CN207510422U - A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design - Google Patents
A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design Download PDFInfo
- Publication number
- CN207510422U CN207510422U CN201721528910.2U CN201721528910U CN207510422U CN 207510422 U CN207510422 U CN 207510422U CN 201721528910 U CN201721528910 U CN 201721528910U CN 207510422 U CN207510422 U CN 207510422U
- Authority
- CN
- China
- Prior art keywords
- station
- layer
- inter
- novel cross
- section pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height designs, including station hall layer, the lower section of the station hall layer is equipped with station layer, and stair are equipped between the station layer and station hall layer, and the top of the station layer is equipped with rail road against the wind.The novel cross section pipeline layout in the inter-city passenger rail underground station and station layer storey height design are reduced to 6.3m by station platform is high layer by layer by 7.2m, station agent structure height can be reduced 900mm, reduction station is gone along with sb. to guard him and agent structure buried depth, the big system loading 25% of ring control equipment is reduced, reduces building staircase hoisting depth 900mm out of the station.
Description
Technical field
The utility model is related to inter-city passenger rail technical field more particularly to a kind of novel cross sections in inter-city passenger rail underground station
Pipeline layout and station layer storey height design.
Background technology
Conventional design thinks inter-city passenger rail station layer floor height by Gui Hang areas train gauge, clearance limit for overhead con tact wire and rail against the wind
The control of three aspect of road gauge, it is about 7.2m thus to derive station layer floor height.Under this floor height, the structure of station layer public area
Clear height about 6.5m is far longer than the needs that normal device is arranged and public area passenger uses, while increasing for floor height also causes
The adverse effects such as the raising of civil engineering cost, passenger's inconvenience out of the station.
Utility model content
The purpose of this utility model is to solve the problems, such as that subway concourse is high excessively high to station layer in the prior art, and is proposed
A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design.
To achieve these goals, the utility model employs following technical solution:
A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design, including upper strata station hall layer
With lower floor's station layer, wherein station layer is by the Gui Hang areas in outside, the platform public area at middle part and the gate for separation, rail
Road is located close to the top of the platform public area outside Gui Hang areas against the wind.
Preferably, road uses concrete material to the rail against the wind.
Preferably, the height of the station layer is higher than track.
Preferably, road is located above the station layer public area rail against the wind, and close to gate.
Preferably, the platform layer Mian Ceng to the subway concourse level layer height be 6.3m.
In the utility model, the novel cross section pipeline layout in the inter-city passenger rail underground station and station layer storey height design pass through
By Gui Hang areas train gauge, clearance limit for overhead con tact wire and rail, gauge three aspect in road is controlled inter-city passenger rail station layer floor height against the wind,
Middle train and contact net are the inseparable systems of train apparatus, and road is fire control smoke exhausting equipment to rail against the wind, has adjusting and optimizing
Condition, by the way that road moves to tunnel side station layer public area space top by tunnel top against the wind by rail, occupy former station layer
The space that public area top can not make full use of, while the installation space of the original line equipment in public area is reduced, and then reduce vehicle
It stands floor height, is tested by Practical Project, station floor height can be reduced to 6.3m by original 7.2m.The inter-city passenger rail underground station
Novel cross section pipeline layout and station layer storey height design have 7.2m to be reduced to 6.3m by station platform is high layer by layer, can be by station entirety
Structure height reduces 900mm, and reduction station is gone along with sb. to guard him and agent structure buried depth, reduces the big system loading 25% of ring control equipment, subtracts
Few building staircase hoisting depth 900mm out of the station.
Description of the drawings
Fig. 1 be the utility model proposes a kind of novel cross section pipeline layout in inter-city passenger rail underground station and platform layer by layer
The structure diagram of high design.
In figure:1 station hall layer, 2 station layers, 3 Gui Hang areas, 4 platform public areas, 5 gates, 6 rails road, 7 communication ports against the wind.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.
In the description of the present invention, it is to be appreciated that term " on ", " under ", "front", "rear", "left", "right",
The orientation or position relationship of the instructions such as " top ", " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, are only
The utility model must have specific with the device or element for simplifying description rather than instruction or hint meaning for ease of description
Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
With reference to Fig. 1, a kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design, including station
Room layer 1, the lower section of station hall layer 1 are equipped with station layer 2, stair are equipped between station layer 2 and station hall layer 1, the top of station layer 2 is equipped with
Rail road 6 against the wind.Wherein station layer is by the Gui Hang areas 3 in outside, the platform public area 4 at middle part and 5 groups of the gate for separation
Into, rail, road 6 is located close to the top of the platform public area 4 outside Gui Hang areas 3 against the wind.And the rail road 6 and the Gui Hang areas 3 against the wind
It is connected by an intercommunicating pore 7.
In the utility model, road 6 uses concrete material to the rail against the wind.The height of the station layer 2 is higher than track.Institute
Stating rail, road 6 is located above 2 public area of station layer against the wind, and close to gate 5.
In the utility model, the novel cross section pipeline layout in the inter-city passenger rail underground station and station layer storey height design pass through
By 3 train gauge of Gui Hang areas, clearance limit for overhead con tact wire and rail, 2 gauge of road, three aspect is controlled inter-city passenger rail station layer floor height against the wind,
Wherein train and contact net are the inseparable systems of train apparatus, and road 2 is fire control smoke exhausting equipment to rail against the wind, and it is excellent to have adjustment
The condition of change by the way that road 2 moves to 3 public area space top of tunnel side station layer by tunnel top against the wind by rail, occupies former station
The space that 3 public area top of platform layer can not make full use of, while the installation space of the original line equipment in public area is reduced, and then drop
Low station floor height, is tested by Practical Project, can station floor height be reduced to 6.3m by original 7.2m.The inter-city passenger rail underground
The novel cross section pipeline layout in station and station layer storey height design have 7.2m to be reduced to 6.3m by station platform is high layer by layer, can be by station
Overall structure is highly reduced to 900mm, and reduction station is gone along with sb. to guard him and agent structure buried depth, reduces the big system loading of ring control equipment
25%, reduce building staircase hoisting depth 900mm out of the station.
The preferable specific embodiment of the above, only the utility model, but the scope of protection of the utility model is not
This is confined to, in the technical scope that any one skilled in the art discloses in the utility model, according to this practicality
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (5)
1. a kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design, which is characterized in that including
The Gui Hang areas (3) of upper strata station hall layer (1) and lower floor's station layer (2), wherein station layer (2) including outside, the platform at middle part are public
Area (4) and the gate (5) for separation, road (6) are located close to the platform public area (4) of Gui Hang areas (3) outside to rail against the wind
Top.
2. a kind of novel cross section pipeline layout in inter-city passenger rail underground station according to claim 1 and station layer floor height are set
Meter, which is characterized in that the rail against the wind road (6) using concrete material.
3. a kind of novel cross section pipeline layout in inter-city passenger rail underground station according to claim 1 and station layer floor height are set
Meter, which is characterized in that the height of the station layer (2) is higher than track.
4. a kind of novel cross section pipeline layout in inter-city passenger rail underground station according to claim 1 and station layer floor height are set
Meter, which is characterized in that the rail against the wind road (6) above the station layer (2) public area, and close to gate (5).
5. a kind of novel cross section pipeline layout in inter-city passenger rail underground station according to claim 1 and station layer floor height are set
Meter, which is characterized in that station layer (2) the face layer to the station hall layer (1) face layer height is 6.3m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721528910.2U CN207510422U (en) | 2017-11-16 | 2017-11-16 | A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721528910.2U CN207510422U (en) | 2017-11-16 | 2017-11-16 | A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207510422U true CN207510422U (en) | 2018-06-19 |
Family
ID=62539420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721528910.2U Active CN207510422U (en) | 2017-11-16 | 2017-11-16 | A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207510422U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107745714A (en) * | 2017-11-16 | 2018-03-02 | 中铁工程设计咨询集团有限公司 | A kind of new cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design |
-
2017
- 2017-11-16 CN CN201721528910.2U patent/CN207510422U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107745714A (en) * | 2017-11-16 | 2018-03-02 | 中铁工程设计咨询集团有限公司 | A kind of new cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design |
CN107745714B (en) * | 2017-11-16 | 2024-05-10 | 中铁工程设计咨询集团有限公司 | Novel cross section pipeline synthesis and platform layer-by-layer high design of inter-city railway underground station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3421289B1 (en) | Railway transportation power supply construction | |
CN207510422U (en) | A kind of novel cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design | |
CN106428028A (en) | Fenster hanging type aerial urban public transit transportation system | |
CN102003207B (en) | Escape platform and security channel structure for single-hole dual-line magnetic suspension tunnel | |
CN203295961U (en) | Railway bridge surface safety protection arrangement structure | |
CN107745714A (en) | A kind of new cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design | |
CN108792888A (en) | intelligent elevator | |
CN112096131B (en) | Transportation hub complex personnel evacuation facility | |
CN109184303A (en) | A kind of falling proof device of stereo garage | |
CN108454634A (en) | A kind of superimposing thread subway station | |
CN102505595A (en) | Vehicle escape structure of double-layered underground passage | |
CN205400741U (en) | Structure under railway shield tunnel rail based on rescue is sparse | |
CN207918219U (en) | Intelligent elevator | |
KR102206271B1 (en) | Great depth undergraound station | |
CN107826936A (en) | A kind of car external passenger elevators | |
CN205115986U (en) | Track traffic is with continuous mountain type roof beam | |
CN105129578B (en) | A kind of machine room is without hoistway wall-hanging elevator | |
CN205295908U (en) | Urban rail transit is with continuous U roof beam | |
CN107651530A (en) | Lift | |
CN208792069U (en) | A kind of underground railway station traffic system | |
CN207536962U (en) | A kind of car external passenger elevators | |
CN205115991U (en) | Inter -city railway is with continuous mountain type roof beam | |
CN204549766U (en) | A kind of sill structure with leveling device | |
CN204024668U (en) | The emergent bassinet structure that moves of a kind of river-crossing tunnel | |
CN108411722A (en) | Exempt from tens meters of underground and deep-cuts under novel earth's surface the public transportation system and method run |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |