CN207498973U - A kind of power station grout curtain cuts dirty drainage tube - Google Patents
A kind of power station grout curtain cuts dirty drainage tube Download PDFInfo
- Publication number
- CN207498973U CN207498973U CN201721606713.8U CN201721606713U CN207498973U CN 207498973 U CN207498973 U CN 207498973U CN 201721606713 U CN201721606713 U CN 201721606713U CN 207498973 U CN207498973 U CN 207498973U
- Authority
- CN
- China
- Prior art keywords
- piston
- outer tube
- tube body
- grouting pipe
- compressed spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model discloses a kind of power station grout curtains to cut dirty drainage tube, belongs to grout curtain auxiliary device field, for solving the form that slurries at overflow port are in gravity flow, the problem of slurry flow when is easily precipitated, overflow port is caused to block.It includes outer tube body, outer tube body upper end side is communicated with overflow pipe, the outer tube body upper end is equipped with end cap, the end cap is from top to bottom inserted with Grouting Pipe, the Grouting Pipe is fixedly connected with end cap, piston is equipped in the outer tube body, the piston is placed on outside Grouting Pipe, the piston and Grouting Pipe airtight connection, the piston and outer tube body airtight connection, the piston upper end are equipped with compressed spring, and the compressed spring is placed on outside Grouting Pipe, compressed spring upper end connection end cap, the compressed spring lower end connect piston.The technical program is simple and reasonable, effectively influence discharge can be blocked in overflow by slurries.
Description
Technical field
The utility model belongs to grout curtain auxiliary device field, is that a kind of power station grout curtain cuts dirt specifically
Drainage tube.
Background technology
Grout curtain is that slurries are poured into crack, the hole of rock mass or soil layer, forms the curtain that continuously blocks water, and is oozed with reducing
Flow and the grouting works for reducing osmotic pressure.
The engineering of seepage proof curtain is built in grout curtain in the rock of gate dam or sand gravel ground using grouting.At the top of curtain
It is connect with concrete gate bottom plate or dam body, the deep opposite impermeable rock stratum certain depth in bottom, with preventing or reduce in ground
The infiltration of lower water;With drainage system collective effect downstream, uplift pressure of the infiltration flow to gate dam can be also reduced.20 generation
Since discipline, grout curtain is always the main means of foundation of hydraulic structure Anti-seeping technology, to ensureing the safety of hydraulic structure
Operation plays an important role.
In filling process, slurries are easily overflowed from grout pipe upper end to be caused, construction environment pollution;To prevent grout pipe upper end
The overflow everywhere of the slurries of spilling opens up an overflow port on grout pipe, for discharging and collecting overflow slurry, still, overflow
Mouthful place's slurries are in the form flow automatically, and slurry flow when is easily precipitated, and overflow port is caused to block.
Utility model content
The utility model aim be intended to provide it is a kind of it is simple and reasonable, effectively can block shadow in overflow by slurries
The power station grout curtain put of rehearsing with musical accompaniment cuts dirty drainage tube.
To realize the above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of power station grout curtain cuts dirty drainage tube, and including outer tube body, outer tube body upper end side is communicated with overflow
Pipe, the outer tube body upper end are equipped with end cap, and the end cap is from top to bottom inserted with Grouting Pipe, and the Grouting Pipe is fixed with end cap to be connected
It connects, piston is equipped in the outer tube body, the piston is placed on outside Grouting Pipe, the piston and Grouting Pipe airtight connection, the work
Plug and outer tube body airtight connection, the piston upper end are equipped with compressed spring, and the compressed spring is placed on outside Grouting Pipe, the compression
Spring upper end connection end cap, the compressed spring lower end connect piston.
It further limits, restraining position ring block is covered in the Grouting Pipe, the spacing ring is located at below piston.
It further limits, the outer tube body outer wall is equipped with mounting flange.
It further limits, the mounting flange lower face is equipped with gasket.
Using the utility model of above-mentioned technical proposal, a layer concrete layer is poured on stratum in advance, makes to be poured coagulation
The stratum of soil layer has airtight effect, prevents slurries during slip casting from leaching upwards, the pouring effect on lower floor stratum is influenced, then at coagulation
Outer tube body is positioned in hole, outer tube body outer wall is made mutually to be clamped with concrete layer solid for slip casting to earth-boring on soil layer
Fixed, the slip casting into hole by Grouting Pipe, when slip casting, compresses air in hole, and compressed air pushes up piston, simultaneously
The thrust of compressed spring will be overcome, compressed air will build up on certain pressure, when piston is moved to overflow pipe position, compression is empty
Gas carries out pressure release discharge, and compressed spring and bottom slurry act on simultaneously during discharge, and discharge pressure increases;Similarly, when air is arranged
After going out, position that slurries will fill original air, with the increase of grouting amount, the slurry pressure in hole will also increase
Greatly, and piston is pushed up, when piston is moved to overflow pipe position, extra slurries will be total in compressed spring and bottom slurry
It is discharged under the action of by overflow pipe, discharge pressure is big, and flow velocity is fast, slurries can be effectively prevent to precipitate and block up during one stream
The problem of plug.Spacing ring can team's piston position limited, prevent piston from coming off downwards;Mounting flange can be with outer tube body one
Body formed setting can be fixedly connected by fixing pieces such as expansion bolts with mixed mud layer, is prevented grouting pressure excessive and is incited somebody to action outer
Tube body extrudes;In mounting flange lower surface, gasket is set, mounting flange and concrete surface can be sealed by gasket,
Slurries overflow between mounting flange and concrete layer when preventing slip casting.
The utility model compared with prior art, it is simple and reasonable, can effectively slurries be blocked in overflow influence discharge.
Description of the drawings
The utility model can be further illustrated by the nonlimiting examples that attached drawing provides;
Fig. 1 is the structure diagram that a kind of power station grout curtain of the utility model cuts dirty drainage tube;
Main element symbol description is as follows:
Outer tube body 1, overflow pipe 2, end cap 3, Grouting Pipe 4, piston 5, compressed spring 6, spacing ring 7, mounting flange 8, sealing
Pad 9.
Specific embodiment
It is right with reference to the accompanying drawings and examples in order to make those skilled in the art that the utility model may be better understood
Technical solutions of the utility model further illustrate.
As shown in Figure 1, a kind of power station grout curtain cuts dirty drainage tube, including outer tube body 1,1 upper end side of outer tube body connects
Overflow pipe 2 is connected with, 1 upper end of outer tube body is equipped with end cap 3, and end cap 3 is from top to bottom inserted with Grouting Pipe 4, and Grouting Pipe 4 is fixed with end cap 3
Connection, outer tube body 1 is interior to be equipped with piston 5, and piston 5 is placed on outside Grouting Pipe 4, piston 5 and 4 airtight connection of Grouting Pipe, piston 5 and outer tube
1 airtight connection of body, 5 upper end of piston are equipped with compressed spring 6, and compressed spring 6 is placed on outside Grouting Pipe 4,6 upper end connecting pin of compressed spring
Lid 3,6 lower end of compressed spring connection piston 5.
Preferably, restraining position ring block 7 is covered in Grouting Pipe 4, spacing ring 7 is located at 5 lower section of piston.
Preferably, 1 outer wall of outer tube body is equipped with mounting flange 8.
Preferably, 8 lower face of mounting flange is equipped with gasket 9.
Using the utility model of above-mentioned technical proposal, a layer concrete layer is poured on stratum in advance, makes to be poured coagulation
The stratum of soil layer has airtight effect, prevents slurries during slip casting from leaching upwards, the pouring effect on lower floor stratum is influenced, then at coagulation
Outer tube body 1 is positioned in hole, 1 outer wall of outer tube body is made mutually to be clamped with concrete layer for slip casting to earth-boring on soil layer
Fixed, the slip casting into hole by Grouting Pipe 4, when slip casting, compresses air in hole, and compressed air pushes up piston 5,
The thrust that will overcome compressed spring 6 simultaneously, compressed air will build up on certain pressure, when piston 5 is moved to 2 position of overflow pipe,
Compressed spring 6 and bottom slurry act on simultaneously when compressed air being carried out pressure release discharge, and being discharged, and discharge pressure increases;Similarly,
After air is discharged, position that slurries will fill original air, with the increase of grouting amount, the slurry pressure in hole
It will increase, and push up piston 5, when piston 5 is moved to 2 position of overflow pipe, extra slurries will be in 6 He of compressed spring
It is discharged under the action of bottom slurry is common by overflow pipe 2, discharge pressure is big, and flow velocity is fast, slurries can be effectively prevent to be flowed through one
The problem of precipitating and blocking in journey.Spacing ring 7 can 5 position of team's piston limited, prevent piston 5 from coming off downwards;Fixation
Orchid 8 can be integrally formed with outer tube body 1 and set, and can be fixedly connected, prevented with mixed mud layer by fixing pieces such as expansion bolts
Grouting pressure is excessive and extrudes outer tube body 1;Gasket 9 is set in 8 lower surface of mounting flange, gasket 9 can be by fixation
Orchid 8 is sealed with concrete surface, and slurries are from overflow between mounting flange 8 and concrete layer when preventing slip casting.
Dirty drainage tube is cut to a kind of power station grout curtain provided by the utility model above to be described in detail.Specifically
The explanation of embodiment is merely used to help understand the method and its core concept of the utility model.It should be pointed out that for this technology
For the those of ordinary skill in field, under the premise of the utility model principle is not departed from, the utility model can also be carried out
Some improvements and modifications, these improvement and modification are also fallen into the protection domain of the utility model claims.
