CN207525931U - The double assembling assembly of L fonts and double assembly connection system - Google Patents

The double assembling assembly of L fonts and double assembly connection system Download PDF

Info

Publication number
CN207525931U
CN207525931U CN201721644470.7U CN201721644470U CN207525931U CN 207525931 U CN207525931 U CN 207525931U CN 201721644470 U CN201721644470 U CN 201721644470U CN 207525931 U CN207525931 U CN 207525931U
Authority
CN
China
Prior art keywords
wall
double
connection component
fonts
assembling assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721644470.7U
Other languages
Chinese (zh)
Inventor
李青山
马云飞
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Construction Technology Co Ltd
Original Assignee
31 Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 31 Construction Technology Co Ltd filed Critical 31 Construction Technology Co Ltd
Priority to CN201721644470.7U priority Critical patent/CN207525931U/en
Application granted granted Critical
Publication of CN207525931U publication Critical patent/CN207525931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of double assembling assembly of L fonts and double assembly connection system, is related to the technical field of building assembling, which includes the first wall and the second wall;First wall has:Support portion and connecting portion;Support portion is L-shaped, and two ends of the support portion of L-type are respectively provided with connecting portion;Each connecting portion passes through connection component and the second wall connecting.By the utility model, the technical issues of difficulty is excessive when alleviating in-site installation in the prior art, and template is more, and assembling amount is larger, complex manufacturing technology.

