CN207331797U - A kind of band separated static ribbon silt dredging mud machine of rubbish - Google Patents

A kind of band separated static ribbon silt dredging mud machine of rubbish Download PDF

Info

Publication number
CN207331797U
CN207331797U CN201720786967.6U CN201720786967U CN207331797U CN 207331797 U CN207331797 U CN 207331797U CN 201720786967 U CN201720786967 U CN 201720786967U CN 207331797 U CN207331797 U CN 207331797U
Authority
CN
China
Prior art keywords
mud
rubbish
dredging
dredging tube
collection box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720786967.6U
Other languages
Chinese (zh)
Inventor
许建龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Green Water Purification Technology Co ltd
Original Assignee
杭州同美水处理技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杭州同美水处理技术有限公司 filed Critical 杭州同美水处理技术有限公司
Priority to CN201720786967.6U priority Critical patent/CN207331797U/en
Application granted granted Critical
Publication of CN207331797U publication Critical patent/CN207331797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of band separated static ribbon silt dredging mud machine of rubbish, including mounting bracket, it is located on mounting bracket by motor-driven drive shaft, if the propulsion device promoted on the driving shaft to mud, it is located at the dredging tube that the mud promoted on mounting bracket to propulsion device is absorbed, the both ends of drive shaft are respectively equipped with a propulsion device, dredging tube is located between two propulsion devices, the side wall of dredging tube is equipped with a garbage collection box connected with dredging tube, a pair of of rubbish is equipped with dredging tube to be isolated and be transported to the interrupter of garbage collection box, a three-way pipe structure is formed between dredging tube and garbage collection box.Classifying screen can be carried out to bottom of river channel rubbish to remove, pipeline is not easy to plug, it can solve the problems, such as that rubbish stirs difficulty in riverway sludge and mud, double helix promotes, and work efficiency higher is simple in structure, easy to operate, production cost is low, dredging effect is good, dredging cost is low, and dredging scope is wide, and channel cleanout depth depth is big.

Description

A kind of band separated static ribbon silt dredging mud machine of rubbish
Technical field
It the utility model is related to riverway sludge cleaning equipment field, and in particular to a kind of separated static ribbon of band rubbish is inhaled Mud machine.
Background technology
Domestic river is since without improvement, substantial amounts of mud and rubbish, serious shadow are deposited in bottom of river channel for a long time The water quality in river is rung, so needing regularly to handle the mud and rubbish of bottom of river channel, so as to ensure the clear of river It is clean, and when clearing up riverway sludge, the cleaning to navigation channel, river and various sedimentation basins at present is mainly clear using manually throttling Reason, excavator cleaning twist suction cleaning equipment, and the cleaning that manually throttles is mainly used in that current are relatively steady and depth is not high River, but cost is higher, and difficulty is big, and labor intensity is high, and excavator is mainly adapted to field shallow, that silt depth is small of paddling Close, when mud is more or the depth of water has certain distance, can not just excavate;Twisting suction cleaning equipment will first be become silted up using winch device Long-pending soil stirs into slurry condition with water, is then pumped out with mud, this method one is agitation and sucking-off be required for it is larger Power, consumption the energy it is big;Second, equipment complexity is expensive;Third, the mud suctioned out needs precipitation to be filled after filtering out moisture Car transports the precipitation place, it is necessary to larger, can also cause environmental pollution, and still, existing strand suction cleaning equipment is generally single Screw-rod structure, work efficiency is low, and limitation is big, can only realize the push of mud by rotating, and during promotion for mud, There is no special shoveling process on existing screw rod, when encountering weeds or steel wire when rubbish or harder mud, Wu Faji When mud and rubbish are stirred, and the existing river garbage processing equipment absorbed by pipeline, due to stone All rubbish that can be sucked such as block, cement, reinforcing bar, tube body are directly absorbed by pipeline, not by size particles Rubbish is classified, it is easy to the phenomenon for blocking pipeline occurs, so that the efficiency to river processing causes very big influence, pipeline Dredging trouble, the situation for being also easy to occur piping failure occur.
Utility model content
In order to solve certain or some technical problems existing in the prior art, the utility model provides a kind of band rubbish point From static ribbon silt dredging mud machine, can to bottom of river channel rubbish carry out classifying screen remove, pipeline is not easy to plug, and can solve river The problem of rubbish stirs difficulty in mud and mud, double helix promote, work efficiency higher, simple in structure, easy to operate, production Cost is low, and dredging effect is good, and dredging cost is low, and dredging scope is wide, and channel cleanout depth depth is big.
To solve above-mentioned existing technical problem, the utility model uses following scheme:
A kind of band separated static ribbon silt dredging mud machine of rubbish, including mounting bracket, be located on mounting bracket and driven by motor Drive shaft, set the propulsion device promoted on the driving shaft to mud, be located on mounting bracket to propulsion device promote silt The dredging tube that mud is absorbed, the both ends of the drive shaft are respectively equipped with a propulsion device for promoting mud to dredging tube, The dredging tube is located between two propulsion devices, and the side wall of the dredging tube is equipped with a garbage collection connected with dredging tube Case, a pair of of rubbish is equipped with the dredging tube and is isolated and is transported to the interrupter of garbage collection box, the dredging tube with A three-way pipe structure is formed between garbage collection box.
Further, the interrupter includes some lateral isolation bars and some longitudinal spacer bars, the transverse direction Spacer bar and longitudinal spacer bar form a latticed filter screen, and the interrupter is inclined in dredging tube, the isolation Mechanism forms a conveying slope by lateral isolation bar and longitudinal spacer bar, and rubbish is by the interrupter to garbage collection box Conveying garbage.
Further, the dredging tube is equipped with one and fixes feed pipe, and the garbage collection box uses dismountable mode On fixed feed pipe.
Further, the garbage collection box is including being used to store the first cavity of rubbish, being connected use with fixed feed pipe In the second cavity of conveying garbage to the first cavity, the inner cavity that first cavity and the second cavity are formed is N-shaped structure.
Further, the propulsion device uses helical blade structure.
Further, the propulsion device is using multiple circular cutter tooth composition spiral shape push structure being obliquely installed.
Further, the drive shaft scrapes mud tooth equipped with some.
Further, the mud tooth of scraping includes using the ratch being screwed with drive shaft, is located at the tooth head on ratch top, The tooth head is spherical structure, and the ratch is arcuate structure.
Further, the mounting bracket uses L-type structure, and a reinforcing rib, institute are equipped between the mounting bracket and dredging tube State the both sides that reinforcing rib is located at dredging tube.
Further, the front end of the dredging tube is equipped with a mud suction mouth for coordinating suction mud with propulsion device, the mud suction mouth The flared structure that journey expands outwardly.
Compared with prior art, the beneficial effects of the utility model are:
When clearing up bottom of river channel mud, drive shaft both ends use mud to the propulsion device that dredging tube promotes Dual promotion, both ends push mud to dredging tube at the same time, can make mud cleaning efficiency higher, and propulsion device uses double helix Structure promotes, and when the rubbish to mud and mud bottom is cleared up, from the influence of mud component, can easily receive Collect the silt pumping cars such as the mud, brick, cement block of complexity and be not easy the debris drawn, and set on the driving shaft between propulsion device Have it is some scrape mud tooth, the steady soil in mud bottom or rubbish can be stirred by scraping mud tooth, so as to solve river The problem of rubbish stirs difficulty in road mud and mud, when being stirred especially for the bigger soil of river bed hardness, effect Fruit is more preferable, and tooth head uses spherical structure, and the tooth head for scraping mud tooth can be made rounder and more smooth, being capable of round and smooth mistake automatically when encountering hard thing Crossing, be not in dieback phenomenon, ratch is arcuate structure, and arc-shaped concave is consistent with direction of rotation during drive shaft propulsion mud, It is more efficient that excavation of the mud tooth to bottom of river channel can be made to scrape, work efficiency higher, after mud and rubbish enter dredging tube, energy Enough bulky grain rubbish is isolated by interrupter, and the rubbish isolated is timely transported in garbage collection box, So that the granulated garbage smaller absorbed by pipeline, makes pipeline be not in clogging, the rubbish in garbage collection box can Individually to be handled, so that river bed rubbish clears up simpler effective, work efficiency higher, labor intensity is lower, moreover it is possible to Realize the purpose classified to rubbish, make the management of rubbish more efficient, it is simple in structure, easy to operate, production cost is low, clearly Silt effect is good, and dredging cost is low, and dredging scope is wide, and channel cleanout depth depth is big.
Brief description of the drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the front view of the utility model garbage collection box;
Fig. 4 is the internal structure side view of the utility model dredging tube;
In figure:Scrape mud tooth 1, tooth first 2, mounting bracket 3, drive shaft 4, propulsion device 5, dredging tube 6, reinforcing rib 7, mud suction mouth 8, Ratch 9, garbage collection box 10, the second cavity 11, the first cavity 12, conveying slope 13, longitudinal spacer bar 14, interrupter 15, Fixed feed pipe 16, lateral isolation bar 17.
Embodiment
In the following, with reference to attached drawing and embodiment, the utility model is described further, it is necessary to explanation is, On the premise of not colliding, it can be formed in any combination between various embodiments described below or between each technical characteristic new Embodiment.
As shown in Figs 1-4, a kind of band separated static ribbon silt dredging mud machine of rubbish, including mounting bracket 3, it is located at mounting bracket 3 It is upper by motor-driven drive shaft 4, be located at the propulsion device 5 promoted in drive shaft 4 to mud, be located on mounting bracket 3 The dredging tube 6 absorbed of mud promoted to propulsion device 5, the both ends of the drive shaft 4 be respectively equipped with one by mud to The propulsion device 5 that dredging tube 6 promotes, the dredging tube 6 are located between two propulsion devices 5, are set on the side wall of the dredging tube 6 There is a garbage collection box 10 connected with dredging tube 6, a pair of of rubbish is equipped with the dredging tube 6 and is isolated and is transported to rubbish The interrupter 15 of collecting box 10, a three-way pipe structure is formed between the dredging tube 6 and garbage collection box 10;The isolation machine Structure 15 includes some lateral isolation bars 17 and some longitudinal spacer bars 14, the lateral isolation bar 17 and longitudinal spacer bar 14 Form a latticed filter screen, the interrupter 15 is inclined in dredging tube 6, the interrupter 15 by transverse direction every A conveying slope 13 is formed from bar 17 and longitudinal spacer bar 14, rubbish is conveyed by the interrupter 15 to garbage collection box 10 Rubbish;The dredging tube 6 is equipped with one and fixes feed pipe 16, and the garbage collection box 10 is installed on solid using dismountable mode Determine on feed pipe 16;The garbage collection box 10 is including being used to store the first cavity 12 of rubbish, being connected with fixed feed pipe 16 For the second cavity 11 of conveying garbage to the first cavity 12, the inner cavity that 12 and second cavity 11 of the first cavity is formed is N-shaped structure;The propulsion device 5 uses helical blade structure;The propulsion device 5 uses multiple circular cutters tooth being obliquely installed Form spiral shape push structure;The drive shaft 4 scrapes mud tooth 1 equipped with some;The mud tooth 1 of scraping includes using with drive shaft 4 The ratch 9 that is screwed, the tooth first 2 for being located at 9 top of ratch, the tooth first 2 is spherical structure, and the ratch 9 is arcuate structure; The mounting bracket 3 uses L-type structure, and a reinforcing rib 7 is equipped between the mounting bracket 3 and dredging tube 6, and the reinforcing rib 7 is located at The both sides of dredging tube 6;The front end of the dredging tube 6 is equipped with one and coordinates the mud suction mouth 8 for inhaling mud, the mud suction mouth 8 with propulsion device 5 The flared structure that journey expands outwardly.
When clearing up bottom of river channel, static ribbon silt dredging mud machine is installed on hull, in the mistake of ship traveling Cheng Zhong, only need to be placed into bottom of river channel by elevating mechanism by static ribbon silt dredging mud machine, drive drive shaft 4 to revolve by motor Turn, so as to drive propulsion device 5 to rotate, the rubbish in the mud and mud of bottom of river channel can just be carried out by propulsion device 5 Stir backward 6 direction of dredging tube to promote, the rubbish of promotion is absorbed by dredging tube 6, so that the cleaning in river is more It is convenient, and the both ends of drive shaft 4 are respectively equipped with a propulsion device 5 for promoting mud to dredging tube 6, are promoted and filled by two Put 5 while promoted to dredging tube 6, mud and rubbish can be made to form an impact zone in the mouth of pipe of dredging tube 6, make mud and rubbish It is intensive in this region height, so that mud and rubbish that dredging tube 6 is absorbed work as silt compared to single 5 content higher of propulsion device After mud and rubbish enter dredging tube 6, bulky grain rubbish can be isolated by interrupter 15, and the rubbish that will be isolated Timely it is transported in garbage collection box 10, so that the granulated garbage smaller absorbed by pipeline, it is not in stifled to make pipeline Phenomenon is filled in, the rubbish in garbage collection box 10 can be handled individually, so that rubbish cleaning in river bed is simpler effectively, work Make more efficient, labor intensity is lower, moreover it is possible to realize the purpose classified to rubbish, make the management of rubbish more efficient, tie Structure is simple and convenient to operate, production cost is low, and dredging effect is good, and dredging cost is low, and dredging scope is wide, channel cleanout depth depth Greatly.
Interrupter 15 is combined by some lateral isolation bars 17 and some longitudinal spacer bars 14 and is formed a latticed mistake Strainer, is sized to carry out isolation to rubbish and delete choosing by filter mesh, bulky grain rubbish is not entered in dredging tube 6, And interrupter 15 is inclined in dredging tube 6, interrupter 15 is formed by lateral isolation bar 17 and longitudinal spacer bar 14 One conveying slope 13, the isolation face incline direction on slope is consistent with rubbish flow direction, after rubbish is by isolation, before can making The rubbish at end is moved up by the motive force of rear end rubbish so that rubbish by interrupter 15 to garbage collection box 10 from Dynamic conveying garbage, it is not necessary to which other structures carry out auxiliary pushing, and structure is simpler, when blocking, as long as to mud suction mouth Pipeline between interrupter 15, which carries out conveying, can complete to comb, and pipe-dredging is more convenient.
A three-way pipeline structure is formed between dredging tube 6 and fixed feed pipe 16, is installed to garbage collection box 10 When fixed, garbage collection box 10 is installed on fixed feed pipe 16 using dismountable mode, the installation to garbage collection box 10 More convenient with replacing, the cleaning to rubbish is easier.The installing port of garbage collection box 10 is located in the second cavity 11, works as rubbish After the second cavity 11 installation of rubbish collecting box 10 is fixed on fixed feed pipe 16, rubbish can enter the by conveying slope 13 In two cavitys 11, then by the second cavity 11 to both sides conveying garbage, rubbish is set to enter eventually into the first cavity 12 into being deposited Storage, can make rubbish volume bigger, while the inner cavity that is formed of the first cavity 12 and the second cavity 11 is N-shaped structure, the first chamber The bottom surface of body 11 is higher than the bottom surface of the first cavity 12, can make rubbish will not be out of first cavity 12 during rubbish storage Flowed into the first cavity 11, make the storage effect of rubbish more preferable.
When being cleared up by propulsion device 5 bottom of river channel, when propulsion device 5 is using helical blade structure, knot Structure is simpler, and production cost is lower, work efficiency higher, to bed-silt and rubbish into 6 progradation of dredging tube, no Influenced by mud component, can easily collect complexity mud, brick, the silt pumping car such as cement block be not easy to draw it is miscellaneous Thing, and in pushing course, promoted by propeller structure, rubbish promotes more uniform.When propulsion device 5 is using more When a circular cutter tooth being obliquely installed forms spiral shape push structure, a spiral rod structures are formed by multiple circular cutters tooth, and Every circular cutter tooth is relatively independent, can carry out any replacement to circular cutter tooth, additionally it is possible to according to required disposable excavation mud The difference of depth replaces propulsion device 5, makes the scope of application of static ribbon silt dredging mud machine wider, and when replacement is simpler Just, cost is lower.
Meanwhile when bottom of river channel rubbish is stirred and promoted by propulsion device 5, pass through scraping in drive shaft 4 Mud tooth 1, which rotates, stirs the steady soil in mud bottom or rubbish, and pan soil, lump etc. in mud are crushed, so that real Now aid in loose mud processing, make propulsion device 5 more convenient simple when being promoted to mud, work efficiency higher, to stiff mud, The crushing effect of lump is more preferable, propulsion device 5 is easily collected the silt pumping cars such as the mud, brick, cement block of complexity The debris for being not easy to draw is removed after being promoted, and difficulty is stirred and remove so as to solve rubbish in riverway sludge and mud Problem, more efficient when being stirred especially for the bigger soil of river bed hardness, river course clear up effect is more preferable.
And scrape between mud tooth 1 and drive shaft 4 using being screwed connection, can according to different functions to scrape mud tooth 1 into Row is replaced, and makes that the replacement for scraping mud tooth 1 is more convenient, and the cost of whole equipment is lower, and the scope of application is wider, is made in replacement simpler Just, more firm when fixed, the tooth first 2 on 9 top of ratch uses spherical structure, and the tooth first 2 for scraping mud tooth 1 can be made rounder and more smooth, When encountering the hard thing that can not be broken can automatic rounding off, be not in dieback phenomenon, ratch 9 is arcuate structure, and arc Direction of rotation is consistent when shape concave surface and drive shaft 4 promote mud, and it is more efficient to make to scrape excavation of the mud tooth 1 to bottom of river channel, Work efficiency higher, simple in structure, easy to operate, production cost is low, dredging effect is good, and dredging cost is low, and dredging scope is wide.
When being cleared up by static ribbon silt dredging mud machine, the mounting bracket 3 uses L-type structure, installs at work Two faces of frame 3 are located at the top and mud propulsion side in river respectively, can when propulsion device 5 is promoting mud Mud is not overflowed upwards, mud and rubbish is more concentrated, make the suction mud effect of dredging tube 6 more preferable, by mounting bracket 3 with Reinforcing rib 7 between dredging tube 6 can reinforce dredging tube 6, make propulsion device 5 dredging tube 6 and peace when being worked It is not in phenomenon of rupture between shelving 3.The front end of the dredging tube 6 is equipped with one and coordinates the mud suction mouth for inhaling mud with propulsion device 5 8, and the flared structure that 8 journey of mud suction mouth expands outwardly, when two propulsion devices 5 in drive shaft 4 are pushed to dredging tube 6 at the same time During rubbish, preferably the rubbish of push can be absorbed by mud suction mouth 8, make the powder feeding efficiency higher of dredging tube 6, logical Cross waste density bigger when the pipeline being connected on dredging tube 6 excludes rubbish.
The above embodiment is only the preferred embodiment of the utility model, it is impossible to is protected with this to limit the utility model Scope, the change of any unsubstantiality that those skilled in the art is done on the basis of the utility model and replacing belongs to In the utility model scope claimed.

Claims (10)

  1. A kind of 1. band separated static ribbon silt dredging mud machine of rubbish, it is characterised in that:Including mounting bracket, it is located on mounting bracket and passes through Motor-driven drive shaft, set the propulsion device promoted on the driving shaft to mud, be located on mounting bracket to propulsion device The dredging tube that the mud of propulsion is absorbed, the both ends of the drive shaft are respectively equipped with one and push away mud to what dredging tube promoted Into device, the dredging tube is located between two propulsion devices, and the side wall of the dredging tube is equipped with one and is connected with dredging tube Garbage collection box, interior a pair of the rubbish that is equipped with of the dredging tube is isolated and is transported to the interrupter of garbage collection box, described A three-way pipe structure is formed between dredging tube and garbage collection box.
  2. A kind of 2. band separated static ribbon silt dredging mud machine of rubbish according to claim 1, it is characterised in that:The isolation Mechanism includes some lateral isolation bars and some longitudinal spacer bars, and the lateral isolation bar and longitudinal spacer bar form a net Trellis filter screen, the interrupter are inclined in dredging tube, the interrupter by lateral isolation bar and longitudinal direction every A conveying slope is formed from bar, rubbish is by the interrupter to garbage collection box conveying garbage.
  3. A kind of 3. band separated static ribbon silt dredging mud machine of rubbish according to claim 2, it is characterised in that:The suction mud Pipe is equipped with one and fixes feed pipe, and the garbage collection box is installed on fixed feed pipe using dismountable mode.
  4. A kind of 4. band separated static ribbon silt dredging mud machine of rubbish according to claim 3, it is characterised in that:The rubbish The first cavity and fixed feed pipe that collecting box includes being used to store rubbish are connected to conveying garbage to the second of the first cavity Cavity, the inner cavity that first cavity and the second cavity are formed are N-shaped structure.
  5. A kind of 5. band separated static ribbon silt dredging mud machine of rubbish according to claim 1, it is characterised in that:The propulsion Device uses helical blade structure.
  6. A kind of 6. band separated static ribbon silt dredging mud machine of rubbish according to claim 1, it is characterised in that:It is described to push away Into device spiral shape push structure is formed using multiple circular cutters tooth being obliquely installed.
  7. 7. according to a kind of band separated static ribbon silt dredging mud machine of rubbish of claim 3-6 any one of them, it is characterised in that: The drive shaft scrapes mud tooth equipped with some.
  8. A kind of 8. band separated static ribbon silt dredging mud machine of rubbish according to claim 7, it is characterised in that:It is described to scrape mud Tooth includes with drive shaft using the ratch being screwed, is located at the tooth head on ratch top, and the tooth head is spherical structure, the tooth Bar is arcuate structure.
  9. A kind of 9. band separated static ribbon silt dredging mud machine of rubbish according to claim 8, it is characterised in that:The installation Frame uses L-type structure, and a reinforcing rib is equipped between the mounting bracket and dredging tube, and the reinforcing rib is located at the both sides of dredging tube.
  10. A kind of 10. band separated static ribbon silt dredging mud machine of rubbish according to claim 9, it is characterised in that:The suction The front end of mud pipe is equipped with one and coordinates the mud suction mouth for inhaling mud, the flared structure that the mud suction mouth journey expands outwardly with propulsion device.
CN201720786967.6U 2017-06-30 2017-06-30 A kind of band separated static ribbon silt dredging mud machine of rubbish Active CN207331797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720786967.6U CN207331797U (en) 2017-06-30 2017-06-30 A kind of band separated static ribbon silt dredging mud machine of rubbish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720786967.6U CN207331797U (en) 2017-06-30 2017-06-30 A kind of band separated static ribbon silt dredging mud machine of rubbish

Publications (1)

Publication Number Publication Date
CN207331797U true CN207331797U (en) 2018-05-08

Family

ID=62426968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720786967.6U Active CN207331797U (en) 2017-06-30 2017-06-30 A kind of band separated static ribbon silt dredging mud machine of rubbish

Country Status (1)

Country Link
CN (1) CN207331797U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578743A (en) * 2018-12-07 2019-04-05 上海市基础工程集团有限公司 For mire water equilibrium tube spoil disposal anti-block apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578743A (en) * 2018-12-07 2019-04-05 上海市基础工程集团有限公司 For mire water equilibrium tube spoil disposal anti-block apparatus

Similar Documents

Publication Publication Date Title
CN207260221U (en) A kind of double helix static state silt dredging mud machine
CN210946947U (en) River channel dredging device
CN205323341U (en) A spiral centrifugal filter for sewage solid -liquid separation
CN210786517U (en) Prevent sewage pipe way of jam
CN107227960B (en) Slurry shield stirring and screening quarrying box
CN207331797U (en) A kind of band separated static ribbon silt dredging mud machine of rubbish
CN108672259A (en) A kind of roller screening type quarrying case
CN212001420U (en) Building water supply and drainage anti-clogging device
CN104815834A (en) Sandstone separator
CN207260227U (en) A kind of static ribbon silt dredging mud machine
CN212427305U (en) Silt excavating gear
KR100498119B1 (en) Apparatus for washing regenerated sand
CN210876206U (en) Straight line vibrations sand and stone separator
CN2675648Y (en) Floating slag collecting device for sewage treatment
CN212612724U (en) Silt loosening device of underwater dredging robot and underwater dredging robot
CN212561674U (en) A desilting device for underground pipe gallery rainwater box culvert
CN212224170U (en) Anti-blocking device for water supply and drainage
CN210115164U (en) Light thing flotation device subassembly head desilting mechanism
CN209052504U (en) A kind of construction site sewage discharge processing system
CN206927623U (en) The purging system of sodium chloride in a kind of removal bunt gypsum
CN114664470A (en) Robot is retrieved to radioactive waste liquid storage tank bottom mud
CN207683003U (en) Integrated grid decontamination squeezer
CN204602788U (en) Sand-stone separator
CN217409911U (en) Slurry shield constructs machine slabstone screening plant
CN221142894U (en) Automatic dredging treatment device for reservoir water channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310000 room 550, building 1, No. 74, Puyan street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou green water purification technology Co.,Ltd.

Address before: 310000 room 550, building 1, No. 74, Puyan street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: HANGZHOU TONGMEI WATER TREATMENT TECHNOLOGY CO.,LTD.