CN207420060U CN201721447054.8U CN201721447054U CN207420060U CN 207420060 U CN207420060 U CN 207420060U CN 201721447054 U CN201721447054 U CN 201721447054U CN 207420060 U CN207420060 U CN 207420060U
Authority
CN
China
Prior art keywords
gate
steel slab
embedded steel
working face
studdle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721447054.8U
Other languages
Chinese (zh)
Inventor
刘玉波
蒋成名
杨乐明
陈宁
廖付华
李慧明
倪晋伟
王伟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201721447054.8U priority Critical patent/CN207420060U/en
Application granted granted Critical
Publication of CN207420060U publication Critical patent/CN207420060U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of positioning tool for working face pre-embedded steel slab, including portal frame, the portal frame includes the gate-type crossbeam between the gate-type column of both sides and gate-type column, the bottom of the gate-type column is fixed with the pedestal being used to support on working face, the intermediate member of the gate-type crossbeam is equipped with slot, the both ends of the slot are connected to the studdle being movably connected in by nut on gate-type crossbeam, and the bottom of the studdle is connected with the collet for being used to support pre-embedded steel slab.The utility model, as one group, is one in front and one in back cooperated using two above-mentioned positioning tools, supports pre-embedded steel slab, then the height of pre-embedded steel slab is adjusted by the nut on studdle, is facilitated the installation of pre-embedded steel slab, is ensured the installation accuracy of pre-embedded steel slab;Simultaneously by the height of adjusting screw rod adjustment base so as to applied to such as there are on the gradient, rough installment work face.

Description

A kind of positioning tool for working face pre-embedded steel slab
Technical field
The utility model belongs to construction auxiliary equipment field, and in particular to a kind of in engineering construction to be used for working face pre-buried steel The positioning tool of plate.
Background technology
In engineering construction, the method for adjustment of traditional pre-embedded steel slab height and position is by pre-embedded steel slab before concrete initial set In Transducers Embedded in Concrete, then the adjustment of height and position being carried out, the pre-embedded steel slab set-up time that this method can be given is limited, and Installation accuracy is relatively low.At present, in some complex engineerings, the quantity of pre-embedded steel slab is more, species is more, installation accuracy is high, and traditional is pre- Engineering construction requirement can not be met by burying the method for adjustment of steel plate height and position.In order to ensure construction quality, it is necessary to develop Go out a kind of new pre-embedded steel slab positioning tool, for complex engineering.
Utility model content
The utility model is to avoid above-mentioned the shortcomings of the prior art, provides a kind of positioning work for pre-embedded steel slab Dress as the auxiliary mould that pre-embedded steel slab height and position are adjusted in engineering construction, to ensure pre-embedded steel slab installation accuracy, improves Construction quality.
The utility model adopts the following technical scheme that solve technical problem:
A kind of positioning tool for working face pre-embedded steel slab, including portal frame, the portal frame includes both sides Gate-type crossbeam between gate-type column and gate-type column, the bottom of the gate-type column, which is fixed with, to be used to support on working face Rectangular base, the intermediate member of the gate-type crossbeam is equipped with slot, and the both ends of the slot are connected to is lived by nut The dynamic studdle being connected on gate-type crossbeam, the bottom of the studdle is connected with the collet for being used to support pre-embedded steel slab.
Further, at least two tune that rectangular base height is adjusted by adjusting nut are connected in the rectangular base Save screw rod.
Compared with the prior art, the utility model has the beneficial effect that:1st, the utility model in engineering construction as adjusting Whole pre-embedded steel slab height and the positioning tool of position compared with traditional method of adjustment, can greatly improve the peace of pre-embedded steel slab Efficiency and precision are filled, ensures engineering construction quality;2nd, the utility model is equipped with the adjusting screw rod of flexible connection in rectangular base, So as to be applied to such as there are the gradient, rough installment work face, it is applied widely;3rd, the utility model can be group Zoarium system arranges corresponding positioning tool number according to engineering construction on-site actual situations, can also be coupled each positioning tool For entirety, flexibility height;4th, the structure that the utility model uses is simple, easy to assembly, low manufacture cost, and practicability is high.
Description of the drawings
Fig. 1 is the three-dimensional structure diagram of the utility model;
In figure:1st, rectangular base;2nd, adjusting screw rod;3rd, nut;4th, gate-type column;5th, gate-type crossbeam;6th, studdle;7、 Collet;8th, adjusting nut.
Specific embodiment
The preferred embodiment of the utility model is described in further detail below in conjunction with the accompanying drawings, following preferred embodiment is used for Illustrate the use of the new type, be not intended to limit the scope of the present invention.
As shown in Figure 1, this positioning tool includes portal frame, studdle, nut, collet, adjusting screw rod, rectangular base And adjusting nut, wherein the portal frame includes the gate-type column of both sides and connects the gate-type of two side door type column upper ends Crossbeam, the rectangular base are arranged on the lower end of gate-type column, for portal frame to be supported on to the work of installation pre-embedded steel slab On face;The middle part of the gate-type crossbeam is equipped with slot, and the studdle is arranged on the both ends of slot, and passes through upper and lower two The nut of side is fixed on gate-type crossbeam, and the upper-lower position of studdle can be adjusted by nut, while can be according to pre- The size for burying steel plate sets position of the studdle in slot;The bottom of the studdle is fixed with collet, the collet Using rectangular-shaped, pre-embedded steel slab is used to support.
As shown in Figure 1, connecting at least two adjusting screw rods by nut in the rectangular base, square is preferably provided in figure The corner end of shape pedestal, adjusting screw rod is fixed on pedestal by adjusting nut, and can adjust adjusting screw rod by adjusting nut and exist Upper-lower position on pedestal, so as to height of the adjustment base on working face.
The utility model uses process:When needing pre-embedded steel slab, pre-embedded steel slab is placed on collet, passes through studdle And position and the elevation of nut adjustment pre-embedded steel slab, while 4 screw rods by being set in two rectangular bases in left and right along surrounding, According to the irregularity degree or the gradient of working face, the height of each adjusting screw rod in specific aim adjustment rectangular base so that this practicality New placement is steadily secured, you can starts to install pre-embedded steel slab;In specific implementation, if pre-embedded steel slab length is larger, two are can be selected The front and rear collaboration of a or multiple the utility model is coupled work.
In order to make the purpose of this utility model, technical solution and advantage more concise, the above tool of the utility model Body embodiment illustrates, and is used only for description the utility model, it is impossible to be interpreted as the limitation to the scope of the utility model.It should It, should all when, it is noted that all any modification, equivalent and improvement done within the spirit and principle of the utility model etc. It is included within the scope of protection of this utility model.Therefore, the protection domain of the utility model patent should be with appended claims Subject to.

Claims (2)

1. a kind of positioning tool for working face pre-embedded steel slab, which is characterized in that including portal frame, the portal frame bag Include the gate-type column of both sides(4)And the gate-type crossbeam between gate-type column(5), the bottom of the gate-type column, which is fixed with, to be used for The rectangular base being supported on working face(1), the intermediate member of the gate-type crossbeam equipped with slot, distinguish by the both ends of the slot It is connected with and passes through nut(3)The studdle being movably connected on gate-type crossbeam(6), the studdle bottom connection it is useful In the collet of support pre-embedded steel slab(7).
2. the positioning tool according to claim 1 for working face pre-embedded steel slab, which is characterized in that the rectangular base On be connected at least two and pass through adjusting nut(8)Adjust the adjusting screw rod of rectangular base height(2).
CN201721447054.8U 2017-11-02 2017-11-02 A kind of positioning tool for working face pre-embedded steel slab Expired - Fee Related CN207420060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721447054.8U CN207420060U (en) 2017-11-02 2017-11-02 A kind of positioning tool for working face pre-embedded steel slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721447054.8U CN207420060U (en) 2017-11-02 2017-11-02 A kind of positioning tool for working face pre-embedded steel slab

Publications (1)

Publication Number Publication Date
CN207420060U true CN207420060U (en) 2018-05-29

Family

ID=62306829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721447054.8U Expired - Fee Related CN207420060U (en) 2017-11-02 2017-11-02 A kind of positioning tool for working face pre-embedded steel slab

Country Status (1)

Country Link
CN (1) CN207420060U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482689A (en) * 2020-11-23 2021-03-12 中国建筑第二工程局有限公司 Armored seam adjusting device and construction method thereof
CN115126265A (en) * 2022-06-22 2022-09-30 中国华冶科工集团有限公司 Embedded steel plate fixing and adjusting device and embedded steel plate construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482689A (en) * 2020-11-23 2021-03-12 中国建筑第二工程局有限公司 Armored seam adjusting device and construction method thereof
CN115126265A (en) * 2022-06-22 2022-09-30 中国华冶科工集团有限公司 Embedded steel plate fixing and adjusting device and embedded steel plate construction method

Similar Documents

Publication Publication Date Title
CN207420060U (en) A kind of positioning tool for working face pre-embedded steel slab
CN102398167A (en) Large area clamp for exhaust elbow drill
CN105643696A (en) Clamping device for cutting and cutting equipment with same
CN201707983U (en) Cementing equipment of insulating pipe and flange
CN204321477U (en) Vertical R6 cabinet welding anti-deformation fixture
CN203514803U (en) Clamping device for building wall templates
CN207027053U (en) A kind of door is clamping to determine carrier
CN205063353U (en) Mechanical type is buried bolt location installation component in advance
CN205271476U (en) Positioner
CN205464984U (en) Bracket processing mould
CN204748895U (en) Spacing recess mould fixing device of track board base
CN203712543U (en) Arc panel placing shelf
CN204117725U (en) A kind of suspended insulator cementing machine
CN203426986U (en) Multifunctional electric installation work bench
CN207521751U (en) A kind of good leaf spring perforating device of clamping effect
CN205571088U (en) Positioning mechanism
CN206839675U (en) A kind of fixture for being used to process decelerator mould assembling face
CN204603098U (en) A kind of bender centering means for correcting
CN205325237U (en) Box -like spare boring grab
CN204565508U (en) A kind of grillage rivet welding frock
CN205129226U (en) A frock that it is right that is used for JW4G framework to organize fast
CN204397189U (en) Multifunctional split-type group is to platform
CN204262914U (en) Modified form micro-brill computer controlled grinding frame machine bracing frame tool
CN204867838U (en) Thing platform is put to laser carving machine
CN203649983U (en) Thin-walled workpiece anti-deformation fixing and supporting clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529