CN207512932U - Prefabricated panel and precast floor slab connection structure - Google Patents

Prefabricated panel and precast floor slab connection structure Download PDF

Info

Publication number
CN207512932U
CN207512932U CN201721656708.8U CN201721656708U CN207512932U CN 207512932 U CN207512932 U CN 207512932U CN 201721656708 U CN201721656708 U CN 201721656708U CN 207512932 U CN207512932 U CN 207512932U
Authority
CN
China
Prior art keywords
wallboard body
preburying part
wallboard
connecting rod
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721656708.8U
Other languages
Chinese (zh)
Inventor
李青山
马云飞
杨逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Construction Technology Co Ltd
Original Assignee
Sany Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Construction Industry Co Ltd filed Critical Sany Construction Industry Co Ltd
Priority to CN201721656708.8U priority Critical patent/CN207512932U/en
Application granted granted Critical
Publication of CN207512932U publication Critical patent/CN207512932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of prefabricated panels and precast floor slab connection structure, are related to wall construction mounting technology field.The prefabricated panel includes connecting portion, the first preburying part, floor ontology and the first wallboard body with precast floor slab connection structure;Floor ontology is set at the top of the first wallboard body, and the first preburying part is set on the joint face at the top of the first wallboard body;Connecting portion includes connecting rod, and connecting rod one end is movably arranged in the first preburying part, and connecting rod is connect with floor ontology.The prefabricated panel of the utility model and precast floor slab connection structure, first preburying part is set on the joint face at the top of the first wallboard body, connecting rod one end is movably arranged in first preburying part, and floor ontology is connect with connecting rod, connecting portion and the first preburying part coordinate so that floor ontology is connect with the first wallboard body, is avoided connecting elements and is gone out muscle, it solves the problems, such as that floor construction is not easy to installation, there is larger application value.

Description

Prefabricated panel and precast floor slab connection structure
Technical field
The utility model is related to wall construction mounting technology fields, are connect more particularly to a kind of prefabricated panel with precast floor slab Structure.
Background technology
At present, the interconnection technique of assembly of shear wall structure reaches its maturity, and has worked out national regulation and atlas.
But current prefabricated panel goes out muscle using the top of prefabricated panel mostly with floor connecting node, lower part is pre-buried Grout sleeve or bellows, floor is mostly using common laminated floor slab, the mode of cast-in-place concrete at connecting node.Wallboard goes out Muscle is produced to component, transport and installation bring inconvenience, and field cast-in-place amount is big, causes low construction efficiency, synthesis of high cost.
In this background, building trade enables to corresponding prefabricated components system there is an urgent need for a kind of completely new connection mode Make simple, easy for installation so that floor construction connection is safe and reliable.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated panel and precast floor slab connection structure, to solve the prior art Present in floor construction be not easy to installation the technical issues of.
To achieve these goals, the utility model uses following technical scheme:
A kind of prefabricated panel provided by the utility model and precast floor slab connection structure, including connecting portion, the first preburying part, Floor ontology and the first wallboard body;
The floor ontology is set at the top of first wallboard body;
First preburying part is set on the joint face at the top of first wallboard body;
The connecting portion includes connecting rod;
Described connecting rod one end is movably arranged in first preburying part, and the connecting rod connects with the floor ontology It connects.
Further, the floor ontology is equipped with extension, and the extension is connect with the connecting rod.
Further, the extension is equipped with dowel;
The extension is connect by the dowel with the connecting rod.
Further, the second wallboard body is further included;
Second wallboard body is set at the top of first wallboard body, and the floor ontology is located at first wall Between plate ontology and second wallboard body.
Further, the joint face of the second wallboard body bottom is equipped with the second preburying part;
Described connecting rod one end is movably arranged in the first preburying part at the top of first wallboard body, and the connecting rod is another One end is movably arranged in the second preburying part of the second wallboard body bottom.
Further, first preburying part includes embedded sleeve barrel.
Further, the embedded sleeve barrel is screw shell.
Further, second preburying part includes service sleeve.
Further, the service sleeve is bellows.
Further, preformed groove is further included;
The preformed groove is set on the joint face of first wallboard body and second wallboard body.
Prefabricated panel provided by the utility model and precast floor slab connection structure, the first preburying part are set on the first wallboard body The joint face at top, connecting rod one end is movably arranged in first preburying part, and floor ontology is connect with connecting rod, makes floor The first preburying part on ontology and the first wallboard body is connected with each other, so as to which connecting portion and the first preburying part coordinate so that floor Ontology is connect with the first wallboard body, solves the problems, such as that floor construction is not easy to installation, suitable for promoting and applying.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness Under the premise of labour, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is a kind of prefabricated panel and the structural representation of precast floor slab connection structure that the utility model embodiment one provides Figure;
Fig. 2 is the structure diagram of a kind of prefabricated panel that the utility model embodiment two provides;
Fig. 3 is the structure diagram of a kind of prefabricated panel that the utility model embodiment two provides;
Fig. 4 is the structure diagram of connection ring in a kind of prefabricated panel that the utility model embodiment two provides.
Reference numeral:
1- embedded sleeve barrels;3- wallboard bodies;The first wallboard bodies of 7-;
The second wallboard bodies of 8-;9- floor ontologies;11- service sleeves;
21- connection rings;22- dowels;23- connecting rods;
91- extensions;92- dowels;The 211- bodies of rod;
212- ring bodies.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality Novel protected range.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instructions such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only The utility model must have specific with the device or element for simplifying description rather than instruction or hint meaning for ease of description Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.In addition, term " the One ", " second ", " third " are only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integrally Connection;Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, It can be the connection inside two elements.For the ordinary skill in the art, can above-mentioned art be understood with concrete condition Concrete meaning of the language in the utility model.
Embodiment one:
In the alternative of the present embodiment, as shown in Figure 1, a kind of prefabricated panel provided in this embodiment and precast floor slab Connection structure, including connecting portion, the first preburying part, 9 and first wallboard body 7 of floor ontology;
Floor ontology 9 is set on 7 top of the first wallboard body, and the first preburying part is set on the connection at 7 top of the first wallboard body Face;
Connecting portion includes connecting rod 23, and 23 one end of connecting rod is movably arranged in the first preburying part, and connecting rod 23 and floor Ontology 9 connects.
In existing assembly of shear wall structure system, floor construction goes out muscle, comes to component installation, production and conveyer belt Inconvenience, also, return component installation and bring more inconvenience.
In the present embodiment, 23 one end of connecting rod is movably connected in the first preburying part, and floor ontology 9 and connecting rod 23 The first preburying part in 9 and first wallboard body 7 of floor ontology is connected with each other by connection;First preburying part and connecting portion are matched It closes and uses, instead of the connection mode of existing sleeper connecting elements, avoid the problem that connecting elements goes out muscle so that the first wallboard Connection and first wallboard body 7 and the connection of other structures component of the ontology 7 with floor ontology 9 are more convenient, also eliminate A variety of inconvenience in production that existing connecting elements is brought due to steel bar arrangement complexity, while also avoid in transport not Just.
In the alternative of the present embodiment, floor ontology 9 is equipped with extension 91, and extension 91 connects with connecting rod 23 It connects.
In the present embodiment, extension 91 is connect by connecting rod 23 with the first preburying part, realizes floor ontology 9 and first The connection of wallboard body 7.
In the alternative of the present embodiment, extension 91 is equipped with dowel 92;Extension 91 by dowel 92 with Connecting rod 23 connects.
In this embodiment, it is preferred that dowel 92 is " L-type steel muscle ", one end is overlapped with extension 91, the other end and company Extension bar 23 is intersecting, and extension 91 and connecting rod 23 are linked into an integrated entity, so as to which floor ontology 9 be connect with the first preburying part, Exactly floor ontology 9 is connect with the first wallboard body 7, connection structure is simple, and the dowel 92 of L-type is so that the connection of the two More stablize.
In the alternative of the present embodiment, the second wallboard body 8 is further included;Second wallboard body 8 is set on the first wallboard 7 top of ontology, and floor ontology 9 is between the first wallboard body 7 and the second wallboard body 8.
In the alternative of the present embodiment, the joint face of 8 bottom of the second wallboard body is equipped with the second preburying part;Connecting rod 23 one end are movably arranged in first preburying part at 7 top of the first wallboard body, and 23 other end of connecting rod is movably arranged at the second wallboard In second preburying part of 8 bottom of ontology.
In the present embodiment, during the connection of 9 and first wallboard body 7 of floor ontology and the second wallboard body 8, by connecting rod 23 one end is connected in the first preburying part of the first wallboard body 7, and extension 91 is connect by dowel 92 with connecting rod 23, One end is overlapped with extension 91, and the other end intersects with connecting rod 23, and is fastened in intersection;Then in floor ontology 9 Cast-in-place connection slurry at the node intersected with the first wallboard body 7, i.e. cast-in-place concrete, and slurry is sat on cast-in-place face;And then then Second wallboard body 8 is set, the other end of connecting rod 23 is made to be set in the second preburying part of 8 bottom of the second wallboard body, it is fixed Second wallboard body 8, then be in the milk into the second preburying part, slurry fills up 9 and first wallboard sheet of the second preburying part and floor ontology Gap between 7 and second wallboard body of body, 8 three, so as to fulfill 9 and first wallboard body 7 of floor ontology and the second wallboard sheet The connection of body 8.
In the alternative of the present embodiment, the first preburying part includes embedded sleeve barrel 1.
In the alternative of the present embodiment, the second preburying part includes service sleeve 11.
In the present embodiment, one end of connecting rod 23 is connected in the first preburying part, that is, is connected in embedded sleeve barrel 1, even The other end of extension bar 23 is set in the second preburying part, i.e., in service sleeve 11, thus by the first wallboard body 7 and the second wall Plate ontology 8 connects, then is in the milk into service sleeve 11, and slurry fills up 9 and first wallboard body 7 of service sleeve 11 and floor ontology Gap between 8 three of the second wallboard body.
In the alternative of the present embodiment, embedded sleeve barrel 1 is screw shell.
In the alternative of the present embodiment, service sleeve 11 is bellows.
Preferably, connecting rod 23 is screw rod, and embedded sleeve barrel 1 is screw shell, and screw-rod structure is connected with screw shell, Convenient for connecting, and stable connection;Meanwhile service sleeve 11 is bellows, connecting rod 23 is inserted in bellows, simple installation, and It is connected convenient for grouting so that the connection between wallboard is relatively reliable.
In the alternative of the present embodiment, preformed groove is further included;Preformed groove be set on the first wallboard body 7 joint face and The joint face of second wallboard body 8.
In the present embodiment, preformed groove can accommodate connection slurry, and slurry fills up preformed groove and the first wallboard body 7 and Gap between the joint face of two wallboard bodies 8 so that the connection between wallboard is more firm.
The present embodiment also provides a kind of floor ontology 9, is different from that existing or complete prefabricated or lower floor is prefabricated, upper strata is cast-in-place Precast floor slab structure, 9 lower floor of this floor ontology is prefabricated, upper strata middle section is prefabricated, and when construction is cast-in-place on middle section periphery.
Embodiment two:
In the alternative of the present embodiment, as shown in Figure 2 and Figure 3, a kind of prefabricated panel provided in this embodiment, including Preburying part, connecting portion and wallboard body 3;
Preburying part is set on left and right two joint faces of wallboard body 3;Connecting portion is movably arranged in preburying part;
Connecting portion includes connection ring 21 and dowel 22;Connection ring 21 is movably arranged in preburying part;22 activity of dowel is set It is connected with each other in the preburying part in adjacent two pieces of wallboard bodies 3 in connection ring 21, can be made.
In the present embodiment, connecting portion is movably connected in preburying part, and adjacent two pieces of wallboard bodies 3 are connected;Preburying part With being used cooperatively for connecting portion, instead of the connection mode of existing sleeper connecting elements, avoid the problem that connecting elements goes out muscle, The connection and the connection of fabricated shear wall and other structures component for causing fabricated shear wall mutual are more convenient.
Specifically, connecting portion includes connection ring 21 and dowel 22;Connection ring 21 is movably arranged in preburying part;Dowel 22 It is movably arranged in connection ring 21, can be connected with each other the preburying part in adjacent two pieces of wallboard bodies 3.
When being connected between wallboard body 3, make the connection on mutual corresponding joint face between two pieces of adjacent wallboard bodies 3 Ring 21 is overlapped, and dowel 22 is inserted into the connection ring 21 of overlapping, i.e., by dowel 22 by the company in two pieces of wallboard bodies 3 It connects ring 21 to be cascaded, then pours into slurry, slurry fills up the gap between the joint face of two pieces of wallboard bodies 3, realizes two The connection of block wallboard body 3.
Also, two pieces of wallboard bodies 3 can word connection, that is, two pieces of wallboard bodies 3 are in the same plane after connecting;Two pieces of walls Plate ontology 3 also can corner connection, that is, into angle between two pieces of wallboard bodies 3 after connecting;Frequently, two pieces of wallboard bodies 3 are into straight Angle connects.
In the alternative of the present embodiment, the preburying part mutual dislocation on left and right two joint face of same wallboard body 3 Setting.
In the present embodiment, the preburying part in different wallboard bodies 3 is set on the position difference of respective joint face, makes Preburying part when must be connected with each other in adjacent wallboard body 3 can mutual dislocation, and then can be overlapped so that be connected to pre- The connection ring 21 buried in portion can be overlapped.
In the alternative of the present embodiment, as shown in figure 4, connection ring 21 includes the body of rod 211 and ring body 212;The body of rod 211 One end is movably arranged in preburying part, and ring body 212 is fixed at 211 other end of the body of rod.
In the present embodiment, ring body 212 is connected to by the body of rod 211 on preburying part.
In the alternative of the present embodiment, preburying part includes embedded sleeve barrel 1.
In the alternative of the present embodiment, embedded sleeve barrel 1 uses screw shell.
In the alternative of the present embodiment, the body of rod 211 uses screw-rod structure.
In the present embodiment, screw-rod structure is connected with screw shell, easy to connect.
In the alternative of the present embodiment, dowel 22 uses reinforcing bar.
In the present embodiment, dowel 22, i.e. reinforcing bar penetrate ring body 212, by multiple ring bodies on adjacent wall board ontology 3 212 series connection;It is easier for installation using reinforcing bar so that the structure of connecting portion entirety is simpler, meanwhile, reinforcing bar is building trade Common component, production and acquisition are relatively easy to, also, also allow for bulk transport.
In the alternative of the present embodiment, preformed groove is further included;Preformed groove is used for the joint face set on wallboard body 3.
In the present embodiment, preformed groove can accommodate connection slurry, by dowel 22 by the company in two pieces of wallboard bodies 3 It connects after ring 21 is cascaded, pours into slurry, slurry is filled up between preformed groove and the joint face of adjacent two pieces of wallboard bodies 3 Gap so that the connection of two sides wallboard body 3 is more firm.
In the alternative of the present embodiment, preburying part is set in preformed groove.
In the present embodiment, preburying part is mounted in preformed groove rather than is directly installed on the joint face of wallboard body 3 On so that it can be linked into an integrated entity between adjacent two pieces of wallboard bodies 3 with smaller gap, so that by 3 structure of wallboard body The structure for the wall built more is stablized.
It should be noted that the present embodiment can be used in the first wallboard body 7 and the second wallboard body 8 in embodiment one In wallboard body 3.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacement, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of prefabricated panel and precast floor slab connection structure, which is characterized in that including connecting portion, the first preburying part, floor sheet Body (9) and the first wallboard body (7);
The floor ontology (9) is at the top of first wallboard body (7);
First preburying part is set on the joint face at the top of first wallboard body (7);
The connecting portion includes connecting rod (23);
Described connecting rod (23) one end is movably arranged in first preburying part, and the connecting rod (23) and the floor ontology (9) it connects.
2. prefabricated panel according to claim 1 and precast floor slab connection structure, which is characterized in that the floor ontology (9) extension (91) is equipped with, the extension (91) connect with the connecting rod (23).
3. prefabricated panel according to claim 2 and precast floor slab connection structure, which is characterized in that the extension (91) It is equipped with dowel (92);
The extension (91) is connect by the dowel (92) with the connecting rod (23).
4. prefabricated panel according to claim 1 and precast floor slab connection structure, which is characterized in that further include the second wallboard Ontology (8);
Second wallboard body (8) is at the top of first wallboard body (7), and the floor ontology (9) is positioned at described Between first wallboard body (7) and second wallboard body (8).
5. prefabricated panel according to claim 4 and precast floor slab connection structure, which is characterized in that the second wallboard sheet The joint face of body (8) bottom is equipped with the second preburying part;
Described connecting rod (23) one end is movably arranged in the first preburying part at the top of first wallboard body (7), the connection Bar (23) other end is movably arranged in the second preburying part of the second wallboard body (8) bottom.
6. prefabricated panel according to claim 1 and precast floor slab connection structure, which is characterized in that first preburying part Including embedded sleeve barrel (1).
7. prefabricated panel according to claim 6 and precast floor slab connection structure, which is characterized in that the embedded sleeve barrel (1) it is screw shell.
8. prefabricated panel according to claim 5 and precast floor slab connection structure, which is characterized in that second preburying part Including service sleeve (11).
9. prefabricated panel according to claim 8 and precast floor slab connection structure, which is characterized in that the service sleeve (11) it is bellows.
10. prefabricated panel according to claim 4 and precast floor slab connection structure, which is characterized in that further include preformed groove;
The preformed groove is set on the joint face of first wallboard body (7) and second wallboard body (8).
CN201721656708.8U 2017-12-01 2017-12-01 Prefabricated panel and precast floor slab connection structure Active CN207512932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721656708.8U CN207512932U (en) 2017-12-01 2017-12-01 Prefabricated panel and precast floor slab connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721656708.8U CN207512932U (en) 2017-12-01 2017-12-01 Prefabricated panel and precast floor slab connection structure

Publications (1)

Publication Number Publication Date
CN207512932U true CN207512932U (en) 2018-06-19

Family

ID=62542882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721656708.8U Active CN207512932U (en) 2017-12-01 2017-12-01 Prefabricated panel and precast floor slab connection structure

Country Status (1)

Country Link
CN (1) CN207512932U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138219A (en) * 2018-09-30 2019-01-04 美好建筑装配科技有限公司 A kind of the slurry anchor connection construction and construction method of upper wainscot sheathing
CN109577536A (en) * 2019-01-18 2019-04-05 长沙远大住宅工业集团股份有限公司 The connecting node and its construction method of laminated floor slab and wall
CN110565817A (en) * 2019-09-09 2019-12-13 重庆中科建设(集团)有限公司 Construction method for concrete body slurry anchor connection
CN110886422A (en) * 2019-12-08 2020-03-17 代营伟 Connecting member for outer wall and floor support plate of steel structure integrally-assembled building body

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138219A (en) * 2018-09-30 2019-01-04 美好建筑装配科技有限公司 A kind of the slurry anchor connection construction and construction method of upper wainscot sheathing
CN109577536A (en) * 2019-01-18 2019-04-05 长沙远大住宅工业集团股份有限公司 The connecting node and its construction method of laminated floor slab and wall
CN110565817A (en) * 2019-09-09 2019-12-13 重庆中科建设(集团)有限公司 Construction method for concrete body slurry anchor connection
CN110565817B (en) * 2019-09-09 2021-05-11 重庆中科建筑科技(集团)有限公司 Construction method for concrete body slurry anchor connection
CN110886422A (en) * 2019-12-08 2020-03-17 代营伟 Connecting member for outer wall and floor support plate of steel structure integrally-assembled building body
CN110886422B (en) * 2019-12-08 2021-01-15 江西先峰钢结构有限公司 Connecting member for outer wall and floor support plate of steel structure integrally-assembled building body

Similar Documents

Publication Publication Date Title
CN207512932U (en) Prefabricated panel and precast floor slab connection structure
CN204753843U (en) PC primary and secondary roof beam bolted connection node
CN205206132U (en) Thermal insulation assembled wallboard structure
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN207553289U (en) A kind of assembled steel and concrete frame space modular structure and system
CN206144032U (en) Mosaic structure of assembled steel core concrete column and post
CN109184030B (en) Assembly type concrete shear wall superposed structure system and installation method
CN208251372U (en) A kind of assembled steel reinforced concrete shear force wall
CN102433958A (en) Prefabricated wall board construction member
CN110029836A (en) A kind of concrete structure reinforcing bars template integrative installation technology dwelling house system
CN205577120U (en) Assembly component of light -duty pottery glass siding wall and floor
CN104032861B (en) Mixing coupled wall steel column and non-energy dissipating beam connecting node structure and construction method thereof
CN207525900U (en) Prefabricated panel
CN206090815U (en) Prefabricated assembled tube structure public building
CN204940585U (en) The precast wall body of assembled-type house
CN107435375B (en) Civil assembled building
CN207499205U (en) Prefabricated panel and prefabricated foundation connection structure
CN203834692U (en) Connection node structure of section steel column and non-energy-dissipation section steel short beam of mixed coupled wall
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN207959596U (en) Shear wall connection structure and shear wall connect system
CN207525899U (en) Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure
CN103498512B (en) A kind of assembled architecture wall beam stablizes syndeton
CN208363277U (en) A kind of single building wall board connection system of board-like assembled
CN111395593A (en) Assembly welding type steel bar template integrated T-shaped component and production method thereof
CN207244838U (en) Bean column node connects system and assembled wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing

Patentee after: Sany Construction Technology Co.,Ltd.

Address before: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.