Claims (4)
1. a kind of power station grout curtain cuts dirty drainage tube, including outer tube body, outer tube body upper end side is communicated with overflow pipe,
The outer tube body upper end is equipped with end cap, and the end cap is from top to bottom inserted with Grouting Pipe, and the Grouting Pipe is fixedly connected with end cap,
It is characterized in that:Piston is equipped in the outer tube body, the piston is placed on outside Grouting Pipe, the piston and Grouting Pipe airtight connection,
The piston and outer tube body airtight connection, the piston upper end are equipped with compressed spring, and the compressed spring is placed on outside Grouting Pipe, institute
Compressed spring upper end connection end cap is stated, the compressed spring lower end connects piston.
2. a kind of power station grout curtain according to claim 1 cuts dirty drainage tube, it is characterised in that:In the Grouting Pipe
Restraining position ring block is covered, the spacing ring is located at below piston.
3. a kind of power station grout curtain according to claim 1 cuts dirty drainage tube, it is characterised in that:Outside the outer tube body
Wall is equipped with mounting flange.
4. a kind of power station grout curtain according to claim 3 cuts dirty drainage tube, it is characterised in that:The mounting flange
Lower face is equipped with gasket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721606713.8U CN207498973U (en) | 2017-11-27 | 2017-11-27 | A kind of power station grout curtain cuts dirty drainage tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721606713.8U CN207498973U (en) | 2017-11-27 | 2017-11-27 | A kind of power station grout curtain cuts dirty drainage tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207498973U true CN207498973U (en) | 2018-06-15 |
Family
ID=62506989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721606713.8U Active CN207498973U (en) | 2017-11-27 | 2017-11-27 | A kind of power station grout curtain cuts dirty drainage tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207498973U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258653A (en) * | 2019-05-31 | 2019-09-20 | 中国建筑第八工程局有限公司 | Basement pile foundation construction connects leading-in device and its construction method |
CN111271095A (en) * | 2020-01-20 | 2020-06-12 | 中煤科工集团西安研究院有限公司 | Method for improving grouting effect of mine curtain |
-
2017
- 2017-11-27 CN CN201721606713.8U patent/CN207498973U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258653A (en) * | 2019-05-31 | 2019-09-20 | 中国建筑第八工程局有限公司 | Basement pile foundation construction connects leading-in device and its construction method |
CN111271095A (en) * | 2020-01-20 | 2020-06-12 | 中煤科工集团西安研究院有限公司 | Method for improving grouting effect of mine curtain |
CN111271095B (en) * | 2020-01-20 | 2021-05-14 | 中煤科工集团西安研究院有限公司 | Method for improving grouting effect of mine curtain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107035401B (en) | A kind of abandoned mine fire damp administers new technology | |
CN104453913B (en) | A kind of Shaft Stopes front pre-grouting method | |
CN107237650B (en) | Drilling siphon negative pressure drainage system and method for treating water seepage of tunnel wall | |
CN202124865U (en) | Quick plugging device for dewatering wellhead of sand-free cement pipe deep well | |
CN207727600U (en) | Plugging dewatering well device | |
CN206016824U (en) | A kind of stopping means for preventing shield sky from pushing away Segment displacement | |
CN207739264U (en) | A kind of Grouting Pipe | |
CN206706792U (en) | Deep foundation pit precipitation well construction | |
CN103382722B (en) | Concrete foundation slab restoring method for preformed water collecting well for higher underground hydraulic pressure | |
CN101881181A (en) | Mine goaf tailing-filled concrete enclosing wall | |
CN207498973U (en) | A kind of power station grout curtain cuts dirty drainage tube | |
CN106894428A (en) | Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation | |
CN203145029U (en) | Plugging structure for deep foundation pit dewatering well | |
KR101065555B1 (en) | System preventing non-woven from mortar particles filled up the back space of PCL Precasting Concrete Lining and method constructing the non-woven to PCL | |
CN206438526U (en) | Deep basal pit tube well dewatering equipment | |
CN209066467U (en) | Vacuum negative pressure type foundation pit Yield rainfall relation facility | |
CN103147450A (en) | Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit | |
CN105178342B (en) | Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing | |
CN109555140A (en) | Foundation pit and Tunnel Base spring pump drainage method for blocking and device | |
CN103397651B (en) | Seal structure of concrete foundation slab of reserved water-collecting well | |
CN209444310U (en) | A kind of plugging dewatering well structure | |
CN204788226U (en) | High -pressure grouting lifts warp monitoring devices | |
CN202000365U (en) | Seepage-proof structure for underground continuous wall | |
CN210766827U (en) | Depressurization well in deep foundation pit | |
CN204570705U (en) | Three-dimensional post jacking structure is held in a kind of artificial grouting layer method stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |