CN207376562U - A kind of key water control project that can filter silt - Google Patents

A kind of key water control project that can filter silt Download PDF

Info

Publication number
CN207376562U
CN207376562U CN201621391049.5U CN201621391049U CN207376562U CN 207376562 U CN207376562 U CN 207376562U CN 201621391049 U CN201621391049 U CN 201621391049U CN 207376562 U CN207376562 U CN 207376562U
Authority
CN
China
Prior art keywords
flume
river
water control
control project
key water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621391049.5U
Other languages
Chinese (zh)
Inventor
肖让
张永玲
赵广兴
陈平平
张鹏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hexi University
Original Assignee
Hexi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hexi University filed Critical Hexi University
Priority to CN201621391049.5U priority Critical patent/CN207376562U/en
Application granted granted Critical
Publication of CN207376562U publication Critical patent/CN207376562U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to a kind of key water control projects, and in particular to a kind of key water control project that can filter silt.A kind of key water control project that can filter silt, by upper river(1), downstream river course(2)And flume(3)Composition, in upper river(1)Overfall dam is equipped with the centre position of downstream river course(4), upper river(1)Interior setting concave bank(5)And convex bank(6), flume(3)It is arranged on upper river(1)Side, setting pot(7)With anti-filter wall(8)It is arranged on flume(3)Inside.

Description

A kind of key water control project that can filter silt
Technical field
The utility model is related to a kind of key water control projects, and in particular to a kind of to have the function of the key water control project of desilting.
Background technology
Existing key water control project, while diversion, it is impossible to control silt well, often bring down substantial amounts of silt into Trip not only breaks up environment, and influences the growth of vegetation.
Flume is mainly used for irrigating, and introduces excessive silt and be easy to cause canal silting, and is unfavorable for irrigating, and also has It may cause the desertification in soil.
In addition, existing sloot, there are great in constructing amount, big for mountain construction difficulty, stability is low, later maintenance into The problems such as this is big.
After to existing key water control project largely investigate and analyse in depth, designing a kind of has the function of desilting for we Key water control project.
The content of the invention
There is the key water control project of desilting it is an object of the invention to provide a kind of.
Key water control project of the present invention, by upper river (1), downstream river course (2) and flume (3) composition, in upstream The centre position of river (1) and downstream river course is equipped with overfall dam (4), and concave bank (5) and convex bank (6) are set in upper river (1), is drawn Water channel (3) is arranged on the side of upper river (1), and setting pot (7) and anti-filter wall (8) are arranged on the inside of flume (3).
In upper river and downstream river course:
Wherein, on overfall dam (4), equipped with sand discharge lock (9).
Wherein, stiling basin (10) is arranged on the junction between downstream river course (2) and overfall dam (4).
Wherein, the height of upper river (1) is higher than downstream river course (2).The two shows from top to bottom, position from high to low Put relation.
Wherein, upper river (1), the both sides of downstream river course (2) are equipped with river wall (12),
Wherein, river wall (10) is vertically set on above upper river and downstream river course.Anchor is set at river wall (12) Bar (11).
In flume:
Wherein, flume (3) is arranged on the side of upper river (1), and setting pot (7) is arranged on the inside of flume (3).
Wherein, setting pot (7) is funnel shaped wide at the top and narrow at the bottom.In the bottom of setting pot (7), sediment outflow gate (13) is set. In the lower section of sediment outflow gate (13), the sand discharging pump (14) of one three-way shape is set.
Wherein, desilting pipeline (15) is housed in the interface of sand discharging pump (14), is connected in the other end of desilting pipeline (15) Downstream river course (2).Silt is flowed by desilting pipeline in downstream river course.
Wherein, water-drawing gate (16) and stiling basin (17) are set on the top of flume (3).
Wherein, water gate (18) is set in the bottom of flume (3).
Wherein, the quantity of setting pot (7) can be configured according to the size of current and the content of sandstone.Can be 1-5 It is a, it is preferably 3.
Wherein, upper river (1) and the junction of flume (3), are provided with trash rack (19).
Wherein, anti-filter wall (8) is mounted on the rear of setting pot (7), and the current into flume first pass through the heavy of setting pot Form sediment, after in the filtering by anti-filter wall, finally flow out flume.
Wherein, anti-filter wall (8) is made of pillar, strainer, loaded filter.
The structure composition of anti-filter wall from inside to outside is:The penetralia of anti-filter wall is pillar, and one is wrapped up in the outer surface of pillar Layer has the strainer of certain plasticity, is the loaded filter of graded gravel in the outer layer of strainer.
Loaded filter is made of multi-layer with uniform and weather resistance sand, gravel, cobble or rubble.
Material requirements used in above-mentioned anti-filter wall is:Columnar stays structure should have enough intensity and durability degree to support Load;The dead weight of anti-filter wall and water pressure can be supported and transferred to strainer and indeformable close to rigid structure;For loaded filter, every layer Gravel grading is uniform, and grain size increases with seepage direction, and loaded filter should have enough sizes to adapt to possible inhomogeneous deformation.
In the present invention, the function of above-mentioned all parts is as follows:
There is enough height difference in upper river with downstream river course.On the one hand the water in upper river is enabled to pass through overfall dam Dirt sand is brought in into downstream river course;On the other hand the dirt sand in flume can be made to drain into downstream river course by desilting pipeline.
The design of the radian of concave bank and convex bank can be designed according to landform, actual current, reach optimal design effect, To reach saving material.
Meanwhile river is arranged to concave bank and convex bank, from hydrodynamics and the law of inertia, convex bank current are slower, make A large amount of sediment depositions are deposited in the convex bank of key water control project, and concave bank current are very fast, and the sediment charge of concave bank is relatively low in river, flume I.e. from the diversion of concave bank side.
The angle of flume and downstream river course and overfall dam should go to calculate according to Practical Project requirement, and 30 ° of angular range- 50°。
The plane height of flume is higher than upper river, effectively bed load sediment can be controlled to enter water-drawing channel.
The water inlet of flume will set trash rack.Prevent branch, spoil in upper river entrained by water etc. Impurity enters flume.
Sand discharge lock is provided on overfall dam, and is provided with sand discharge hole.Part can be also played when sand discharge lock is not opened The effect of sand discharge also can be that downstream ecology needs to provide part water source.
River almost horizontal before overfall dam, to accumulate drop.It, can be with when sedimentation amount reaches design sediment outflow amount Starting gate washes away the sand setting of overfall dam upstream using the prop-carrying capacity in river itself.
The present invention sets overfall dam and another effect for having sand discharge lock to be that it is possible to ensure water diversion flow in dry season, Simultaneously flooding action is played in the flood water phase.
Steel-slag sand is mounted on sand discharge lock.But steel-slag sand easily corrodes in environment, we use the moon of sacrificial anode Pole Protection Code protects steel-slag sand.Spelter is arranged according to actual needs.
Stiling basin is provided with after overfall dam, it is placed over to have baffle wall style.By hydraulic jump, the torrent that discharge structure is released It is changed into unhurried current, to eliminate the Energy Dissipation Modes of kinetic energy.The flowing water effectively reduced rapidly washes away downstream river course (2).
River wall is arranged to vertical pattern, improves the trapezium structure of traditional mode.The excavation in mountain area is reduced with after Phase difficulty of construction.
River wall, the vertical mode of setting reduce stability, we are provided with (9) anchor pole inside it, to enhance Its stability.
The effect of stiling basin of the present invention and function:By hydraulic jump, the torrent that discharge structure is released is changed into Unhurried current, to eliminate the Energy Dissipation Modes of kinetic energy.Because its mainstream is located at gool bottom, therefore also known as energy dissipation by hydraulic jump.Energy dissipation by hydraulic jump mainly by Strong turbulent fluctuation, shearing and blending effect between the surface roller of hydraulic jump generation and rotary roll and underflow.It has fluid stable, energy dissipating The advantages that effect is preferable, adaptable to geological conditions and tail water luffing, and tail water fluctuation is small, and maintenance cost saves.Meanwhile stiling basin On be provided with baffle wall style, the effect of energy dissipating is made to become more preferable.
Setting pot slows down the flow velocity of water using its width, so that the ability that flowing water carries silt is greatly reduced, silt Setting pot bottom will be deposited on.Setting pot bottom is arranged to infundibulate, facilitates to form vortex, in order to sediment outflow.
When sand setting amount reaches a certain setting value, sediment outflow gate and sand pump are opened, is vortexed in setting pot, sand setting quilt Discharge.
The effect of water-drawing gate:Natural water is introduced into this water conservancy projects according to water diversion flow requirement.
The effect of stiling basin:The kinetic energy of natural water is eliminated, its flow velocity is reduced, facilitates follow-up sand discharge process.
The effect of trash rack:Prevent natural water surface floating material (branch, dead wood, production and living rubbish etc.) into originally Water conservancy projects.
Sand discharging pump, in the present invention, each sand discharging pump are connected to two sediment outflow pipelines, usually only use wherein one, separately A piece conduct is spare.Control cost can so be greatlyd save.The sand discharging pump and sediment outflow gate of sediment outflow are all positioned in underground gallery It is interior, facilitate the maintenance of staff.
Most silt is discharged into downstream river course to pipeline at last, pipeline exposure river wall, this be in order to prevent silt in river side bank Bulk deposition interferes river normal operation.
Anti-filter wall:Graded gravel from fine to coarse is subject to strainer and columnar stays structure.Graded gravel requirement any layer Particle does not allow the hole through adjacent thicker one layer.The particle of same layer can not generate relative movement.Strainer use compared with The material of high intensity, shape and position to fixed graded gravel.Columnar stays structure, that is, pile is for ensuring that anti-filter wall Position and the required structure of stability, but it is noted that must not influence current normal through or cause larger whirlpool.
When current by when, the sieve of graded gravel picture from level to level has blocked the different silt of particle size, and current then may be used With normal through.The silt that anti-filter wall upstream is blocked can be discharged to channel (river) by measures such as scouring sluice, sand pumps.
Channel wall can be arranged to vertical in form by the present invention in view of mountain construction is more difficult, to reduce excavated volume.It is but vertical Be unfavorable for enhancing its stability, therefore we set anchor pole on river wall, make its it is firm be fixed on ground, ensure its energy Bear corresponding pressure.
The present invention cannot make overall plans for existing key water control project, i.e., diversion while cannot be guaranteed downstream ecology demand; Withered, the news water phase cannot effectively be controlled to reach diversion requirement and ensure building safety.Provide a preferable settling mode.
The present invention has the characteristics that compared with existing key water control project:
The present invention key water control project so that the flowing water of upstream high sediment concentration can reduction of speed desilting, reduce sediment charge.Upper strata Clear water enters water-drawing channel, to prevent bed load sediment from entering water-drawing channel, the datum line of flume is taken to be higher than river ground To a certain degree, while trash rack is set to prevent sundries from entering flume.
Tract disposes overfall dam, can be while water diversion flow is ensured in dry season, in flood water phase flood control and disaster reduction.Horizontal river The drop of road accumulation, improves water diversion, can wash away upstream shoal materials by current sand carrying capacity when the guillotine door was open.
Meanwhile the present invention can effectively be lowered into the sediment charge of flume, and the no longer manually method of dredging Handle the desilting of upstream.
What the key water control project of the present invention was designed primarily directed to mountain area, the design of sloot bend:According to upland water stream Speed design channel bending degree.Flume position:It chooses optimum position opening at sloot and flume is set.Accumulation falls Difference:According to landform longitudinal slope, channel length is designed, upstream silt can be washed away by ensureing the head of accumulation, and for people Desilting in work channel can drain into river downstream by desilting pipeline.Channel cofferdam:Using vertical pattern, with solving mountain area Shape excavates the problem of difficulty is big, reduces construction volume.To ensure stability, riveting muscle is added in wherein.Selection:It takes on the spot as far as possible Material reduces cost, but has to calculate materials according to the actual demand of related specifications and hydraulic engineering.
The key water control project of the present invention, can not only realize 100m3The water diversion flow of/s, and disclosure satisfy that and stop 0.1mm More than silt enters the effect of flume.We used a series of component building objects, and on the basis of mountain area building is considered Trash rack, electrochemical anti-corrosive etching method etc. are used.We know very well the importance of the safe operation of engineering construction, therefore, in order to The irrigation in mountain area flume layout on plane engineering can be permanent performance water conservancy effect, ensure its trouble-free operation, we be its There is provided more firm structures, facilitate subsequent use, and create facility as big as possible for possible repair.
Description of the drawings
The resultative construction figure of Fig. 1, key water control project
Fig. 2, overfall dam
Fig. 3, setting pot
Fig. 4, anti-filter wall
It is marked in figure:
Upper river (1), downstream river course (2), flume (3), overfall dam (4), concave bank (5) and convex bank (6), setting pot (7), anti-filter wall (8), sand discharge lock (9), stiling basin (10), anchor pole (11), river wall (12), sediment outflow gate (13), sand discharging pump (14), desilting pipeline (15), water-drawing gate (16), stiling basin (17), water gate (18), trash rack (19),
Specific embodiment
By specific examples below, the present invention is further illustrated, but not as the limitation of the present invention.
Embodiment 1, key water control project
Key water control project of the present invention, by upper river (1), downstream river course (2) and flume (3) composition, in upstream The centre position of river (1) and downstream river course is equipped with overfall dam (4), and concave bank (5) and convex bank (6) are set in upper river (1), is drawn Water channel (3) is arranged on the side of upper river (1), and setting pot (7) and anti-filter wall (8) are arranged on the inside of flume (3).
In upper river and downstream river course:
Wherein, on overfall dam (4), equipped with sand discharge lock (9).
Wherein, stiling basin (10) is arranged on the junction between downstream river course (2) and overfall dam (4).
Wherein, the height of upper river (1) is higher than downstream river course (2).The two shows from top to bottom, position from high to low Put relation.
Wherein, upper river (1), the both sides of downstream river course (2) are equipped with river wall (12),
Wherein, river wall (10) is vertically set on above upper river and downstream river course.Anchor is set at river wall (12) Bar (11).
Embodiment 2, key water control project
Key water control project of the present invention, by upper river (1), downstream river course (2) and flume (3) composition, in upstream The centre position of river (1) and downstream river course is equipped with overfall dam (4), and concave bank (5) and convex bank (6) are set in upper river (1), is drawn Water channel (3) is arranged on the side of upper river (1), and setting pot (7) and anti-filter wall (8) are arranged on the inside of flume (3).
In flume:
Wherein, flume (3) is arranged on the side of upper river (1), and setting pot (7) is arranged on the inside of flume (3).
Wherein, setting pot (7) is funnel shaped wide at the top and narrow at the bottom.In the bottom of setting pot (7), sediment outflow gate (13) is set. In the lower section of sediment outflow gate (13), the sand discharging pump (14) of one three-way shape is set.
Wherein, desilting pipeline (15) is housed in the interface of sand discharging pump (14), is connected in the other end of desilting pipeline (15) Downstream river course (2).Silt is flowed by desilting pipeline in downstream river course.
Wherein, water-drawing gate (16) and stiling basin (17) are set on the top of flume (3).
Wherein, water gate (18) is set in the bottom of flume (3).
Wherein, the quantity of setting pot (12) can be configured according to the size of current and the content of sandstone.Can be 1-5 It is a, it is preferably 3.
Wherein, upper river (1) and the junction of flume (3), are provided with trash rack (19).
Wherein, anti-filter wall (8) is mounted on the rear of setting pot (12), and the current into flume first pass through the heavy of setting pot Form sediment, after in the filtering by anti-filter wall, finally flow out flume.

Claims (6)

1. a kind of key water control project that can filter silt, which is characterized in that by upper river(1), downstream river course(2)And flume (3)Composition, in upper river(1)Overfall dam is equipped with the centre position of downstream river course(4), upper river(1)Interior setting concave bank (5)And convex bank(6), flume(3)It is arranged on upper river(1)Side, setting pot(7)With anti-filter wall(8)It is arranged on diversion Canal(3)Inside,
Wherein, setting pot(7)For funnel shaped wide at the top and narrow at the bottom, in setting pot(7)Bottom set sediment outflow gate(13), arranging Sand gate(13)Lower section set a three-way shape sand discharging pump(14),
Wherein, anti-filter wall(8)Mounted on setting pot(7)Rear, the current into flume first pass through the precipitation of setting pot, after In the filtering by anti-filter wall, flume is finally flowed out.
2. key water control project according to claim 1, which is characterized in that in overfall dam(4)On, equipped with sand discharge lock(9).
3. key water control project according to claim 1, which is characterized in that stiling basin(10)It is arranged on downstream river course(2)With overflowing Flow dam(4)Between junction.
4. key water control project according to claim 1, which is characterized in that upper river(1), downstream river course(2)Both sides set There is river wall(20).
5. key water control project according to claim 1, which is characterized in that in sand discharging pump(14)Interface be equipped with desilting pipeline (15), in desilting pipeline(15)The other end connection downstream river course(2).
6. key water control project according to claim 1, which is characterized in that in flume(3)Top set water-drawing gate(16) And stiling basin(10), in flume(3)Bottom set water gate(18).
CN201621391049.5U 2016-12-17 2016-12-17 A kind of key water control project that can filter silt Expired - Fee Related CN207376562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621391049.5U CN207376562U (en) 2016-12-17 2016-12-17 A kind of key water control project that can filter silt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621391049.5U CN207376562U (en) 2016-12-17 2016-12-17 A kind of key water control project that can filter silt

Publications (1)

Publication Number Publication Date
CN207376562U true CN207376562U (en) 2018-05-18

Family

ID=62297247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621391049.5U Expired - Fee Related CN207376562U (en) 2016-12-17 2016-12-17 A kind of key water control project that can filter silt

Country Status (1)

Country Link
CN (1) CN207376562U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108529831A (en) * 2018-05-31 2018-09-14 广西恒晟水环境治理有限公司 A kind of full ecological management system of earth's surface drinking water source ground contamination
CN109736270A (en) * 2019-01-03 2019-05-10 张文庆 A kind of river environmental protection governing system
CN110284460A (en) * 2019-07-02 2019-09-27 中设工程咨询(重庆)股份有限公司 Hydraulic Projects processed based on modularization filtering layer are constructed
CN114753314A (en) * 2022-04-24 2022-07-15 中国电建集团西北勘测设计研究院有限公司 Structure of husky is arranged in subsiding water of many silt channels

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108529831A (en) * 2018-05-31 2018-09-14 广西恒晟水环境治理有限公司 A kind of full ecological management system of earth's surface drinking water source ground contamination
CN109736270A (en) * 2019-01-03 2019-05-10 张文庆 A kind of river environmental protection governing system
CN109736270B (en) * 2019-01-03 2021-05-18 张文庆 River environmental protection governance system
CN110284460A (en) * 2019-07-02 2019-09-27 中设工程咨询(重庆)股份有限公司 Hydraulic Projects processed based on modularization filtering layer are constructed
CN114753314A (en) * 2022-04-24 2022-07-15 中国电建集团西北勘测设计研究院有限公司 Structure of husky is arranged in subsiding water of many silt channels
CN114753314B (en) * 2022-04-24 2024-01-19 中国电建集团西北勘测设计研究院有限公司 Sediment outflow structure of many silt channels

Similar Documents

Publication Publication Date Title
CN207376562U (en) A kind of key water control project that can filter silt
CN109056761A (en) Channel cleanout method
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN207392122U (en) It is a kind of that there is the key water control project of desilting
CN1330830C (en) Technology for repairing basement of lake steep bank inshore water area
CN104805799A (en) Heavy metal-polluted ephemeral stream sediment dredging method
WO2021097934A1 (en) Debris flow prevention system
CN203782664U (en) Anti-scour structure of sandy foundation water gate
CN207392146U (en) A kind of key water control project with filtering function
CN206562602U (en) A kind of water conservancy anti-clogging gate
CN108457237A (en) A kind of dredging sand discharge dam system's arrangement system and its working method
JP3918043B2 (en) Sand discharge and mud drainage system method for water storage and intake dams and sand discharge and mud discharge method for water storage and intake dams
CN110344374A (en) Mud-rock flow flexible blocking backstop and mud-rock flow flexibility blocking dam
CN207904879U (en) A kind of Debris Flow on Slope Surface improvement integration engineering structure
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN109338982A (en) A kind of clear erosion and deposition regulating reservoir of diversion works head storage
Boroujeni Sediment management in hydropower dam (case study–Dez dam project)
CN205604186U (en) Clay core morals and manners material dam
CN204676677U (en) Silting blocking formula inverted-siphon sewer system
CN104831689B (en) A kind of automatic flood control, the water intake facilities of anti-alluvial of blowdown
CN104762922B (en) A kind of Controlling Debris Flow method based on waterpower purge source
Auel et al. Sediment management in the Solis reservoir using a bypass tunnel
CN103790223B (en) A kind of karst depression drainage system
CN206986826U (en) It is a kind of can effective reduction of speed desilting key water control project
CN102383401A (en) Overflow water drainage integral type sluice weir

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518