CN207348267U CN201721403465.7U CN201721403465U CN207348267U CN 207348267 U CN207348267 U CN 207348267U CN 201721403465 U CN201721403465 U CN 201721403465U CN 207348267 U CN207348267 U CN 207348267U
Authority
CN
China
Prior art keywords
keel
lightgage steel
fiberboard
steel joist
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721403465.7U
Other languages
Chinese (zh)
Inventor
吴楚卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen New Changcheng Steel Engineering Co Ltd
Original Assignee
Xiamen New Changcheng Steel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen New Changcheng Steel Engineering Co Ltd filed Critical Xiamen New Changcheng Steel Engineering Co Ltd
Priority to CN201721403465.7U priority Critical patent/CN207348267U/en
Application granted granted Critical
Publication of CN207348267U publication Critical patent/CN207348267U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of lightgage steel joist to irrigate internal partition wall structure, including lightgage steel joist frame and panel, and lightgage steel joist frame includes day ground joist, vertical keel and perforation keel.Vertical keel is vertically fixed between day ground joist, and perforation keel pass through vertical keel along horizontal direction.The two sides of lightgage steel joist frame are installed fiberboard and are fixed on as panel, fiberboard by connector on lightgage steel joist frame respectively, are bonded together between the fiberboard that is connected by AB glue.It is arranged at intervals with grout hole on fiberboard, the empty intra-bladder instillation lightweight concrete between fiberboard.The hole passed through for perforation keel is offered on vertical keel, the top of hole is circle, and lower part is stairstepping, and perforation keel are through the semi-circular hole and are directly overlapped on hole.The utility model is beneficial in that:Perforation keel can be directly overlapped on hole when mounted, without setting temporary support, greatly facilitate the construction of perforation keel.

Description

A kind of lightgage steel joist irrigates internal partition wall structure
Technical field
Building field is the utility model is related to, more particularly to a kind of lightgage steel joist perfusion internal partition wall structure.
Background technology
As construction site personnel are constantly reduced, cost of labor is continuously increased, using solid clay brick and air entrained concrete The wall body structure of building block is gradually not suitable with internal partition for building, gradually by lightgage steel joist internal partition wall etc. one because weight is heavy, of high cost A little lightweight inner partition walls are substituted.Lightgage steel joist internal partition wall have it is light-weight, intensity is higher, fire resistance is good, it is versatile and install Easy characteristic, has and adapts to shockproof, dust-proof, sound insulation, sound-absorbing, constant temperature and other effects, while also has short time limit, easy construction, no The advantages that yielding.So all types of buildings such as the present residential district, office building, hotel, market, factory are more and more using light Steel joist internal partition wall.
Lightgage steel joist internal partition wall is usually made of light steel keel support and outer layer panel and in internal casting concrete, light steel Keel bracket is generally assembled by day ground joist, vertical keel and perforation keel.Traditional vertical keel and perforation keel and The connection bore hole size of water power pipe is larger, and the intensity and rigidity weakening to centre keel web are larger, and hole is usually rectangle, For force balance, perforation keel need first to set temporary support when mounted, to ensure perforation keel installation in hole Portion position, difficulty of construction is big and construction efficiency is slow.
The content of the invention
The purpose of this utility model is to provide a kind of lightgage steel joist to irrigate internal partition wall structure, by reducing on vertical keel Bore hole size and change the shape of hole so that penetrate through the easier for installation quick of keel, and can effectively reduce hole Weakening to vertical keel integral strength.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of lightgage steel joist irrigates internal partition wall structure, including lightgage steel joist frame and panel.The lightgage steel joist frame includes Its ground joist, vertical keel and perforation keel, the vertical keel are vertically fixed between the day ground joist, and described passes through Logical keel pass through the vertical keel along horizontal direction.The two sides of the lightgage steel joist frame are installed by fiberboard conduct respectively The panel, the fiberboard are fixed on lightgage steel joist frame by connector, are bonded between the fiberboard that is connected by AB glue Together.It is arranged at intervals with grout hole on the fiberboard, the empty intra-bladder instillation lightweight concrete between the fiberboard.Institute The hole passed through for the perforation keel is offered on the vertical keel stated, the top of described hole is semi-circular hole, and lower part is Stepped bore.The stepped bore and the junction of semi-circular hole form a platform, and the perforation keel pass through the semicircle Shape hole simultaneously directly overlaps on the platform.
Further, the seam of 2~3mm is reserved between connected two pieces of fiberboards, the seam is interior and seam perimeter applies Brush AB glue, shearing resistance cracking resistance grid cloth is by the AB glue paving on fiberboard.The red painting bullet of outermost layer brushing of the fiberboard Property putty and white apply bouncing putty.
Further, horizontal and vertical interlaced arrangement has some supply lines to pass through in the cavity between the fiberboard Pvc pipe, the fibreboard surface offers the through hole for installing terminal box.Hydroelectric line is when can be in keel installation at the same time Arrangement, avoids and chisel is picked caused by hydroelectric line set aside pre-embedded.
Further, it is no stone to make panel that there is the intensity of higher and more preferable sound insulation effect, the fiberboard Cotton cement pressure fiberboard.
Further, the connector is high-strength self threading pin.
Further, the lightweight concrete is EPS granular polystyrene lightweight concretes.The concrete is used to cause wall Overall weight substantially reduce.Chemical Physics performance is stablized after irrigating EPS concrete, and in dry moisture absorption process, expansion and contraction is smaller, Effectively overcome domestic other light weight boards at present and cause lacking for gaping of joints due to itself stretching larger in use Fall into.
Further, splicing installation for convenience, the day ground joist, vertical keel and perforation keel are U-shaped light Steel joist.
The utility model has the advantages that:Perforation keel can be directly overlapped on hole when mounted, without setting Temporary support is put, greatly facilitates the construction of perforation keel;Hole integrally diminishes, and reduces the weakening to vertical keel intensity.
Brief description of the drawings
Fig. 1 is the schematic perspective view of the utility model.
Fig. 2 is the schematic diagram of hole.
Fig. 3 is the overlap joint schematic diagram of perforation keel and hole.
Fig. 4 is the connection diagram of fiberboard and lightgage steel joist frame.
Primary clustering symbol description:1st, lightgage steel joist frame;11st, day keel;12nd, ground joist;13rd, vertical keel;131st, hole Hole;132nd, platform;14th, keel are penetrated through;2nd, without asbestos cement pressure fiberboard;21st, grout hole;22nd, terminal box through hole;3、PVC Pipe;4th, electric wire;41st, terminal box;5th, EPS granular polystyrenes lightweight concrete;6th, shearing resistance cracking resistance grid cloth;7th, seam;8th, high intensity Self threading pin.
Embodiment
With reference to the accompanying drawings and detailed description, the utility model is described further.
As shown in figures 1-4, a kind of lightgage steel joist perfusion internal partition wall structure, including lightgage steel joist frame 1 and panel 2.Light steel dragon Skeleton 1 includes day keel 11, ground joist 12, vertical keel 13 and perforation keel 14, vertical keel 13 and is vertically welded in a day keel Between 11 and ground joist 12, perforation keel 14 pass through vertical keel 13 along horizontal direction.It is its keel 11, ground joist 12, vertical Keel 13 and perforation keel 14 are U-shaped lightgage steel joist.It is fine that no asbestos cement pressure is installed in the two sides of lightgage steel joist frame 1 respectively Plate 2 is tieed up, no asbestos cement pressure fiberboard 2 is fixed on the vertical keel 13 of lightgage steel joist frame 1 by high-strength self threading pin 8, phase Even two pieces between asbestos cement pressure fiberboard 2 by AB glue without being bonded together.It is spaced on no asbestos cement pressure fiberboard 2 It is provided with grout hole 21, the empty intra-bladder instillation EPS granular polystyrenes lightweight concrete 5 between no asbestos cement pressure fiberboard 2.It is perpendicular The hole 131 passed through for perforation keel 14 is offered on to keel 13, the top of hole 131 is semi-circular hole, and lower part is ladder The junction of shape hole, stepped bore and semi-circular hole forms a platform 132, and perforation keel 14 are through semi-circular hole and directly overlap On platform 132.
It is connected two pieces without the seam 7 that 2~3mm is reserved between asbestos cement pressure fiberboard 2, in seam 7 and seam 7 weeks Side brushing AB glue, shearing resistance cracking resistance grid cloth 6 is by AB glue paving on no 2 surface of asbestos cement pressure fiberboard.Without asbestos cement The outermost layer brushing of pressure fiberboard 2 is red to apply bouncing putty and white painting bouncing putty.Without between asbestos cement pressure fiberboard 2 Horizontal and vertical interlaced arrangement has the pvc pipe 3 that some supply lines 4 pass through, no 2 surface of asbestos cement pressure fiberboard in cavity Offer the through hole 22 for installing terminal box 41.
The operation principle of the utility model is:First with day keel 11, ground joist 12, vertical keel 13 and perforation keel 14 Lightgage steel joist frame 1 is spliced to form, then, lays the pvc pipe 3 for being used on installation electric wire 4.It will be reserved by high-strength self threading pin 8 Grout hole 21 and terminal box through hole 22 are fixed on lightgage steel joist frame 1 without asbestos cement pressure fiberboard 2.On both sides without asbestos EPS granular polystyrenes lightweight concrete 5 is poured in the cavity formed between cement pressure fiberboard 2.It is connected without asbestos cement pressure The seam 7 of 2~3mm is reserved between power fiberboard 2, is filled up seam 7 with AB glue, and the brushing AB glue around seam 7, then paste Upper shearing resistance cracking resistance grid cloth 6, finally brushes red painting bouncing putty and white painting bouncing putty.
Although specifically showing and describing the utility model with reference to preferred embodiment, those skilled in the art should This is understood, in the spirit and scope for not departing from the utility model that the appended claims are limited, in form and details On the utility model is made a variety of changes, be the scope of protection of the utility model.

Claims (7)

1. a kind of lightgage steel joist irrigates internal partition wall structure, including lightgage steel joist frame and panel, the lightgage steel joist frame include day Ground joist, vertical keel and perforation keel, the vertical keel are vertically fixed between the day ground joist, the perforation Keel pass through the vertical keel along horizontal direction, and fiberboard is installed as institute in the two sides of the lightgage steel joist frame respectively Panel is stated, the fiberboard is fixed on lightgage steel joist frame by connector, is bonded between the fiberboard that is connected by AB glue Together, it is arranged at intervals with grout hole on the fiberboard, the empty intra-bladder instillation lightweight concrete between the fiberboard, it is special Sign is:The hole passed through for the perforation keel is offered on the vertical keel, the top of described hole is semicircle Hole, lower part are stepped bore, and the junction of the stepped bore and semi-circular hole forms a platform, and the perforation keel pass through The semi-circular hole simultaneously directly overlaps on the platform.
A kind of 2. lightgage steel joist perfusion internal partition wall structure as claimed in claim 1, it is characterised in that:Be connected two pieces of fiberboards it Between be reserved with the seam of 2~3mm, in the seam and seam perimeter brushing AB glue, shearing resistance cracking resistance grid cloth pass through the AB glue On fiberboard, the outermost layer brushing of the fiberboard is red to apply bouncing putty and white painting bouncing putty for paving.
A kind of 3. lightgage steel joist perfusion internal partition wall structure as claimed in claim 1, it is characterised in that:Between the fiberboard Cavity in the horizontal and vertical pvc pipe that some supply lines pass through that is laid staggeredly, the fibreboard surface, which offers, to be used for The through hole of terminal box is installed.
A kind of 4. lightgage steel joist perfusion internal partition wall structure as claimed in claim 1, it is characterised in that:The fiberboard is nothing Asbestos cement pressure fiberboard.
A kind of 5. lightgage steel joist perfusion internal partition wall structure as claimed in claim 1, it is characterised in that:The connector is height Strong self threading pin.
A kind of 6. lightgage steel joist perfusion internal partition wall structure as claimed in claim 1, it is characterised in that:The lightweight concrete For EPS granular polystyrene lightweight concretes.
7. a kind of lightgage steel joist as described in any one of claim 1~6 claim irrigates internal partition wall structure, its feature exists In:Day ground joist, vertical keel and the perforation keel are U-shaped lightgage steel joist.
CN201721403465.7U 2017-10-27 2017-10-27 A kind of lightgage steel joist irrigates internal partition wall structure Active CN207348267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721403465.7U CN207348267U (en) 2017-10-27 2017-10-27 A kind of lightgage steel joist irrigates internal partition wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721403465.7U CN207348267U (en) 2017-10-27 2017-10-27 A kind of lightgage steel joist irrigates internal partition wall structure

Publications (1)

Publication Number Publication Date
CN207348267U true CN207348267U (en) 2018-05-11

Family

ID=62352694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721403465.7U Active CN207348267U (en) 2017-10-27 2017-10-27 A kind of lightgage steel joist irrigates internal partition wall structure

Country Status (1)

Country Link
CN (1) CN207348267U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110000920A (en) * 2019-03-29 2019-07-12 河北创天新型材料科技有限公司 A kind of manufacture craft and structure of load-bearing board wall
CN110593458A (en) * 2019-08-26 2019-12-20 中国五冶集团有限公司 Assembly method of heat-preservation and heat-insulation wall
CN111042392A (en) * 2019-12-17 2020-04-21 山东华昊建筑工程配套有限公司 Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN111622441A (en) * 2020-06-10 2020-09-04 谢秋玲 Assembling construction method for light steel keel partition wall veneer
CN113700178A (en) * 2021-09-27 2021-11-26 苏州美瑞德建筑装饰有限公司 PVC skeleton partition wall structure of pre-buried design of water and electricity pipeline
CN114045979A (en) * 2021-11-29 2022-02-15 江西雄宇筑工科技有限公司 Preparation method of self-bearing heat-preservation fireproof sound-insulation polyphenyl particle cement light steel keel plate
CN114412020A (en) * 2022-01-12 2022-04-29 湖北金楚新型建材科技有限公司 Preparation method of modular phosphogypsum wall with light steel keel and disassembly-free template
CN114508237A (en) * 2022-03-08 2022-05-17 王小红 Dislocation extrusion formula light gauge steel low point cement grouting equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110000920A (en) * 2019-03-29 2019-07-12 河北创天新型材料科技有限公司 A kind of manufacture craft and structure of load-bearing board wall
CN110593458A (en) * 2019-08-26 2019-12-20 中国五冶集团有限公司 Assembly method of heat-preservation and heat-insulation wall
CN111042392A (en) * 2019-12-17 2020-04-21 山东华昊建筑工程配套有限公司 Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN111622441A (en) * 2020-06-10 2020-09-04 谢秋玲 Assembling construction method for light steel keel partition wall veneer
CN111622441B (en) * 2020-06-10 2021-05-18 广东凯悦建设有限公司 Assembling construction method for light steel keel partition wall veneer
CN113700178A (en) * 2021-09-27 2021-11-26 苏州美瑞德建筑装饰有限公司 PVC skeleton partition wall structure of pre-buried design of water and electricity pipeline
CN114045979A (en) * 2021-11-29 2022-02-15 江西雄宇筑工科技有限公司 Preparation method of self-bearing heat-preservation fireproof sound-insulation polyphenyl particle cement light steel keel plate
CN114412020A (en) * 2022-01-12 2022-04-29 湖北金楚新型建材科技有限公司 Preparation method of modular phosphogypsum wall with light steel keel and disassembly-free template
CN114508237A (en) * 2022-03-08 2022-05-17 王小红 Dislocation extrusion formula light gauge steel low point cement grouting equipment
CN114508237B (en) * 2022-03-08 2023-08-04 安徽鹏佳建设有限公司 Staggered extrusion type light steel keel low-position cement grouting equipment

Similar Documents

Publication Publication Date Title
CN207348267U (en) A kind of lightgage steel joist irrigates internal partition wall structure
CN105421818B (en) Built-in steel Standard house
WO2022000718A1 (en) Prefabricated construction device and use method therefor
CN205444458U (en) Integrated assembled steel construction building
CN109322392B (en) Light steel house and construction method thereof
CN104389349B (en) The novel house can quickly remove, assembled and assemble method
CN100513717C (en) Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN207211444U (en) A kind of mounting clip pieces coordinated with groove and tognue type Light trabses
CN202519875U (en) Composite wallboard, connecting component with composite wallboard and connecting structure with composite wallboard
CN207934332U (en) Assembled architecture with steel Special-Shaped Column
CN102587598A (en) Split mounting type heat-insulation and waterproof roof structure
CN211621648U (en) Foundation structure of passive house
CN204139316U (en) A kind of steel structure shear wall structure system
CN206769187U (en) A kind of integrated exterior wall hanging plate
CN215253841U (en) Picatinny floor
CN205577173U (en) Novel special combination light partition wall board of fitment
CN202990234U (en) Construction-member-type light retaining wallboard
CN211396199U (en) Profiled bidirectional plate and bidirectional floor system
CN208934219U (en) A kind of light gauge cold-formed steel shape well word floor construction
CN204326583U (en) A kind of container type house
CN207646886U (en) The assembled arthitecutral structure that steel construction is combined with concrete structure
CN206070813U (en) A kind of paper honeycomb composite plate partition wall
CN207988157U (en) Prefabricated partition wall connecting node
CN207469509U (en) A kind of steel house wall external heat-insulation decoration system
CN207392523U (en) A kind of lightweight steel construction assembles the metope modular system of decoration integrated building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant