CN207469263U - A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile - Google Patents

A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile Download PDF

Info

Publication number
CN207469263U
CN207469263U CN201721380624.6U CN201721380624U CN207469263U CN 207469263 U CN207469263 U CN 207469263U CN 201721380624 U CN201721380624 U CN 201721380624U CN 207469263 U CN207469263 U CN 207469263U
Authority
CN
China
Prior art keywords
pile
stake
rotary digging
foundation pit
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721380624.6U
Other languages
Chinese (zh)
Inventor
胡学龙
高伟
董君
朱耀光
肖植可
吴德虎
李敏
薛连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Railway Construction Co Ltd Of Zhong Tiebaju Group
Kunming Railway Construction Co of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Kunming Railway Construction Co Ltd Of Zhong Tiebaju Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Railway Construction Co Ltd Of Zhong Tiebaju Group filed Critical Kunming Railway Construction Co Ltd Of Zhong Tiebaju Group
Priority to CN201721380624.6U priority Critical patent/CN207469263U/en
Application granted granted Critical
Publication of CN207469263U publication Critical patent/CN207469263U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of rotary digging stakes and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, belong to deep footing groove enclosing structure technical field, row's rotary digging drilling hole reinforced concrete pile including being set along foundation pit walls, row's high-pressure slip-casting drilled pile on the outside of foundation pit, waist rail in the middle part of rotary digging stake top portion's Guan Liang and rotary digging stake.There are gaps between the stake and stake of rotary digging drilling hole reinforced concrete pile, and the geotechnical boring of high-pressure slip-casting is set between adjacent studs.The utility model is to tilt a kind of existing structure intensity for seriously being difficult to apply under ground-connecting-wall geological conditions for rock face to have the Extra-Deep Foundation Pit system of sealing effect again.

Description

A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile
Technical field
The utility model belongs to deep footing groove enclosing structure technical field.
Background technology
Foundation pit surrounding rock body oblique rock surface degree is larger and gradient is irregular, rock mass is hard and the poor presence of globality is split When gap, underground water development hydraulic pressure are larger, deep footing groove enclosing structure requires existing corresponding construction intensity to ensure not invade base again Interior main body structure gauge is cheated, while building enclosure is required to have water-proof function.
Such geological conditions impact drill construction is difficult to ensure that into hole perpendicularity, does not have and applies ground-connecting-wall condition, and independent Do not have water-proof function if applying piling structure using rotary digging stake.Because boring, hammer is hard in impact rock mass and oblique rock surface is tight Sideslip phenomenon is serious in heavy and irregular gradient geological process, impact opening position verticality, the hole position extremely difficult guarantee of misalignment of axe, And impact process easily generates card hammer, adjacent axially bored line is inconsistent to be difficult to form continuous wall construction, is applied according to rotary drilling rig It if Raft enclosed structures, can not be engaged between stake and stake, do not have water-proof function and not have per pile stake for single structure body Continuity, Support Function stability are poor.
Utility model content
The purpose of this utility model is that:It is proposed a kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, Form a kind of existing structure intensity has the Extra-Deep Foundation Pit system of sealing effect again.
The purpose of this utility model is realized by following technical proposals:
A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, it is characterised in that:Including being set along foundation pit walls Row's high pressure water mud inlet well stake on the outside of the row's rotary digging drilling hole reinforced concrete pile and foundation pit put, rotary digging drilling hole There are gaps between the stake and stake of reinforced concrete pile, and high pressure water mud inlet well stake is set between each stake and stake, At the top of rotary digging drilling hole reinforced concrete pile and middle part applies Guan Liang and waist rail respectively.
In the utility model, with reference to three kinds of rotary digging drilling hole stake, geotechnical boring, high-pressure slip-casting technological merits, rotary digging is first applied Drill reinforced concrete pile, and geotechnical boring is applied between stake and stake, and slip casting steel pipe is inserted into geotechnical boring to geotechnical boring Surrounding rock mass carries out high-pressure slip-casting and blocks rock cranny to reach sealing effect.Guan Liang is applied in rotary digging stake top, is being revolved after excavation Bar planting applies waist rail, Guan Liang and waist rail and rotary digging stake is linked into an integrated model in the middle part of digging stake, and it is strong to form a kind of existing structure Degree has the Extra-Deep Foundation Pit system of sealing effect again.
Alternatively, multiple tracks high pressure water mud inlet well stake is set between rotary digging drilling hole reinforced concrete pile.
Alternatively, rotary digging drilling hole reinforced concrete pile reinforcing bar reserves 0.45m length, rotary digging drilling hole armored concrete stake top Portion applies 0.5*0.8m Guan Liangs, in the middle part of rotary digging drilling hole reinforced concrete pile bar planting apply 0.5*0.5m waist rails.
Alternatively, steel reinforcement cage is equipped in rotary digging drilling hole reinforced concrete pile.
As further selection, rotary digging drilling hole reinforced concrete pile stake holes diameter 0.8m, pile center spacing 0.9m, interior steel Muscle cage diameter 0.7m, geotechnical boring diameter 108mm.In the program, preferred structural parameters so that Extra-Deep Foundation Pit system has Best structural strength has the balance quality of best sealing effect again simultaneously.
The aforementioned main scheme of the utility model and its each further selection scheme can be freely combined to form multiple schemes, The scheme that can be used and be claimed for the utility model;And the utility model, (each non conflicting selection) selection between and It can also be freely combined between other selections.Those skilled in the art are after the present invention program is understood according to the prior art and public affairs Know that common sense can be understood there are many combining, be the claimed technical solution of the utility model, do not do exhaustion herein.
The beneficial effects of the utility model:
1. evade the technology management and control risk that ground-connecting-wall is applied under irregular inclined rock base geological conditions;
2. mechanized construction degree is high, construction efficiency is done;
3. the structural protective system is easy for construction, there is no security risks.
Description of the drawings
Fig. 1 is the stake bit plane arrangement schematic diagram of the utility model embodiment;
Fig. 2 is the exemplary schematic diagram of maintenance system construction of the utility model embodiment;
Fig. 3 is the Guan Liang of the utility model embodiment and the exemplary schematic diagram of waist rail construction;
In figure, 1 is rotary digging drilling hole reinforced concrete wall, and 2 be high pressure water mud inlet well stake, and 3 Guan Liangs, 4 be waist rail.
Specific embodiment
The utility model is further described with reference to specific embodiments and the drawings.
With reference to shown in figure 1,2,3, a kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile are set along foundation pit walls Put the rotary digging drilling hole reinforced concrete pile and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, including set along foundation pit walls one Arrange row's high pressure water mud between rotary digging drilling hole reinforced concrete pile 1 on the outside of rotary digging drilling hole reinforced concrete pile 1 and foundation pit Inlet well stake 2, is equipped with steel reinforcement cage in rotary digging drilling hole reinforced concrete pile 1, the stake and stake of rotary digging drilling hole reinforced concrete pile 1 it Between there are gap, high pressure water mud inlet well stake 2 is set between each stake and stake.Foundation pit walls corner is not provided with churning driven Hole reinforced concrete pile 1, but directly several high pressure water mud inlet well stakes 2 are continuously set.Preferably, such as 1 institute of attached drawing Show, the continuously 2 high pressure water mud inlet well stakes 2 of setting of foundation pit walls corner.It is set at 1 top of rotary digging drilling hole reinforced concrete pile It puts Guan Liang 3 to link rotary digging stake, during long to the stake half depth of excavation of foundation pit, be planted on rotary digging drilling hole reinforced concrete pile 1 Muscle applies waist rail 4 and further links Raft.Preferably, as shown in attached drawing 2,3, rotary digging drilling hole reinforced concrete pile 1 Stake holes diameter 0.8m, pile center spacing 0.9m, interior steel reinforcement cage diameter 0.7m, geotechnical boring diameter 108mm.Guan Liang size is 0.5*0.8m, waist rail size are 0.5*0.5m
The Specific construction step of aforementioned utility model is as follows:
Rotary digging drilling hole reinforced concrete pile 1 stake holes diameter 0.8m, pile center spacing 0.9m, steel reinforcement cage diameter 0.7m, stake with Foundation pit lateral direction carries out geotechnical boring between stake, and bore diameter Ф 108mm are inserted into hot rolled seamless steel tube in geotechnical boring 4 Ф 10mm slurry outlets are opened in A108mm, thickness of pipe wall 6mm, length of tube direction every 200mm along circumferential direction.Steel pipe uses screw thread Connection, screw thread length are 15cm.Slip casting machine selects KBY50/70 hydraulic pressure slip casting machines to inject cement grout in steel pipe, and cement mortar is No. 42.5 Portland cements, the ratio of mud 0.8:1~1.5:1, grouting pressure control:First pressing 0.5MPa~1.0MPa, final pressure 2MPa stops slip casting after holding pressure 15min.The earthwork at the top of rotary digging drilling hole reinforced concrete pile is excavated, applies Guan Liang, in excavation pit Cubic metre of earth to waist rail absolute altitude, on drilling reinforced concrete pile is dug bar planting apply waist rail.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (5)

1. a kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, it is characterised in that:Including being set along foundation pit walls Row's rotary digging drilling hole reinforced concrete pile and foundation pit on the outside of row's high pressure water mud inlet well stake, rotary digging drilling hole steel There are gaps between the stake and stake of rib concrete pile, and high pressure water mud inlet well stake is set between each stake and stake, is being revolved It digs at the top of drilling reinforced concrete pile and middle part applies Guan Liang and waist rail respectively.
2. rotary digging stake as described in claim 1 and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, it is characterised in that:Rotary digging Multiple tracks high pressure water mud inlet well stake is set between drilling reinforced concrete pile.
3. rotary digging stake as described in claim 1 and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, it is characterised in that:Rotary digging Drilling reinforced concrete pile reinforcing bar reserves 0.45m length, and 0.5*0.8m Guan Liangs are applied at the top of rotary digging drilling hole reinforced concrete pile, Bar planting applies 0.5*0.5m waist rails in the middle part of rotary digging drilling hole reinforced concrete pile.
4. rotary digging stake as described in claim 1 and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, it is characterised in that:Rotary digging The reinforced concrete pile that drills is interior to be equipped with steel reinforcement cage.
5. rotary digging stake as claimed in claim 4 and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile, it is characterised in that:Rotary digging Drill reinforced concrete pile stake holes diameter 0.8m, pile center spacing 0.9m, interior steel reinforcement cage diameter 0.7m, geotechnical boring diameter 108mm。
CN201721380624.6U 2017-10-25 2017-10-25 A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile Active CN207469263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721380624.6U CN207469263U (en) 2017-10-25 2017-10-25 A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721380624.6U CN207469263U (en) 2017-10-25 2017-10-25 A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile

Publications (1)

Publication Number Publication Date
CN207469263U true CN207469263U (en) 2018-06-08

Family

ID=62264752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721380624.6U Active CN207469263U (en) 2017-10-25 2017-10-25 A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile

Country Status (1)

Country Link
CN (1) CN207469263U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293566A (en) * 2021-12-21 2022-04-08 中交二航局成都城市建设工程有限公司 Enclosure construction method suitable for subway station auxiliary structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293566A (en) * 2021-12-21 2022-04-08 中交二航局成都城市建设工程有限公司 Enclosure construction method suitable for subway station auxiliary structure
CN114293566B (en) * 2021-12-21 2023-08-22 中交二航局成都城市建设工程有限公司 Building envelope construction method suitable for subway station auxiliary structure

Similar Documents

Publication Publication Date Title
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN106245626A (en) A kind of hard formation churning driven enters method
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN104631438B (en) Long auger guncreting uplift pile construction method
CN104790408B (en) Irregular foundation pit construction method
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN1657711A (en) Rotary spray anchoring pile construction process
CN103835651A (en) Single-hole directional drilling local grouting raise boring technology
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN107339108B (en) The layer of sand location subway pipe shed construction method of underground water enrichment
CN108708743A (en) A method of using grouting treatment Tunnel Collapse
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN102660955A (en) Quick construction method for foundation pit slope support
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
CN110656947A (en) Method for tunneling raised section of seabed bedrock
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN105019431B (en) Crush and complete alternate steep dip stratified rock masses Large Diameter Super-long Bored Piles construction method
CN207469263U (en) A kind of rotary digging stake and the compound Extra-Deep Foundation Pit system of high-pressure slip-casting pile pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant