CN207522799U - A kind of 30m prefabricated box -beams integrated hydraulic formula template - Google Patents

A kind of 30m prefabricated box -beams integrated hydraulic formula template Download PDF

Info

Publication number
CN207522799U
CN207522799U CN201721427033.XU CN201721427033U CN207522799U CN 207522799 U CN207522799 U CN 207522799U CN 201721427033 U CN201721427033 U CN 201721427033U CN 207522799 U CN207522799 U CN 207522799U
Authority
CN
China
Prior art keywords
block
fixedly connected
integrated hydraulic
prefabricated box
drive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721427033.XU
Other languages
Chinese (zh)
Inventor
曹相莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Yingdi Trading Co Ltd
Original Assignee
Yangzhou Yingdi Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Yingdi Trading Co Ltd filed Critical Yangzhou Yingdi Trading Co Ltd
Priority to CN201721427033.XU priority Critical patent/CN207522799U/en
Application granted granted Critical
Publication of CN207522799U publication Critical patent/CN207522799U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Press-Shaping Or Shaping Using Conveyers (AREA)

Abstract

The utility model discloses a kind of 30m prefabricated box -beams integrated hydraulic formula templates, including pedestal, the top of the pedestal is fixedly connected with supporting block respectively, supporting rod and the first motor, and the output shaft of the first motor is fixedly connected with drive rod by shaft coupling, one end of the drive rod and the side of supporting block are rotatablely connected, and the thread surface of drive rod is connected with drive block, sliding block is fixedly connected at the top of the drive block, and the surface of supporting rod is fixedly connected with fixed block, two opposite sides of the fixed block have been fixedly connected with slide plate, and the surface of slide plate and the internal slide of sliding block connect, the utility model is related to technical field of buildings.30m prefabricated box -beams integrated hydraulic formula template, changes since templatespace is big, and concrete cement is caused to pour uneven the problem of causing box beam internal structure loose, the quality of box beam is improved, eliminates the security risk of bridge, ensure that the progress of engineering.

Description

A kind of 30m prefabricated box -beams integrated hydraulic formula template
Technical field
The utility model is related to technical field of buildings, specially a kind of 30m prefabricated box -beams integrated hydraulic formula template.
Background technology
Box beam is one kind of science of bridge building central sill, and inside is hollow shape, and there are the edge of a wing in top both sides, similar chest, thus Name, point single case, more casees etc., it is common at present to be divided with material, there are mainly two types of, when prestressed reinforced concrete box beam, first, steel case Beam, wherein, prestressed reinforced concrete box beam is site operation, and other than having longitudinal prestressing, some also set up transverse prestress, steel Box beam is transported to in-site installation again after usually processing in the factory, there is full steel structure, also there is part plus reinforced concrete pave-load layer.
The box beam of reinforced concrete structure is divided into prefabricated case beam and cast-in-situ box girder, in the box beam joining rack that independent place is prefabricated Bridge machine can be set up after the completion of the engineering of lower part, can be accelerated project progress, be saved the duration, cast-in-situ box girder is chiefly used in Large Scale and Continuous Bridge.
Prefabricated case beam is needed after being poured reinforcing bar and concrete cement in template, by extrusion forming, but template During interior progress concrete cement pouring, since templatespace is big, the uneven of concrete cement pouring is caused to cause case The internal structure of beam is loose, reduces the quality of box beam, can cause security risk to bridge, influence the progress of engineering.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of 30m prefabricated box -beams integrated hydraulic formula template, solution It has determined since templatespace is big, concrete cement is caused to pour uneven the problem of causing box beam internal structure loose.
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of 30m prefabricated box -beams are with whole Body fluid pressure type template, including pedestal, the top of the pedestal is fixedly connected with supporting block, supporting rod and the first motor respectively, and And first the output shaft of motor drive rod is fixedly connected with by shaft coupling, one end of the drive rod and the side of supporting block turn Dynamic connection, and the thread surface of drive rod is connected with drive block, sliding block is fixedly connected at the top of the drive block, and prop up The surface of strut is fixedly connected with fixed block, and two opposite sides of the fixed block have been fixedly connected with slide plate, and slide plate Surface and sliding block internal slide connect.
Preferably, the top of the sliding block is fixedly connected with the second motor and link block respectively, and the second motor is defeated Shaft is fixedly connected with rotating bar by shaft coupling, and the surface of the rotating bar and the inner rotation of link block connect, and turn One end of lever is fixedly connected with first axle block, and the side of the first axle block is connected with the second axis block.
Preferably, the side of the first axle block is fixedly connected with fixture block, and the side of the second axis block offers card slot, And the inner wall of card slot and the surface of fixture block are clamped, and the surface of the first axle block and the surface of the second axis block have been fixedly connected with Contact block, and the surface of contact block opens up fluted, and the side of the second axis block is fixedly connected with connecting rod, and connect The surface of bar is fixedly connected with driving plate.
Preferably, the top movable of the pedestal is connected with formwork, and template slot is offered at the top of formwork.
Preferably, stable block is fixedly connected at the top of the pedestal, and it is equal to stablize the block side opposite with supporting block Slide bar is fixedly connected with, the surface of the slide bar and the internal slide of drive block connect.
Preferably, the surface of the supporting rod slidably connects movable plate, and liquid is fixedly connected at the top of movable plate Press is fixedly connected with support plate, and the bottom of support plate is fixedly connected with the top of supporting rod at the top of the hydraulic press, The bottom of the movable plate is fixedly connected with pressure plare.
Advantageous effect
The utility model provides a kind of 30m prefabricated box -beams integrated hydraulic formula template.Has following advantageous effect:
(1), 30m prefabricated box -beams integrated hydraulic formula template is fixedly connected with the second electricity respectively by the top of sliding block Machine and link block, and the output shaft of the second motor is fixedly connected with rotating bar, the surface of rotating bar and connection by shaft coupling The inner rotation connection of block, and one end of rotating bar is fixedly connected with first axle block, and the side of first axle block is connected with second Axis block, the side of first axle block are fixedly connected with fixture block, and the side of the second axis block offers card slot, and the inner wall of card slot It is clamped with the surface of fixture block, the surface of first axle block and the surface of the second axis block have been fixedly connected with contact block, and contact block Surface open up fluted, the side of the second axis block is fixedly connected with connecting rod, and the surface of connecting rod is fixedly connected with drive Movable plate is changed since templatespace is big, and concrete cement is caused to pour uneven the problem of causing box beam internal structure loose, The quality of box beam is improved, eliminates the security risk of bridge, ensure that the progress of engineering.
(2), 30m prefabricated box -beams integrated hydraulic formula template, by the top of pedestal be fixedly connected with respectively supporting block, Supporting rod and the first motor, and the output shaft of the first motor is fixedly connected with drive rod, one end of drive rod by shaft coupling It is rotatablely connected, and the thread surface of drive rod is connected with drive block, is fixedly connected at the top of drive block with the side of supporting block There is sliding block, and the surface of supporting rod is fixedly connected with fixed block, two opposite sides of fixed block have been fixedly connected with slide plate, And the surface of slide plate and the internal slide of sliding block connect, and change the single knot of 30m prefabricated box -beam integrated hydraulic formula templates Structure, considerably increases its functionality, and whole operation process is simple and convenient.
(3), 30m prefabricated box -beams integrated hydraulic formula template, movable plate is slidably connected by the surface of supporting rod, and And hydraulic press is fixedly connected at the top of movable plate, support plate, and the bottom of support plate are fixedly connected at the top of hydraulic press Be fixedly connected with the top of supporting rod, the bottom of movable plate is fixedly connected with pressure plare, realize to the concrete in template into Row extrusion forming ensure that the rugged construction inside box beam.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the side view of the utility model structure sliding block;
Fig. 3 is the side view of the utility model structure first axle block;
Fig. 4 is the side view of the utility model structure the second axis block;
Fig. 5 is the front view of the utility model structure contact block.
In figure:1 pedestal, 2 supporting blocks, 3 supporting rods, 4 first motors, 5 drive rods, 6 drive blocks, 7 sliding blocks, 8 fixed blocks, 9 Slide plate, 10 second motors, 11 link blocks, 12 rotating bars, 13 first axle blocks, 14 second axis blocks, 15 fixture blocks, 16 card slots, 17 contacts Block, 24 slide bars, 25 movable plates, 26 hydraulic pressure are stablized in block, 18 grooves, 19 connecting rods, 20 driving plates, 21 formworks, 22 template slots, 23 Machine, 27 support plates, 28 pressure plares.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of 30m prefabricated box -beams integrated hydraulic formula mould Plate, including pedestal 1, the top of pedestal 1 is fixedly connected with supporting block 2,3 and first motor 4 of supporting rod respectively, and supporting block 2 plays The effect of support, and the output shaft of the first motor 4 is fixedly connected with drive rod 5, one end of drive rod 5 and branch by shaft coupling The side rotation connection of bracer 2, and the thread surface of drive rod 5 is connected with drive block 6, and drive rod 5 drives drive block 6 to carry out Effect movement, the top of drive block 6 are fixedly connected with sliding block 7, and the surface of supporting rod 3 is fixedly connected with fixed block 8, two The opposite side of fixed block 8 has been fixedly connected with slide plate 9, plays the role of support, and the surface of slide plate 9 and sliding block 7 is interior Portion is slidably connected, and plays the role of limiting, and the top of sliding block 7 is fixedly connected with the second motor 10 and link block 11 respectively, and The output shaft of second motor 10 is fixedly connected with rotating bar 12, the surface of rotating bar 12 and the inside of link block 11 by shaft coupling Rotation connection, and one end of rotating bar 12 is fixedly connected with first axle block 13, and the side of first axle block 13 is connected with the second axis Block 14, the side of first axle block 13 are fixedly connected with fixture block 15, and the side of the second axis block 14 offers card slot 16, and block The inner wall of slot 16 is clamped with the surface of fixture block 15, connects and fixes the surface of the inner wall and fixture block 15 of card slot 16, first axle block 13 The surface of surface and the second axis block 14 be fixedly connected with contact block 17, and the surface of contact block 17 opens up fluted 18, Screw rod makes first axle block 13 be fixedly connected with the second axis block 14 by groove 18, easy to disassemble, and the side of the second axis block 14 is fixed Connecting rod 19 is connected with, and the surface of connecting rod 19 is fixedly connected with driving plate 20, driving plate 20 rotates the coagulation to pouring Soil-cement carries out uniform stirring, and the top movable of pedestal 1 is connected with formwork 21, and the top of formwork 21 offers template Slot 22, placing concrete cement, the top of pedestal 1 are fixedly connected with stable block 23, and it is opposite with supporting block 2 to stablize block 23 Side has been fixedly connected with slide bar 24, and the surface of slide bar 24 is connect with the internal slide of drive block 6, plays the role of limiting, branch The surface of strut 3 slidably connects movable plate 25, and the top of movable plate 25 is fixedly connected with hydraulic press 26, hydraulic press 26 Top is fixedly connected with support plate 27, and the bottom of support plate 27 is fixedly connected with the top of supporting rod 3, the bottom of movable plate 25 Portion is fixedly connected with pressure plare 28, realizes and carries out extrusion forming to the concrete in template, ensure that the structure inside box beam It is solid.
During work, concrete cement is poured in template slot 22, and the first motor 4 drives drive rod 5 to rotate, and makes driving Block 6 is moved left and right with movable slider 7 on slide plate 9, and the second motor 14 drives rotating bar 12 to rotate, inner wall and the fixture block 15 of card slot 16 Surface clamping, screw rod makes first axle block 13 be fixedly connected with the second axis block 14 by groove 18, the drive of first axle block 13 second Axis block 14 and connecting rod 19 rotate, and driving plate 20 is driven to rotate and move left and right, to the concrete cement poured in template slot 22 Uniform stirring is carried out, after stirring evenly, screw rod is unloaded, first axle block 13 is made to be detached from the second axis block 14, hydraulic press 26 drives Movable plate 25 and pressure plare 28 carry out extrusion forming to the concrete in template slot 22, ensure that the rugged construction inside box beam, This completes the prefabricated of box beam.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this practical relationship or sequence.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.In the absence of more restrictions.By sentence " element limited including one ..., it is not excluded that Also there are other identical elements in the process, method, article or apparatus that includes the element ".
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of 30m prefabricated box -beams integrated hydraulic formula template, including pedestal (1), it is characterised in that:The top of the pedestal (1) Portion is fixedly connected with supporting block (2), supporting rod (3) and the first motor (4) respectively, and the output shaft of the first motor (4) passes through Shaft coupling is fixedly connected with drive rod (5), and one end of the drive rod (5) is rotatablely connected with the side of supporting block (2), and is driven The thread surface of lever (5) is connected with drive block (6), and sliding block (7) is fixedly connected with, and prop up at the top of the drive block (6) The surface of strut (3) is fixedly connected with fixed block (8), and two opposite sides of the fixed block (8) have been fixedly connected with slide plate (9), and the surface of slide plate (9) is connect with the internal slide of sliding block (7).
2. a kind of 30m prefabricated box -beams integrated hydraulic formula template according to claim 1, it is characterised in that:The sliding block (7) top is fixedly connected with the second motor (10) and link block (11) respectively, and the output shaft of the second motor (10) passes through Shaft coupling is fixedly connected with rotating bar (12), and the surface of the rotating bar (12) is connect with the inner rotation of link block (11), and And one end of rotating bar (12) is fixedly connected with first axle block (13), the side of the first axle block (13) is connected with the second axis block (14)。
3. a kind of 30m prefabricated box -beams integrated hydraulic formula template according to claim 2, it is characterised in that:Described first The side of axis block (13) is fixedly connected with fixture block (15), and the side of the second axis block (14) offers card slot (16), and block The inner wall of slot (16) is clamped with the surface of fixture block (15), and the surface of the first axle block (13) and the surface of the second axis block (14) are equal Contact block (17) is fixedly connected with, and the surface of contact block (17) opens up fluted (18), the one of the second axis block (14) Side is fixedly connected with connecting rod (19), and the surface of connecting rod (19) is fixedly connected with driving plate (20).
4. a kind of 30m prefabricated box -beams integrated hydraulic formula template according to claim 1, it is characterised in that:The pedestal (1) top movable is connected with formwork (21), and template slot (22) is offered at the top of formwork (21).
5. a kind of 30m prefabricated box -beams integrated hydraulic formula template according to claim 1, it is characterised in that:The pedestal (1) stable block (23) is fixedly connected at the top of, and stablizes block (23) side opposite with supporting block (2) and has been fixedly connected with Slide bar (24), the surface of the slide bar (24) are connect with the internal slide of drive block (6).
6. a kind of 30m prefabricated box -beams integrated hydraulic formula template according to claim 1, it is characterised in that:The support The surface of bar (3) slidably connects movable plate (25), and hydraulic press (26) is fixedly connected at the top of movable plate (25), described Support plate (27) is fixedly connected at the top of hydraulic press (26), and the bottom of support plate (27) and the top of supporting rod (3) are consolidated Fixed connection, the bottom of the movable plate (25) is fixedly connected with pressure plare (28).
CN201721427033.XU 2017-10-31 2017-10-31 A kind of 30m prefabricated box -beams integrated hydraulic formula template Expired - Fee Related CN207522799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721427033.XU CN207522799U (en) 2017-10-31 2017-10-31 A kind of 30m prefabricated box -beams integrated hydraulic formula template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721427033.XU CN207522799U (en) 2017-10-31 2017-10-31 A kind of 30m prefabricated box -beams integrated hydraulic formula template

Publications (1)

Publication Number Publication Date
CN207522799U true CN207522799U (en) 2018-06-22

Family

ID=62571727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721427033.XU Expired - Fee Related CN207522799U (en) 2017-10-31 2017-10-31 A kind of 30m prefabricated box -beams integrated hydraulic formula template

Country Status (1)

Country Link
CN (1) CN207522799U (en)

Similar Documents

Publication Publication Date Title
CN210308385U (en) Automatic pouring device for cement precast block
CN101144328A (en) Construction method for after-pouring band beam-slab template
CN207829004U (en) A kind of preformed hole template for building civil construction
CN207522799U (en) A kind of 30m prefabricated box -beams integrated hydraulic formula template
CN104329100A (en) Integral casting construction method for cable trench of highway tunnel water ditch
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN207480852U (en) A kind of 30m prefabricated box -beams integrated hydraulic formula template
CN111350348A (en) Positioning and reinforcing device for outer wall anti-seepage inverted beam template and construction method
CN214195535U (en) Template device for engineering service construction
CN104894943A (en) Integral formwork for road and bridge drainage ditch construction concrete pouring
CN213226755U (en) Assembled building mould for wallboard
CN203834752U (en) Sleeper wall partition structure
CN214266076U (en) Make things convenient for concrete prefabricated part mould of drawing of patterns
CN212764002U (en) Assembled bearing beam mould
CN207736474U (en) A kind of greenwave mortar injection forming equipment
CN208294062U (en) A kind of concrete wall template and support combinations structure
CN207630231U (en) A kind of brick-making mould of included material scraping plate
CN204703023U (en) Road and bridge gutter construction pouring concrete integral mold plate
CN215166654U (en) Novel device for fixing post-cast strip water-stop steel plate
CN213868914U (en) Concrete column pours and uses template reinforcing apparatus
CN220661254U (en) Mould fixing device for prefabricated laminated slab
CN217998940U (en) Combined steel concrete water-stop reverse ridge template reinforcing device
CN219946642U (en) Precast beam mould system
CN215631920U (en) Template for building engineering construction
CN220903658U (en) Concrete brick production mould convenient to drawing of patterns

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20181031

CF01 Termination of patent right due to non-payment of annual fee