CN207462658U - A kind of climbing bridge with jungle gym - Google Patents

A kind of climbing bridge with jungle gym Download PDF

Info

Publication number
CN207462658U
CN207462658U CN201721522622.6U CN201721522622U CN207462658U CN 207462658 U CN207462658 U CN 207462658U CN 201721522622 U CN201721522622 U CN 201721522622U CN 207462658 U CN207462658 U CN 207462658U
Authority
CN
China
Prior art keywords
bar
bridge
spill
climbing
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721522622.6U
Other languages
Chinese (zh)
Inventor
刘三祥
陈兆宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Virgin Culture And Education Ltd Co In Wuhan Hundred Million
Original Assignee
Virgin Culture And Education Ltd Co In Wuhan Hundred Million
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Virgin Culture And Education Ltd Co In Wuhan Hundred Million filed Critical Virgin Culture And Education Ltd Co In Wuhan Hundred Million
Priority to CN201721522622.6U priority Critical patent/CN207462658U/en
Application granted granted Critical
Publication of CN207462658U publication Critical patent/CN207462658U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The technical program is related to amusement facility field, particularly a kind of climbing bridge with jungle gym, including at least bridge railings and the plain net being set between bridge railings and spill net, it is characterised in that:Bridge railings is located at the both sides of climbing bridge, bridge railings is connected with jungle gym, climbing bridge passes through the they sup-port that is arranged on bridge railings, bridge railings includes horizon bar, tilting bar, spill bar and fold-line-shaped bar, bridge railings being linked in sequence according to the first tilting bar, first level bar, spill bar, the first fold-line-shaped bar and the second tilting bar of bridge side is climbed, climbs bridge railings being linked in sequence according to third tilting bar, the second horizon bar, third horizon bar, the second fold-line-shaped bar and the 4th tilting bar of bridge opposite side.User can creep on the climbing bridge with jungle gym, temper limb force and body harmony, and jungle gym is climbed convenient for user and climbs bridge, and climbing bridge, which is additionally provided with, hangs the facilities such as stake, hanging ring and rope, is simultaneously participated in convenient for more children.

Description

A kind of climbing bridge with jungle gym
Technical field
The technical program is related to amusement facility field, particularly a kind of climbing bridge with jungle gym.
Background technology
Climbing class amusement facility is deep in recent years to be liked by children, can not only cultivate interest of the children to sports, and energy Temper the balanced capacity and muscle power of children.Large-scale climbing class amusement facility is convenient for house in order to which children are concentrated on fixed area at present Length is looked after, and is mainly fabricated to enclosed, and closed amusement facility is typically provided fixed entrance, such as Chinese invention patent A kind of closed amusement facility formed by outer net encirclement proposed in " one kind, which is travelled, climbs net " (CN2015101817495), Usually build higher of closed amusement facility in megastore is simultaneously stopped with iron wire and safety belt is tied up with children To ensure safety, the sense of participation of this enclosed climbing class amusement facility and not as good as open good, tying up safety belt can also limit The scope of activities of children processed, so open climbing class amusement facility is more suitable for the more children such as community and kindergarten at any time Entertain the place of group participation.However existing open amusement facility is mainly slide, swing, seesaw etc., it is in the form of a single Can not meet the needs of children.
Invention content
The purpose of this utility model is to provide a kind of open and various informative climbing class amusement facilities.
In order to achieve the goal above, the technical solution of the utility model is a kind of climbing bridge with jungle gym, at least wrap The plain net and spill net for including bridge railings and being set between bridge railings, it is characterised in that:Bridge railings is located at the both sides of climbing bridge, bridge Railing is connected with jungle gym, and climbing bridge is included horizon bar, tilted by the they sup-port that is arranged on bridge railings, bridge railings Bar, spill bar and fold-line-shaped bar, the both ends height of tilting bar is different and both ends are respectively equipped with circular arc shaped curvature, the tilting bar The bending direction in bending two ends portion is on the contrary, the turning point position circular arc chamfering of fold-line-shaped bar, the both ends of spill bar are higher than intermediate position; The bridge railings of bridge side is climbed according to the first tilting bar, first level bar, spill bar, the first fold-line-shaped bar and the second tilting bar It is linked in sequence, climbs the bridge railings of bridge opposite side according to third tilting bar, the second horizon bar, third horizon bar, the second fold-line-shaped Bar and the 4th tilting bar are linked in sequence, and plain net, first level bar and second are equipped between the first tilting bar and third tilting bar Spill net is equipped between horizon bar, plain net, the first fold-line-shaped bar and the second fold-line-shaped are equipped between spill bar and third horizon bar Bar forms climbing bridge turning site, is equipped with spill net between the first fold-line-shaped bar and the second fold-line-shaped bar, the second tilting bar and the Plain net is equipped between four tilting bars.
Moreover, jungle gym includes the vertical supporting rod being connect with bridge railings and is in serpentine or rectangular on vertical supporting rod The gangboard of shape setting.
Moreover, plain net between the first tilting bar and third tilting bar is equipped with skin skidding or climbing rope, positioned at the Plain net between two tilting bars and the 4th tilting bar is equipped with skin skidding or climbing rope.
Moreover, it is connected with rope between plain net and supporting rod, between supporting rod and supporting rod.
Moreover, spill side off the net between first level bar and the second horizon bar, which is equipped with, hangs stake, hang stake include with it is recessed The connection of shape net hangs stake rope, is set in the handle and foot pedal hung on stake rope.
Moreover, the spill side off the net between the first fold-line-shaped bar and the second fold-line-shaped bar is equipped with hanging ring, hanging ring and spill net Between connected by hanging ring rope.
Moreover, plain net and spill net are equipped with connecting portion, the connecting portion and plain net of plain net and spill net and spill net Grid be equipped with reinforcing member, reinforcing member surface circular arc chamfering.
Moreover, the both ends of bridge railings are equipped with connecting portion, the connecting portion of bridge railings is equipped with ring flange, outside ring flange Equipped with hemispherical fastener.
Moreover, being equipped with the safe fastener of arc above bridge railings, the safe fastener of arc includes card slot part and extension, card Slot part is matched with horizon bar, tilting bar, spill bar and fold-line-shaped bar size, and the outside of extension to climbing bridge extends.
Moreover, horizon bar both ends are connect respectively with the lower end of two tilting bars instead of spill bar.
In use, user can creep on the climbing bridge with jungle gym, limb force and body harmony are tempered, Jungle gym is climbed convenient for user and climbs bridge, and climbing bridge, which is additionally provided with, hangs the facilities such as stake, hanging ring and rope, same convenient for more children When participate in.
The advantageous effect of the technical program is:1st, the climbing bridge with jungle gym of the technical program is in open, more The place of group participation is entertained at any time suitable for the more children such as community and kindergarten, without limitation on the scope of activities of children;2、 Climbing bridge with jungle gym climbs web form with a variety of, can be suitable for various landform, can be put in vacant lot can also be placed on Enclosure wall side;3rd, the plain net between two tilting bars is equipped with skin skidding or climbing rope, user and can be slided from skin skidding Under, it can upward or downward be climbed by climbing rope;4th, climbing bridge is equipped with turning site, tempers user and turns on climbing bridge To skill;5th, bridge railings is connected with jungle gym, is climbed convenient for user and climbs bridge;6th, one when spill bar and fold-line-shaped bar make Body formed, the mode than plurality of rods splicing is more secured;7th, grid spacing is 120mm-140mm so that the legs and feet of children can be with It passes through, but more than waist cannot pass through, to ensure the safety of children;8th, it is bonded to each other between bridge railings with ring flange and uses spiral shell Nail locking, connection are more stable and firm;9th, the safe fastener of arc is equipped with above bridge railings, avoids children from high falling.
Description of the drawings
Fig. 1 is the schematic diagram of the climbing bridge embodiment with jungle gym;
Fig. 2 be mounted with the safe fastener of arc climb net schematic diagram;
Fig. 3 is the schematic diagram of the safe fastener of arc;
Reference sign:1st, the first tilting bar;2nd, first level bar;3rd, spill bar;4th, the first fold-line-shaped bar;5th, second Tilting bar;6th, supporting rod;7th, plain net;8th, spill net;9th, third tilting bar;10th, the second horizon bar;11st, third horizon bar;12、 Second fold-line-shaped bar;13rd, the 4th tilting bar;14th, gangboard;15th, skin skidding;16th, climbing rope;17th, rope;18th, stake is hung;19th, it holds ;20th, foot pedal;21st, hanging ring;22nd, the safe fastener of arc;23rd, jungle gym.
Specific embodiment
The technical program is illustrated below in conjunction with drawings and examples.
A kind of embodiment of the climbing bridge with jungle gym is as shown in Figure 1, the climbing bridge with jungle gym is in integrally to open Formula forms closed region not over outer net or fence, including at least bridge railings and the plain net being set between bridge railings 7 and Spill net 8, bridge railings are located at the both sides of climbing bridge, and bridge railings is connected with jungle gym 23, and jungle gym includes what is connect with bridge railings Vertical supporting rod and the gangboard 14 set on vertical supporting rod in serpentine or rectangle, climbing bridge is by being arranged on bridge railings On supporting rod 6 support, bridge railings includes horizon bar, tilting bar, spill bar and fold-line-shaped bar, and the both ends height of tilting bar is different And both ends are respectively equipped with circular arc shaped curvature, the bending direction in the tilting bar bending two ends portion on the contrary, tilting bar it is arc-shaped The bar cramp angle of bending section and tilting bar middle section is all higher than 90 degree;The turning point position circular arc chamfering of fold-line-shaped bar;Spill bar Both ends are higher than intermediate position, and horizon bar both ends are connect respectively with the lower end of two tilting bars can replace spill bar.Climb bridge The bridge railings of side is according to the first tilting bar 1, first level bar 2, spill bar 3, the first fold-line-shaped bar 4 and the second tilting bar 5 It is linked in sequence, climbs the bridge railings of bridge opposite side according to third tilting bar 9, the second horizon bar 10, third horizon bar 11, the second folding Linear 12 and the 4th tilting bar 13 of bar is linked in sequence, and plain net, first level are equipped between the first tilting bar and third tilting bar Spill net is equipped between bar and the second horizon bar, plain net, the first fold-line-shaped bar and the are equipped between spill bar and third horizon bar Two fold-line-shaped bars form climbing bridge turning site, spill net are equipped between the first fold-line-shaped bar and the second fold-line-shaped bar, second inclines Plain net is equipped between brace and the 4th tilting bar.
When in use, bridge railings is connected with jungle gym to the present embodiment, is climbed convenient for user and climbs bridge;First tilting bar Plain net between third tilting bar is equipped with skin skidding 15, and the plain net between the second tilting bar and the 4th tilting bar is equipped with and climbs Rope climbing 16, user can slide from skin skidding, can upward or downward be climbed by climbing rope, temper limb force;Make User can climb at relatively low spill bar and climb bridge, take exercises harmony;Spill net can temper the body association of user Tonality can also rest for user;The turning site of climbing bridge can temper steering skill of the user on climbing bridge.
Spill side off the net between first level bar and the second horizon bar, which is equipped with, hangs stake 18, hangs stake and includes and spill net Connection hangs stake rope, is set in the handle 19 and foot pedal 20 hung on stake rope, and user can be by way of mobile on stake is hung Temper limb force and body harmony.Spill side off the net between first fold-line-shaped bar and the second fold-line-shaped bar is equipped with hanging ring 21, connected between hanging ring and spill net by hanging ring rope, the length of hanging ring rope can identical also length interlock, user can utilize Hanging ring does the arm exercises such as chin-up and forward movement.
Be connected with rope 17 between plain net and supporting rod between spill bar and third horizon bar, supporting rod and supporting rod it Between be connected with rope 17.User by boring, around, climb, the different modes such as jump in the case where not contacting rope by rope, For tempering children's torso sensitivity and flexibility.
Plain net and spill net are equipped with connecting portion, the connecting portion and plain net of plain net and spill net and the grid of spill net Reinforcing member is equipped with, reinforcing member surface circular arc chamfering avoids user from being scraped off, and reinforcing member uses aluminum alloy materials, firm resistance to With.Rope used in plain net and spill net is extra large cable rope, and using nylon material, 6 strands of steel wires of interior package of restricting, grid spacing is 120mm- 140mm so that the legs and feet of children can be to pass through, but more than waist cannot pass through, to ensure the safety of children.
The both ends of bridge railings are equipped with connecting portion, and the connecting portion of bridge railings is equipped with ring flange, usage between bridge railings Blue disk is bonded to each other and uses screw locking, external to be fastened again with two hemispherical aluminium alloy fasteners.
Because there is the possibility for climbing out of the climbing bridge with jungle gym from eminence and falling in children, it is therefore desirable to carry out protection Measure.It is higher than the bridge railings of 80cm for height, the safe fastener 22 of arc is equipped with above bridge railings, the safe fastener of arc includes card Slot part and extension, as shown in figure 3, the safe fastener of arc can be stuck on bridge railings, card slot part and horizon bar, inclination Bar, spill bar and the matching of fold-line-shaped bar size, the outside of extension to climbing bridge extend, and Fig. 2 is is mounted with arc safety card Part climbs net schematic diagram, wherein it is the plain net between the first tilting bar and third tilting bar to climb net.The safe fastener table of arc Face is smooth, and children can not utilize the smooth surface of the safe fastener of arc to borrow power climbing, such children aloft when would not be from climbing It falls the both sides for climbing bridge.
Climbing pars basilaris pontis with jungle gym is equipped with cushion, and cushion can play the role of buffering.Supporting rod includes straight-bar and J Font bar uses straight-bar as supporting rod when bridge railings is nearer from the ground, bridge railings from the ground farther out (highly higher than 80cm) when Using J-shaped bar as supporting rod.

Claims (10)

1. a kind of climbing bridge with jungle gym, including at least bridge railings and the plain net being set between bridge railings and spill net, It is characterized in that:Bridge railings is located at the both sides of climbing bridge, and bridge railings is connected with jungle gym, and climbing bridge is by being arranged on bridge railings They sup-port, bridge railings includes horizon bar, tilting bar, spill bar and fold-line-shaped bar, the both ends height of tilting bar it is different and Both ends are respectively equipped with circular arc shaped curvature, and the bending direction in the tilting bar bending two ends portion is on the contrary, the turning point of fold-line-shaped bar Position circular arc chamfering, the both ends of spill bar are higher than intermediate position;The bridge railings of bridge side is climbed according to the first tilting bar, first level Bar, spill bar, the first fold-line-shaped bar and the second tilting bar are linked in sequence, and the bridge railings of climbing bridge opposite side tilts according to third Bar, the second horizon bar, third horizon bar, the second fold-line-shaped bar and the 4th tilting bar are linked in sequence, the first tilting bar and third Plain net is equipped between tilting bar, is equipped with spill net between first level bar and the second horizon bar, spill bar and third horizon bar it Between be equipped with plain net, the first fold-line-shaped bar and the second fold-line-shaped bar form climbing bridge turning site, the first fold-line-shaped bar and the second folding Spill net is equipped between linear bar, plain net is equipped between the second tilting bar and the 4th tilting bar.
2. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Jungle gym includes connecting with bridge railings Vertical supporting rod and the gangboard that is set on vertical supporting rod in serpentine or rectangle.
3. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Incline positioned at the first tilting bar with third Plain net between brace is equipped with skin skidding or climbing rope, the plain net between the second tilting bar and the 4th tilting bar are equipped with Skin skidding or climbing rope.
4. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Between plain net and supporting rod, support Rope is connected between bar and supporting rod.
5. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Positioned at first level bar and the second water Spill side off the net between flat bar, which is equipped with, hangs stake, hangs stake and hangs stake rope including what is connect with spill net, is set in and hangs holding on stake rope And foot pedal.
6. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:First fold-line-shaped bar and the second broken line Spill side off the net between shape bar is equipped with hanging ring, is connected between hanging ring and spill net by hanging ring rope.
7. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Plain net and spill net are equipped with connecting portion Position, the connecting portion and plain net of plain net and spill net and the grid of spill net are equipped with reinforcing member, and reinforcing member surface circular arc falls Angle.
8. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:The both ends of bridge railings are equipped with connection Position, the connecting portion of bridge railings are equipped with ring flange, hemispherical fastener are equipped with outside ring flange.
9. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Arc safety is equipped with above bridge railings Fastener, the safe fastener of arc include card slot part and extension, card slot part and horizon bar, tilting bar, spill bar and broken line Shape bar size matches, and the outside of extension to climbing bridge extends.
10. the climbing bridge according to claim 1 with jungle gym, it is characterised in that:Horizon bar both ends respectively with two The lower end connection of tilting bar replaces spill bar.
CN201721522622.6U 2017-11-15 2017-11-15 A kind of climbing bridge with jungle gym Active CN207462658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721522622.6U CN207462658U (en) 2017-11-15 2017-11-15 A kind of climbing bridge with jungle gym

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721522622.6U CN207462658U (en) 2017-11-15 2017-11-15 A kind of climbing bridge with jungle gym

Publications (1)

Publication Number Publication Date
CN207462658U true CN207462658U (en) 2018-06-08

Family

ID=62260710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721522622.6U Active CN207462658U (en) 2017-11-15 2017-11-15 A kind of climbing bridge with jungle gym

Country Status (1)

Country Link
CN (1) CN207462658U (en)

Similar Documents

Publication Publication Date Title
US6511383B1 (en) Multi-bay bungee-cord acrobatic suspension & trampoline structure
EP3115085B1 (en) Fitness system, fitness assembly arrangement and functional fitness elements
KR101932081B1 (en) Variable module type complex playing facility
CN207462658U (en) A kind of climbing bridge with jungle gym
CN107930005B (en) Open travel of one kind climbs bridge
CN207506909U (en) It is a kind of to carry the climbing bridge for hanging stake and hanging ring
CN207506905U (en) A kind of climbing bridge with rope
CN107875565B (en) Open travel of one kind climbs ring
CN207506904U (en) A kind of climbing bridge that net is climbed with U-shaped
CN207506901U (en) A kind of amusement climbing bridge
WO2016193805A1 (en) Adventure park
CN207462534U (en) One kind, which is played, climbs bridge
CN207506903U (en) One kind, which is travelled, climbs bridge
CN207462657U (en) A kind of climbing bridge
CN207506908U (en) A kind of climbing bridge that net is climbed with spill
CN207506907U (en) A kind of climbing bridge that net is climbed with basin shape
CN105715102A (en) Buffer fence for sports field
CN207462535U (en) A kind of climbing bridge that net is climbed with waveform
CN207506902U (en) A kind of climbing ring
CN207506906U (en) A kind of climbing bridge that net is laterally climbed with inclined-plane
US20080318733A1 (en) Acrobatic elevated-path amusement device
White The indoor climbing manual
KR200429261Y1 (en) sport apparatus of ethnic customs for a rope play
CN217163102U (en) Outdoor balance training device
CN212166504U (en) Composite entertainment facility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant