CN207498908U - A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern - Google Patents

A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern Download PDF

Info

Publication number
CN207498908U
CN207498908U CN201721535846.0U CN201721535846U CN207498908U CN 207498908 U CN207498908 U CN 207498908U CN 201721535846 U CN201721535846 U CN 201721535846U CN 207498908 U CN207498908 U CN 207498908U
Authority
CN
China
Prior art keywords
diversion tunnel
reinforced concrete
lining layer
concrete lining
vertical cyclindrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721535846.0U
Other languages
Chinese (zh)
Inventor
翁永红
徐唐锦
王团乐
饶志文
漆祖芳
李蘅
周嵩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201721535846.0U priority Critical patent/CN207498908U/en
Application granted granted Critical
Publication of CN207498908U publication Critical patent/CN207498908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of diversion tunnel vertical cyclindrical shape stopper structure pattern, it includes diversion tunnel (1), described diversion tunnel (1) periphery is provided with reinforced concrete lining layer (8), and vertical cyclindrical shape plug (2) is provided in the diversion tunnel (1);Shallow shearing resistance slot (4) is provided on described vertical cyclindrical shape plug (2) section reinforced concrete lining layer (8) stalk;Anchor pole (6) is disposed on described vertical cyclindrical shape plug (2) section reinforced concrete lining layer (8) bottom plate;The first sealing piece (3) between country rock is set in diversion tunnel (1) the periphery reinforced concrete lining layer (8), the second sealing piece (5) is set between the vertical cyclindrical shape plug (2) and the reinforced concrete lining layer (8).The utility model, which overcomes wedge-shaped Enlargement excavation security risk in the prior art, to be increased, invests the shortcomings of larger, is had the advantages that the innovation in existing Diversion Tunnel Plug structural shape and method.

Description

A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern
Technical field
More specifically it is a kind of diversion tunnel the utility model is related to arrive Construction for Hydroelectric Project diversion technology field Vertical cyclindrical shape stopper structure pattern.
Background technology
《Hydraulic tunnel design specification》(DL5195-2004) it provides, " section shape of the pattern of occluding body according to hydraulic tunnel The factors such as shape, execution conditions, engineering geological condition are selected.The pattern of occluding body vertical section preferably preferentially selects wedge shape." wedge shape plug Specific set-up mode and operational procedure are generally divided into two classes:
(1) the reserved wedge-type bodily form is excavated early period
During early period diversion tunnel construction, plug section country rock has been excavated together by the permanent plug bodily form that the later stage is formed After the completion of into, tunnel lining the position bottom plate and side wall formed the direct overcurrent of local pit slot (part engineering smoothes out for flow, Engineering measure is taken to protect the pit slot, protection facility is removed before pouring permanent bulkhead concrete).It is complete in diversion tunnel operation mission Cheng Hou, lock under diversion tunnel, to diversion tunnel, permanent plug section carries out dabbing, then pours bulkhead concrete, is finally returned Grouting, joint grouting and surface grouting etc. are filled out, has the function that rock mass carries (with reference to shown in Fig. 1) jointly with plug.
(2) later stage digs the wedge-type bodily form
After the completion of diversion tunnel runs mission, lock under diversion tunnel, the bottom plate of permanent plug section and side to diversion tunnel Wall carries out wedge shape and digs (including removing former tunnel lining armored concrete etc.), then pours bulkhead concrete, is finally returned Grouting, joint grouting and surface grouting etc. are filled out, has the function that rock mass carries (with reference to shown in Fig. 1) jointly with plug.
The permanent plug of diversion tunnel belongs to permanent building, and wedge-shaped stopper structure pattern overload capacity is stronger, is adopted extensively With, but have the following disadvantages:
(1) construction investment is larger.Wedge shape, which digs, increases blasting rock move excavation project amount, backfill bulkhead concrete quantities, And the increased consolidation grouting quantities when loose rock mass is shaken in explosion.
(2) wedge shape digs increase construction safety risk.Particularly large-scale diversion tunnel big cross section, the poor position of geological conditions Carry out wedge-shaped Enlargement excavation security risk bigger.
(3) wedge-shaped plug digged for the later stage, plug section original diversion tunnel lining cutting armored concrete is removed, country rock digs and Digging the destruction increased later stage consolidation grouting of rock mass all needs to occupy the straight line duration, is unfavorable for simplifying construction, shortens the construction period, saves Save construction investment.
(4) wedge-shaped plug is reserved for excavating early period, permanent plug section reserves the meeting of pit slot position during diversion tunnel overcurrent Unfavorable flow-shape is formed, influences diversion tunnel discharge capacity;Local cavitation erosion is easily formed when flow velocity is larger, influences diversion tunnel fortune Row safety.
Utility model content
The purpose of the utility model is to overcome the shortcoming of above-mentioned background technology, and propose a kind of diversion tunnel right cylinder Shape stopper structure pattern.
The purpose of this utility model is implemented by following technical solution:A kind of diversion tunnel vertical cyclindrical shape stopper structure Pattern, it includes diversion tunnel, and the diversion tunnel inner peripheral wall is provided with reinforced concrete lining layer, the diversion tunnel Vertical cyclindrical shape plug is provided in hole;
In the vertical cyclindrical shape plug and the diversion tunnel contact surface on the both sides stalk of reinforced concrete lining layer It is provided with shallow shearing resistance slot;
The uniform cloth on reinforced concrete lining layer bottom plate in the vertical cyclindrical shape plug and the diversion tunnel contact surface It is equipped with anchor pole.
In the above-mentioned technical solutions:First is set between the diversion tunnel periphery reinforced concrete lining layer and country rock Sealing piece sets the second sealing piece between the vertical cyclindrical shape plug and the reinforced concrete lining layer.
In the above-mentioned technical solutions:First sealing piece and the second sealing piece pour pre contract mortar using fluting Mode is buried.
In the above-mentioned technical solutions:The shallow shearing resistance slot flows downstream on the reinforced concrete lining layer both sides stalk Direction arranged for interval.
In the above-mentioned technical solutions:The depth of the shallow shearing resistance slot is protected no more than the reinforced concrete lining layer reinforcing bar Covering thickness.
The utility model has the following advantages that:
(1) wedge shape is avoided to dig causes in-place blasting out to injure surrounding rock of chamber, reduces wedge-shaped Enlargement excavation security risk, special It is not that features as poor geologic condition, the permanent plug of large cross-sectional diversion tunnel dig the construction safety risk brought.(such as black East Germany power station mistake Water cross dimensions is 16.5m × 24m (wide × high), excavated section 18.9m × 26.4m (wide × high), according to wedge-shaped plug knot Configuration formula then digs rear excavated section size up to 24.9m × 28.2m (wide × high), and the increasing of section span broadens 6m, this practicality is new Type technical solution reduces large span Enlargement excavation security risk.)
(2) cost saving, reduce wedge shape dig, concrete backfill and consolidation grouting quantities.(such as black East Germany water power Diversion Tunnel Plug of standing uses technical solutions of the utility model, and dismounting reinforced concrete lining layer is saved in single hole and country rock digs engineering Measure nearly 4000m3, it is corresponding to reduce the nearly 4000m of fill concrete3, about 2,410,000 yuan of cost saving, construction investment save amplitude reach 18%.)
(3) construction period is saved, most of diversion tunnel permanent plug construction periods are more nervous, the utility model skill Art scheme eliminates demolition blasting and because in-place blasting out country rock consolidation grouting construction period.(as black East Germany power station wedge shape is blocked up The header structure pattern construction period is 5.5 months, and the technical solutions of the utility model plug construction period is 4.5 months, saves the duration About 1 month.)
(4) facilitate construction, be conducive to excavate by standard section tissue diversion tunnel and reinforced concrete lining layer is constructed, avoid The difficulty of construction and the adverse effect to flow-shape that special-shaped section is brought.
(5) Diversion Tunnel Plug construction period upstream and each working tunnel are in full closeding state, only by construction ventilation Facility improves hole inner air flow situation, and wedge shape, which digs, causes air pollution and construction environment in hole to deteriorate, the utility model skill Art scheme is conducive to construction personnel's labour protection.
Description of the drawings
Fig. 1 is conventional diversion tunnel wedge shape plug plan view.
Fig. 2 is the utility model diversion tunnel vertical cyclindrical shape plug profilograph.
Fig. 3 is shallow shearing resistance slot drawing in the utility model.
Fig. 4 is diversion tunnel vertical cyclindrical shape plug drawing in side sectional elevation in the utility model.
In figure:It is diversion tunnel 1, vertical cyclindrical shape plug 2, the first sealing piece 3, shallow shearing resistance slot 4, the second sealing piece 5, anchor pole 6, pre- Contracting mortar 7, reinforced concrete lining layer 8.
Specific embodiment
The performance of the utility model is described in detail below in conjunction with the accompanying drawings, but they are not formed to the utility model Limit, it is only for example, while by illustrating the utility model the advantages of will become clearer and be readily appreciated that.
Technical solutions of the utility model replace (or cancellation) permanent plug of diversion tunnel to dig sphenoid structural shape, avoid Diversion tunnel sets and diversion tunnel progress explosion is digged during permanent plug;The diversion tunnel construction phase reinforced concrete lining layer with Pre-buried first sealing piece between country rock;Diversion tunnel blocks the phase in the plug hole of setting section using dabbing, the shallow shearing resistance slot of cutting, chisel Slot directly pours bulkhead concrete after burying the structural measures such as the second sealing piece and backplane anchor pole;Simplify construction, save work Journey is invested and the construction period, is innovated in the permanent stopper structure pattern of existing diversion tunnel.
With reference to shown in Fig. 2-4:A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern, it includes diversion tunnel 1, and described leads Stream 1 inner peripheral wall of tunnel is provided with reinforced concrete lining layer 8, and vertical cyclindrical shape plug 2 is provided in 1 hole of diversion tunnel;
The both sides stalk of reinforced concrete lining layer 8 in the vertical cyclindrical shape plug 2 and 1 contact surface of diversion tunnel On be provided with shallow shearing resistance slot 4;
In the vertical cyclindrical shape plug 2 and 1 contact surface of diversion tunnel on 8 bottom plate of reinforced concrete lining layer uniformly It is disposed with anchor pole 6.
The first sealing piece 3 is set between the 1 periphery reinforced concrete lining layer 8 of diversion tunnel and country rock, described Vertical cyclindrical shape plug 2 and the reinforced concrete lining layer 8 between the second sealing piece 5 is set.
First sealing piece 3 and the second sealing piece 5 are buried in a manner that fluting pours pre contract mortar 7.
The shallow shearing resistance slot 4 Parallel to the flow direction arranged for interval (figure on the 8 both sides stalk of reinforced concrete lining layer Middle arrow is water (flow) direction).
The depth of the shallow shearing resistance slot 4 is not more than 8 thickness of protection tier of reinforced concrete lining layer.
The sealing piece 5 also can be arranged in diversion tunnel construction phase pre-plugged and suitably protecting is taken during overcurrent Measure.
The utility model further includes a kind of method of diversion tunnel vertical cyclindrical shape stopper structure pattern, it includes the following steps:
1., slot in country rock before described 1 periphery reinforced concrete lining layer 8 of diversion tunnel construction and embedded first to stop Then water piece 3 pours the reinforced concrete lining layer 8;
2., after the diversion tunnel 1 completes water conservancy diversion mission, 1 time lock closure of diversion tunnel, in the steel Reinforced concrete lining cutting 8 is slotted embedded with 2 contact surface of vertical cyclindrical shape plug by upstream section along the 1 hole week of diversion tunnel There is the second sealing piece 5;
3., dabbing processing is carried out, and in the reinforced concrete lining layer 8 to 8 surface of reinforced concrete lining layer The shallow shearing resistance slot 4 is dug on the stalk of both sides;
4., the anchor pole 6 on construction 8 bottom plate of reinforced concrete lining layer;
5., pour 2 concrete of vertical cyclindrical shape plug, rockfill grouting is carried out to 2 crown of vertical cyclindrical shape plug, is treated Joint grouting and surface grouting are carried out after vertical cyclindrical shape plug 2 concrete cooling to design requirement temperature.
The shallow shearing resistance slot 4 Parallel to the flow direction arranged for interval on the 8 both sides stalk of reinforced concrete lining layer.
Above-mentioned unspecified part is the prior art.

Claims (3)

1. a kind of diversion tunnel vertical cyclindrical shape stopper structure pattern, it is characterised in that:It includes diversion tunnel (1), the water conservancy diversion Tunnel (1) inner peripheral wall is provided with reinforced concrete lining layer (8), and vertical cyclindrical shape plug is provided in the diversion tunnel (1) hole (2);
The both sides of reinforced concrete lining layer (8) are straight in the vertical cyclindrical shape plug (2) with described diversion tunnel (1) contact surface Shallow shearing resistance slot (4) is provided on wall;
In the vertical cyclindrical shape plug (2) and described diversion tunnel (1) contact surface on reinforced concrete lining layer (8) bottom plate It is even to be disposed with anchor pole (6);
The first sealing piece (3) is set between country rock in diversion tunnel (1) the periphery reinforced concrete lining layer (8), in institute The second sealing piece (5) is set between the vertical cyclindrical shape plug (2) and the reinforced concrete lining layer (8) stated;
First sealing piece (3) and the second sealing piece (5) are buried in a manner that fluting pours pre contract mortar (7).
2. a kind of diversion tunnel vertical cyclindrical shape stopper structure pattern according to claim 1, it is characterised in that:Described is shallow anti- Cut slot (4) Parallel to the flow direction arranged for interval on reinforced concrete lining layer (8) both sides stalk.
3. a kind of diversion tunnel vertical cyclindrical shape stopper structure pattern according to claim 2, it is characterised in that:Described is shallow anti- The depth for cutting slot (4) is not more than described reinforced concrete lining layer (8) thickness of protection tier.
CN201721535846.0U 2017-11-14 2017-11-14 A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern Active CN207498908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721535846.0U CN207498908U (en) 2017-11-14 2017-11-14 A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721535846.0U CN207498908U (en) 2017-11-14 2017-11-14 A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern

Publications (1)

Publication Number Publication Date
CN207498908U true CN207498908U (en) 2018-06-15

Family

ID=62505058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721535846.0U Active CN207498908U (en) 2017-11-14 2017-11-14 A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern

Country Status (1)

Country Link
CN (1) CN207498908U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724351A (en) * 2017-11-14 2018-02-23 长江勘测规划设计研究有限责任公司 A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern and method
CN109357923A (en) * 2018-11-09 2019-02-19 中国科学院武汉岩土力学研究所 A kind of country rock-lining cutting contact surface device and method that reduction tensioning splitting generates
CN110499740A (en) * 2019-08-01 2019-11-26 四川大学 The safe method for blocking of diversion tunnel under a kind of hydroelectric project high water head unfavorable geological condition

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724351A (en) * 2017-11-14 2018-02-23 长江勘测规划设计研究有限责任公司 A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern and method
CN109357923A (en) * 2018-11-09 2019-02-19 中国科学院武汉岩土力学研究所 A kind of country rock-lining cutting contact surface device and method that reduction tensioning splitting generates
CN109357923B (en) * 2018-11-09 2020-05-26 中国科学院武汉岩土力学研究所 Device and method for reducing surrounding rock-lining contact surface generated by tension splitting
CN110499740A (en) * 2019-08-01 2019-11-26 四川大学 The safe method for blocking of diversion tunnel under a kind of hydroelectric project high water head unfavorable geological condition
CN110499740B (en) * 2019-08-01 2021-06-08 四川大学 Safe blocking method for diversion tunnel under unfavorable geological condition of high water head in hydroelectric engineering

Similar Documents

Publication Publication Date Title
CN107724351A (en) A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern and method
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN207498908U (en) A kind of diversion tunnel vertical cyclindrical shape stopper structure pattern
CN102061923B (en) Tunnel construction method capable of protecting existing building
CN109826081A (en) Large-scale solution cavity, underground river span of arch structure and construction method in a kind of tunnel
CN204371354U (en) The compound supporting and protection structure of a kind of Karst Tunnel
CN205012288U (en) Embankment dam pitch core -wall base
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN206592136U (en) A kind of plain wall closing water sealing consolidation structure of shield launching
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN108798684A (en) A kind of method of completely decomposed fine sand stratum tunnel excavation
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN108166532A (en) A kind of groutable underground continuous wall connector and its construction method
CN107816050A (en) A kind of concrete cofferdam and earth rock cofferdam combined cofferdam and its construction method
CN207582477U (en) A kind of concrete cofferdam and earth rock cofferdam combined cofferdam
CN209722685U (en) Large-scale solution cavity, underground river span of arch structure in a kind of tunnel
CN207672587U (en) A kind of bedrock surface subsurface pressure water burst dredges structure
CN110206062A (en) The dark construction method of underground river shallow embedding is worn under a kind of Urban Underground pipe gallery
CN207295765U (en) Tunnel engineering construction platform back structure
CN211872840U (en) Face combination retaining wall structure forever among urban hydraulic engineering
CN210263095U (en) Full-tunnel section maintenance cofferdam structure of diversion tunnel in early and middle period
CN209722944U (en) Karst hole plugging structure that falls into water
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation
CN110468837B (en) Underwater hollowing defect repairing method and device for ship lock navigation wall pile foundation on gravel layer basis