prior art, the cantilevered shape of a hoof involved by the utility model The prefabricated shape of a hoof beam of bent cap is conducive to the quality control of integral construction and actual effect control;Prefabricated shape of a hoof component exists Place maintenance a period of time is stored in before erection, so as to reduce the contraction of concrete after assembling Cheng Liang and creep; Requirement to Transport Machinery and lifting machine is relatively low, and less Site Template machine is cast with the protection conducive to environment;Meanwhile Larger mobility is provided on working procedure, it is positive that the transport hub and other congested areas to urban district protect road to have Meaning, and construction team's surrounding enviroment and traffic above-ground influence are small, and construction period is shorter, rapid recovery traffic pressure;Make at scene Industry amount is few, quick construction, technically simple maturation, conducive to popularization.The construction production of cantilevered shape of a hoof bent cap can be achieved, improve The precision of bent cap assembly, the requirement to operation side is little, convenient, fast.
Description of the drawings
Fig. 1 is the structure diagram of the precast beam unit of the cantilevered shape of a hoof bent cap of the utility model;
Fig. 2 is the positional structure schematic diagram of the six steel Shu Zhangla of end of precast beam unit in Fig. 1;
Fig. 3 is the positional structure schematic diagram of the six steel Shu Zhangla of centre position of precast beam unit in Fig. 1;
Fig. 4 is the schematic diagram of positional structure of the six steel beams of tensioning in Fig. 1 in precast beam unit;
Fig. 5 is the precast beam unit of the utility model and the assembling structure schematic diagram of column;
Fig. 6 is the dimensional structure diagram after the precast beam unit of the utility model pours;
Fig. 7 is the positional structure schematic diagram of eight steel Shu Zhangla of the end of precast beam unit in Fig. 6;
Fig. 8 is the positional structure schematic diagram of the eight steel Shu Zhangla in the centre position of precast beam ditch part in Fig. 6;
Fig. 9 is the schematic diagram of positional structure of the eight steel beams of tensioning in Fig. 6 in precast beam unit.
Specific embodiment
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
The embodiment one of the precast beam unit of the cantilevered shape of a hoof bent cap of the utility model, as shown in Fig. 1 ~ 4, as rear The bed die of continuous stage entirety erection without scaffolding and the precast beam unit of side form, structure are in the shape of a hoof, and bottom has for two simultaneously The support portion that bridge pier 7 is integrally supported is arranged, while service sleeve 2 is installed at support portion, in the present embodiment, in beam 1 Portion pours groove 5 as trapezium structure, this trapezium structure pour groove 5 enable to horseshoe-shaped beam 1 itself Weight reaches most light, ensures the convenient of subsequent lifting, and tensioning is gone back on the beam 1 of horseshoe-shaped structure 6 steel beams, after being Continuous prestressed stretch-draw reserving hole channel.
When producing cantilevered shape of a hoof bent cap, generally poured and in the gradually tensioning of each stage using prefabricated in batches The mode of steel beam carries out the whole erection without scaffolding of cantilevered shape of a hoof bent cap, specifically includes following four step:
Step(1):As shown in Fig. 1 ~ 4:Using precast beam unit as the bed die of follow-up phase entirety erection without scaffolding and Side form, the precast beam unit are horseshoe-shaped beam 1, and beam 1 is equipped with that surrounding is totally enclosed pours groove 5, pours recessed Slot 5 is trapezoidal groove, while installs service sleeve 2 in the bottom of beam middle position corresponding with bridge pier, for supplying bridge The reinforcing bar 6 reserved on pier passes through, and enhances the load bearing stength of bent cap.6 prestressed strand F1 ~ F3 of tensioning on beam is formed Steel beam hole 3, the prestressed stretch-draw reserving hole channel for follow-up phase.
Step(2):As shown in figure 5, above-mentioned beam 1 is moved to 7 top of bridge pier, and the steel that will be reserved on bridge pier 7 Muscle 6 passes through service sleeve 2 and stretches to and pour in groove 5, and beam 1 is lifted on bridge pier 7.
Step(3):As shown in Fig. 6 ~ 9, using the hollow space for pouring groove 5 of 8 cast-in-place beam of fill concrete, together When accordingly length pour 8 prestressed strand F4 ~ F5. of tensioning in groove 5
Step(4):It is conserved, the whole erection without scaffolding of cantilevered shape of a hoof bent cap is completed.
In particular, it should be pointed out that the cantilevered shape of a hoof bent cap is molded using one-time-concreting, therefore it is four to pour groove 5 Thorough closed pockets, final one-time-concreting is in place;Simultaneously as the structure stress feature of cantilevered shape of a hoof bent cap, in tensioning During steel beam 4, the position height among steel beam 4 ensures the knot of bent cap higher than tensioning is carried out by the way of the position height at both ends Structure stress and structure reactance meet stress needs.
In other embodiments, the structure for pouring groove 5 can be other structures, such as U-shaped, V-arrangement.
In other embodiments, the quantity of the tensioning steel beam in each stage can increase or decrease according to the actual needs.
In other embodiments, the stretching mode of steel beam can be replaced by other modes, need to ensure the cantilevered shape of a hoof The intensity of the final structure of each position of bent cap reaches requirement.

Claims (4)

1. a kind of precast beam unit of cantilevered shape of a hoof bent cap, it is characterised in that:The precast beam unit is horseshoe-shaped structure Beam, is provided with that surrounding is totally enclosed to pour groove on beam, and the bottom middle position of beam is equipped with pre-buried set Pipe, on beam tensioning have first prestressed strand, be arranged on the side wall of the opposite end of the beam for second Criticize the perforation that prestressed strand installs.
2. the precast beam unit of cantilevered shape of a hoof bent cap according to claim 1, it is characterised in that:The precast beam structure The cross section for pouring groove of part is trapezoidal.
3. the precast beam unit of cantilevered shape of a hoof bent cap according to claim 1 or 2, it is characterised in that:It is described prefabricated The height in the centre position of the prestressed strand in beam is higher than the height at both ends.
4. the precast beam unit of cantilevered shape of a hoof bent cap according to claim 1 or 2, it is characterised in that:First is pre- Stress steel beam has at least 6, and at least eight is perforated on the side wall of wherein one end of beam.
CN201721280583.3U 2017-09-30 2017-09-30 A kind of precast beam unit of cantilevered shape of a hoof bent cap Active CN207537870U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721280583.3U CN207537870U (en) 2017-09-30 2017-09-30 A kind of precast beam unit of cantilevered shape of a hoof bent cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721280583.3U CN207537870U (en) 2017-09-30 2017-09-30 A kind of precast beam unit of cantilevered shape of a hoof bent cap

Publications (1)

Publication Number Publication Date
CN207537870U true CN207537870U (en) 2018-06-26

Family

ID=62610113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721280583.3U Active CN207537870U (en) 2017-09-30 2017-09-30 A kind of precast beam unit of cantilevered shape of a hoof bent cap

Country Status (1)

Country Link
CN (1) CN207537870U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319080A (en) * 2022-01-17 2022-04-12 宁波市高等级公路建设管理中心 High strength bent cap structure based on UHPC shell

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319080A (en) * 2022-01-17 2022-04-12 宁波市高等级公路建设管理中心 High strength bent cap structure based on UHPC shell
CN114319080B (en) * 2022-01-17 2024-06-04 宁波市高等级公路建设管理中心 High strength bent cap structure based on UHPC shell

Similar Documents

Publication Publication Date Title
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN101824800B (en) Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam
CN107447647A (en) Assembled bridge pier and its construction method
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN101424073A (en) Bridge deck and steel girder second combination method for whole arch precasted steel-concrete composite continuous box girder
CN103981803B (en) The combined gate pier of precast assembly and construction method thereof
CN109591183A (en) A kind of construction technology and precast beam unit of cantilevered shape of a hoof bent cap
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN102230313A (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN110387826A (en) A kind of precast segment assembly bridge pier steel member and construction method and application
CN103290784A (en) Arched beam combination bridge lifting construction method
CN212358846U (en) Assembled concrete composite beam
CN203795291U (en) Bearing-free prestressed concrete continuous rigid frame bridge with single-wall piers
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN113279323A (en) Thin-wall open steel box-prestressed reinforced concrete combined capping beam and construction method
CN207878263U (en) Half precast pier segment and bridge pier
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN210975503U (en) Large-span prefabricated assembled bent cap and pier stand connection structure
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN207537870U (en) A kind of precast beam unit of cantilevered shape of a hoof bent cap
CN110886235B (en) Bridge construction method
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN211769949U (en) Movable arm type tower crane underframe ballast type foundation
CN206887746U (en) A kind of concrete circular stub binder backward construction column-form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.91, Longhai Middle Road, Erqi District, Zhengzhou City, Henan Province, 450000

Patentee after: Zhengzhou Transportation planning Survey, Design and Research Institute Co.,Ltd.

Address before: No.91, Longhai Middle Road, Erqi District, Zhengzhou City, Henan Province, 450000

Patentee before: ZHENGZHOU COMMUNICATIONS PLANNING SURVEY & DESIGN INSTITUTE