CN207309269U - A kind of preceding energy-absorbing beam left and right installation board assembly - Google Patents

A kind of preceding energy-absorbing beam left and right installation board assembly Download PDF

Info

Publication number
CN207309269U
CN207309269U CN201721184786.2U CN201721184786U CN207309269U CN 207309269 U CN207309269 U CN 207309269U CN 201721184786 U CN201721184786 U CN 201721184786U CN 207309269 U CN207309269 U CN 207309269U
Authority
CN
China
Prior art keywords
installing plate
plate assembly
assembly body
absorbing beam
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721184786.2U
Other languages
Chinese (zh)
Inventor
高曹军
王明伟
张亮亮
郦光威
魏礼富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tai Hong Stamping Parts Co Ltd
Original Assignee
Ningbo Tai Hong Stamping Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tai Hong Stamping Parts Co Ltd filed Critical Ningbo Tai Hong Stamping Parts Co Ltd
Priority to CN201721184786.2U priority Critical patent/CN207309269U/en
Application granted granted Critical
Publication of CN207309269U publication Critical patent/CN207309269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vibration Dampers (AREA)

Abstract

It the utility model is related to a kind of preceding energy-absorbing beam left and right installation board assembly, including installing plate assembly body, hook and grip block, the hole position for being socketed energy-absorbing beam box is provided with the middle part of the installing plate assembly body, there are several grip blocks around arrangement of boring holes on the installing plate assembly body, the direction of grip block is respectively positioned on the same side of installing plate assembly body, the top that the installing plate totle drilling cost body is located at hole position is provided with hook, which is located at the side of installing plate assembly body with grip block respectively.The utility model was not only compact but also practical, solved the Welding Problems of one man operation's front anti-collision beam well, and perfect can be connected to energy-absorbing beam box and be matched with the installation of collision prevention girders.

Description

A kind of preceding energy-absorbing beam left and right installation board assembly
Technical field
Auto parts and components mounting technique field is the utility model is related to, more particularly to a kind of preceding energy-absorbing beam left and right installation board Assembly.
Background technology
The manufacture installation of present automobile is toward reduction manually aspect development, how to optimize mounting means and reduces operator at the same time Work is the most important thing.Since front anti-collision beam is long and heavy, how welding is completed in the case of oneThis is skill in terms of automobile Art personnel want to solve the problems, such as always.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of preceding energy-absorbing beam left and right installation board assembly, left and right each one A preceding energy-absorbing beam left and right installation board assembly, the hook on two installing plate assembly bodies can make the temporary horizontal extension of collision prevention girders, 1 People can complete, saving labour, and the hole position in the middle part of installing plate assembly body is for covering energy-absorbing beam box, grip block and energy-absorbing Connected between beam box by spot welding.The utility model was not only compact but also practical, solved the weldering of one man operation's front anti-collision beam well Problem is connect, and perfect can be connected to energy-absorbing beam box and be matched with the installation of collision prevention girders.
Technical solution is used by the utility model solves its technical problem:A kind of preceding energy-absorbing beam left and right installation board is provided Assembly, including installing plate assembly body, hook and grip block, installing plate assembly body middle part is provided with inhales for being socketed Can beam box hole position, have several grip blocks, the equal position of direction of grip block around arrangement of boring holes on the installing plate assembly body In the same side of installing plate assembly body, the top that the installing plate totle drilling cost body is located at hole position is provided with hook, the hook It is located at the side of installing plate assembly body respectively with grip block.
Supplemented as one kind to technical solution described in the utility model, the installing plate assembly body is in long slab Shape, four corners of the installing plate assembly body are both provided with location hole.
Supplemented as one kind to technical solution described in the utility model, installing plate assembly body edges arrangement There is a circle flange, which is located at the same side of grip block.
Supplemented as one kind to technical solution described in the utility model, the installing plate totle drilling cost body is located at hole position Top be provided with rectangular through-hole, hook is installed on the side inner wall of the rectangular through-hole.
Beneficial effect:It the utility model is related to a kind of preceding energy-absorbing beam left and right installation board assembly, the preceding energy-absorbing beam in each one of left and right Left and right installation board assembly, the hook on two installing plate assembly bodies can make the temporary horizontal extension of collision prevention girders, and 1 people can be complete Into saving labour, the hole position in the middle part of installing plate assembly body is for covering energy-absorbing beam box, is led between grip block and energy-absorbing beam box Spot welding connection is crossed, energy-absorbing beam box one end is matched with collision prevention girders installation.The utility model was not only compact but also practical, solved list well People operates the Welding Problems of front anti-collision beam, and perfect can be connected to energy-absorbing beam box and be matched with the installation of collision prevention girders.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the right view of the utility model;
Fig. 3 is the mounting structure schematic diagram of the utility model;
Fig. 4 is the mounting structure schematic diagram of the utility model.
Diagram:1st, installing plate assembly body, 2, Kong Wei, 3, hook, 4, rectangular through-hole, 5, location hole, 6, grip block, 7, turn over Side, 8, collision prevention girders, 9, connector.
Embodiment
With reference to specific embodiment, the utility model is expanded on further.It is to be understood that these embodiments are merely to illustrate this Utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, reading the content of the utility model instruction Afterwards, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Shen Please the appended claims limited range.
The embodiment of the utility model is related to a kind of preceding energy-absorbing beam left and right installation board assembly, as shown in Figs 1-4, including peace Loading board assembly body 1, hook 3 and grip block 6, the middle part of installing plate assembly body 1 are provided with for being socketed energy-absorbing beam box Hole position 2, be disposed with several grip blocks 6 around hole position 2 on the installing plate assembly body 1, the direction of grip block 6 is respectively positioned on The same side of installing plate assembly body 1, the top that the installing plate assembly body 1 is located at hole position 2 are provided with hook 3, the extension Hook 3 is located at the side of installing plate assembly body 1 with grip block 6 respectively.
The installing plate assembly body 1 is in long plate shape, and four corners of the installing plate assembly body 1, which are both provided with, to be determined Position hole 5.
1 edge of installing plate assembly body is disposed with a circle flange 7, which is located at the same side of grip block 6.
The top that the installing plate assembly body 1 is located at hole position 2 is provided with rectangular through-hole 4, in the side of the rectangular through-hole 4 Hook 3 is installed on wall.
Embodiment
The both ends of collision prevention girders 8 are mounted on connector 9, are provided with the flanging of connector 9 and lead to what hook 3 matched Hole, the preceding energy-absorbing beam left and right installation board assembly in each one of left and right, preceding energy-absorbing beam left and right installation board assembly are fixed with longeron one end, two Hook 3 on installing plate assembly body 1 can make the temporary horizontal extension of collision prevention girders, and hook 3 is buckled on the through hole of connector 9,1 people It can complete, save labour, then on the location hole 5 of 1 four corners of installing plate assembly body and 9 flanging of connector Hole be aligned by stud fastening and realize and fix, the hole position 2 at the middle part of installing plate assembly body 1 is for covering energy-absorbing beam box, clamping Connected between plate 6 and energy-absorbing beam box by spot welding.From the point of view of whole design, preceding energy-absorbing beam left and right installation board was not only compact but also practical, very The good Welding Problems for solving one man operation's front anti-collision beam, and perfect can be connected to the installation of energy-absorbing beam box and collision prevention girders Match somebody with somebody.

Claims (4)

1. a kind of preceding energy-absorbing beam left and right installation board assembly, including installing plate assembly body (1), hook (3) and grip block (6), its It is characterized in that:The hole position (2) for being socketed energy-absorbing beam box, the installing plate are provided with the middle part of the installing plate assembly body (1) Several grip blocks (6) are disposed with around hole position (2), it is total that the direction of grip block (6) is respectively positioned on installing plate on assembly body (1) Into the same side of body (1), the installing plate assembly body (1), which is located above hole position (2), is provided with hook (3), the extension Hook (3) is located at the side of installing plate assembly body (1) with grip block (6) respectively.
A kind of 2. preceding energy-absorbing beam left and right installation board assembly according to claim 1, it is characterised in that:The installing plate is total It is in long plate shape into body (1), four corners of the installing plate assembly body (1) are both provided with location hole (5).
A kind of 3. preceding energy-absorbing beam left and right installation board assembly according to claim 1, it is characterised in that:The installing plate is total A circle flange (7) is disposed with into body (1) edge, which is located at the same side of grip block (6).
A kind of 4. preceding energy-absorbing beam left and right installation board assembly according to claim 1, it is characterised in that:The installing plate is total It is located at into body (1) above hole position (2) and is provided with rectangular through-hole (4), hook is installed on the side inner wall of the rectangular through-hole (4) (3)。
CN201721184786.2U 2017-09-15 2017-09-15 A kind of preceding energy-absorbing beam left and right installation board assembly Active CN207309269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721184786.2U CN207309269U (en) 2017-09-15 2017-09-15 A kind of preceding energy-absorbing beam left and right installation board assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721184786.2U CN207309269U (en) 2017-09-15 2017-09-15 A kind of preceding energy-absorbing beam left and right installation board assembly

Publications (1)

Publication Number Publication Date
CN207309269U true CN207309269U (en) 2018-05-04

Family

ID=62382858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721184786.2U Active CN207309269U (en) 2017-09-15 2017-09-15 A kind of preceding energy-absorbing beam left and right installation board assembly

Country Status (1)

Country Link
CN (1) CN207309269U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112809289A (en) * 2021-01-26 2021-05-18 上海天永智能装备股份有限公司 Front longitudinal beam positioning mechanism suitable for white vehicle body
FR3120337A1 (en) * 2021-03-02 2022-09-09 Psa Automobiles Sa Bumper reinforcement interface plate for a motor vehicle
FR3123276A1 (en) * 2021-05-31 2022-12-02 Psa Automobiles Sa Shock absorption assembly support plate with pre-holding means.

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112809289A (en) * 2021-01-26 2021-05-18 上海天永智能装备股份有限公司 Front longitudinal beam positioning mechanism suitable for white vehicle body
FR3120337A1 (en) * 2021-03-02 2022-09-09 Psa Automobiles Sa Bumper reinforcement interface plate for a motor vehicle
WO2022184987A1 (en) * 2021-03-02 2022-09-09 Psa Automobiles Sa Bumper reinforcement interface fixture for a motor vehicle
FR3123276A1 (en) * 2021-05-31 2022-12-02 Psa Automobiles Sa Shock absorption assembly support plate with pre-holding means.

Similar Documents

Publication Publication Date Title
CN207309269U (en) A kind of preceding energy-absorbing beam left and right installation board assembly
CN203864813U (en) Hinge installation reinforcing structure of automobile
CN205298171U (en) Plate connecting device
CN206446670U (en) A kind of automobile roof front beam assembly
CN205047340U (en) Fuel filter bracket
CN206031262U (en) Pipeline fixing device and have its vehicle
CN205311428U (en) Car safety handle supporting structure
CN203920749U (en) A kind of 100% low floor tramway train trailer body
CN203283298U (en) Connection structure of top cover beam and side edge beams of automobile
JP2007232017A (en) Reinforcement structure of sheet material joining portion
CN209977686U (en) Sheet metal part and sheet metal connecting structure
CN207128570U (en) A kind of vehicle and its car door mounting structure
CN203995999U (en) The mounting structure of a kind of automobile TCU
CN203681295U (en) Upper supporting frame of automotive instrument panel beam
CN207333367U (en) A kind of right-angle connector
JP3209749U (en) Control device
CN204774608U (en) Expansion tank mounting structure
CN203585041U (en) Nut installing device
CN206086895U (en) Public support of engine ECU and engine sheath
JP6723474B2 (en) Railcar equipment enclosure
CN204488637U (en) A kind of front ceiling lamp fixed sturcture and automobile
CN207523628U (en) A kind of automobile rear bumper side stand
CN207311607U (en) A kind of engine room front longitudinal beam energy-absorbing beam
CN107630873A (en) A kind of right-angle connector
CN207344038U (en) A kind of pin assembly of tape relay block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant