CN207368634U - Intelligent air switchs - Google Patents

Intelligent air switchs Download PDF

Info

Publication number
CN207368634U
CN207368634U CN201721489461.5U CN201721489461U CN207368634U CN 207368634 U CN207368634 U CN 207368634U CN 201721489461 U CN201721489461 U CN 201721489461U CN 207368634 U CN207368634 U CN 207368634U
Authority
CN
China
Prior art keywords
intelligent air
air switch
unit
data acquisition
acquisition unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721489461.5U
Other languages
Chinese (zh)
Inventor
李建保
郑炜
李夏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengshi Locke (ya Dong) Intelligent Technology Co Ltd
Original Assignee
Shengshi Locke (ya Dong) Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengshi Locke (ya Dong) Intelligent Technology Co Ltd filed Critical Shengshi Locke (ya Dong) Intelligent Technology Co Ltd
Priority to CN201721489461.5U priority Critical patent/CN207368634U/en
Application granted granted Critical
Publication of CN207368634U publication Critical patent/CN207368634U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model discloses a kind of intelligent air switch, intelligent air switch includes housing, end of incoming cables and leading-out terminal on the housing, breaking units are opened between the end of incoming cables and the leading-out terminal, with the data acquisition unit opened breaking units and be connected, the data analysis unit and communication unit being connected with the data acquisition unit, the data acquisition unit is used for the circuit parameter for detecting the intelligent air switch, the data analysis unit is used to analyze and process the circuit parameter that the data acquisition unit detects, the communication unit is sent to external server for the fault message that the circuit parameter for detecting the data acquisition unit and the data analysis unit are analyzed.Running circuit parameter and fault can be uploaded to external server by the utility model so that field review is not required in professional staff and user, you can knows circuit parameter and fault.

Description

Intelligent air switchs
Technical field
A kind of the utility model air switch technical field, and in particular to intelligent air switch.
Background technology
Air switch is one kind of breaker.Usually by air switch be arranged between city's circuit and interior circuit, with for The faults such as short circuit, overload, under-voltage occur for the electrical equipment that electricity consumption electric current exceedes in rated current, circuit in interior circuit It is automatic to disconnect, damaged to avoid the dangerous phenomenon of the electricity consumption caused by fault, such as electrical fire or electrical equipment.
In the prior art, such as there is air switch tripping, it is necessary to which professional staff is on the spot to each in interior circuit Item circuit parameter measures, so as to investigate to obtain guilty culprit.So not only the work efficiency of staff is low, but also gives User brings inconvenience.
Therefore, it is necessary to providing a kind of new air switch solves above-mentioned technical problem.
Utility model content
The main purpose of the utility model is to provide a kind of intelligent air switch, it is intended to solves existing air switch and jumps Lock phenomenon needs manually inconvenience caused by investigation on the spot.
To achieve the above object, the utility model proposes intelligent air switch include housing, on the housing End of incoming cables and leading-out terminal, opening breaking units, opening breaking units phase with described between the end of incoming cables and the leading-out terminal The data acquisition unit of connection, the data analysis unit being connected with the data acquisition unit and communication unit, the data Collecting unit is used for the circuit parameter for detecting the intelligent air switch, and the data analysis unit is used to analyze and process the number The circuit parameter detected according to collecting unit, described in the communication unit is used to detecting the data acquisition unit The fault message that circuit parameter and the data analysis unit are analyzed is sent to external server.
Preferably, the communication unit is additionally operable to receive the control signal that the external server is sent, the Intelligent air Air cock further includes control unit, and described control unit is used to receive the control signal from the communication unit, and according to institute State and open breaking units described in control signal control.
Preferably, it is described open breaking units include being arranged on breaking buckle releaser between the end of incoming cables and the leading-out terminal, Over-pressed buckle releaser, overload release and device for under-voltage releasing equipment.
Preferably, it is described open breaking units further include it is de- with the breaking buckle releaser, the over-pressed buckle releaser, the overload Device and the handle of device for under-voltage releasing equipment linkage are detained, the through hole for exposing the handle is offered on the housing.
Preferably, the breaking units of opening further include the cantilever being oppositely arranged with the handle, and described control unit is used for The cantilever motion is controlled to stir the handle.
Preferably, the intelligent air switch further includes the multiple LED lights being connected with the data acquisition unit, Multiple LED lights respectively with the breaking buckle releaser, over-pressed buckle releaser, the overload release and the undervoltage tripping Device corresponds.
Preferably, the intelligent air switch further includes storage battery, and the storage battery is used for for the communication unit and institute State data acquisition unit power supply.
Preferably, the data acquisition unit further includes the power data collecting unit being connected with the end of incoming cables, described Power data collecting unit is used to measure the electric power for flowing through the intelligent air switch.
Preferably, the intelligent air switch further includes display screen, and the display screen is used to show the data acquisition list The data and/or the communication unit that member detects receive the fault type that the external server obtains.
In technical solutions of the utility model, by setting data analysis unit and data acquisition unit, so that without receiving and distributing Dynamic measurement, you can know fault and circuit parameter;By setting communication unit, so as to monitor and obtain intelligent air The circuit parameter and fault of switch, it is real without professional staff so that professional staff and user check Ground is investigated, and professional staff can also know the circuit problem in user's use.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other attached drawings can also be obtained according to the structure shown in these attached drawings.
Fig. 1 is the cellular construction schematic diagram that the utility model intelligent air switchs an embodiment;
Fig. 2 is the dimensional structure diagram that the utility model intelligent air switchs an embodiment.
Drawing reference numeral explanation:
Label Title Label Title
100 Intelligent air switchs 1 Housing
2 End of incoming cables 3 Data analysis unit
4 Open breaking units 5 Data acquisition unit
6 Communication unit 7 Control unit
8 Handle 9 LED light
10 Display screen 11 Cantilever
12 Storage battery 200 External server
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise Lower all other embodiments obtained, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining relative position relation under a certain particular pose (as shown in drawings) between each component, motion conditions etc., such as When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, and it cannot be managed in the utility model such as relating to the description of " first ", " second " etc. is only used for description purpose Solve to indicate or implying its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " the One ", at least one this feature can be expressed or be implicitly included to the feature of " second ".It is " more in the description of the utility model It is a " it is meant that at least two, such as two, three etc., unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " connection ", " fixation " etc. should do broad sense reason Solution, for example, " fixation " can be fixedly connected or be detachably connected, or integrally;Can mechanically connect, also may be used Be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be the connection inside two elements Or the interaction relationship of two elements, unless otherwise restricted clearly.For the ordinary skill in the art, can be with Concrete meaning of the above-mentioned term in the utility model is understood as the case may be.
In addition, the technical solution between each embodiment of the utility model can be combined with each other, but must be with ability Domain those of ordinary skill can be implemented as basis, will be understood that when the combination appearance of technical solution is conflicting or can not realize The combination of this technical solution is not present, also not within the protection domain of the requires of the utility model.
The utility model proposes a kind of intelligent air switch.
Referring to Fig.1 and 2, wherein, Fig. 1 is the cellular construction signal that the utility model intelligent air switchs an embodiment Figure, Fig. 2 are the dimensional structure diagram that the utility model intelligent air switchs an embodiment.In one embodiment of the utility model In, intelligent air switch 100 includes housing 1, the end of incoming cables 2 on housing 1 and leading-out terminal, arranged on end of incoming cables 2 and outlet Breaking units 4 are opened between end, with opening data acquisition unit 5 that breaking units 4 are connected, being connected with data acquisition unit 5 Data analysis unit 3 and communication unit 6, data acquisition unit 5 be used for detect intelligent air switch 100 circuit parameter, number The circuit parameter detected according to analytic unit 3 for analyzing and processing data collecting unit 5, communication unit 6 are used for data acquisition The fault message that circuit parameter and data analysis unit 3 analysis that unit 5 detects obtain is sent to external server 200.
Specifically, circuit parameter can be electric current, voltage, power etc..Data analysis unit 3 can be analyzed by pre-set programs Circuit parameter obtains fault type.Data acquisition unit 5 will detect obtained circuit parameter by communication unit 6 send to External server 200, communication unit 6 can specifically be established with external server 200 by SIM card and communicated, and can also pass through route Device is established with external server 200 and communicated.Professional staff obtains circuit parameter by logging in external server 200, accurately Analyze and fault type and counter-measure are provided, then fault type and counter-measure are sent to user terminal, for User refers to.Such as obtain flowing through when detection intelligent air switch 100 electric current it is excessive, voltage is normal, you can judgement is somebody's turn to do Intelligent air switchs the current overload of 100 place circuits, if being provided only with 2 on the circuit where intelligent air switch 100 Air-conditioning, data analysis unit 3 can generate the volume that air-conditioning power is excessive, suggests 1 air-conditioning of closing or heightens intelligent air switch 100 The information of constant current, and sent by external server 200 for reference to user terminal.
By setting data analysis unit 3 and data acquisition unit 5, so that without manual measurement, you can know circuit Failure and circuit parameter;By setting communication unit 6, so as to monitor and obtain the circuit parameter of intelligent air switch 100 And fault, so that professional staff and user check, investigated on the spot without professional staff, professional work Personnel can also know the circuit problem in user's use.
In one embodiment, communication unit 6 is additionally operable to receive the control signal that external server 200 is sent, intelligent air Switch 100 further includes control unit 7, and control unit 7 is used to receive control signal from communication unit 6, and according to control signal control System opens breaking units 4.Specifically, operational order can be transmitted to external server 200, external server in user or staff 2002 generate and send control signal according to operational order refers to intelligent air switch 100, intelligent air switch 100 according to operation The operations such as power-off, energization, modification rated current, modification rated voltage are made in order.
Further, opening breaking units 4 includes being arranged on breaking buckle releaser, overvoltage between the end of incoming cables 2 and leading-out terminal Buckle releaser, overload release and device for under-voltage releasing equipment.By setting breaking buckle releaser between end of incoming cables 2 and leading-out terminal, crossing pressure-off Device, overload release and device for under-voltage releasing equipment are detained, can prevent occur open circuit, overvoltage, overload and under-voltage fault on circuit.
Yet further, breaking units 4 are opened to further include and breaking buckle releaser, over-pressed buckle releaser, overload release and under-voltage The handle 8 of buckle releaser linkage, offers the through hole for exposing handle 8 on housing 1.By setting handle 8 so that refer to when by operation Order cannot make intelligent air switch 100 power-off or be powered when, can by 8 mechanically actuated intelligent air of handle switch 100 power-off or It is powered.
In one embodiment, breaking units 4 are opened and further include the cantilever 11 being oppositely arranged with handle 8, control unit 7 is used to control Cantilever 11 processed is moved with toggle handle 8.In this embodiment, when cantilever 11 remains static, cantilever 11 and 8 relative spacing of handle Set;When cantilever 11 is in running order, cantilever 11 rotates, and its one end contacts for 8 casees with handle, and promotes handle 8 to move, so that Realize the power-off or energization of intelligent air switch 100.Specifically.When intelligent air switch 100 is in "on" position, at handle 8 In open position, control unit 7 controls cantilever 11 to rotate so that and one end of cantilever 7 is contacted with handle 8, and cantilever 7 continues to move, So as to promote handle 8 in the closed position, the power-off of intelligent air switch 100 is realized.
Intelligent air switch 100 further includes the multiple LED lights 9 being connected with data acquisition unit 5, and multiple LED refer to Show that lamp 9 is corresponded with breaking buckle releaser, over-pressed buckle releaser, overload release and device for under-voltage releasing equipment respectively.Specifically, intelligence is worked as When air switch 100 powers off, LED light 9 corresponding with failure lights, and such as breaking buckle releaser causes to power off, then corresponding open circuit The LED light 9 of buckle releaser lights.By setting LED light 9 so that user can quickly identify specifically which kind of circuit occur Failure.
Intelligent air switch 100 further includes storage battery 12, and it is communication unit 6 and data acquisition unit 5 that storage battery 12, which is used for, Power supply.Specifically, storage battery 12 can be used for being communication unit in the case where intelligent air switch 100 cannot be powered by city's circuit 6 and data acquisition unit 5 power.Intelligent air switch 100 is commonly used in connection city's circuit and interior circuit, when breaking down When, intelligent air switch 100 will disconnect the connection of interior circuit and city's circuit, to prevent that electricity consumption is dangerous caused by fault Problem, by setting storage battery 12 so that after a loss of power, communication unit 6 and data acquisition unit 5 are remained to external server 200 send data.
Data acquisition unit 5 further includes the power data collecting unit being connected with end of incoming cables 2, and power data collecting unit is used The electric power of intelligent air switch 100 is flowed through in measurement.By setting power data collecting unit, it is hereby achieved that user Electric power, so that user or external server 200 analyze the electricity consumption situation in a period of time.
Intelligent air switch 100 further includes display screen 10, and display screen 10 is used for the number that display data collecting unit 5 detects According to and/or communication unit 6 receive the obtained fault type of external server 200.Specifically, external server 200 is sent Control signal is to control unit 7, the reason for control unit 7 shows fault according to control signal control display screen 10, example Such as display circuit short circuit, circuit overloads are leaked electricity.
The above is only the preferred embodiment of the present invention, and it does not limit the scope of the patent of the present invention, It is every under the design of the utility model, equivalent structure transformation made based on the specification and figures of the utility model, or Directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (9)

1. a kind of intelligent air switch, it is characterised in that end of incoming cables and leading-out terminal including housing, on the housing, set Between the end of incoming cables and the leading-out terminal open breaking units, with the data acquisition list opened breaking units and be connected Member, the data analysis unit being connected with the data acquisition unit and communication unit, the data acquisition unit are used to detect The circuit parameter of the intelligent air switch, the data analysis unit are detected for analyzing and processing the data acquisition unit The circuit parameter, the communication unit is used for the circuit parameter that detects the data acquisition unit and the number The fault message analyzed according to analytic unit is sent to external server.
2. intelligent air switch as claimed in claim 1, it is characterised in that the communication unit is additionally operable to receive the outside The control signal that server is sent, the intelligent air switch further include control unit, and described control unit is used for from described logical Believe that unit receives the control signal, and breaking units are opened according to control signal control.
3. intelligent air as claimed in claim 2 switch, it is characterised in that it is described open breaking units include being arranged on it is described into Breaking buckle releaser, over-pressed buckle releaser, overload release and device for under-voltage releasing equipment between line end and the leading-out terminal.
4. intelligent air switch as claimed in claim 3, it is characterised in that the breaking units of opening further include and the open circuit Buckle releaser, the over-pressed buckle releaser, the overload release and the handle of device for under-voltage releasing equipment linkage, open up on the housing There is the through hole for exposing the handle.
5. intelligent air switch as claimed in claim 4, it is characterised in that the breaking units of opening further include and the handle The cantilever being oppositely arranged, described control unit are used to control the cantilever motion to stir the handle.
6. intelligent air switch as claimed in claim 3, it is characterised in that the intelligent air switch further includes and the number The multiple LED lights being connected according to collecting unit, multiple LED lights respectively with the breaking buckle releaser, described cross pressure-off Device, the overload release and the device for under-voltage releasing equipment is detained to correspond.
7. the intelligent air switch as any one of claim 1 to 6, it is characterised in that the intelligent air switch is also Including storage battery, the storage battery is used to power for the communication unit and the data acquisition unit.
8. the intelligent air switch as any one of claim 1 to 6, it is characterised in that the data acquisition unit is also Including the power data collecting unit being connected with the end of incoming cables, the power data collecting unit flows through the intelligence for measurement The electric power of energy air switch.
9. the intelligent air switch as any one of claim 1 to 6, it is characterised in that the intelligent air switch is also Including display screen, the display screen is used to showing that the data that the data acquisition unit detects and/or the communication unit to connect Receive the fault type that the external server obtains.
CN201721489461.5U 2017-11-08 2017-11-08 Intelligent air switchs Expired - Fee Related CN207368634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721489461.5U CN207368634U (en) 2017-11-08 2017-11-08 Intelligent air switchs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721489461.5U CN207368634U (en) 2017-11-08 2017-11-08 Intelligent air switchs

Publications (1)

Publication Number Publication Date
CN207368634U true CN207368634U (en) 2018-05-15

Family

ID=62343649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721489461.5U Expired - Fee Related CN207368634U (en) 2017-11-08 2017-11-08 Intelligent air switchs

Country Status (1)

Country Link
CN (1) CN207368634U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110164740A (en) * 2019-05-31 2019-08-23 汤楷鹏 A kind of intelligent air switch and its control method
CN118033208A (en) * 2024-04-12 2024-05-14 江苏尚研电力科技有限公司 Intelligent air switch

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110164740A (en) * 2019-05-31 2019-08-23 汤楷鹏 A kind of intelligent air switch and its control method
CN110164740B (en) * 2019-05-31 2021-04-27 汤楷鹏 Intelligent air switch and control method thereof
CN118033208A (en) * 2024-04-12 2024-05-14 江苏尚研电力科技有限公司 Intelligent air switch
CN118033208B (en) * 2024-04-12 2024-06-18 江苏尚研电力科技有限公司 Intelligent air switch

Similar Documents

Publication Publication Date Title
US20090184804A1 (en) Method and apparatus for monitoring a building
CN206774470U (en) New Type of Low Voltage Circuit Breaker with Data Detection function
CN207368634U (en) Intelligent air switchs
CN110556923A (en) Distribution transformer data monitoring terminal, monitoring system and monitoring method
CN103311984A (en) Alternating current charging post for electric automobile
CN109212308A (en) intelligent breaker
CN115112970A (en) Method and system for monitoring state of pressure plate at outlet of relay protection operation loop
CN107611794A (en) Fire-fighting power distribution cabinet based on bas and fas monitoring systems
CN207638324U (en) A kind of circuit breaker intelligent controller
CN203444008U (en) High-voltage charge display locking device
CN109708687A (en) Monitoring system of pole-mounted switch
CN109546746A (en) Monitor for electricity use and monitoring method
CN107732864A (en) Intelligent air switch system, mobile terminal and server
CN109521311B (en) Relay protection multi-outlet pressing plate measuring instrument
CN208272608U (en) Overcurrent protection relay circuit and overcurrent protection relay
CN217087167U (en) Power distribution cabinet with intelligent monitoring function
CN208753985U (en) Intelligent lightning protection device and the lightning protection box for protecting three-phase circuit
CN202502139U (en) High-voltage charged display device
CN109412899A (en) Centralized receiving display system
CN114236246A (en) System and method for detecting backup capability of FTU (fiber to the Unit) super capacitor
CN106329729A (en) Intelligent power distribution terminal based on distributed type virtual plug-in
CN113030747A (en) Station storage battery pack checking discharge test system
CN208690917U (en) A kind of arc extinguishing type protective device
CN208385846U (en) Integrated ring network cabinet with DTU
CN206096281U (en) Monitoring devices to 400V power supply system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

Termination date: 20181108

CF01 Termination of patent right due to non-payment of annual fee