CN207469307U - A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline - Google Patents

A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline Download PDF

Info

Publication number
CN207469307U
CN207469307U CN201721383167.6U CN201721383167U CN207469307U CN 207469307 U CN207469307 U CN 207469307U CN 201721383167 U CN201721383167 U CN 201721383167U CN 207469307 U CN207469307 U CN 207469307U
Authority
CN
China
Prior art keywords
inspection shaft
brick template
ring
template
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721383167.6U
Other languages
Chinese (zh)
Inventor
周益军
胡义新
李基高
罗燊
徐庭
詹林
李送根
王路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201721383167.6U priority Critical patent/CN207469307U/en
Application granted granted Critical
Publication of CN207469307U publication Critical patent/CN207469307U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of gang form structures of the inspection shaft cast-in-place construction of town road pipeline, including inspection shaft, supervisor pours steel form, it builds by laying bricks or stones in the inspection shaft basis brick template on inspection shaft branch pipe, one end of inspection shaft branch pipe is set in the brick template of inspection shaft basis, the other end passes through inspection shaft basis brick template, the top surface of inspection shaft basis brick template is located above inspection shaft branch pipe, and inspection shaft supervisor pours the top that steel form is set to inspection shaft basis brick template.It is efficiently solved by the brick template built by laying bricks or stones because pipeline is more, causes wooden model or punching block reserved opening excessive, cause to reinforce the problem of loss of difficult and template is big;The structure of steel form makes the positioning of steel form and reinforces simply inside and outside installation on brick template, is easy to construct.By the combination mounting structure form of brick template and steel form, the concrete reliable construction quality of inspection shaft supervisor ensure that, pipeline and concrete interface position not spillage, good leak tightness.

Description

A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline
Technical field
The utility model is related to inspection shaft technical field of construction equipment, in particular to a kind of inspection shaft of town road pipeline The gang form structure of cast-in-place construction.
Background technology
It is usually plank sheathing for the cast-in-place used construction formwork of concrete inspection well in town road pipeline construction Or steel form.If the inspection well construction of identical size is more, steel form is generally configured, convenient for constructing and having enough to meet the need.Identical size Check that well construction is less, the general plank sheathing that is configured facilitates dismounting.And concrete inspection well is generally two logical or three driftings, at most four Drifting.Well base to pipeline heights of roofs section, plank sheathing or steel form installation reinforces difficult, needs to checking that well conduit carries out preformed hole Design, spillage of material is big, and the concrete quality of the inspection well bore of the template segment is difficult to ensure that can not meet has closed-water test requirement The construction requirement of sewage inspection well.
Utility model content
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, provides a kind of simple in structure, construction party Just, the gang form structure of the inspection shaft cast-in-place construction of the town road pipeline of well depth concrete quality can be effectively ensured.
In order to achieve this, the gang form of the inspection shaft cast-in-place construction of town road pipeline designed by the utility model Structure, including inspection shaft, supervisor pours steel form, it is characterised in that:It, which is further included, builds by laying bricks or stones in the inspection shaft base on inspection shaft branch pipe Plinth brick template, one end of the inspection shaft branch pipe are set in the brick template of inspection shaft basis, and the other end passes through inspection shaft basis brick Template, the top surface of inspection shaft basis brick template are located above inspection shaft branch pipe, and the inspection shaft supervisor pours steel form and sets It is placed in the top of inspection shaft basis brick template.
Specifically, inspection shaft basis brick template includes the interior brick template ring being arranged concentrically and outer brick template ring, it is described One end of inspection shaft branch pipe is fixed in interior brick template ring, and the other end sequentially passes through interior brick template ring and outer brick template ring.
Preferably, the top surface of the interior brick template ring and the either flush of outer brick template ring, the top of the interior brick template ring Face and the top surface of outer brick template ring are respectively positioned on above inspection shaft branch pipe.
Further, base concrete, the inspection shaft master have been poured between the interior brick template ring and outer brick template ring Pipe pours steel form and is set on base concrete.
Further, be fixed in the base concrete more be vertically arranged, along base concrete circumferentially Spacer bar, the spacer bar top stretches out base concrete, and the inspection shaft supervisor pours steel form and includes interior punching block Plate ring and outer steel mould plate ring, the spacer bar is between interior steel form ring and outer steel mould plate ring.
The beneficial effects of the utility model are:It is efficiently solved by the brick template built by laying bricks or stones because pipeline is more, causes wooden model Or punching block reserved opening is excessive, causes to reinforce the problem of loss of difficult and template is big;The steel form inside and outside installation on brick template Structure makes the positioning of steel form and reinforces simply, is easy to construct.By the combination mounting structure form of brick template and steel form, protect Demonstrate,prove the concrete reliable construction quality of inspection shaft supervisor, pipeline and concrete interface position not spillage, good leak tightness.Steel form in well bore concrete After dismounting, worker enters in well room, manually cuts interior brick template ring and cleans out, part brick may be reused.
Description of the drawings
Fig. 1 is the vertical view that gang form structure is connect with inspection shaft branch pipe in the utility model;
Fig. 2 is the sectional view of A-A in Fig. 1;
Fig. 3 is the vertical view that gang form structure is connect with inspection shaft branch pipe after brick template ring in being removed in the utility model Figure;
Fig. 4 is the sectional view of B-B in Fig. 3;
Fig. 5 is the longitudinal sectional view for checking well construction poured in the utility model after inspection shaft supervisor;
Wherein, 1-inspection shaft supervisor pours steel form (1.1-interior steel form ring, 1.2-outer steel mould plate ring), 2-check Well basis brick template (2.1-interior brick template ring, 2.2-outer brick template ring), 3-inspection shaft branch pipe, 4-base concrete, 5- Spacer bar, 6-inspection shaft supervisor.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
The gang form structure of the inspection shaft cast-in-place construction of town road pipeline as shown in Fig. 1-5, including building by laying bricks or stones in inspection The inspection shaft basis brick template 2 on well branch pipe 3 is looked into, inspection shaft basis brick template 2 includes interior 2.1 He of brick template ring being arranged concentrically Outer brick template ring 2.2, one end of inspection shaft branch pipe 3 are fixed in interior brick template ring 2.1, and the other end sequentially passes through interior brick template ring 2.1 and outer brick template ring 2.2.The top surface of interior brick template ring 2.1 and the either flush of outer brick template ring 2.2, interior brick template ring 2.1 Top surface and the top surface of outer brick template ring 2.2 be respectively positioned on the top of inspection shaft branch pipe 3.Interior brick template ring 2.1 and outer brick template ring 2.2 Between poured base concrete 4, be fixed in base concrete 4 more be vertically arranged, along base concrete 4 circumferentially Spacer bar 5,5 top of spacer bar stretch out base concrete 4, inspection shaft supervisor pour steel form 1 include interior steel form ring 1.1 and outer steel mould plate ring 1.2, between interior steel form ring 1.1 and outer steel mould plate ring 1.2, inspection shaft supervisor pours spacer bar 5 Steel form 1 is built to be set on base concrete 4.
In the utility model, on the well base concrete bottom plate poured, the pipeline opening of inspection shaft branch pipe 3 is cleaned up, is opened Beginning builds brick template ring 2.1 and outer brick template ring 2.2 in well bore by laying bricks or stones.The concordant stock mould medial surface of pipeline opening (adopt by inside and outside brick template ring With 200mm thickness sand-lime brick masonries, when pipe diameter is less than 300mm, it is brick that 100mm thickness sand-limes can be used in interior brick template ring 2.1 It builds).Interior brick template ring 2.1 and outer brick template ring 2.2 are built by laying bricks or stones to 100mm high on the top of inspection shaft branch pipe 3, and inside and outside brick template After the completion of ring is built by laying bricks or stones.Base concrete 4 is poured to pipeline top more than 100mm high, to ensure that inspection shaft supervisor pours steel form 1 It is not supported on pipeline, and the requirement of joints of concrete projects junction can be met.Binding well bore reinforcing bar is simultaneously supported in base concrete 4 On, steel form ring 1.1 and outer steel mould plate ring 1.2 in installation.After reinforcing correction, concrete is poured to the designed elevation of inspection shaft supervisor 6. Inside and outside steel form ring is removed, is manually entered in well room, is cut interior brick template ring 2.1 and clean out, part brick can repeat It uses.
The above descriptions are merely preferred embodiments of the present invention, not the structure of the utility model is done any Formal limitation.Every any simple modification made according to the technical essence of the utility model to above example is equal Variation and modification, in the range of still falling within the technical solution of the utility model.

Claims (5)

1. a kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline, including inspection shaft, supervisor pours steel form (1), it is characterised in that:It, which is further included, builds by laying bricks or stones in the inspection shaft basis brick template (2) on inspection shaft branch pipe (3), the inspection shaft One end of branch pipe (3) is set in inspection shaft basis brick template (2), and the other end passes through inspection shaft basis brick template (2), the inspection The top surface for looking into well basis brick template (2) is located above inspection shaft branch pipe (3), and the inspection shaft supervisor pours steel form (1) setting In the top of inspection shaft basis brick template (2).
2. a kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline as described in claim 1, feature It is:Inspection shaft basis brick template (2) includes the interior brick template ring (2.1) being arranged concentrically and outer brick template ring (2.2), institute The one end for stating inspection shaft branch pipe (3) is fixed in interior brick template ring (2.1), the other end sequentially pass through interior brick template ring (2.1) and Outer brick template ring (2.2).
3. a kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline as claimed in claim 2, feature It is:The top surface of the interior brick template ring (2.1) and the either flush of outer brick template ring (2.2), the interior brick template ring (2.1) Top surface and the top surface of outer brick template ring (2.2) be respectively positioned on above inspection shaft branch pipe (3).
4. a kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline as claimed in claim 2 or claim 3, special Sign is:Base concrete (4), the inspection shaft have been poured between the interior brick template ring (2.1) and outer brick template ring (2.2) Supervisor pours steel form (1) and is set on base concrete (4).
5. a kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline as claimed in claim 4, feature It is:Be fixed in the base concrete (4) more be vertically arranged, the positioning steel circumferentially along base concrete (4) Base concrete (4) is stretched out on muscle (5), spacer bar (5) top, and the inspection shaft supervisor pours steel form (1) including interior Steel form ring (1.1) and outer steel mould plate ring (1.2), the spacer bar (5) is positioned at interior steel form ring (1.1) and outer steel mould plate ring (1.2) between.
CN201721383167.6U 2017-10-20 2017-10-20 A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline Expired - Fee Related CN207469307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721383167.6U CN207469307U (en) 2017-10-20 2017-10-20 A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721383167.6U CN207469307U (en) 2017-10-20 2017-10-20 A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline

Publications (1)

Publication Number Publication Date
CN207469307U true CN207469307U (en) 2018-06-08

Family

ID=62264885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721383167.6U Expired - Fee Related CN207469307U (en) 2017-10-20 2017-10-20 A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline

Country Status (1)

Country Link
CN (1) CN207469307U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842732A (en) * 2018-08-09 2018-11-20 何胜东 It is a kind of municipal administration water conservancy dykes and dams check well construction auxiliary sleeve tool and its method
CN109137989A (en) * 2018-10-23 2019-01-04 北京市城远市政工程有限责任公司 Well room builds device
CN109653252A (en) * 2019-01-08 2019-04-19 湖南省第五工程有限公司 A kind of cast-in-place well room steel form of circle and construction method
CN112878462A (en) * 2021-01-13 2021-06-01 广州市第三市政工程有限公司 Construction method of circular inspection well template

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842732A (en) * 2018-08-09 2018-11-20 何胜东 It is a kind of municipal administration water conservancy dykes and dams check well construction auxiliary sleeve tool and its method
CN108842732B (en) * 2018-08-09 2023-08-25 深圳市盛利华建筑工程有限公司 Municipal water conservancy dyke inspection well construction auxiliary set and method thereof
CN109137989A (en) * 2018-10-23 2019-01-04 北京市城远市政工程有限责任公司 Well room builds device
CN109137989B (en) * 2018-10-23 2023-09-22 北京市城远市政工程有限责任公司 Well chamber masonry device
CN109653252A (en) * 2019-01-08 2019-04-19 湖南省第五工程有限公司 A kind of cast-in-place well room steel form of circle and construction method
CN112878462A (en) * 2021-01-13 2021-06-01 广州市第三市政工程有限公司 Construction method of circular inspection well template

Similar Documents

Publication Publication Date Title
CN207469307U (en) A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline
AU2015205943B2 (en) Dowel sleeves
CN206625428U (en) Floor closed system is poured after a kind of pipe well
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN106638697A (en) Method for rapidly constructing light formwork of reinforced-concrete-cast-in-place circular draining inspection well
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN106284428A (en) A kind of concrete column method for supporting of building structure post-cast strip
CN108532939A (en) Shear wall single side formwork method
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN202164698U (en) Steel die for sewage inspection well
CN211114798U (en) Kitchen and bathroom board descending and shaping die
CN110541567A (en) Plugging die for pipeline hanging hole gap and construction method
CN107419780B (en) Connecting structure and method between non-pressure pipes on upper floor and lower floor of module
CN102400564A (en) Temporary underpinning system for masonry structure bearing wall rear opening and construction method thereof
CN214739890U (en) Steel form for concrete constructional column construction
CN212506649U (en) Rainwater well disassembly-free template
CN205875714U (en) A consolidate fixture for retainer plate beam mold board
CN108442698B (en) Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN209211649U (en) A kind of pre-buried anchor ear casing
CN207526109U (en) Hole device is blocked up around through the erect riser of floor
CN206800648U (en) A kind of reinforced concrete water pond pool wall pre-embedded steel slab fixing device for installing
CN206723622U (en) One kind is reusable to hang die worker's tool
CN111335445A (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN115075287B (en) Disassembly-free prefabricated pipeline foundation and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

CF01 Termination of patent right due to non-payment of annual fee