CN207356047U - A kind of water squeezing structure and collodion mop for collodion mop - Google Patents

A kind of water squeezing structure and collodion mop for collodion mop Download PDF

Info

Publication number
CN207356047U
CN207356047U CN201621448115.8U CN201621448115U CN207356047U CN 207356047 U CN207356047 U CN 207356047U CN 201621448115 U CN201621448115 U CN 201621448115U CN 207356047 U CN207356047 U CN 207356047U
Authority
CN
China
Prior art keywords
water squeezing
section
water
length
collodion head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621448115.8U
Other languages
Chinese (zh)
Inventor
李克全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Argotech Home Furnishing Products Co Ltd
Original Assignee
Zhejiang Argotech Home Furnishing Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Argotech Home Furnishing Products Co Ltd filed Critical Zhejiang Argotech Home Furnishing Products Co Ltd
Application granted granted Critical
Publication of CN207356047U publication Critical patent/CN207356047U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning Implements For Floors, Carpets, Furniture, Walls, And The Like (AREA)

Abstract

The utility model discloses a kind of water squeezing structure and collodion mop for collodion mop, the multiple water squeezing sections including connecting rod and being rollably sheathed in connecting rod, the water squeezing section includes water squeezing portion and an at least extension, and the drainage space for draining is equipped between adjacent water squeezing portion.The utility model manufacture is easy, and product qualification rate is high;Assembly manipulation is convenient and efficient, time saving and energy saving, and production efficiency is high;The pressure action that collodion head is subject to is big, and collodion head water squeezing is clean, and water squeezing work efficiency is high.

Description

A kind of water squeezing structure and collodion mop for collodion mop
Technical field
Utility model belongs to burnisher technical field, more particularly, to a kind of water squeezing structure for collodion mop.
Background technology
Collodion mop is the common cleaning thing of Modern Family, because its cleaning capacity it is strong, it is easy to use, clean and wring out just The advantages that prompt and be extensively popular.Chinese patent CN203763016 U are disclosed《A kind of ball mop》, including mophead, cleaning Head, pull rod, tie rod and two ball bars, resistance is small, and flushing operation is laborsaving.But under this kind of structure, ball sets for independent ball Put, and be directly solidly set in shaft core;Ball bar is larger for the frictional resistance of collodion head during water squeezing so that water squeezing is more painstaking; And when shaft core meets aquatic rust, it is necessary to be replaced to whole ball bar, maintenance cost is higher.
Utility model content
In order to overcome the deficiencies of the prior art and provide, a kind of manufacture is simple, energy-saving and environment-friendly to be used for collodion to the utility model The water squeezing structure and collodion mop and mop of mop.
To achieve these goals, the utility model uses following technical scheme:A kind of water squeezing knot for collodion mop Structure, including connecting rod and multiple water squeezing sections for being rollably sheathed in connecting rod, the water squeezing section include water squeezing portion and at least One extension, the drainage space for draining is equipped between adjacent water squeezing portion.Water squeezing section in the utility model can opposite connection Bar rolls, and the frictional force between water squeezing section and collodion head can reduce nearly 30%, and the reduction frictional resistance of high degree, water squeezing is more It is laborsaving;And due to being mutually separately set between connecting rod and water squeezing section, when connecting rod is got rusty, individually connecting rod can be carried out more Change;When abrasion or damage occur for water squeezing section, water squeezing section also can be only individually replaced, compares the situation that both match somebody with somebody admittedly, can very big journey The reduction maintenance cost of degree, also more energy conservation and environmental protection;The manufacture of card during to(for) water squeezing section and connecting rod, which is matched somebody with somebody, to be required to reduce, water squeezing section Accuracy during perforation reduces, as long as ensureing that pore size is more than connecting rod, processing is simple, is less prone to scrap products, Improve production qualification rate;Meanwhile in assembling process, frictional force is not present between water squeezing section inner wall and connecting rod outer wall, connect Bar can be penetrated to water squeezing section easily, compare the situation that water squeezing section is connected, and assembling speed can improve at least 2 times, and high degree carries High efficiency;And the number of assembler or the quantity of equipment can be reduced, and effectively reduce production cost;
Further, there is provided drainage space, extruding force of the drainage space in water squeezing for collodion head is almost nil, And then water squeezing structure carries out collodion head the area reduction of squeezing action;In the case of equal pressure, the size and work of pressure Be inversely proportional with the size of area, then in the case where active area reduces, water squeezing structure increases for the local pressure of collodion head, More than 50% is enhanced for the active force of collodion head extruding so that at least 2 times of water squeezing effect promoting, cotton head water squeezing are more clean;
Also, air present in collodion head can quickly be discharged by the drainage space of both sides, further reduce water squeezing The resistance being subject in operation, feel is light during water squeezing, more laborsaving, improves at least 2 times of water squeezing efficiency;Certainly, water squeezing Cheng Zhong, the water in collodion head can also be flowed out via the drainage space, and drainage speed improves nearly 40%, effectively accelerates water squeezing speed, Improve water squeezing efficiency;Also, collodion head will be partly caught in drainage space during water squeezing, water squeezing section and collodion head it Between there is certain frictional force, and then collodion head is not susceptible to slipping phenomenon, and water squeezing section can realize collodion head good extruding, The active force of its extruding is also more balanced at the same time, and water squeezing effect is good;
Furthermore process of the ball in manufacture and shaping is numerous and diverse, inefficiency;Moreover, the material given up when processing ball Expect more, material consumption is serious, and cost is higher;, can be by a body of rod and the water squeezing section manufacture in the utility model is relatively easy to Directly cutting forms multiple water squeezing sections, and the manufacture of counter ball reduces manufacturing process, and processing duration reduces so that production effect Rate improves at least 40%;And when processing water squeezing section, the material given up is few, the consumptive material into 30% is reduced, reduces manufacture cost, Also more energy conservation and environmental protection;Secondly, the connecting rod can be metallic rod made of rigid material, such as iron, stainless steel, aluminium alloy, Firmness is high, and long-time service is also not susceptible to deform or damage, service life length.
Preferably, rotation stop coordinates between the adjacent water squeezing section;Realize the synchronization action between multiple water squeezing sections, compared to Mutual free rolling situation, the frictional resistance between water squeezing section and collodion head can reduce nearly 30%, the reduction friction of high degree Resistance, water squeezing are more laborsaving.
Preferably, the length of the water squeezing section is arranged to 18-22mm;When the length of water squeezing section is in this kind of value range, Its water squeezing effect for collodion head is best, in the case of comparing other length values, can improve at least 20% water squeezing amount, right It is more clean in the water squeezing of collodion head.
Or it is preferable, the length of the drainage space is arranged to 6-9mm;When the length of drainage space is in this kind of value range When, its water squeezing effect for collodion head is best, in the case of comparing other length values, can improve at least 20% water squeezing amount, Water squeezing for collodion head is more clean;And particularly in the case of water squeezing section and drainage space are matched, water squeezing structure The overall water squeezing effect for collodion head is best, compares other length mated conditions, can improve at least 30% water squeezing amount, for The water squeezing of collodion head is more clean;And under this kind of structure, collodion head long-time service will not also deform damage, service life It is long.
Preferably, at least part outer surface of the water squeezing section is equipped with anti-slip structure;Since the outer wall of ball is light It is sliding to set so that easily skid between ball and cleaning head, the work of extruding poor hence for the squeezing effect of cleaning head Firmly also easily unbalanced, the easy residual water of cleaning head, causes water squeezing effect poor;By the setting of anti-slip structure, can effectively increase Frictional force greatly between collodion head and water squeezing section so that water squeezing structure carries out collodion head good extruding, and water squeezing effect is more preferable; Furthermore water squeezing rod outer surface need not carry out smooth processing, and the smooth situation of counter ball, reduces at least two procedures, processing Duration shortens so that production efficiency improves at least 60%.
The utility model additionally provides a kind of water squeezing structure for collodion mop, including connecting rod and is rollably arranged The drainage space for draining is equipped between multiple water squeezing sections in connecting rod, adjacent water squeezing section;Squeezing in the utility model Water section can be rolled with respect to connecting rod, and the frictional force between water squeezing section and collodion head can reduce nearly 30%, the reduction friction of high degree Resistance, water squeezing are more laborsaving;And due to being mutually separately set between connecting rod and water squeezing section, can be independent when connecting rod is got rusty Connecting rod is replaced;When abrasion or damage occur for water squeezing section, water squeezing section also can be only individually replaced, compares what both matched somebody with somebody admittedly Situation, can high degree reduction maintenance cost, also more energy conservation and environmental protection;The manufacture of card during to(for) water squeezing section and connecting rod is matched somebody with somebody will Reduction is asked, accuracy when water squeezing section is perforated reduces, as long as ensureing that pore size is more than connecting rod, processing is simple, is not easy There are scrap products, improve production qualification rate;Meanwhile in assembling process, do not deposited between water squeezing section inner wall and connecting rod outer wall In frictional force, connecting rod can be penetrated to water squeezing section easily, compare the situation that water squeezing section is connected, and assembling speed can improve at least 2 Times, high degree improves production efficiency;And the number of assembler or the quantity of equipment can be reduced, and effectively reduce production cost;
Further, there is provided drainage space, extruding force of the drainage space in water squeezing for collodion head is almost nil, And then water squeezing structure carries out collodion head the area reduction of squeezing action;In the case of equal pressure, the size and work of pressure Be inversely proportional with the size of area, then in the case where active area reduces, water squeezing structure increases for the local pressure of collodion head, More than 50% is enhanced for the active force of collodion head extruding so that at least 2 times of water squeezing effect promoting, cotton head water squeezing are more clean;
Also, air present in collodion head can quickly be discharged by the drainage space of both sides, further reduce water squeezing The resistance being subject in operation, feel is light during water squeezing, more laborsaving, improves at least 2 times of water squeezing efficiency;Certainly, water squeezing Cheng Zhong, the water in collodion head can also be flowed out via the drainage space, and drainage speed improves nearly 40%, effectively accelerates water squeezing speed, Improve water squeezing efficiency;Also, collodion head will be partly caught in drainage space during water squeezing, water squeezing section and collodion head it Between there is certain frictional force, and then collodion head is not susceptible to slipping phenomenon, and water squeezing section can realize collodion head good extruding, The active force of its extruding is also more balanced at the same time, and water squeezing effect is good.
The utility model additionally provides a kind of collodion mop, including collodion head, water squeezing frame and the water squeezing on water squeezing frame Structure;The multiple water squeezing sections including connecting rod and being rollably sheathed in connecting rod, the water squeezing section include water squeezing portion and extremely Lack an extension, the drainage space for draining is equipped between adjacent water squeezing portion.Water squeezing section in the utility model opposite can connect Extension bar rolls, and the frictional force between water squeezing section and collodion head can reduce nearly 30%, and the reduction frictional resistance of high degree, water squeezing is more To be laborsaving;And due to being mutually separately set between connecting rod and water squeezing section, when connecting rod is got rusty, individually connecting rod can be carried out Replace;When abrasion or damage occur for water squeezing section, water squeezing section also can be only individually replaced, compares the situation that both match somebody with somebody admittedly, can be very big The reduction maintenance cost of degree, also more energy conservation and environmental protection;The manufacture of card during to(for) water squeezing section and connecting rod, which is matched somebody with somebody, to be required to reduce, water squeezing Accuracy during section perforation reduces, as long as ensureing that pore size is more than connecting rod, processing is simple, is less prone to and scraps production Product, improve production qualification rate;Meanwhile in assembling process, frictional force is not present between water squeezing section inner wall and connecting rod outer wall, even Extension bar can be penetrated to water squeezing section easily, compare the situation that water squeezing section is connected, and assembling speed can improve at least 2 times, high degree Improve production efficiency;And the number of assembler or the quantity of equipment can be reduced, and effectively reduce production cost;
Further, there is provided drainage space, extruding force of the drainage space in water squeezing for collodion head is almost nil, And then water squeezing structure carries out collodion head the area reduction of squeezing action;In the case of equal pressure, the size and work of pressure Be inversely proportional with the size of area, then in the case where active area reduces, water squeezing structure increases for the local pressure of collodion head, More than 50% is enhanced for the active force of collodion head extruding so that at least 2 times of water squeezing effect promoting, cotton head water squeezing are more clean;
Also, air present in collodion head can quickly be discharged by the drainage space of both sides, further reduce water squeezing The resistance being subject in operation, feel is light during water squeezing, more laborsaving, improves at least 2 times of water squeezing efficiency;Certainly, water squeezing Cheng Zhong, the water in collodion head can also be flowed out via the drainage space, and drainage speed improves nearly 40%, effectively accelerates water squeezing speed, Improve water squeezing efficiency;Also, collodion head will be partly caught in drainage space during water squeezing, water squeezing section and collodion head it Between there is certain frictional force, and then collodion head is not susceptible to slipping phenomenon, and water squeezing section can realize collodion head good extruding, The active force of its extruding is also more balanced at the same time, and water squeezing effect is good;
Furthermore process of the ball in manufacture and shaping is numerous and diverse, inefficiency;Moreover, the material given up when processing ball Expect more, material consumption is serious, and cost is higher;, can be by a body of rod and the water squeezing section manufacture in the utility model is relatively easy to Directly cutting forms multiple water squeezing sections, and the manufacture of counter ball reduces manufacturing process, and processing duration reduces so that production effect Rate improves at least 40%;And when processing water squeezing section, the material given up is few, the consumptive material into 30% is reduced, reduces manufacture cost, Also more energy conservation and environmental protection;Secondly, the connecting rod can be metallic rod made of rigid material, such as iron, stainless steel, aluminium alloy, Firmness is high, and long-time service is also not susceptible to deform or damage, service life length.
Preferably, rotation stop coordinates between the adjacent water squeezing section;Realize the synchronization action between multiple water squeezing sections, compared to Mutual free rolling situation, the frictional resistance between water squeezing section and collodion head can reduce nearly 30%, the reduction friction of high degree Resistance, water squeezing are more laborsaving.
Preferably, the length of the water squeezing section is arranged to 18-22mm;When the length of water squeezing section is in this kind of value range, Its water squeezing effect for collodion head is best, in the case of comparing other length values, can improve at least 20% water squeezing amount, right It is more clean in the water squeezing of collodion head.
Or it is preferable, the length of the drainage space is arranged to 6-9mm;When the length of drainage space is in this kind of value range When, its water squeezing effect for collodion head is best, in the case of comparing other length values, can improve at least 20% water squeezing amount, Water squeezing for collodion head is more clean;And particularly in the case of water squeezing section and drainage space are matched, water squeezing structure The overall water squeezing effect for collodion head is best, compares other length mated conditions, can improve at least 30% water squeezing amount, for The water squeezing of collodion head is more clean;And under this kind of structure, collodion head long-time service will not also deform damage, service life It is long.
A kind of collodion mop, including collodion head, water squeezing frame and be respectively arranged at left and right sides of the water squeezing frame at least two Arrange follower;The follower includes connecting rod and the multiple water squeezing sections being rollably sheathed in connecting rod, the water squeezing section The drainage space for draining is equipped with including water squeezing portion and an at least extension, between adjacent water squeezing portion;Upper row's follower On rhone and lower row's follower on rhone be interlaced setting.When single follower is set, collodion head corresponds to The position of drainage space is unable to reach and extracted completely, by the setting of two rows of followers, and drainage space interlocks by less than extruding Set, the drainage space correspondence of lower row's follower is in the water squeezing section of upper row's follower so that collodion head is not affected by lower exclusion water The part of the drainage space extruding of rod, when arranging the position of follower on being moved to, can be extruded by the water squeezing section of row's follower, from And all positions of collodion head can obtain sufficient extruding, displacement improves 30%, and water squeezing effect is more preferable;And due to drainage space Be staggered, collodion head is not easy to be scratched, long-time service will not also be damaged, and service life is longer during water squeezing; Water squeezing section in the utility model can be rolled with respect to connecting rod, and the frictional force between water squeezing section and collodion head can reduce nearly 30%, pole The reduction frictional resistance of big degree, water squeezing are more laborsaving;And due to being mutually separately set between connecting rod and water squeezing section, work as connection When bar gets rusty, individually connecting rod can be replaced;When abrasion or damage occur for water squeezing section, water squeezing also can be only individually replaced Section, compares the situation that both match somebody with somebody admittedly, can high degree reduction maintenance cost, also more energy conservation and environmental protection;For water squeezing during manufacture The card of section and connecting rod, which is matched somebody with somebody, to be required to reduce, and accuracy when water squeezing section is perforated reduces, as long as ensureing that pore size is more than connecting rod , processing is simple, is less prone to scrap products, improves production qualification rate;Meanwhile in assembling process, water squeezing section inner wall with Frictional force is not present between connecting rod outer wall, connecting rod can be penetrated to water squeezing section easily, compare the situation that water squeezing section is connected, dress At least 2 times can be improved with speed, high degree improves production efficiency;And the number of assembler or the quantity of equipment can be reduced, Effectively reduce production cost;
Further, there is provided drainage space, extruding force of the drainage space in water squeezing for collodion head is almost nil, And then water squeezing structure carries out collodion head the area reduction of squeezing action;In the case of equal pressure, the size and work of pressure Be inversely proportional with the size of area, then in the case where active area reduces, water squeezing structure increases for the local pressure of collodion head, More than 50% is enhanced for the active force of collodion head extruding so that at least 2 times of water squeezing effect promoting, cotton head water squeezing are more clean;
Also, air present in collodion head can quickly be discharged by the drainage space of both sides, further reduce water squeezing The resistance being subject in operation, feel is light during water squeezing, more laborsaving, improves at least 2 times of water squeezing efficiency;Certainly, water squeezing Cheng Zhong, the water in collodion head can also be flowed out via the drainage space, and drainage speed improves nearly 40%, effectively accelerates water squeezing speed, Improve water squeezing efficiency;Also, collodion head will be partly caught in drainage space during water squeezing, water squeezing section and collodion head it Between there is certain frictional force, and then collodion head is not susceptible to slipping phenomenon, and water squeezing section can realize collodion head good extruding, The active force of its extruding is also more balanced at the same time, and water squeezing effect is good;
Furthermore process of the ball in manufacture and shaping is numerous and diverse, inefficiency;Moreover, the material given up when processing ball Expect more, material consumption is serious, and cost is higher;, can be by a body of rod and the water squeezing section manufacture in the utility model is relatively easy to Directly cutting forms multiple water squeezing sections, and the manufacture of counter ball reduces manufacturing process, and processing duration reduces so that production effect Rate improves at least 40%;And when processing water squeezing section, the material given up is few, the consumptive material into 30% is reduced, reduces manufacture cost, Also more energy conservation and environmental protection;Secondly, the connecting rod can be metallic rod made of rigid material, such as iron, stainless steel, aluminium alloy, Firmness is high, and long-time service is also not susceptible to deform or damage, service life length.
Preferably, rotation stop coordinates between the adjacent water squeezing section;Realize the synchronization action between multiple water squeezing sections, compared to Mutual free rolling situation, the frictional resistance between water squeezing section and collodion head can reduce nearly 30%, the reduction friction of high degree Resistance, water squeezing are more laborsaving.
Preferably, the length of the water squeezing section is arranged to 18-22mm;When the length of water squeezing section is in this kind of value range, Its water squeezing effect for collodion head is best, in the case of comparing other length values, can improve at least 20% water squeezing amount, right It is more clean in the water squeezing of collodion head.
Or it is preferable, the length of the drainage space is arranged to 6-9mm;When the length of drainage space is in this kind of value range When, its water squeezing effect for collodion head is best, in the case of comparing other length values, can improve at least 20% water squeezing amount, Water squeezing for collodion head is more clean;And particularly in the case of water squeezing section and drainage space are matched, water squeezing structure The overall water squeezing effect for collodion head is best, compares other length mated conditions, can improve at least 30% water squeezing amount, for The water squeezing of collodion head is more clean;And under this kind of structure, collodion head long-time service will not also deform damage, service life It is long.
In conclusion the utility model has the following advantages:Manufacture is easy, and product qualification rate is high;Assembly manipulation facilitates fast Victory, time saving and energy saving, production efficiency is high;The pressure action that collodion head is subject to is big, and collodion head water squeezing is clean, and water squeezing work efficiency is high.
Brief description of the drawings
Fig. 1 is the structure diagram of the first embodiment of water squeezing structure.
Fig. 2 is the partial exploded view of Fig. 1.
Fig. 3 is the structure diagram of second of embodiment of water squeezing structure.
Fig. 4 is the structure diagram of the third embodiment of water squeezing structure
Fig. 5 is the structure diagram of collodion mop.
Fig. 6 is the partial schematic diagram of water squeezing frame.
Embodiment
It is real below in conjunction with the utility model in order to make those skilled in the art be better understood from the utility model The attached drawing in example is applied, clear, complete description is carried out to the technical scheme in the embodiment of the utility model.
Embodiment 1
As shown in Figs 1-4, a kind of water squeezing structure for collodion mop, can be symmetrically disposed on the water squeezing frame of mop, into And drainage space is formed between two water squeezing structures, when collodion head is pulled up into drainage space, water squeezing structure can be to collodion head Extruded, the water on collodion head is extruded, realizes the water squeezing of mop;The water squeezing structure includes connecting rod 1, multiple water squeezing sections 2 and drainage space 3, the multiple water squeezing section 2 be rollably sheathed in connecting rod 1, the water squeezing section includes water squeezing portion 21 An at least extension 22, when 2 gap of water squeezing section is sheathed in connecting rod, water squeezing portion can be isolated from each other by extension 22 Come so that the drainage space 3 for draining is formed between adjacent water squeezing portion;, also can be by the water squeezing knot in other embodiment Structure includes connecting rod 1, multiple water squeezing sections 2 and drainage space 3, and the multiple water squeezing section 2 is rollably sheathed on connecting rod 1 On, and water squeezing section 2 can not be moved axially with respect to connecting rod, then have certain gap between connected water squeezing section, you can formed The rhone 3 for draining;Due to the presence of drainage space 3, and drainage space is almost for the extruding force of collodion head Zero, and then water squeezing structure carries out collodion head the area reduction of squeezing action;In the case of equal pressure, the size of pressure with The size of contact area is inversely proportional;Then in flushing operation, water squeezing section 2 is larger for the local pressure of collodion head, for collodion The extruding of head is more strong so that water squeezing is more clean;Secondly, during water squeezing, water can be flowed out by drainage space 3, and draining is more To be quick, quickening water squeezing speed;During draining, air present in collodion head can also be fast by the drainage space of both sides Speed discharge, further reduces the resistance that is subject in flushing operation, and feeling is better during water squeezing, improves water squeezing efficiency.
Preferably, coordinate between adjacent water squeezing section 2 for rotation stop, and then can realize the synchronous rotation of all water squeezing sections, water squeezing Effect is more preferable;Certainly, can be to be freely rotated between each other also to be not configured to rotation stop between each water squeezing section;It is specifically, described Grafting rotation stop is coordinated by recess and convex portion between adjacent water squeezing section;Specifically, as shown in Figs. 1-3, a left side for each water squeezing section 2 Respectively it is equipped with two extensions 22 on right both sides, two extensions 22 are that loop configuration is set, and are both provided with inside both The through hole passed through for connecting rod 1, the diameter of the through hole are all higher than the diameter of connecting rod 1;The extension 22 in left side is equipped with multiple First convex portion 221, forms the first groove 223 between adjacent first convex portion 221;It is convex that the extension 22 on right side is equipped with multiple second Portion 2222, forms the second groove 224 between adjacent second convex portion 2222;First convex portion 221 and the position phase of the second convex portion 2222 Mutually staggeredly, during assembling, first water squeezing section 2 is first covered to connecting rod 1, afterwards by 2 sets of second water squeezing section to connecting rod 1, The right side extension 22 of first water squeezing section 2 can contact with each other with the extension 22 in second left side of water squeezing section 2 at this time, and first Convex portion 221 is inserted into the second groove 224, and the second convex portion 2222 can be inserted into the first groove 223, realizes the first convex portion and the Two convex portions are mutually inserted occlusion, so adjacent two water squeezings section can rotation stop be combined together.
As shown in Figs. 1-2, the water squeezing section 2 can rotate with respect to connecting rod 1, and water squeezing section is from connecting rod in order to prevent Dropped out on 1, can be spirally connected an end cap 9 respectively at the both ends of connecting rod, and the diameter of end cap 9 is more than the diameter of the through hole in water squeezing section 2, And then effectively prevent water squeezing section 2 from being dropped out from connecting rod;In other embodiment, as shown in figure 4, also can be close to connecting rod 1 Both ends position set annular groove, on 2 inner surface of water squeezing section of end positions set annular protrusion 23, when the convex annular 23 are played when being caught in annular groove, you can the axial movement of limitation water squeezing section 2, after the water squeezing section at both ends is fixed, you can prevent So water squeezing section drops out.
Preferably, the length of the water squeezing section 2 is more than the length of the drainage space, as shown in Figure 1, can be squeezed described The length of water section 2 is arranged to 18-22mm, reaches preferable water squeezing effect;
Several experimental datas are simply enumerated below:
2 length of water squeezing section is 15mm, when 3 length of drainage space is 7mm:After flushing operation, the water of 60%-70% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 7mm:After flushing operation, the water of 75%-82% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 7mm:After flushing operation, the water of 85%-85% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-92% on collodion head It is extruded;
2 length of water squeezing section is 22mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-88% on collodion head It is extruded;
2 length of water squeezing section is 25mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 60%-70% on collodion head It is extruded;
According to above-mentioned experimental result:When the length of water squeezing section 2 is arranged to 18-22mm, more than 80% water on collodion head It can be discharged;Reach good water squeezing effect;In other embodiment, the length of water squeezing section 2 may be alternatively provided as smaller, width It is similar with ball or disk, as shown in Figure 3;
Or it is preferable, the length of the drainage space 3 is arranged to 6-9mm, reaches preferable water squeezing effect;
Several experimental datas are simply enumerated below:
2 length of water squeezing section is 15mm, when 3 length of drainage space is 5mm:After flushing operation, the water of 60%-65% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 6mm:After flushing operation, the water of 75%-82% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-90% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 85%-92% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 90%-95% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 12mm:After flushing operation, 60%-65% on collodion head Water is extruded;
According to above-mentioned experimental result:When the length of the drainage space 3 is arranged to 6-9mm, more than 80% on collodion head Water can be discharged;Reach good water squeezing effect;
Further, the length of the water squeezing section 2 is more than the length of the drainage space, as shown in Figure 1, can be by the water squeezing The length of section 2 is arranged to 18-22mm, and the length of the drainage space 3 is arranged to 6-9mm, reaches preferable water squeezing effect;
Several experimental datas are simply enumerated below:
2 length of water squeezing section is 15mm, when 3 length of drainage space is 5mm:After flushing operation, the water of 60-65% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 6mm:After flushing operation, the water of 65%-75% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-85% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 82-88% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 6mm:After flushing operation, the water of 85%-92% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 88%-95% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 80%-85% on collodion head It is extruded;
2 length of water squeezing section is 22mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 70%-82% on collodion head It is extruded;
2 length of water squeezing section is 25mm, when 3 length of drainage space is 10mm:After flushing operation, 65%-75% on collodion head Water is extruded;
According to above-mentioned experimental result:When the length of water squeezing section 2 is arranged to 18-22mm, the length of drainage space 3 is set When being set to 6-9mm, the displacement of collodion head can reach more than 80%, reach good water squeezing effect;And it is preferable, work as water squeezing The length of section 2 is arranged to 20mm, and when the length of drainage space 3 is arranged to 8mm, the displacement of collodion head can reach 95%, displacement Maximum, basically reaches extracting completely for collodion head;And the water squeezing structure and drainage space in above-mentioned length interval Under cooperation, during long-time service, collodion head is not easy, deformed damaged, service life length;At the same time by many experiments After draw, the water squeezing structure under the value range combine mop carry out flushing operation when, required active force takes compared to this Water squeezing structure outside value scope can save 30%, and operation is very laborsaving, and the less women old man of strength can squeeze mop completely It is dry.
Further, the water squeezing section 2 is equipped with anti-slip structure, specifically, the anti-slip structure includes multiple strips Groove 24, be preferably arranged to 13-6, these grooves 24 are arranged on 2 outer surface of water squeezing section, and the length of length and water squeezing section 2 Degree is arranged to equal so that and the both ends of groove 24 can be placed on the both ends of water squeezing section 2, i.e., 24 both ends of groove can be that opening is set, During water squeezing, water can be flowed out from the opening at both ends;The cross-sectional area of groove 24 be square structure set, may also be configured to certainly U-shaped, The other structures such as triangle;The groove 24 passes through the setting of groove 24 around the peripheral direction gap distribution of water squeezing section, it is possible to increase Frictional force between water squeezing section 2 and collodion head, in the case where contact area reduces, effectively prevents slipping phenomenon;It is preferred that , which carried out chamfer angle technique, and preferably rounded corner, and then the position corresponding to 2 outer surface side of water squeezing section On tooth it is more smooth, will not be excessively sharp, and then collodion head is not easy to be scratched;, can also be by anti-slip in other embodiment Structure setting is along the circumferentially distributed tooth on its outer surface of water squeezing section 2, salient point either some convex ribs etc. or directly by water squeezing The outer surface of section 2 is arranged to rough external surface, such as matte surface.
As shown in figure 5, a kind of collodion mop, which is a kind of collodion mop, it is with water squeezing knot described above Structure;The collodion mop includes collodion head 4, water squeezing frame 5, mop rod 6, handle 7 and the movable part being connected with collodion head;It is described Water squeezing symmetrical configuration is arranged on the left and right sides position of the water squeezing frame;The water squeezing frame 5 includes water squeezing hack lever body 51 and squeezes Water frame body 52, the upper end of mop rod 6 is nested with water squeezing hack lever body 51 to be connected together, and can be mutually connected by screw 100;The work Moving part includes motion bar 81 and the clamp bar 82 arranged on motion bar lower part, which can be connected with the collodion head 4, motion bar Upper end can be penetrated to water squeezing frame 5, and gap distribution has multiple teeth along its length on motion bar;The handle 7 is hinged on crowded On water frame 5, its end is set for circular or semicircular structure, and is provided with tooth;The tooth on tooth and motion bar on handle It is meshed, and then pulling handle 7 can drive motion bar to move up and down, and then drive and moved up on collodion head 4 in spacing, realize Water squeezing;Certainly, in other embodiment, motion bar and tooth can be also not provided with, collodion head is driven by two or a pull rod Mobile, pull rod one end connection collodion head, other end connection handle, handle, which is pulled, to drive collodion head to move up, and carry out water squeezing.
Embodiment 2
As shown in figure 5, a kind of collodion mop, the collodion mop include collodion head 4, water squeezing frame 5, follower, mop rod 6, Handle 7 and the movable part being connected with collodion head;The water squeezing frame 5 includes water squeezing hack lever body 51 and water squeezing frame body 52, mop The upper end of bar 6 is nested with water squeezing hack lever body 51 and is connected together, and can be mutually connected by screw 100;The movable part includes activity Bar 81 and the clamp bar 82 arranged on motion bar lower part, the clamp bar 82 can be connected with the collodion head 4, the upper end of motion bar can penetrate to In water squeezing frame 5, and gap distribution has multiple teeth along its length on motion bar;The handle 7 is hinged on water squeezing frame 5, its end Portion is set for circular or semicircular structure, and is provided with tooth;Tooth on handle is meshed with the tooth on motion bar, and then pulls Dynamic handle 7 can drive motion bar to move up and down, and then drive and moved up on collodion head 4 in spacing, realize water squeezing;Certainly, in In other embodiment, motion bar and tooth can be also not provided with, drives collodion head to move by two or a pull rod, pull rod one end Collodion head is connected, other end connection handle, handle, which is pulled, to drive collodion head to move up, and carry out water squeezing.
The follower is symmetricly set on the left and right sides position of the water squeezing frame, and then two followers that left and right is adjacent Between formed can water squeezing space, when collodion head is pulled up into water squeezing space, follower can extrude collodion head, by glue Water extrusion on cotton head, realizes the water squeezing of mop;As shown in Figs 1-4, the water squeezing structure includes connecting rod 1, multiple water squeezing sections 2 And drainage space 3, the multiple water squeezing section 2 are rollably sheathed in connecting rod 1, the water squeezing section includes 21 He of water squeezing portion An at least extension 22, when 2 gap of water squeezing section is sheathed in connecting rod, water squeezing portion can be isolated from each other by extension 22 Come so that the drainage space 3 for draining is formed between adjacent water squeezing portion;, also can be by the water squeezing knot in other embodiment Structure includes connecting rod 1, multiple water squeezing sections 2 and drainage space 3, and the multiple water squeezing section 2 is rollably sheathed on connecting rod 1 On, and water squeezing section 2 can not be moved axially with respect to connecting rod, then have certain gap between connected water squeezing section, you can formed The rhone 3 for draining;Due to the presence of drainage space 3, and drainage space is almost for the extruding force of collodion head Zero, and then water squeezing structure carries out collodion head the area reduction of squeezing action;In the case of equal pressure, the size of pressure with The size of contact area is inversely proportional;Then in flushing operation, water squeezing section 2 is larger for the local pressure of collodion head, for collodion The extruding of head is more strong so that water squeezing is more clean;Secondly, during water squeezing, water can be flowed out by drainage space 3, and draining is more To be quick, quickening water squeezing speed;During draining, air present in collodion head can also be fast by the drainage space of both sides Speed discharge, further reduces the resistance that is subject in flushing operation, and feeling is better during water squeezing, improves water squeezing efficiency.
Preferably, coordinate between adjacent water squeezing section 2 for rotation stop, and then can realize the synchronous rotation of all water squeezing sections, water squeezing Effect is more preferable;Certainly, can be to be freely rotated between each other also to be not configured to rotation stop between each water squeezing section;It is specifically, described Grafting rotation stop is coordinated by recess and convex portion between adjacent water squeezing section;Specifically, as shown in Figs. 1-3, a left side for each water squeezing section 2 Respectively it is equipped with two extensions 22 on right both sides, two extensions 22 are that loop configuration is set, and are both provided with inside both The through hole passed through for connecting rod 1, the diameter of the through hole are all higher than the diameter of connecting rod 1;The extension 22 in left side is equipped with multiple First convex portion 221, forms the first groove 223 between adjacent first convex portion 221;It is convex that the extension 22 on right side is equipped with multiple second Portion 2222, forms the second groove 224 between adjacent second convex portion 2222;First convex portion 221 and the position phase of the second convex portion 2222 Mutually staggeredly, during assembling, first water squeezing section 2 is first covered to connecting rod 1, afterwards by 2 sets of second water squeezing section to connecting rod 1, The right side extension 22 of first water squeezing section 2 can contact with each other with the extension 22 in second left side of water squeezing section 2 at this time, and first Convex portion 221 is inserted into the second groove 224, and the second convex portion 2222 can be inserted into the first groove 223, realizes the first convex portion and the Two convex portions are mutually inserted occlusion, so adjacent two water squeezings section can rotation stop be combined together.
As shown in Figs. 1-2, the water squeezing section 2 can rotate with respect to connecting rod 1, and water squeezing section is from connecting rod in order to prevent Dropped out on 1, can be spirally connected an end cap 9 respectively at the both ends of connecting rod, and the diameter of end cap 9 is more than the diameter of the through hole in water squeezing section 2, And then effectively prevent water squeezing section 2 from being dropped out from connecting rod;In other embodiment, as shown in figure 4, also can be close to connecting rod 1 Both ends position set annular groove, on 2 inner surface of water squeezing section of end positions set annular protrusion 23, when the convex annular 23 are played when being caught in annular groove, you can the axial movement of limitation water squeezing section 2, after the water squeezing section at both ends is fixed, you can prevent So water squeezing section drops out.
Preferably, the length of the water squeezing section 2 is more than the length of the drainage space, as shown in Figure 1, can be squeezed described The length of water section 2 is arranged to 18-22mm, reaches preferable water squeezing effect;
Several experimental datas are simply enumerated below:
2 length of water squeezing section is 15mm, when 3 length of drainage space is 7mm:After flushing operation, the water of 60%-70% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 7mm:After flushing operation, the water of 75%-82% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 7mm:After flushing operation, the water of 85%-85% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-92% on collodion head It is extruded;
2 length of water squeezing section is 22mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-88% on collodion head It is extruded;
2 length of water squeezing section is 25mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 60%-70% on collodion head It is extruded;
According to above-mentioned experimental result:When the length of water squeezing section 2 is arranged to 18-22mm, more than 80% water on collodion head It can be discharged;Reach good water squeezing effect;In other embodiment, the length of water squeezing section 2 may be alternatively provided as smaller, width It is similar with ball or disk, as shown in Figure 3;
Or it is preferable, the length of the drainage space 3 is arranged to 6-9mm, reaches preferable water squeezing effect;
Several experimental datas are simply enumerated below:
2 length of water squeezing section is 15mm, when 3 length of drainage space is 5mm:After flushing operation, the water of 60%-65% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 6mm:After flushing operation, the water of 75%-82% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-90% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 85%-92% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 90%-95% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 12mm:After flushing operation, 60%-65% on collodion head Water is extruded;
According to above-mentioned experimental result:When the length of the drainage space 3 is arranged to 6-9mm, more than 80% on collodion head Water can be discharged;Reach good water squeezing effect;
Further, the length of the water squeezing section 2 is more than the length of the drainage space, as shown in Figure 1, can be by the water squeezing The length of section 2 is arranged to 18-22mm, and the length of the drainage space 3 is arranged to 6-9mm, reaches preferable water squeezing effect;
Several experimental datas are simply enumerated below:
2 length of water squeezing section is 15mm, when 3 length of drainage space is 5mm:After flushing operation, the water of 60-65% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 6mm:After flushing operation, the water of 65%-75% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 80%-85% on collodion head It is extruded;
2 length of water squeezing section is 18mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 82-88% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 6mm:After flushing operation, the water of 85%-92% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 8mm:After flushing operation, the water of 88%-95% on collodion head It is extruded;
2 length of water squeezing section is 20mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 80%-85% on collodion head It is extruded;
2 length of water squeezing section is 22mm, when 3 length of drainage space is 9mm:After flushing operation, the water of 70%-82% on collodion head It is extruded;
2 length of water squeezing section is 25mm, when 3 length of drainage space is 10mm:After flushing operation, 65%-75% on collodion head Water is extruded;
According to above-mentioned experimental result:When the length of water squeezing section 2 is arranged to 18-22mm, the length of drainage space 3 is set When being set to 6-9mm, the displacement of collodion head can reach more than 80%, reach good water squeezing effect;And it is preferable, work as water squeezing The length of section 2 is arranged to 20mm, and when the length of drainage space 3 is arranged to 8mm, the displacement of collodion head can reach 95%, displacement Maximum, basically reaches extracting completely for collodion head;And the water squeezing structure and drainage space in above-mentioned length interval Under cooperation, during long-time service, collodion head is not easy, deformed damaged, service life length;At the same time by many experiments After draw, the water squeezing structure under the value range combine mop carry out flushing operation when, required active force takes compared to this Water squeezing structure outside value scope can save 30%, and operation is very laborsaving, and the less women old man of strength can squeeze mop completely It is dry.
Further, the water squeezing section 2 is equipped with anti-slip structure, specifically, the anti-slip structure includes multiple strips Groove 24, be preferably arranged to 13-6, these grooves 24 are arranged on 2 outer surface of water squeezing section, and the length of length and water squeezing section 2 Degree is arranged to equal so that and the both ends of groove 24 can be placed on the both ends of water squeezing section 2, i.e., 24 both ends of groove can be that opening is set, During water squeezing, water can be flowed out from the opening at both ends;The cross-sectional area of groove 24 be square structure set, may also be configured to certainly U-shaped, The other structures such as triangle;The groove 24 passes through the setting of groove 24 around the peripheral direction gap distribution of water squeezing section, it is possible to increase Frictional force between water squeezing section 2 and collodion head, in the case where contact area reduces, effectively prevents slipping phenomenon;It is preferred that , which carried out chamfer angle technique, and preferably rounded corner, and then the position corresponding to 2 outer surface side of water squeezing section On tooth it is more smooth, will not be excessively sharp, and then collodion head is not easy to be scratched;, can also be by anti-slip in other embodiment Structure setting is along the circumferentially distributed tooth on its outer surface of water squeezing section 2, salient point either some convex ribs etc. or directly by water squeezing The outer surface of section 2 is arranged to rough external surface, such as matte surface.
Preferably, as seen in figs. 5-6, the follower is arranged to 4 rows, is symmetrically arranged on water squeezing frame body 52 or so two-by-two There are two rows of followers, and two groups of followers are from top to bottom sequentially distributed and are squeezing on both sides, i.e., on the same side of water squeezing frame body 52 On water frame body 52;There are two linking arms 521 on the water squeezing frame body 52, there is upper and lower two bayonets 522 on linking arm 521, into And the connecting rod 1 of follower can be caught in the opening, and then it is limited on water squeezing frame;Connecting rod 1 can be with respect to bayonet 522 Rotated, then in water squeezing, connecting rod 1 can drive all water squeezing sections 2 thereon to rotate;In water squeezing, two companies Water squeezing section 2 on extension bar 1 at the same time extrudes collodion head, and water squeezing effect is more preferable;Preferably, the two rows follower Spacing 3 is interlaced setting, is come specifically, the position of the water squeezing section 2 on two rows follower is just interlaced, into And make it that the position of the spacing 3 on two rows follower is also interlaced and come, the spacing 3 of lower part follower will not be with top For the spacing 3 of follower on same position, the 3 corresponding position of spacing of usual lower part follower is top follower water squeezing section 2 The position at place, then collodion head same position will not be extruded always, water squeezing is more abundant during water squeezing;It is and long Phase is not easy to be scratched after, and service life is longer.
Obviously, described embodiment is only the part of the embodiment of the utility model, instead of all the embodiments. Based on the embodiment in the utility model, what those of ordinary skill in the art were obtained without making creative work Every other embodiment, should all belong to the scope of the utility model protection.

Claims (10)

  1. A kind of 1. water squeezing structure for collodion mop, it is characterised in that:It is sheathed on including connecting rod (1) and rollably connection Multiple water squeezing sections (2) on bar (1), the water squeezing section include water squeezing portion (21) and an at least extension (22), adjacent water squeezing portion Between be equipped with for draining drainage space (3).
  2. A kind of 2. water squeezing structure for collodion mop according to claim 1, it is characterised in that:The adjacent water squeezing Coordinate between section (2) for rotation stop.
  3. A kind of 3. water squeezing structure for collodion mop according to claim 1, it is characterised in that:The water squeezing section (2) Length be arranged to 18-22mm.
  4. A kind of 4. water squeezing structure for collodion mop according to claim 1, it is characterised in that:The drainage space (3) length is arranged to 6-9mm.
  5. A kind of 5. water squeezing structure for collodion mop according to claim 1, it is characterised in that:The water squeezing section (2) At least part outer surface be equipped with anti-slip structure.
  6. A kind of 6. water squeezing structure for collodion mop, it is characterised in that:It is sheathed on including connecting rod (1) and rollably connection Multiple water squeezing sections (2) on bar (1), the drainage space (3) for draining is equipped between adjacent water squeezing section (2).
  7. 7. a kind of collodion mop, including collodion head (4), water squeezing frame (5) and the water squeezing structure on water squeezing frame (5);Its feature It is:Including connecting rod (1) and the multiple water squeezing sections (2) being rollably sheathed in connecting rod (1), the water squeezing section includes squeezing Water portion (21) and an at least extension (22), the drainage space (3) for draining is equipped between adjacent water squeezing portion.
  8. A kind of 8. collodion mop according to claim 7, it is characterised in that:It is rotation stop between the adjacent water squeezing section (2) Coordinate.
  9. 9. a kind of collodion mop, including collodion head (4), water squeezing frame (5) and water squeezing structure, the water squeezing structure are at least two groups, Two water squeezing structures are from top to bottom sequentially distributed on water squeezing frame (5);It is characterized in that:Cover including connecting rod (1) and rollably Multiple water squeezing sections (2) in connecting rod (1), the water squeezing section include water squeezing portion (21) and an at least extension (22), phase The drainage space for draining is equipped between adjacent water squeezing portion;Drainage space (3) in the two water squeezings structure sets to be interlaced Put.
  10. A kind of 10. collodion mop according to claim 9, it is characterised in that:It is rotation stop between the adjacent water squeezing section (2) Coordinate.
CN201621448115.8U 2016-11-16 2016-12-27 A kind of water squeezing structure and collodion mop for collodion mop Active CN207356047U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016212306972 2016-11-16
CN201621230697 2016-11-16

Publications (1)

Publication Number Publication Date
CN207356047U true CN207356047U (en) 2018-05-15

Family

ID=59800237

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201621290024.6U Active CN206491762U (en) 2016-11-16 2016-11-29 A kind of light collodion mop of water squeezing
CN201621290113.0U Active CN206491771U (en) 2016-11-16 2016-11-29 Socket type collodion mop
CN201621397881.6U Active CN207152548U (en) 2016-11-16 2016-12-20 The mop drive mechanism and collodion mop of a kind of rapid operation
CN201621446617.7U Active CN206934064U (en) 2016-11-16 2016-12-27 A kind of water squeezing structure and water squeezing labour-saving collodion mop for mop
CN201621448115.8U Active CN207356047U (en) 2016-11-16 2016-12-27 A kind of water squeezing structure and collodion mop for collodion mop
CN201621446618.1U Active CN207101236U (en) 2016-11-16 2016-12-27 A kind of mop water-expelling structure and collodion mop
CN201621446642.5U Active CN207286013U (en) 2016-11-16 2016-12-27 A kind of water squeezing labour-saving collodion mop

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN201621290024.6U Active CN206491762U (en) 2016-11-16 2016-11-29 A kind of light collodion mop of water squeezing
CN201621290113.0U Active CN206491771U (en) 2016-11-16 2016-11-29 Socket type collodion mop
CN201621397881.6U Active CN207152548U (en) 2016-11-16 2016-12-20 The mop drive mechanism and collodion mop of a kind of rapid operation
CN201621446617.7U Active CN206934064U (en) 2016-11-16 2016-12-27 A kind of water squeezing structure and water squeezing labour-saving collodion mop for mop

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201621446618.1U Active CN207101236U (en) 2016-11-16 2016-12-27 A kind of mop water-expelling structure and collodion mop
CN201621446642.5U Active CN207286013U (en) 2016-11-16 2016-12-27 A kind of water squeezing labour-saving collodion mop

Country Status (1)

Country Link
CN (7) CN206491762U (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109567694A (en) * 2018-12-06 2019-04-05 西安佳品创意设计有限公司 Cotton wool mop
CN113289940B (en) * 2021-06-04 2022-06-14 海南师范大学 Intelligent operation and maintenance big data supervision equipment

Also Published As

Publication number Publication date
CN206491762U (en) 2017-09-15
CN207101236U (en) 2018-03-16
CN207286013U (en) 2018-05-01
CN207152548U (en) 2018-03-30
CN206491771U (en) 2017-09-15
CN206934064U (en) 2018-01-30

Similar Documents

Publication Publication Date Title
CN207356047U (en) A kind of water squeezing structure and collodion mop for collodion mop
CN204378838U (en) A kind of juice extractor cup
CN108968858B (en) Squeezing assembly in collodion flat mop cleaning barrel
CN209595674U (en) One kind is exempted to hand-wash cotton wool mop
CN110974100A (en) Labor-saving water squeezing mop
CN214342184U (en) Sponge mop and water squeezing roller assembly
CN205912859U (en) Brush decorticator
CN204671079U (en) Cleaning device
CN203953587U (en) The water squeezing structure of floor mop
CN204232165U (en) Hydraulic pressure oodle maker
CN208693192U (en) Flat mop squeezing water and plate mop cleaning squeezing bucket
CN207666553U (en) Cotton wool mop easy to use
CN204483803U (en) A kind of modified of juice extractor is squeezed the juice net
CN212630541U (en) Hydraulic fresh orange squeezer
CN201604302U (en) Combined type barrel oil press
CN208447193U (en) Bowl structure is squeezed on juice extractor
CN201931533U (en) Water sucking device of prebaked anode green body carbon bowl
WO2022217723A1 (en) Energy-saving miniature water pump
CN216569837U (en) Labor-saving water squeezing mop
CN217510438U (en) A wash dewatering device for dull and stereotyped mop of push type
CN201781939U (en) Bean worm rolling machine
CN221242779U (en) Mop free of hand washing
CN209564082U (en) The exempting from of a kind of cotton wool mop hand-washes cleaning barrel
CN210541402U (en) Drawing type telescopic mop
CN210794207U (en) Yunnan manyflower solomonseal rhizome protection device that overwrites

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant