CN207525738U - The quick hangs muscle of steel reinforcement cage - Google Patents

The quick hangs muscle of steel reinforcement cage Download PDF

Info

Publication number
CN207525738U
CN207525738U CN201721452255.7U CN201721452255U CN207525738U CN 207525738 U CN207525738 U CN 207525738U CN 201721452255 U CN201721452255 U CN 201721452255U CN 207525738 U CN207525738 U CN 207525738U
Authority
CN
China
Prior art keywords
hangs muscle
main reinforcement
sleeve
hole
hangs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721452255.7U
Other languages
Chinese (zh)
Inventor
郭崇
江博
李赐仁
索小伟
王荣波
李健
刘壮
李鹏
马锋伟
宋贵鹏
张祥德
曹凌川
樊启轩
唐金生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201721452255.7U priority Critical patent/CN207525738U/en
Application granted granted Critical
Publication of CN207525738U publication Critical patent/CN207525738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to deposited reinforced concrete pile construction field, and in particular to a kind of quick hangs muscle of steel reinforcement cage;Including hangs muscle main reinforcement, the first hangs muscle sleeve, the second hangs muscle sleeve and Gua Diao mechanisms, one end of the hangs muscle main reinforcement is set as external screw thread, hangs muscle main reinforcement passes through Gua Diao mechanisms with externally threaded one end, first hangs muscle sleeve is provided with internal thread, and it is fitted in hangs muscle main reinforcement and is provided with externally threaded one end, one end of Gua Diao mechanisms is fixedly connected with second hangs muscle sleeve one end, and the second hangs muscle sleeve is fixedly connected with hangs muscle main reinforcement;Gua Diao mechanisms include rod shot-hole and crane lifting eye, and crane lifting eye is arranged below rod shot-hole;It is simple in structure, it is easy to make, can recycled for multiple times, be detached from steel reinforcement cage fast and easy, in casting concrete, steel reinforcement cage " will not float ".

Description

The quick hangs muscle of steel reinforcement cage
Technical field:
The utility model belongs to deposited reinforced concrete pile construction field, and in particular to a kind of quick hangs muscle of steel reinforcement cage.
Background technology:
With the high speed development of urban construction and falling sharply for construction land, high-rise is more and more, the underground space Using the attention for being also increasingly subject to people, deep basal pit is also more and more therewith.As a kind of major way of deep foundation pit support, steel Reinforced concrete bored concrete pile is naturally also widely applied.Deposited reinforced concrete pile be it is a kind of directly at the scene on stake position on the spot Pore-forming hangs the stake that casting concrete forms again after steel reinforcement cage, and by the difference of its forming hole method, deposited reinforced concrete pile can divide For cast-in-situ bored pile, driven cast-in-place pile, the stake of excavated by manual work fill orifice and borehole bottom-enlarging filling pile etc..The master of deposited reinforced concrete pile The working procedure is wanted to be:Measuring stake position, pore-forming, borehole cleaning, hang steel reinforcement cage, steel reinforcement cage positioning, secondary pile hole cleaning, casting concrete, into Stake.When steel reinforcement cage positions after hanging, steel reinforcement cage is generally fixed on middle position in stake holes by horizontal direction using limited block, vertically Direction common are two kinds of ways to ensure that reinforcing bar cage top (or bottom) absolute altitude meets design requirement:A kind of way is in reinforcing bar cage top Hangs muscle is welded in portion, achievees the purpose that control reinforcing bar cage top (or bottom) absolute altitude by adjusting the length of hangs muscle.In order to reduce as far as possible Cost, steel reinforcement cage hanging steel bar usually make of the hot rolling plain bar of certain length, and hangs muscle is " n " type, and lower end is straight with steel reinforcement cage Connect welding, hangs muscle does not recycle during casting concrete, and there are following two drawbacks for this method spacer bar cage:First, hangs muscle system Make, weld it is time-consuming and laborious, it is not recyclable to cause waste of material;Second is that steel reinforcement cage " floating " cannot be controlled effectively during casting concrete System.Another way is to make suspension hook with the main reinforcement of steel reinforcement cage, makees hanging ring at the top of suspension hook, steel reinforcement cage is hung over hole by whippletree Mouthful, lower part is linked up with for opening, and concreting completion can recycle and reuse suspension hook, and there are following drawbacks for this kind of method:One It is that distance is fixed between hooking into hanging ring, it is high is not easy to adjustment steel reinforcement cage top mark;Second is that lower hook is open type, it is easily " de- Hook ";Third, if rising of steel cage during casting concrete, can not discover and take measures in time.
Utility model content:
The shortcomings that in order to overcome in the prior art, the present utility model provide a kind of quick hangs muscle of steel reinforcement cage, structure Simply, it is easy for installation, it can repeatedly utilize.
The quick hangs muscle of steel reinforcement cage includes hangs muscle main reinforcement, the first hangs muscle sleeve, the second hangs muscle sleeve and Gua Diao mechanisms, described One end of hangs muscle main reinforcement is set as external screw thread, and hangs muscle main reinforcement passes through Gua Diao mechanisms, the first hangs muscle set with externally threaded one end Cylinder is provided with internal thread, and be fitted in hangs muscle main reinforcement and be provided with externally threaded one end, one end and second of the Gua Diao mechanisms Hangs muscle sleeve one end is fixedly connected, and the second hangs muscle sleeve is fixedly connected with hangs muscle main reinforcement;The Gua Diao mechanisms include rod shot-hole With crane lifting eye, crane lifting eye is arranged below rod shot-hole, and the rod shot-hole includes left rod shot-hole and right rod shot-hole, left Rod shot-hole and right rod shot-hole is symmetrical is distributed at left and right sides of hangs muscle main reinforcement, the crane lifting eye includes the lifting of left crane Hole and right crane lifting eye, left crane lifting eye and right crane lifting eye are symmetrical set in the both sides of hangs muscle main reinforcement.
Preferably, hangs muscle main reinforcement is fining twisted steel, and the length of hangs muscle main reinforcement is adjusted by rotating the second hangs muscle sleeve.
Preferably, the second hangs muscle sleeve is provided with internal thread, is coordinated by internal thread and hangs muscle main reinforcement.
The utility model is simple in structure, easy to make, can recycled for multiple times, be detached from steel reinforcement cage fast and easy, pouring Steel reinforcement cage " will not float " during concrete.It using being screwed, firmly installs, is not easy de- ditch;And be provided with crane lifting hole(eyelet) and Rod shot-hole is easy to disassemble, you can mutual disassembly can be met again by meeting machinery dismounting, easy to operate.Reduce manual labor, cost It is low.
Description of the drawings:
Fig. 1 is the quick hangs muscle working state schematic representation of steel reinforcement cage.
In figure, steel reinforcement cage 1, steel reinforcement cage main reinforcement 2, the first hangs muscle sleeve 3, hangs muscle main reinforcement 4, Gua Diao mechanisms 5, the second hangs muscle set Cylinder 6, left crane lifting eye 71, right crane lifting eye 72, left rod shot-hole 81, right rod shot-hole 82.
Specific embodiment:
As shown in Figure 1, the quick hangs muscle of steel reinforcement cage includes hangs muscle main reinforcement 4, the first hangs muscle sleeve 3, the second hangs muscle sleeve 6 and hangs Fall mechanism 5, one end of the hangs muscle main reinforcement 4 is set as external screw thread, and hangs muscle main reinforcement 4 passes through with externally threaded one end and hangs machine Structure 5, the first hangs muscle sleeve 3 are provided with internal thread, and are fitted in hangs muscle main reinforcement 4 and are provided with externally threaded one end, and the extension One end of mechanism 5 is fixedly connected with 6 one end of the second hangs muscle sleeve, and the second hangs muscle sleeve 6 is fixedly connected with hangs muscle main reinforcement 4.Hangs muscle Main reinforcement 4 is fining twisted steel, and the length of hangs muscle main reinforcement 4 is adjusted by rotating the second hangs muscle sleeve 6, and the second hangs muscle sleeve 4 is set There is internal thread, coordinated by internal thread and hangs muscle main reinforcement 4.
Gua Diao mechanisms 5 include rod shot-hole and crane lifting eye, and crane lifting eye is arranged below rod shot-hole, the rod Hole includes left rod shot-hole 81 and right rod shot-hole 82, and symmetrical to be distributed in hangs muscle main reinforcement 4 left for left rod shot-hole 81 and right rod shot-hole 82 Right both sides, the crane lifting eye include left crane lifting eye 71 and right crane lifting eye 72, left crane lifting eye 71 and the right side Crane lifting eye 72 is symmetrical set in the both sides of hangs muscle main reinforcement 4.
Operation principle:By the quick hangs muscle of steel reinforcement cage described above with after installing, the left crane in Gua Diao mechanisms 5 is lifted by crane Hole 71 and right crane lifting eye 72 are fixed by rope and crane, and crane slings the quick hangs muscle of steel reinforcement cage and causes the first hangs muscle sleeve 3 one end and 2 vertical alignment of steel reinforcement cage main reinforcement of underground connect the first hangs muscle sleeve 3 with steel reinforcement cage main reinforcement 2, are equipped with secured Afterwards, entire fixation procedure is completed.Entire steel reinforcement cage will be dismantled after concreting is completed by artificial or crane fast to hang Muscle so that the first hangs muscle sleeve 3 is detached with steel reinforcement cage main reinforcement, completes dismounting.

Claims (3)

1. the quick hangs muscle of steel reinforcement cage, it is characterised in that:The quick hangs muscle of steel reinforcement cage includes hangs muscle main reinforcement, the first hangs muscle sleeve, second Hangs muscle sleeve and Gua Diao mechanisms, one end of the hangs muscle main reinforcement are set as external screw thread, and hangs muscle main reinforcement carries externally threaded one end Across Gua Diao mechanisms, the first hangs muscle sleeve is provided with internal thread, and is fitted in hangs muscle main reinforcement and is provided with externally threaded one end, described One end of Gua Diao mechanisms be fixedly connected with second hangs muscle sleeve one end, the second hangs muscle sleeve is fixedly connected with hangs muscle main reinforcement;Institute The Gua Diao mechanisms stated include rod shot-hole and crane lifting eye, and crane lifting eye is arranged below rod shot-hole, the rod shot-hole packet Include left rod shot-hole and right rod shot-hole, left rod shot-hole and right rod shot-hole is symmetrical is distributed at left and right sides of hangs muscle main reinforcement is described Crane lifting eye includes left crane lifting eye and right crane lifting eye, left crane lifting eye and right crane lifting eye is symmetrical sets It puts in the both sides of hangs muscle main reinforcement.
2. the quick hangs muscle of steel reinforcement cage according to claim 1, it is characterised in that:The hangs muscle main reinforcement is finish rolling screw thread Steel adjusts the length of hangs muscle main reinforcement by rotating the second hangs muscle sleeve.
3. the quick hangs muscle of steel reinforcement cage according to claim 1 or 2, it is characterised in that:The second hangs muscle sleeve setting There is internal thread, coordinated by internal thread and hangs muscle main reinforcement.
CN201721452255.7U 2017-11-03 2017-11-03 The quick hangs muscle of steel reinforcement cage Expired - Fee Related CN207525738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721452255.7U CN207525738U (en) 2017-11-03 2017-11-03 The quick hangs muscle of steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721452255.7U CN207525738U (en) 2017-11-03 2017-11-03 The quick hangs muscle of steel reinforcement cage

Publications (1)

Publication Number Publication Date
CN207525738U true CN207525738U (en) 2018-06-22

Family

ID=62572381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721452255.7U Expired - Fee Related CN207525738U (en) 2017-11-03 2017-11-03 The quick hangs muscle of steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN207525738U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109455613A (en) * 2018-11-19 2019-03-12 上海市基础工程集团有限公司 Ke Xunhuanliyong suspension clamping device
CN110386544A (en) * 2019-08-28 2019-10-29 中铁七局集团第三工程有限公司 A kind of hoisting ring device for heavy steel reinforcement cage lifting
CN111926820A (en) * 2020-07-28 2020-11-13 王属俊 Cast-in-place pile reinforcement cage lowering device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109455613A (en) * 2018-11-19 2019-03-12 上海市基础工程集团有限公司 Ke Xunhuanliyong suspension clamping device
CN110386544A (en) * 2019-08-28 2019-10-29 中铁七局集团第三工程有限公司 A kind of hoisting ring device for heavy steel reinforcement cage lifting
CN111926820A (en) * 2020-07-28 2020-11-13 王属俊 Cast-in-place pile reinforcement cage lowering device
CN111926820B (en) * 2020-07-28 2021-11-12 嘉兴鼎尚信息科技有限公司 Cast-in-place pile reinforcement cage lowering device

Similar Documents

Publication Publication Date Title
CN207525738U (en) The quick hangs muscle of steel reinforcement cage
CN106638940B (en) A kind of assembled high residential building concrete prefabricated element construction
CN101302760A (en) Ultralong overweight concrete filling pile reinforcement type reinforcing steel bar caging
CN102733608B (en) Construction method for spray head layer of granulation tower
CN211057777U (en) Steel reinforcement cage hoisting device
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN208088822U (en) A kind of caisson of toilet formwork structure
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN103924653B (en) A kind of frame type catch pit and construction method thereof
CN210151723U (en) Pile foundation steel reinforcement cage elevation positioner
CN210562147U (en) Directional reinforcement cage
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN204080793U (en) Hoisting device for reinforcement cage
CN201236340Y (en) Novel tool type hanging steel bar
CN208650086U (en) A kind of movable type streetlamp foundation
CN203782863U (en) Frame type draining well
CN207002010U (en) The detachable hangs muscle of reinforcing bar cage hoisting
CN206753037U (en) Slding form operation vertical reinforcement locating rack
CN212248217U (en) Accurate positioning device for reinforcing cage in bridge pile foundation construction
CN210657851U (en) Precast concrete pavement slab capable of being hoisted quickly
CN208219724U (en) A kind of bracing means for preventing diaphram wall from settling
CN204001427U (en) A kind of steel pipe column suspension column is installed the pre-buried positioning supports structure with location ring flat-plate
CN102653947A (en) Underground embedded steel component limiting straightening construction method
CN209837126U (en) Device for controlling and protecting pile head height of concrete cast-in-place pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20201103

CF01 Termination of patent right due to non-payment of annual fee