CN207314998U - Civil engineering building guardrail - Google Patents
Civil engineering building guardrail Download PDFInfo
- Publication number
- CN207314998U CN207314998U CN201721408446.3U CN201721408446U CN207314998U CN 207314998 U CN207314998 U CN 207314998U CN 201721408446 U CN201721408446 U CN 201721408446U CN 207314998 U CN207314998 U CN 207314998U
- Authority
- CN
- China
- Prior art keywords
- column
- guardrail
- bearing diagonal
- groove
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Architectural Equipment technical field, more particularly to civil engineering building guardrail are the utility model is related to, including:Dustproof cover, the first column, connecting shaft;Dustproof cover is arranged on the top of the first column and the second column, and dustproof cover is connected with the first column and the second column by the mode of being screwed on;Attachment device is installed on the exterior both ends of the first column and the second column, and attachment device is connected with the first column and the second column by fastening bolt;The side of first column is internally provided with fixed seat, and the first column is connected with fixed seat by welding manner;The utility model is by the improvement in structure, there is guardrail body to be set for dismountable type, using effect is comprehensive;Guardrail can be folded according to actual needs, disclosure satisfy that existing protection requirements;And guardrail body has installed bracing means additional, the advantages of security risk is not present in when use, solve produced problem and deficiency in existing apparatus technology, be allowed to the purpose more with practicality.
Description
Technical field
It the utility model is related to Architectural Equipment technical field, more particularly to civil engineering building guardrail.
Background technology
It is well known that civil engineering with building guardrail be it is a kind of be used in civil engineering carry out mechanical structure block protection,
What building blocked protection and other related civil engineering articles blocks protective device, it is widely made in civil engineering
With.
Being found by observing for a long time with understanding, existing civil engineering is commonly integral type with building guardrail and sets,
Using effect is more single;Guardrail can not be folded according to actual needs, it is impossible to meet existing protection requirements;And building shield
Column does not install bracing means additional, causes in use there are security protection hidden danger, then, how to provide a kind of guardrail body is
Dismountable type is set, and using effect is comprehensive;Guardrail can be folded according to actual needs, disclosure satisfy that existing protection needs
Ask;And guardrail body has installed bracing means additional, there is no the civil engineering work guardrail of security risk during use, become mesh
The preceding important topic for needing to solve.
In view of this, the present inventor adheres to the relevant design concept of the sector for many years and practical operation experience, and to existing
Techno-absence is studied improvement, there is provided a kind of guardrail body is set for dismountable type, and using effect is comprehensive;Guardrail can basis
Actual needs is folded, and disclosure satisfy that existing protection requirements;And guardrail body has installed bracing means additional, when use, is not present
The civil engineering work guardrail of security risk, is allowed to the purpose more with practicality.
Utility model content
It is proposed in the above background technology to solve the purpose of this utility model is to provide civil engineering building guardrail
Integral type setting is commonly, using effect is more single;Guardrail can not be folded according to actual needs, it is impossible to be met existing
Protection requirements;And building guardrail does not install bracing means additional, cause in use that there are the problem of security protection hidden danger and not
Foot.
The purpose of this utility model and effect, are reached by technical solution in detail below:
Civil engineering building guardrail, including:It is dustproof cover, the first column, connecting shaft, guardrail body, tension device, interior
It is axis, groove, the second column, tightening device, snap-gauge, warning tape, base, attachment device, fastening bolt, fixed seat, bearing diagonal one, logical
Axis, bearing diagonal two and reinforcing bolt;The dustproof cover is arranged on the top of the first column and the second column, and dustproof cover and first
Column and the second column are connected by the mode of being screwed on;The attachment device is installed on the outside two of the first column and the second column
End, and attachment device is connected with the first column and the second column by fastening bolt;Set inside the side of first column
Fixed seat is equipped with, and the first column is connected with fixed seat by welding manner;The front portion of the fixed seat is provided with guardrail sheet
Body, and fixed seat is connected by connecting shaft with guardrail body by perforation;The front portion of the guardrail body is provided with tension dress
Put, and guardrail body is connected with tension device by embedded mode;The bosom setting of second column is fluted, and
Second column is connected with groove by welding manner;The inside of the groove is provided with snap-gauge, and groove by tightening device with
Snap-gauge is connected by the mode of being screwed on;The front portion of the snap-gauge offers interior axle, and tension device is passed through by interior axle and snap-gauge
Perforation is connected;The outside of first column and the second column is provided with warning tape, and the first column and the second column and police
Show that band is connected by bonding mode;The bottom of first column and the second column is provided with base, and the first column and
Two columns are connected with base by welding manner;One forequarter of first column and the second column is respectively arranged with oblique branch
Support one and bearing diagonal two, and the first column and the second column are fixedly linked by reinforcing bolt with bearing diagonal one and bearing diagonal two
Connect;The inside of the bearing diagonal one is provided with bearing diagonal two, and bearing diagonal one is connected by axis with bearing diagonal two by perforation
Connect.