Description

The double assembling assembly of L fonts and double assembly connection system
Technical field
The utility model is related to build the technical field of assembling, more particularly, to the double assembling assembly of a kind of L fonts and double Arrange assembly connection system.
Background technology
Building industrialization is the inevitable direction of Building Trade in China sustainable development, is to raise labour productivity, improve engineering Quality and technological progress, the important channel for realizing construction industry transition and upgrade.Implementing building industrialization building technology can be greatly decreased Recruitment shortens the construction period, improves worker's operating condition, reduces labor intensity, is building enterprise of China, building trade Transformation Development Only way is flourished at home.
Prefabricated assembled concrete structural construction is one of building industrialization structural system and government is strongly now One of structural system of popularization, and the construction of prefabrication are hung from the batch production processing that is designed into of component to scene again Dress, the multiple transition to be undergone join with cumbersome process, operating mode, and there is an urgent need to a kind of set of assembled architectures to build skill Art, using software platform management, easily mounting technique etc. is more clear building course, is specification, controllable, making construction more Add safe, high-quality, science.
In the case where the overall background of assembled architecture is recommended energetically by country, assembled architecture, which such as emerges rapidly in large numbersBamboo shoots after a spring rain to remove, to be emerged in large numbers, assembled Building key technology also reaches its maturity.In order to further improve construction precision, construction cost is reduced, is accelerated construction progress, is assembled Formula building becomes the development trend in present industry.
But there are difficulty during in-site installation is excessive, and template is more in present prefabricated components, assembling amount is larger, makes The shortcomings of complex process.
The information for being disclosed in the background technology part is merely intended to deepen the reason to the general background technology of the utility model Solution, and be not construed as recognizing or to imply that the information is formed in any form known to those skilled in the art existing Technology.
Utility model content
The purpose of this utility model is to provide the double assembling assembly of L fonts and double assembly connection system, to alleviate Difficulty is excessive during in-site installation in the prior art, and template is more, and assembling amount is larger, and the technology of complex manufacturing technology is asked Topic.
In a first aspect, a kind of double assembling assembly of L fonts provided by the utility model, including:First wall and the second wall Body;
First wall has:Support portion and connecting portion;
The support portion is L-shaped, and two ends of the support portion of L-type are respectively provided with the connecting portion;
Each connecting portion passes through connection component and second wall connecting.
Further, the free end of the connecting portion is provided with the first working face;
There are two blind holes for setting on first working face of connection;
There are two through-holes for setting on the second working face for connection of second wall;
Two blind holes and two through-holes are connected one to one by connection component.
Further, it is both provided with the sleeve for being socketed on the connection component in the blind hole;
The sleeve inner is provided with the internal thread screw thread coordinated with the connection component.
Further, be provided with the lateral anchor pole sleeve being fixed in first wall on the sleeve.
Further, the connection component includes:Stud;
Described stud one end is connect with the bush whorl, and the stud is threaded through in the through-hole.
Further, the connection component further includes:Nut and gasket;
The one end of the stud far from the sleeve passes through the through-hole by being connect with the nut thread by the pad Piece compresses;
The outer diameter of the nut is more than the internal diameter of the through-hole.
Further, second wall offers to facilitate the installation hand hole for installing the connection component, the peace Dress hand hole is connected with each through-hole;
The side that the installation hand hole of second wall is contacted with the connection component is in step-like.
Further, the first groove is provided on first working face, is provided on second working face Two grooves, and first groove is opposite with second groove and cooperatively forms the grout compartment for being useful for cast concrete.
Further, first work is oppositely arranged to be formed with the second working face gap connects the grout compartment Grouting channel.
Second aspect, a kind of double assembly connection system provided by the utility model, including grouting material provisions for grouting and with The double assembling assembly of L fonts described in first aspect.
Had below beneficial to effect using the double assembling assembly of L fonts provided by the utility model and double assembly connection system Fruit:
The double assembling assembly of L fonts provided by the utility model, including:First wall and the second wall, two wall phases To setting, the first wall has support portion and connecting portion, and connecting portion is set in L font structures in the free end of connecting portion There is the first working face;And for convenience by the first wall and the second wall connecting, by connection component by the second wall and Connecting portion connects so that it is convenient to which the connection component for connecting above-mentioned two wall is inserted into and corresponds.Also, the first wall L-type Structure is adapted to be mounted in special occasions, increases the use scope of special occasions, and to install since there are two stress simultaneously Face, then the stability that can be connected significantly, while the first wall includes:Two positions of support portion and connecting portion, two set in this way A position can mutually restrict so that it is more secured to interconnect relationship.Above-mentioned this connection mode, construction speed is fast, climate Conditionality is small, and construction quality can simultaneously be improved by saving labour.It is sent out according to supply side structural reform and novel urbanization is promoted The assembled architectures such as steel construction, concrete are greatly developed in the requirement of exhibition, are had development energy conservation and environmental protection NPD projects, are improved building peace It complete horizontal, the benefits of neutralizing superfluous production capacity etc. is pushed to achieve many things at one stroke, and facilitate in-site installation, is simple to manufacture, without group will be connected The advantages that part takes out.And a large amount of building subassembly is machined by Workshop Production;The a large amount of assembling work in scene, it is more existing than original Operation is poured to greatly reduce;Meet the requirement of green building.
Double assembly connection system provided by the utility model with the above-mentioned double assembling assembly of L fonts with all are excellent Point, and the setting that can be moved at any time by grouting material provisions for grouting is at the scene, and scene is poured into a mould, and realizes half dry type connection, Field cast-in-place amount is few, and need not take out connection component reinforcing bar etc..
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness Under the premise of labour, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is that the L fonts connection for the double assembling assembly of L fonts that the utility model embodiment provides uses schematic diagram;
Fig. 2 is the schematic diagram without setting connection component for the double assembling assembly of L fonts that the utility model embodiment provides;
Fig. 3 is the schematic diagram of the first wall of the double assembling assembly of L fonts that the utility model embodiment provides;
Fig. 4 is the schematic diagram of the second wall of the double assembling assembly of L fonts that the utility model embodiment provides.
Icon:The first walls of 100-;The first working faces of 110-;111- blind holes;The first grooves of 112-;1111- covers Cylinder;120- transverse direction anchor poles;130- support portions;140- connecting portions;The second walls of 200-;210- installation hand holes;220- Two working faces;221- through-holes;The second grooves of 222-;300- connection components;310- studs;320- nuts;330- gaskets; 400- grout compartments;410- grouting channels;411- grooves.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality Novel protected range.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instructions such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only The utility model must have specific with the device or element for simplifying description rather than instruction or hint meaning for ease of description Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.In addition, term " the One ", " second ", " third " are only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integrated Connection;Can be mechanical connection or solder design;It can be directly connected, the indirect phase of intermediary can also be passed through Even, can be the connection inside two elements.For the ordinary skill in the art, can be understood with concrete condition above-mentioned Concrete meaning of the term in the utility model.
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be understood that herein Described specific embodiment is only used for describing and explaining the present invention, and is not intended to limit the utility model.
Fig. 1-4 are please referred to, the double assembling assembly of L fonts provided below in conjunction with attached drawing the utility model embodiment And double assembly connection system elaborates.
A kind of double assembling assembly of L fonts that the utility model embodiment provides, including:First wall 100 and the second wall Body 200;First wall 100 has:Support portion 130 and connecting portion 140;Support portion is L-shaped, two ends of the support portion of L-type It is respectively provided with connecting portion;Each connecting portion is connect by connection component 300 with the second wall 200.
It should be noted that the double assembling assembly of L fonts provided by the utility model, including:First wall 100 and second Wall 200, two walls are oppositely arranged, and the first wall 100 has support portion and connecting portion, and connecting portion is in L font structures, The free end of connecting portion is provided with the first working face 110;And the first wall 100 and the second wall 200 are connected for convenience It connects, is connected the second wall 200 so that it is convenient to connect the connection component of above-mentioned two wall with connecting portion by connection component It is inserted into and corresponds.Also, the structure of the first wall L-type is adapted to be mounted in special occasions, increases the use of special occasions Range, and due to simultaneously there are two stress mounting surface, then the stability that can be connected significantly, while the first wall 100 includes:Branch Two positions in support part and connecting portion, two positions set in this way can mutually restrict so that it is more secured to interconnect relationship.On This connection mode is stated, construction speed is fast, and climate conditionality is small, and construction quality can simultaneously be improved by saving labour.According to pushing away Into supply side structural reform and the requirement of novel Urbanization Progress, the assembled architectures such as steel construction, concrete are greatly developed, are had There are development energy conservation and environmental protection NPD projects, improve the benefits of horizontal, promotion neutralizing superfluous production capacity of building safety etc. is achieved many things at one stroke, and conveniently In-site installation is simple to manufacture, the advantages that without connection component is taken out.And a large amount of building subassembly is processed by Workshop Production Into;The a large amount of assembling work in scene, greatly reduces than original cast-in-place operation;Meet the requirement of green building.
In addition, the free end of connecting portion is provided with the first working face 110;It is set on the first working face 110 of connection There are two blind holes;There are two through-holes for setting on the second working face for connection of the second wall 200;Two blind holes and two Through-hole is connected one to one by connection component.
Preferably, the sleeve 1111 for being socketed on connection component 300 is both provided in blind hole 111.
Therefore, in order to ensure the stability of connection component 300, then sleeve 1111, sleeve 1111 are provided in blind hole 111 Be in a manner of mechanical connection is attached between blind hole 111, so as to be fixed in blind hole.Sleeve 1111 is not only to even in this way Connected components 300 play certain fixed function, and certain protection is also functioned to similarly for wall, avoid and allow connection component 300 Directly with the connection of wall, so as to ensure the intensity of wall.
In addition, sleeve 1111 is internally provided with the internal thread screw thread coordinated with connection component 300.
Specifically, sleeve 1111 is arranged to facilitating for internal thread screw thread and passes through screw thread between connection component 300 and sleeve 1111 It is attached, such connection mode is not only advantageous to dismantle at any time, while also so that between connection component 300 and sleeve 1111 Connection more fasten, so as to considerably increase the bonding strength between the first wall 100 and the second wall 200.
Further, be provided with the lateral anchor pole 120 sleeve 1111 being fixed in first wall 100 on sleeve 1111.
It should be noted that after the first wall 100 and the second wall 200 is connected by connection component 300, it is So that stability of the sleeve 1111 in the first wall 100, then be provided with lateral anchor pole 120 on its sleeve 1111 so that In the fixation and the first wall 100 that sleeve 1111 is stablized.
Especially, lateral anchor pole 120 is an integral structure with sleeve 1111.
In order to increase the intensity of sleeve 1111 and lateral anchor pole 120, then lateral anchor pole 120 and sleeve 1111 are set to Integral structure, such structure cause between the two there is no stress concentration point, so as to considerably increase intensity so that use Time limit greatly increases, therefore reduces cost.
Connection component 300 therein includes:Stud 310;
310 one end of stud is threadedly coupled with sleeve 1111, and stud 310 is threaded through in through-hole 221.
It should be noted that 310 preset in advance of stud is in the through-hole 221 of the second cavity, later by 100 He of the first wall Second wall 200 corresponds to, and the lower half portion of stud 310 is threaded through in sleeve 1111, after by stud 310 and the sleeve for having internal thread 1111 are threadedly coupled, and are fixed.It is achieved thereby that the simple fixed and positioning of the first wall 100 and the second wall 200.
In addition to this, connection component 300 further includes:Nut 320 and gasket 330;
Gasket 330 is pressed by being threadedly coupled with nut 320 across through-hole 221 one end of stud 310 far from sleeve 1111 Tightly;
The outer diameter of nut 320 is more than the internal diameter of through-hole 221.
It should be noted that in order to increase the pretightning force of connection, it is follow-up to pass through 320 He of nut in the end of stud 310 again Gasket 330 is tightened, so as to fulfill the close connection between nut 320 and gasket 330 and stud 310.In order to ensure to connect Tight type, then to cause nut 320 outer diameter be more than through-hole 221 internal diameter, prevent since the power tightened is excessive, it will occur Nut 320 is screwed into through-hole 221, so that sealing effect and pretightning force are poor.
Further, the second wall 200 offers the installation hand hole 210 for facilitating installation connection component 300, installs hand Hole 210 is connected with each through-hole 221;
The side that the installation hand hole 210 of second wall 200 is contacted with connection component 300 is in step-like.
In order to ensure the connection effect of two walls, then it is provided on the second wall 200 and facilitates installation connection component 300 Installation hand hole 210, the size of installation hand hole 210 is for convenience of the hand space size that either operation instrument is operated.And The nut 320 and gasket 330 of connection component 300 are then exposed in installation hand hole 210, therefore only need to twist simply by spanner Tightly.
In addition, being provided with the first groove 112 on the first working face 110, it is recessed to be provided with second on the second working face 220 Slot 222, and the first groove 112 and the second groove 222 are opposite and cooperatively form the grout compartment 400 for being useful for cast concrete.
It should be noted that after being connected the first wall 100 and the second wall 200 by connection component 300, in order to Ensure the intensity of the connection between both, then concrete cast is carried out in gap between them, so as to greatly increase Bonding strength between the two, to be filled with entire grout compartment 400, formation is reliably connected concrete.
In addition it is oppositely arranged to form the grouting for connecting grout compartment 400 with 220 gap of the second working face in the first working face 110 Channel 410.
In order to ensure the convenience of the fluency of grouting and operation, then the first working face 110 and the second working face 220 it Between be formed with grouting channel 410, so as to considerably increase the convenience of operation.After concrete has been poured to grout compartment 400, it is Prevent connection component 300 and the position of sleeve 1111 from moving, then work will be played by being arranged on sleeve 1111 lateral anchor pole 120 With so that sleeve 1111 is firmly secured in the first wall 100, position will not be caused to move because of cast concrete.
In addition, groove 411 is provided with along in the circumferential direction of grouting channel 410, and groove 411 is used to set blocking concrete Closure part.
It should be noted that in order to ensure that the concrete after grouting is in leather hard, in order to avoid concrete is dry and cracked etc., Fluted 411 are then set in grouting channel 410, and rubber stopper is positioned in groove 411, concrete is blocked.
One installation process of the double assembling assembly of L fonts that the utility model embodiment provides, advance first wall 100 Interior embedded sleeve barrel 1111, predetermined portions trepanning and the reserved hole for placing connection component 300 and sleeve 1111 in the first wall 100 Position, field worker are interted double fastening bolt and are mechanically connected.Pre-buried bolt collar 1111, bolt, nut 320 and gasket 330 be usually high grade, and material is the stainless steel of high antirust grade or zinc-plated product or novel substitute products.
The first wall 100 and the second wall 200 connected realizes that second consolidation connects by grouting, fills up grout compartment 400 be typically the product composition of wall product composition in itself or a strength grade higher than wall.
Second aspect, a kind of double assembly connection system that the utility model embodiment provides are in the milk including grouting material and are filled It puts and the double assembling assembly of L fonts with first aspect.
It should be noted that double assembly connection system provided by the utility model has the double assembling group of above-mentioned L fonts All advantages that part has, and the setting that can move at any time of filling apparatus is in the milk at the scene by grouting material, scene is poured Note realizes half dry type connection, and field cast-in-place amount is few, and need not take out 300 reinforcing bar of connection component etc..
The double assembling assembly of L fonts of the utility model and double assembly connection system are illustrated above, still, The utility model is not limited to above-mentioned specific embodiment, without departing from the scope of the claims, can carry out various each The deformation or change of sample.The various modifications and change that the utility model is included within the scope of the claims.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacement, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of double assembling assembly of L fonts, which is characterized in that including:First wall (100) and the second wall (200);
First wall (100) has:Support portion (130) and connecting portion (140);
The support portion (130) is L-shaped, and two ends of the support portion (130) of L-type are respectively provided with the connecting portion (140);
Each connecting portion (140) is connect by connection component (300) with second wall (200).
2. the double assembling assembly of L fonts according to claim 1, which is characterized in that the free end of the connecting portion (140) It is provided with the first working face (110);
There are two blind holes (111) for setting on first working face (110) of connection;
There are two through-holes (221) for setting on the second working face (220) for connection of second wall (200);
Two blind holes (111) and two through-holes (221) are connected one to one by the connection component (300).
3. the double assembling assembly of L fonts according to claim 2, which is characterized in that be both provided in the blind hole (111) It is socketed on the sleeve (1111) of the connection component (300);
The sleeve (1111) is internally provided with the internal thread screw thread coordinated with the connection component (300).
4. the double assembling assembly of L fonts according to claim 3, which is characterized in that be provided on the sleeve (1111) The sleeve (1111) is fixed on the lateral anchor pole (120) in first wall (100).
5. the double assembling assembly of L fonts according to claim 4, which is characterized in that the connection component (300) includes: Stud (310);
Described stud (310) one end is threadedly coupled with the sleeve (1111), and the stud (310) is threaded through the through-hole (221) in.
6. the double assembling assembly of L fonts according to claim 5, which is characterized in that the connection component (300) is also wrapped It includes:Nut (320) and gasket (330);
The stud (310) far from the sleeve (1111) one end pass through the through-hole (221) by with the nut (320) It is threadedly coupled and compresses the gasket (330);
The outer diameter of the nut (320) is more than the internal diameter of the through-hole (221).
7. the double assembling assembly of L fonts according to claim 2, which is characterized in that second wall (200) offers For facilitating the installation hand hole (210) for installing the connection component (300), the installation hand hole (210) and each through-hole (221) it connects;
The side that the installation hand hole (210) of second wall (200) is contacted with the connection component (300) is in step Shape.
8. the double assembling assembly of L fonts according to claim 2, which is characterized in that on first working face (110) The first groove (112) is provided with, the second groove (222), and first groove are provided on second working face (220) (112) it is opposite with second groove (222) and cooperatively form the grout compartment (400) for being useful for cast concrete.
9. the double assembling assembly of L fonts according to claim 8, which is characterized in that first working face (110) and institute It states the second working face (220) gap and is oppositely arranged the grouting channel (410) to be formed and connect the grout compartment (400).
10. a kind of double assembly connection system, which is characterized in that including grouting material provisions for grouting and in claim 1-9 The double assembling assembly of any one of them L fonts.
CN201721644470.7U 2017-11-30 2017-11-30 The double assembling assembly of L fonts and double assembly connection system Active CN207525931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721644470.7U CN207525931U (en) 2017-11-30 2017-11-30 The double assembling assembly of L fonts and double assembly connection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721644470.7U CN207525931U (en) 2017-11-30 2017-11-30 The double assembling assembly of L fonts and double assembly connection system

Publications (1)

Publication Number Publication Date
CN207525931U true CN207525931U (en) 2018-06-22

Family

ID=62581270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721644470.7U Active CN207525931U (en) 2017-11-30 2017-11-30 The double assembling assembly of L fonts and double assembly connection system

Country Status (1)

Country Link
CN (1) CN207525931U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636316A (en) * 2020-06-03 2020-09-08 苏交科集团股份有限公司 Block spliced precast concrete box culvert and construction process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636316A (en) * 2020-06-03 2020-09-08 苏交科集团股份有限公司 Block spliced precast concrete box culvert and construction process thereof

Similar Documents

Publication Publication Date Title
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN204960022U (en) Prefabricated exterior wall template structure system with heat preservation function
CN207525931U (en) The double assembling assembly of L fonts and double assembly connection system
CN103240687B (en) Multifunctional guy production clamp
CN204456877U (en) For the split bolt syndeton of construction formwork
CN207525927U (en) The double assembling assembly of T fonts and double assembly connection system
CN207538252U (en) The double assembling assembly of "-" type and double assembly connection system
CN102979183B (en) Embedded cylindrical nut anchor bed and use method thereof
CN204663543U (en) A kind of concrete lining mould of assembled arcuated stalk tunnel
CN102661047B (en) Pouring method of building insulation external wall and fastener used in same
CN202969728U (en) Embedded cylindrical nut anchor bearing
CN210888078U (en) Embedded box for hyperboloid structural veneer and hyperboloid veneer construction structure
CN210858016U (en) Building template connecting piece
CN204590584U (en) Architectural template structure
CN203867588U (en) Pre-buried channel fixing component
CN106812252A (en) The anti-skidding prestressing force pull end anchorage of one kind sealing
CN202672726U (en) Splicing structure of fair-faced concrete pouring formworks
CN201172966Y (en) Securing fixture for bidirectionally adjusting cast-in-situ concrete shuttering
CN205171834U (en) Sealed anti -skidding prestressing force stretch -draw end ground tackle
CN204960340U (en) Full -prestressed stretch -draw sleeve -board spare
CN204531420U (en) Concreting plate device
CN203905493U (en) Template reinforcing fixture structure
CN204001696U (en) The mould of building cob
CN209620513U (en) A kind of circle angle bead
CN205134938U (en) Cast -in -place wall body forming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing

Patentee after: Sany Construction Technology Co.,Ltd.

Address before: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address