CN207531447U - road green belt - Google Patents

road green belt Download PDF

Info

Publication number
CN207531447U
CN207531447U CN201721674015.1U CN201721674015U CN207531447U CN 207531447 U CN207531447 U CN 207531447U CN 201721674015 U CN201721674015 U CN 201721674015U CN 207531447 U CN207531447 U CN 207531447U
Authority
CN
China
Prior art keywords
level
baffle
road
greenbelt
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721674015.1U
Other languages
Chinese (zh)
Inventor
马宁宁
马立山
李延博
杨国丽
张海平
郭旖琪
曹璟
任柯玮
张傲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Architecture
Original Assignee
Hebei University of Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Architecture filed Critical Hebei University of Architecture
Priority to CN201721674015.1U priority Critical patent/CN207531447U/en
Application granted granted Critical
Publication of CN207531447U publication Critical patent/CN207531447U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of road green belt, belongs to urban infrastructure technical field, the greenbelt including being set to both sides road center, and trapezoidal high for intermediate low, both sides of greenbelt infiltrates structure, and greenbelt is equipped with rainwater baffle from both sides to center spacer;Greenbelt is from top to bottom followed successively by the soil horizon for planting flowers and plants and the packing layer for infiltration, and the bottom of packing layer is equipped with the collector pipe connected with municipal drain.Trapezoidal structure of infiltrating can be such that rainwater is infiltrated by outer and inner realization short stay, cushioning effect be played to rainwater, while effectively improve rain infiltration efficiency by the laying of soil horizon and packing layer, alleviate normal soil due to infiltration rate is relatively slow and caused by seeping phenomenon;The effect beautified the environment can be played by planting flowers and plants in soil horizon.The utility model by setting greenbelt in the road center of two-way lane, make rational planning for, using space, and rainstorm weather road ponding situation is made to be eased, and efficiently uses rainwater resource by realization.

Description

Road green belt
Technical field
The utility model belongs to urban infrastructure technical field, is to be related to a kind of road green belt more specifically.
Background technology
At present, with the quickening of Development of Urbanization paces, hardened ground rate is higher and higher so that and rain infiltration rate reduces, Rainfall runoff increases, and rainwater resource cannot be reasonably utilized, and cause the waste of resource.In addition, due to rainfall in recent years Amount continues to increase, and part road ponding is serious, and people's trip is impacted.
Utility model content
The purpose of this utility model is to provide a kind of road green belt, to solve rainwater resource in the prior art The technical issues of cannot rationally trip being seriously affected using, road ponding.
To achieve the above object, the technical solution adopted in the utility model is:A kind of road green belt is provided, including setting In the greenbelt of both sides road center, trapezoidal high for intermediate low, both sides of the greenbelt infiltrates structure, and the greenbelt is by two While it is equipped with rainwater baffle to center spacer;The greenbelt is from top to bottom followed successively by soil horizon for planting flowers and plants and for oozing The packing layer of water, the bottom of described filler layer are equipped with the collector pipe connected with municipal drain.
Further, it is described trapezoidal to infiltrate structure by edge to center to be more than two-stage.
Further, for three-level, the third level including being in greenbelt center enters the trapezoidal structure of infiltrating of the greenbelt It oozes, is infiltrated to set gradually the second level to both sides and enter to blend the first order from the third level and be infiltrated, the first order is infiltrated and both sides road Edge it is adjacent;The rainwater baffle includes first baffle and second baffle, and the first baffle is vertically set on described first Grade enters to blend between the second level infiltrates, and the second baffle is vertically set between the second level infiltrates and infiltrate with the third level; It is from top to bottom soil horizon and packing layer that the first order, which is infiltrated, the second level enters to blend the third level to infiltrate.
Further, the first baffle is higher by the first order and infiltrates upper surface, and the second baffle is higher by the second level and infiltrates Upper surface.
Further, the first baffle is higher by the first order and infiltrates upper surface 3-5cm, and the second baffle is higher by the second level Infiltrate upper surface 3-5cm.
Further, the edge of the road is face of slope, and the first order infiltrates the face of slope with the road It is adjacent.
Further, described filler layer is grade distribution type base-material.
Further, the grade distribution type base-material from top to bottom successively the first order with fine sand layer, the second level with fine sand layer and the Graduation three fine sand layer, the first order match the packing material size of fine sand layer successively with fine sand layer, the second level with fine sand layer and the third level Become larger.
Further, the collector pipe is multiple and is uniformly arranged in packing layer bottom.
Further, the rainwater baffle extends to greenbelt bottom, and the rainwater baffle bottom crosses water equipped with several Hole.
The advantageous effect of road green belt provided by the utility model is:Compared with prior art, the utility model road Road greening band infiltrates structure by being provided with the trapezoidal of rainwater baffle in both sides road center, can make rainwater by outer and inner realization Short stay is infiltrated, and is infiltrated by stages at different levels and is played cushioning effect, while effective by the laying of soil horizon and packing layer Improve rain infiltration efficiency, alleviate normal soil due to infiltration rate is relatively slow and caused by seeping phenomenon;By in soil horizon Plantation flowers and plants can play the effect beautified the environment;Rainwater penetrates into and confluence enters municipal drainage pipe network after collector pipe is collected. The utility model by setting greenbelt in the road center of two-way lane, make rational planning for, using space, and make heavy rain day by realization Air flue road ponding situation is eased, and efficiently uses rainwater resource.
Description of the drawings
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing is briefly described needed in description, it should be apparent that, the accompanying drawings in the following description is only that this practicality is new Some embodiments of type, for those of ordinary skill in the art, without having to pay creative labor, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the cross-section diagram of road green belt that the utility model embodiment provides;
Fig. 2 is Fig. 1 vertical views;
Fig. 3 is the B-B cross-section diagrams in Fig. 1;
Fig. 4 is the structure diagram of rainwater baffle in Fig. 1;
Wherein, each reference numeral in figure:
1- roads, 2- greenbelts, 3- rainwater baffles, 4- packing layers, 5- municipal drain, 6- collector pipes, the 7- third level enter It oozes, 8- is infiltrated the second level, and the 9- first order is infiltrated, 10- soil horizons, 31- first baffles, 32- second baffles, and the 41- first order is with thin Fine sand layer is matched in layer of sand, the 42- second level, and the 43- third level matches fine sand layer, 101- water holes.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and advantageous effect is more clearly understood, with Lower combination accompanying drawings and embodiments, the present invention is further described in detail.It should be appreciated that specific reality described herein It applies example to be only used to explain the utility model, is not used to limit the utility model.
It should be noted that when element is referred to as " being fixed on " or " being set to " another element, it can be directly another On one element or it is connected on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", " on ", " under ", "front", "rear", "left", "right", " vertical ", The orientation or position relationship of the instructions such as " level ", " top ", " bottom " " interior ", " outer " are to be closed based on orientation shown in the drawings or position System is for only for ease of description the utility model and simplifies description rather than instruction or imply that signified device or element are necessary With specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
In addition, term " first ", " second " are only used for description purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature." multiple " are meant that two or two in the description of the present invention, More than, unless otherwise specifically defined.
Also referring to Fig. 1 to Fig. 3, now road green belt provided by the utility model is illustrated.The road is green Change band, the greenbelt 2 including being set to the center of road 1, trapezoidal high for intermediate low, both sides of the greenbelt 2 infiltrates structure, institute It states greenbelt 2 and is equipped with rainwater baffle 3 from both sides to center spacer;The greenbelt 2 is from top to bottom followed successively by plant flowers and plants Soil horizon 10 and the packing layer 4 for infiltration, the bottom of described filler layer 4 be equipped with the collector pipe connected with municipal drain 5 6.Rainwater infiltrates structure and oozes down step by step through trapezoidal, and the filtering step by step through soil horizon and packing layer, can improve rainwater infiltrates efficiency, And pass through the filtering of packing layer, prevent larger impurity from entering municipal drainage pipe network.
Road green belt provided by the utility model, compared with prior art, the utility model pass through in the road of both sides Centre is provided with the trapezoidal of rainwater baffle and infiltrates structure, and rainwater can be made to be infiltrated by outer and inner realization short stay, pass through ranks at different levels Section property, which is infiltrated, plays cushioning effect, while effectively improve rain infiltration efficiency by the laying of soil horizon and packing layer, alleviates Normal soil due to infiltration rate it is relatively slow and caused by seeping phenomenon;It is beautified the environment by that can be played in soil horizon plantation flowers and plants Effect;Rainwater penetrates into and confluence enters municipal drainage pipe network after collector pipe is collected.
Further, referring to Fig. 1, a kind of specific embodiment as road green belt provided by the utility model, It is described trapezoidal to infiltrate structure by edge to center to be more than two-stage.The trapezoidal structure of infiltrating of the greenbelt 2 is three-level, including place The third level in greenbelt center infiltrates 7, from the third level infiltrate 7 to both sides set gradually the second level infiltrate 8 and the first order infiltrate 9, it is adjacent with the edge of both sides road 1 that the first order infiltrates 9;The rainwater baffle 3 includes first baffle 31 and second baffle 32, the first baffle 31 be vertically set on the first order infiltrate 9 and the second level infiltrate between 8, the second baffle 32 hang down Directly be arranged on the second level infiltrate 8 and the third level infiltrate between 7;The first order infiltrates the 9, second level and infiltrates 8 and the third level It is from top to bottom soil horizon 10 and packing layer 4 to infiltrate 7.Rainwater flows into greenbelt from road, and rainwater initially enters the first order and enters It oozes through being oozed under soil horizon and packing layer classified filtering to collector pipe;When rainwater increase to the first order infiltrate cannot and ooze at present when, Rainwater is infiltrated through first baffle overflow to the second level through being oozed under soil horizon and packing layer classified filtering to collector pipe;Equally work as rainwater Infiltrated in the second level cannot quickly under ooze, rainwater infiltrates to be filtered down through second baffle overflow to the third level again to be oozed.Utilize this Kind trapezoidal structure of infiltrating can realize that the quick of rainwater enters to blend classified filtering, and it is slow effectively to alleviate simple soil infiltration rate Drawback, and by phase process at different levels, buffering effect can be played.
Wherein, the thickness of soil horizon is 15-30cm, for planting the flowers and plants of greening, the soil horizon table that the first order is infiltrated Face is less than upper road surface 20-30cm.
Further, referring to Fig. 1, a kind of specific embodiment as road green belt provided by the utility model, Rainwater is infiltrated in the first order and carry out short stay is infiltrated in the second level in order to make, for rain infiltration provide it is enough under ooze the time, The first baffle 31 design is higher by the first order and infiltrates 9 upper surfaces, the design of second baffle 32 is higher by the second level and infiltrates on 8 Surface.Specifically, the first baffle 31, which is higher by the first order, infiltrates 9 upper surface 3-5cm, the second baffle 32 is higher by the second level Infiltrate 8 upper surface 3-5cm.
Further, referring to Fig. 1, in a specific embodiment of the utility model, the edge of the road 1 is inclines Slope, it is adjacent with the face of slope of the road 1 that the first order infiltrates 9.The face of slope of road is to meet road Construction requirements, angle of inclination are designed as 5 ° -10 °, also can suitably be adjusted according to actual conditions.
Further, as a kind of specific embodiment of road green belt provided by the utility model, described filler layer 4 For grade distribution type base-material.Referring to Fig. 3, the grade distribution type base-material from top to bottom with fine sand layer 41, the second level match carefully successively by the first order With fine sand layer 43, the first order matches fine sand with fine sand layer 41, the second level with fine sand layer 42 and the third level for layer of sand 42 and the third level The packing material size of layer 43 becomes larger successively.The first order matches the thickness 5cm, grain size 0.1-0.3cm of fine sand layer;Match fine sand layer in the second level Thickness 3cm, grain size 0.5cm;The third level matches the thickness 5cm, grain size 1cm of fine sand layer.The first order matches fine sand with fine sand layer, the second level Other spaces are laid with rubble layer material under the different gradation filler of layer and the third level with fine sand layer.The filler particles of different gradation Of different sizes, porosity is big, can accelerate the infiltration rate of rainwater;The filler of different-grain diameter not only acts as the mesh of filtering rainwater , while can also avoid the soil losses of soil horizon.
Further, referring to Fig. 1, a kind of specific embodiment as road green belt provided by the utility model, The collector pipe 6 is multiple and is uniformly arranged in 11 bottom of packing layer.The caliber of collector pipe selects 50mm, by packing layer mistake Rainwater conflux to collector pipe after filter is collected, and finally converges into municipal drainage pipe network.
Further, referring to Fig. 4, in a specific embodiment of the utility model, the rainwater baffle 10 extends To the bottom of greenbelt 2,10 bottom of rainwater baffle is equipped with several water holes 101.The aperture of water hole is 3-5mm, square Just in the rainwater conflux to collector pipe after packing layer is filtered.
Wherein, collector pipe is three, has certain corrosivity for rainwater, collector pipe can be by corrosion-resistant, bearing capacity High material is made.
In conclusion the utility model has the advantages that simple in structure, rainwater infiltration speed is fast, good filtration effect, this reality With novel by setting greenbelt in the road center of two-way lane, realization is made rational planning for using space, effectively alleviates simple soil The drawbacks of earth infiltration rate is slow makes rainstorm weather road ponding situation be eased, efficiently uses rainwater resource.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (10)

1. road green belt, it is characterised in that:Greenbelt including being set to both sides road center, the greenbelt are centre High trapezoidal in low, both sides infiltrates structure, and the greenbelt is equipped with rainwater baffle from both sides to center spacer;The greenbelt is by upper The soil horizon for planting flowers and plants and the packing layer for infiltration are followed successively by under, the bottom of described filler layer is equipped with arranges with municipal administration The collector pipe of water pipe connection.
2. road green belt as described in claim 1, it is characterised in that:It is described it is trapezoidal infiltrate structure by edge to center be two Grade or more.
3. road green belt as claimed in claim 2, it is characterised in that:The trapezoidal structure of infiltrating of the greenbelt is three-level, The third level including being in greenbelt center is infiltrated, and is infiltrated to set gradually the second level to both sides and enter to blend the first order from the third level and It oozes, the first order is infiltrated adjacent with the edge of both sides road;The rainwater baffle includes first baffle and second baffle, described First baffle is vertically set on the first order and enters to blend between the second level infiltrates, and the second baffle is vertically set on described Two level is infiltrated infiltrate with the third level between;It is from top to bottom soil that the first order, which is infiltrated, the second level enters to blend the third level to infiltrate Earth layer and packing layer.
4. road green belt as claimed in claim 3, it is characterised in that:The first baffle is higher by the first order and infiltrates upper table Face, the second baffle are higher by the second level and infiltrate upper surface.
5. road green belt as claimed in claim 4, it is characterised in that:The first baffle is higher by the first order and infiltrates upper surface 3-5cm, the second baffle are higher by the second level and infiltrate upper surface 3-5cm.
6. road green belt as claimed in claim 3, it is characterised in that:The edge of the road is face of slope, described the Level-one is infiltrated adjacent with the face of slope of the road.
7. road green belt as described in claim 1, it is characterised in that:Described filler layer is grade distribution type base-material.
8. road green belt as claimed in claim 7, it is characterised in that:The grade distribution type base-material from top to bottom first order successively With fine sand layer, the second level with fine sand layer and the third level with fine sand layer, the first order is with fine sand layer, the second level with fine sand layer and the The packing material size of graduation three fine sand layer becomes larger successively.
9. road green belt as described in claim 1, it is characterised in that:The collector pipe is multiple and be uniformly arranged and filling out Bed of material bottom.
10. such as claim 1-9 any one of them road green belts, it is characterised in that:The rainwater baffle extends to greening Band bottom, the rainwater baffle bottom are equipped with several water holes.
CN201721674015.1U 2017-12-05 2017-12-05 road green belt Expired - Fee Related CN207531447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721674015.1U CN207531447U (en) 2017-12-05 2017-12-05 road green belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721674015.1U CN207531447U (en) 2017-12-05 2017-12-05 road green belt

Publications (1)

Publication Number Publication Date
CN207531447U true CN207531447U (en) 2018-06-26

Family

ID=62617187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721674015.1U Expired - Fee Related CN207531447U (en) 2017-12-05 2017-12-05 road green belt

Country Status (1)

Country Link
CN (1) CN207531447U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109691326A (en) * 2018-12-25 2019-04-30 花王生态工程股份有限公司 A kind of Afforestation Landscape road

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109691326A (en) * 2018-12-25 2019-04-30 花王生态工程股份有限公司 A kind of Afforestation Landscape road

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN105104002B (en) A kind of concrete retaining wall spilled water hole greening structure and method
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN204959952U (en) Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system
CN105089142A (en) Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system
CN206128250U (en) Urban road rainwater regulating and accumulating system
CN104532938B (en) A kind of rain-water accumulating that solves city waterlogging, haze and tropical island effect stays system
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN106917522A (en) A kind of Outdoor Parking position system based on sponge the idea of the city
CN102966165B (en) System for eliminating and reducing urban inland inundation by utilizing adsorption layer of green area and inland inundation eliminating and reducing method
CN107881875A (en) A kind of karst ecology parking lot and its building method
CN107143021A (en) A kind of biological delaying basin
CN207062968U (en) A kind of composite foundation structure of sponge urban construction
CN103015487A (en) System using green land rainwater for compensating urban groundwater
CN204385854U (en) A kind of rainwater accumulation system solving urban waterlogging, haze and heat island effect
CN207531447U (en) road green belt
CN205295848U (en) Firm type ecology system of mating formation of permeating water
CN203878713U (en) Basement roof drainage system
CN206903094U (en) A kind of garden landscape step
CN206245443U (en) A kind of novel grass-planting trench system
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device
CN107864781A (en) The cultivation matrix structure and method of construction in roof rain water garden
CN108283079A (en) A kind of water storage type urban landscape and greenland system
CN104088491B (en) The vertical method for arranging of a kind of 220kV transformer station ramp type
CN207176866U (en) A kind of sunk type lawn watering structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180626

Termination date: 20181205