As the further optimization of the technical program, before guardrail body described in the utility model civil engineering building guardrail
Depending on the array-like structure in staggered form, and guardrail body be provided with it is multigroup.
As the further optimization of the technical program, groove described in the utility model civil engineering building guardrail, which is overlooked, is in
Square groove-like is provided with one group, and groove is rectangular solid structure.
As the further optimization of the technical program, the utility model civil engineering snap-gauge forward sight described in building guardrail is
Flat solid structure, and snap-gauge is installed on the inside of groove in vertical vertical configuration.
As the further optimization of the technical program, before tension device described in the utility model civil engineering building guardrail
Depending on the solid structure in strip, and tension device is provided with three groups.
As the further optimization of the technical program, the utility model civil engineering attachment device described in building guardrail is
Circular buckle-like structure, and attachment device forward sight is provided with four groups in symmetry shape.
Due to the utilization of above-mentioned technical proposal, the utility model has following advantages compared with prior art:
1st, the utility model by guardrail body forward sight in staggered form array-like structure and tension device setting, favorably
When being actually needed, guardrail body can be opened and closed by tension device, used as door, realize guardrail sheet
The advantages of body can be disassembled and using effect is comprehensive.
2nd, the utility model is provided with the setting of connecting shaft by guardrail body upper part, and being conducive to can be to guardrail body
Freely fold, meet the effect of existing protection requirements.
3rd, setting of the utility model by bearing diagonal one and bearing diagonal two for detaching structure, can realize guardrail body jail
Solidity is stronger and the effect of security protection hidden danger is not present in use.
4th, the utility model there is guardrail body to be set for dismountable type, using effect by the improvement in above structure
Comprehensively;Guardrail can be folded according to actual needs, disclosure satisfy that existing protection requirements;And guardrail body has installed reinforcing additional
The advantages of security risk is not present in device, when use, so as to effectively solve problem and shortage present in existing apparatus.
Brief description of the drawings
Fig. 1 is the forward sight structure diagram of the utility model;
Fig. 2 is the side structure schematic view of the utility model;
Fig. 3 is the overlooking the structure diagram of the utility model.
In figure:Dustproof cover 1, the first column 2, connecting shaft 3, guardrail body 4, tension device 5, interior axle 6, groove 7, second are vertical
Column 8, tightening device 9, snap-gauge 10, warning tape 11, base 12, attachment device 13, fastening bolt 14, fixed seat 15, bearing diagonal 1,
Axis 17, bearing diagonal 2 18, reinforce bolt 19.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1 to Fig.3, the utility model provides civil engineering building guardrail technical solution:
Civil engineering building guardrail, including:Dustproof cover 1, the first column 2, connecting shaft 3, guardrail body 4, tension device
5th, interior axle 6, groove 7, the second column 8, tightening device 9, snap-gauge 10, warning tape 11, base 12, attachment device 13, fastening bolt 14,
Fixed seat 15, bearing diagonal 1, axis 17, bearing diagonal 2 18 and reinforcing bolt 19;Dustproof cover 1 is arranged on the first column 2 and
The top of two columns 8, and dustproof cover 1 is connected with the first column 2 and the second column 8 by the mode of being screwed on;Attachment device 13 is pacified
Mounted in the exterior both ends of the first column 2 and the second column 8, and 13 and first column 2 of attachment device and the second column 8 pass through fastening
Bolt 14 is connected;The side of first column 2 is internally provided with fixed seat 15, and the first column 2 passes through welding with fixed seat 15
Mode is connected;The front portion of fixed seat 15 is provided with guardrail body 4, and fixed seat 15 is passed through by connecting shaft 3 and guardrail body 4
Perforation is connected;The front portion of guardrail body 4 is provided with tension device 5, and guardrail body 4 passes through embedded mode with tension device 5
It is connected;The bosom of second column 8 sets fluted 7, and the second column 8 is connected with groove 7 by welding manner;It is recessed
The inside of groove 7 is provided with snap-gauge 10, and groove 7 is connected by tightening device 9 with snap-gauge 10 by the mode of being screwed on;Before snap-gauge 10
Portion offers interior axle 6, and tension device 5 is connected by interior axle 6 with snap-gauge 10 by perforation;First column 2 and the second column 8
Outside be provided with warning tape 11, and the first column 2 and the second column 8 are connected with warning tape 11 by bonding mode;First
The bottom of 2 and second column 8 of column is provided with base 12, and the first column 2 and the second column 8 pass through welding manner with base 12
It is connected;One forequarter of the first column 2 and the second column 8 is respectively arranged with bearing diagonal 1 and bearing diagonal 2 18, and first
2 and second column 8 of column is connected to a fixed by reinforcing bolt 19 with bearing diagonal 1 and bearing diagonal 2 18;Bearing diagonal 1
Inside is provided with bearing diagonal 2 18, and bearing diagonal 1 is connected by axis 17 with bearing diagonal 2 18 by perforation.
Specifically, 4 forward sight of guardrail body is in the array-like structure of staggered form, and guardrail body 4 is provided with multigroup, guardrail sheet
Body 4 can be folded according to actual needs, make its structural strong and high using flexible effect.
Specifically, groove 7, which overlooks the groove-like being square, is provided with one group, and groove 7 is rectangular solid structure,
Groove 7 is the fixed connection apparatus of snap-gauge 10, stability stronger effect when pulling open guardrail body 4.
Specifically, 10 forward sight of snap-gauge is flat solid structure, and snap-gauge 10 is installed on groove 7 in vertical vertical configuration
Inside, 10 forward sight of snap-gauge be flat solid structure setting, can effectively ensure that guardrail body 4 open when fastening
And fastness.
Specifically, 5 forward sight of tension device is in the solid structure of strip, and tension device 5 is provided with three groups, tenses dress
Putting 5 has three groups of setting, can realize the effect of degree of balance when guardrail body 4 is pushed forward.
Specifically, attachment device 13 is circular buckle-like structure, and 13 forward sight of attachment device is provided with four in symmetry shape
Group, attachment device 13 are the setting of circular buckle-like structure, can connect more guardrail bodies 4 according to actual needs.
Specifically used method and effect:
During using the device, dustproof cover 1 can ensure to will not fall into dust in the tube body of the first column 2 and the second column 8
And rainwater, the service life of guardrail body 4 can be extended, the first column 2 and the second column 8 are the tube body of toroidal, cost
Cheap and portable construction, tension device 5 and snap-gauge 10 can also be incited somebody to action 4 opening and closing of guardrail body by tightening device 9
Guardrail body 4 is used as the access way door in construction site, and bearing diagonal 1 can by axis 17 and bearing diagonal 2 18
Ensure the fastness of guardrail body 4, can also when being actually needed by bearing diagonal 1 and bearing diagonal 2 18 by reinforcing bolt
19 are disassembled, and meet the effect of existing requirement of shelter.
In summary:The civil engineering building guardrail, by guardrail body forward sight in staggered form array-like structure and
The setting of tension device, is conducive to when being actually needed, and guardrail body can be opened and closed by tension device, as door
To use, realizing guardrail body can disassemble and the advantages of using effect is comprehensive;Connection is provided with by guardrail body upper part
The setting of axis, is conducive to that guardrail ontological idea of freedom can be folded, meets the effect of existing protection requirements;Pass through bearing diagonal
One and bearing diagonal two be detaching structure setting, can realize guardrail body fastness it is stronger and in use there is no peace
Full protection hidden danger obtains effect;Solve above-mentioned middle appearance is commonly integral type setting, and using effect is more single;Guardrail can not
Folded according to actual needs, it is impossible to meet existing protection requirements;And building guardrail does not install bracing means additional, cause to make
There are the problem of security protection hidden danger during.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. civil engineering building guardrail, including:Dustproof cover (1), the first column (2), connecting shaft (3), guardrail body (4), drawing
Tight device (5), interior axle (6), groove (7), the second column (8), tightening device (9), snap-gauge (10), warning tape (11), base (12),
Attachment device (13), fastening bolt (14), fixed seat (15), bearing diagonal one (16), axis (17), bearing diagonal two (18) and reinforcing
Bolt (19);It is characterized in that:The dustproof cover (1) is arranged on the top of the first column (2) and the second column (8), and dust-proof
Lid (1) is connected with the first column (2) and the second column (8) by the mode of being screwed on;The attachment device (13) is installed on first
The exterior both ends of column (2) and the second column (8), and attachment device (13) with the first column (2) and the second column (8) by tight
Fixing bolt (14) is connected;The side of first column (2) is internally provided with fixed seat (15), and the first column (2) is with consolidating
Reservation (15) is connected by welding manner;The front portion of the fixed seat (15) is provided with guardrail body (4), and fixed seat (15)
It is connected by connecting shaft (3) with guardrail body (4) by perforation;The front portion of the guardrail body (4) is provided with tension device
(5), and guardrail body (4) is connected with tension device (5) by embedded mode;The bosom of second column (8) is set
Groove (7) is equipped with, and the second column (8) is connected with groove (7) by welding manner;The inside of the groove (7) is provided with
Snap-gauge (10), and groove (7) is connected by tightening device (9) with snap-gauge (10) by the mode of being screwed on;Before the snap-gauge (10)
Portion offers interior axle (6), and tension device (5) is connected by interior axle (6) with snap-gauge (10) by perforation;First column
(2) and the outside of the second column (8) is provided with warning tape (11), and the first column (2) and the second column (8) and warning tape (11)
It is connected by bonding mode;The bottom of first column (2) and the second column (8) is provided with base (12), and first is vertical
Column (2) and the second column (8) are connected with base (12) by welding manner;First column (2) and the second column (8)
One forequarter is respectively arranged with bearing diagonal one (16) and bearing diagonal two (18), and the first column (2) and the second column (8) are by adding
Fixing bolt (19) is connected to a fixed with bearing diagonal one (16) and bearing diagonal two (18);The inside of the bearing diagonal one (16) is provided with
Bearing diagonal two (18), and bearing diagonal one (16) is connected by axis (17) with bearing diagonal two (18) by perforation.
2. civil engineering building guardrail according to claim 1, it is characterised in that:Guardrail body (4) forward sight is in
The array-like structure of staggered form, and guardrail body (4) be provided with it is multigroup.
3. civil engineering building guardrail according to claim 1, it is characterised in that:The groove (7) overlooks and is square
Groove-like be provided with one group, and groove (7) is rectangular solid structure.
4. civil engineering building guardrail according to claim 1, it is characterised in that:Snap-gauge (10) forward sight is tablet
The solid structure of shape, and snap-gauge (10) is installed on the inside of groove (7) in vertical vertical configuration.
5. civil engineering building guardrail according to claim 1, it is characterised in that:Tension device (5) forward sight is in
The solid structure of strip, and tension device (5) is provided with three groups.
6. civil engineering building guardrail according to claim 1, it is characterised in that:The attachment device (13) is circle
Buckle-like structure, and attachment device (13) forward sight is provided with four groups in symmetry shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721408446.3U CN207314998U (en) | 2017-10-27 | 2017-10-27 | Civil engineering building guardrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721408446.3U CN207314998U (en) | 2017-10-27 | 2017-10-27 | Civil engineering building guardrail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314998U true CN207314998U (en) | 2018-05-04 |
Family
ID=62379881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721408446.3U Expired - Fee Related CN207314998U (en) | 2017-10-27 | 2017-10-27 | Civil engineering building guardrail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314998U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643698A (en) * | 2018-06-08 | 2018-10-12 | 佛山新籁工程科技有限公司 | A kind of flexible Combined type power fence |
CN109138592A (en) * | 2018-09-14 | 2019-01-04 | 宋盈盈 | A kind of adjustable power equipment guardrail |
-
2017
- 2017-10-27 CN CN201721408446.3U patent/CN207314998U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643698A (en) * | 2018-06-08 | 2018-10-12 | 佛山新籁工程科技有限公司 | A kind of flexible Combined type power fence |
CN109138592A (en) * | 2018-09-14 | 2019-01-04 | 宋盈盈 | A kind of adjustable power equipment guardrail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202072170U (en) | Assembly type enamel steel plate grain bin | |
CN207314998U (en) | Civil engineering building guardrail | |
CN104652670B (en) | It is a kind of can indoor location glass curtain wall system | |
CN207739662U (en) | A kind of construction site safety device | |
CN208023781U (en) | A kind of assembled architecture wall and prefabricated concrete structure | |
CN204357328U (en) | A kind of OLED is except haze window | |
CN105350687A (en) | Shear wall combining concrete filled steel tube side frame with seam or opening | |
CN203669172U (en) | Sealing structure of curtain wall panels | |
CN208763568U (en) | A kind of easy-to-dismount sliding door | |
CN205637844U (en) | Construction safety encloses fender | |
CN207842608U (en) | A kind of monoblock type panzer front windshield | |
CN206070830U (en) | A kind of novel curtain wall sheet material | |
CN205935772U (en) | Room of making an uproar falls in movable | |
CN204940521U (en) | A kind of steel work movable plank house | |
CN208763536U (en) | A kind of architectural engineering fence easy to use | |
CN207003844U (en) | A kind of movable plank house waterproof construction | |
CN103046677A (en) | Hidden opening frame curtain wall | |
CN202248277U (en) | Anti-seismic, cold-proof and heat-insulation rapidly-movable house | |
CN205918178U (en) | Energy -efficient pin -connected panel basic station room | |
CN201943257U (en) | Lintel for earth constructions | |
CN207079892U (en) | A kind of outer protective scaffold of novel architecture | |
CN205276611U (en) | Overlap glass curtain wall | |
CN208152727U (en) | 10kV branch box purse net with warning effect | |
CN204919419U (en) | Municipal administration environmental protection protection network | |
CN204371061U (en) | A kind of OLED is except haze clearing window |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180504 Termination date: 20181027 |
|
CF01 | Termination of patent right due to non-payment of annual fee |