CN207529205U - For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment - Google Patents

For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment Download PDF

Info

Publication number
CN207529205U
CN207529205U CN201721656862.5U CN201721656862U CN207529205U CN 207529205 U CN207529205 U CN 207529205U CN 201721656862 U CN201721656862 U CN 201721656862U CN 207529205 U CN207529205 U CN 207529205U
Authority
CN
China
Prior art keywords
data
areas
power station
intelligent front
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721656862.5U
Other languages
Chinese (zh)
Inventor
杨凯镟
范佳卿
邓志成
汪勇
程应冠
郭荣
高升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Power Equipment Research Institute Co Ltd
Original Assignee
Shanghai Power Equipment Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Power Equipment Research Institute Co Ltd filed Critical Shanghai Power Equipment Research Institute Co Ltd
Priority to CN201721656862.5U priority Critical patent/CN207529205U/en
Application granted granted Critical
Publication of CN207529205U publication Critical patent/CN207529205U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The utility model provides a kind of intelligent front end multimedia information acquisition system of lean monitoring power station equipment, multi-group data harvester including being set on production I areas, data acquisition device is connected with each device systems in production I areas, and data acquisition device is also connected by the first one-way safety isolating device with the intelligent front end data server set on production II areas;Intelligent front end data server connects the second one-way safety isolating device, and the second one-way safety isolating device is connect by private network with the cloud server set on management information great Qu;System to the real time data of acquisition without simple lossy compression, but dynamic sampling rate adjusting and data compression, and be stored in structured database according to actual needs;Unstructured database is stored in non-real-time data.The data of this system acquisition have accuracy, integrality, consistency, data transmission security and efficient;Using identical coding rule, data application is with more high efficiency, convenience, purpose.

Description

For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment
Technical field
The utility model is related to a kind of power station information acquisition systems more particularly to a kind of lean that is used for monitor power station equipment Intelligent front end multimedia information acquisition system.
Background technology
In present Thermal Power Station, safe and environment-friendly and energy-saving and emission-reduction be each Thermal Power Station competitively strive by mesh Mark, however the safe and environment-friendly and energy-saving and emission-reduction of Thermal Power Station all be unable to do without data, each unit of each Thermal Power Station A large amount of operation data is owned by, these data reflection unit allocation process, operational effect, status of equipment etc..
Traditional power station platform data acquisition system is as shown in Figure 1, it is integrated with the real time data of level of factory production process.Hair Change committee's 14 commands in 2014《Electric power monitoring system security protection provides》, the information security of electricity power enterprise adheres to " security partitioning, net Network is special, lateral isolation, longitudinal certification " principle.Therefore, level of factory information system includes control zone, noncontrolled area and management letter Xi great areas three-decker.Current power station big data platform is taken to obtain information by the mirror image for being located at management information great Qu Business device obtains system data.Simultaneously as power station big data platform needs to obtain the data of a large amount of operating unit, these data Different coding is all employed in each power plant, and big data platform needs carry out the same type data of different units at analysis Reason, needs the different codings in the level of factory information system by each power plant to be unified into identical coding.
At present, with the gradual development of Internet technology, electricity power enterprise's data start gradually to the cloud of more concentration, intelligence End big data direction is developed.Compared with traditional level of factory information system, power generation big data can obtain a large amount of units and its equipment With the long-term operation data of system, it can be run for power station and the operation instruction to become more meticulous is provided.The fortune more to become more meticulous to power station Row guidance, needs data source more fine.Compared with traditional power station information system, power station big data platform is for front end number New requirement is proposed according to acquisition.In order to preferably supervision equipment state, so as to equipment and electricity generation system economy, spirit Activity, reliability and safety optimize, and need the front end to become more meticulous intelligent data acqusition system that power station big data is pushed to put down Platform develops to more accurate and true direction.
And traditional power station platform data acquisition system has following defect in face of the application of big data platform:
1st, the data of traditional data acquisition system pass through SIS systems, and same data compression is carried out to different data source Algorithm process so that data generate lossy compression, destroys the accuracy, integrality, consistency of data.Due to mirror image server In data originally be for level of factory state supervision, have already been through the processing such as data smoothing, compression, there is no consider go deep into Data mining and equipment and system optimization, lead to the salvage value of data to reduce.
2nd, since the front end intelligent multimedia acquisition system to become more meticulous needs to obtain the data of a large amount of operating unit, these Data all employ different coding in each power plant, and big data platform needs analyze the same type data of different units Processing, needs the different coding in the level of factory information system by each power plant to be unified into identical coding.Also exist in certain power plant DCS there is also the problem of corresponding data point of level of factory information system does not update after transformation.
3rd, the front end intelligent multimedia acquisition system gathered data source to become more meticulous needs ERP, embedded device, inspection The non-real-time datas such as instrument, service bulletin, analysis report need better platform that can receive these data.Relational data stores To relevant database, non-real-time data storage to the file management systems such as Hadoop, then by data critical feature extraction, Then relevant database is arrived in storage.Traditional power station platform data acquisition system can not meet above-mentioned requirements.
Utility model content
The technical problems to be solved in the utility model is how to realize power station big data platform intelligent front end multimedia messages The primitiveness of acquisition and coding uniformity.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is to provide a kind of lean monitoring power station equipment Intelligent front end multimedia information acquisition system, it is characterised in that:Multi-group data harvester including being set on production I areas, it is described Data acquisition device is connected with each device systems in production I areas, and the data acquisition device is also isolated by the first one-way safety Device is connected with the intelligent front end data server set on production II areas;The intelligent front end data server connection second is unidirectional Safety insulating device, the second one-way safety isolating device are connect by private network with the cloud server set on management information great Qu;
System to the real time data of acquisition without simple lossy compression, but according to actual needs dynamic adjustment sampling Frequency and data compression, and it is stored in structured database;Unstructured database is stored in non-real-time data.
Preferably, the data acquisition device is connected by matched interface arrangement with each device systems in production I areas.
It is highly preferred that the interface arrangement includes but not limited to DCS interfaces, PLC interface, SCADA interfaces, embedded device Interface, fuel system interface.
Preferably, the data of each device systems in the production I areas by data acquisition device and the first one-way safety every The intelligent front end data server set on production II areas is transferred to from device;Intelligent front end data server receives all production I The data in area, and frequency is adopted using dynamic according to data source characteristic and carries out lossless data compression storage, it is ensured that the standard of initial data True property, integrality, consistency;The data of intelligent front end data server are transferred to management by the second one-way safety isolating device Information great Qu enters public network by special line, is ultimately connected to cloud server.
Preferably, the data in unstructured database are carried out with key feature extraction, and the key feature that will be extracted It is stored in structured database.
Preferably, in data encoding rule, the system on the basis of big data platform is formulated to different unit different systems One coding rule.
The side of data is directly obtained by being located at the mirror image server of management information great Qu with current power station big data platform Formula is compared, and the intelligent front end multimedia information acquisition system of lean provided by the utility model monitoring power station equipment has following beneficial Effect:
1st, for system closer to data source, the level in front end is more flat, and the data of acquisition are with more accuracy, complete Whole property, consistency;
2nd, system requires to advise the pretreatment that non-relational data source is customized according to the data analysis of big data platform Then, the key feature extraction and storage of data are realized, data mining analysis result later more reflects that power plant's operating system is real Border situation more has decision guidance meaning;
3rd, system will be in each power plant's level of factory information system according to the requirement of big data platform transverse direction Data Analysis Services In different coding unification to identical coding rule, data application later is with more high efficiency, convenience, purpose;
4th, the function of system determines that the unique subscriber of system is exactly the big data platform in high in the clouds, with SIS mirror image servers Multi-user compares, data transmission efficiency higher, safer.
Description of the drawings
Fig. 1 is traditional power station platform data acquisition system schematic diagram;
Fig. 2 is that the intelligent front end multimedia information acquisition system structure of lean provided in this embodiment monitoring power station equipment is shown It is intended to;
Fig. 3 is the intelligent front end multimedia information acquisition system flow that lean provided in this embodiment monitors power station equipment Figure;
Fig. 4 stores schematic diagram for data;
Fig. 5 stores schematic diagram for data source and system;
Fig. 6 is extracted for image key feature with storing schematic diagram;
Fig. 7 is Video Key feature extraction and storage schematic diagram;
Fig. 8 is extracted for document key feature with storing schematic diagram.
Specific embodiment
With reference to specific embodiment, the utility model is expanded on further.
Fig. 2 is the intelligent front end multimedia information acquisition system signal that lean provided in this embodiment monitors power station equipment Figure, the intelligent front end multimedia information acquisition system of lean monitoring power station equipment include being set on multigroup number in production I areas According to harvester, data acquisition device is connected with each device systems in production I areas, and data acquisition device also passes through the first unidirectional peace Full isolating device is connected with the intelligent front end data server set on production II areas, and intelligent front end data server connection second is single To safety insulating device, the second one-way safety isolating device is connected by private network and the cloud server set on management information great Qu It connects.
Data acquisition device is connect by DCS interfaces, PLC interface, SCADA interfaces, embedded device interface, fuel system Mouthful ... each device systems matching with production I areas is waited to be connected.
With reference to Fig. 3, the workflow of the intelligent front end multimedia information acquisition system of lean monitoring power station equipment is as follows:Enterprise The data such as industry resource planning ERP system, embedded device, logging, service bulletin, analysis report, intelligent fuel system are in life Are produced from I areas, enter production II areas by data acquisition device and the first one-way safety isolating device;Intelligent front end data server cloth It puts in production II areas, two-node cluster hot backup can be used according to demand, and add disk array, the data in all production I areas of reception, and according to Data source characteristic adopts frequency using dynamic and carries out lossless data compression storage, it is ensured that the accuracy of initial data, integrality, consistent Property;The intelligent front end data server in production II areas enters management information great Qu by the second one-way safety isolating device, passes through Special line enters public network, is ultimately connected to cloud server.
With reference to Fig. 3~Fig. 5, for:ERP, sales data, embedded device, logging, cell phone pictures, service bulletin, change The live multi-media information device such as report is tested, is taken by the intelligent front end data in any one headend equipment and produced on-site II areas Business device connection, service are respectively set to server-side Server, client Client.For the pass of the embedded device at front end scene The information such as key signals, coal analysis report, fault video image are transmitted to the intelligent front end in production II areas by web application modes The non-relationals data file management systems such as the HDFS (Hadoop) on data server and typing.
System to the real time data that data acquisition device acquires without simple lossy compression, but according to actual needs Dynamic sampling rate adjusting and data compression, and it is stored in structured database (relevant database);To picture, video, text The non-real-time datas such as shelves are stored in unstructured database, such as HDFS (Hadoop) file management system.To unstructured data The data in library carry out key feature extraction, and the key feature extracted is stored in structured database.
With reference to Fig. 6~Fig. 8, the key feature of image, video, document is extracted, carries out image identification, video point first Analysis, document analysis judge that it is applicable in SDK interfaces or api interface access, then carry out key feature extraction to it, and by institute The key feature of extraction is stored in structured database.
For the intelligent data acquisition front end of big data platform, not only require nothing more than that there is field level front end data and adopt in real time Collect function, also there is data-transformation facility to the big data platform in high in the clouds, not require the meter of grade progress related service at the scene Calculate function.In transmission process, make every effort to be simple and efficient, production II areas are ensured by isolator with external network and produce I areas Related data safety.
The utility model replaces traditional big data platform to be used with a set of intelligent front end multimedia information acquisition system Level of factory data collecting system SIS.Intelligent front end multimedia information acquisition system is required according to the data analysis of big data platform To the preprocessing rule that data source is customized, realize the key feature extraction and storage of data, ensure data source accuracy, Integrality, consistency;Simultaneously according to the requirements of big data platform transverse direction Data Analysis Services by each power plant's level of factory information system In different coding it is unified in identical coding rule.Data source more diversity changes original SIS data library and only acquires The feature of real time data.It is more succinct with transmitting than legacy data acquisition on data transmission scheme.In data encoding rule On, different unit different systems are formulated with the Unified coding rule on the basis of big data platform.
Although it should be understood that herein may usage amount term " first ", " second " etc. each unit is described, But these units should not be limited by these terms.The use of these items is only for by a unit and another unit It distinguishes.For example, in the case of the range without departing substantially from exemplary embodiment, it is single that first unit can be referred to as second Member, and similarly second unit can be referred to as first unit.
The preferred embodiment of the above, only the utility model, it is in any form and substantive not to the utility model On limitation, it is noted that for those skilled in the art, in the premise for not departing from the utility model method Under, several improvement and supplement can be also made, these are improved and supplement also should be regarded as the scope of protection of the utility model.It is all ripe Professional and technical personnel is known, in the case where not departing from the spirit and scope of the utility model, when using disclosed above Technology contents and the equivalent variations of a little variation, modification and evolution made, be the utility model equivalent embodiment;Together When, variation, modification and evolution of any equivalent variations that all substantial technologicals according to the utility model make above-described embodiment, In the range of still falling within the technical solution of the utility model.

Claims (3)

1. a kind of intelligent front end multimedia information acquisition system of lean monitoring power station equipment, it is characterised in that:Including being set on life The multi-group data harvester in I areas is produced, the data acquisition device is connected with each device systems in production I areas, and the data are adopted Acquisition means are also connected by the first one-way safety isolating device with the intelligent front end data server set on production II areas;The intelligence Energy front end data server connects the second one-way safety isolating device, and the second one-way safety isolating device is by private network with being set on pipe Manage the cloud server connection of information great Qu.
2. a kind of intelligent front end multimedia information acquisition system of lean monitoring power station equipment as described in claim 1, special Sign is:The data acquisition device is connected by matched interface arrangement with each device systems in production I areas.
3. a kind of intelligent front end multimedia information acquisition system of lean monitoring power station equipment as claimed in claim 2, special Sign is:The interface arrangement includes but not limited to DCS interfaces, PLC interface, SCADA interfaces, embedded device interface, fuel System interface.
CN201721656862.5U 2017-12-01 2017-12-01 For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment Active CN207529205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721656862.5U CN207529205U (en) 2017-12-01 2017-12-01 For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721656862.5U CN207529205U (en) 2017-12-01 2017-12-01 For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment

Publications (1)

Publication Number Publication Date
CN207529205U true CN207529205U (en) 2018-06-22

Family

ID=62577157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721656862.5U Active CN207529205U (en) 2017-12-01 2017-12-01 For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment

Country Status (1)

Country Link
CN (1) CN207529205U (en)

Similar Documents

Publication Publication Date Title
CN111131480A (en) Cloud edge cooperative service system for smart power plant
CN105187010B (en) The Intellectualized monitoring and operational system of a kind of photovoltaic plant
CN107730394B (en) Multi-element heterogeneous data fusion method for panoramic power grid based on big data
CN202009267U (en) Integrated intelligent transformer substation equipment state monitoring and analysis system
US20180132015A1 (en) Integrated Solution of Internet of Things and Smart Grid Network Pertaining to Communication, Data and Asset Serialization, and Data Modeling Algorithms
CN107885156A (en) Intelligent front end multimedia information acquisition system for lean monitoring power station equipment
CN105069025A (en) Intelligent aggregation visualization and management and control system for big data
CN108446396B (en) Power data processing method based on improved CIM model
CN102539911A (en) Intelligent electric energy metering system under internet-of-things architecture
CN110572435B (en) Data processing method of cloud computing system
CN203135591U (en) Micro-grid centralized monitoring system used for photovoltaic building integrated combination
CN111654488B (en) Three-station-in-one transformer substation and sensing terminal information access method
CN107341609B (en) Energy efficiency management system and method based on cloud platform
CN106357414A (en) The information exchange method and system used for base station power generation management
CN105844395A (en) Cooling, heating and power hybrid energy integrated information management system
CN114169570A (en) Smart energy management platform based on Internet of things and cloud computing technology
CN114448094A (en) Data sharing system based on platform area intelligent service terminal edge calculation
CN109561155B (en) Remote centralized monitoring and operation and maintenance method for substation equipment
CN117312293B (en) Electric power multisource heterogeneous data management and intelligent analysis method and system
CN109002901A (en) A kind of province ground county's integration electric network information total management system and device
Li et al. A Real‐Time Monitoring and Warning System for Power Grids Based on Edge Computing
CN109800498A (en) A kind of photovoltaic plant data diagnosis system
CN207529205U (en) For the intelligent front end multimedia information acquisition system of lean monitoring power station equipment
CN204231378U (en) Electric power system snap information repair based on condition of component and service system
Fu et al. An edge computing framework for digital grid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant