CN207296567U - A kind of intelligence communication bar - Google Patents

A kind of intelligence communication bar Download PDF

Info

Publication number
CN207296567U
CN207296567U CN201721007165.7U CN201721007165U CN207296567U CN 207296567 U CN207296567 U CN 207296567U CN 201721007165 U CN201721007165 U CN 201721007165U CN 207296567 U CN207296567 U CN 207296567U
Authority
CN
China
Prior art keywords
tower
bar
prefabricated section
tower bar
secondary pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721007165.7U
Other languages
Chinese (zh)
Inventor
范志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oriental Institute Of Zhejiang University Of Finance & Economics
Original Assignee
Oriental Institute Of Zhejiang University Of Finance & Economics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oriental Institute Of Zhejiang University Of Finance & Economics filed Critical Oriental Institute Of Zhejiang University Of Finance & Economics
Priority to CN201721007165.7U priority Critical patent/CN207296567U/en
Application granted granted Critical
Publication of CN207296567U publication Critical patent/CN207296567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Support Of Aerials (AREA)

Abstract

A kind of intelligence communication bar, including tower body and column foot, column foot includes the main basal base, secondary pedestal and connecting seat of reinforced concrete structure, the of length no more than 10m of tower body, tower body includes the first tower bar, the second tower bar, the 3rd tower bar and the 4th tower bar connected by casing from bottom to top, and tower body is equipped with multiple functions component.The utility model has the advantages that tower-base structure, and rationally tower body firm, easy to assembly is integrated with multiple functions.

Description

A kind of intelligence communication bar
Technical field
Communication tower field is the utility model is related to, especially a kind of intelligence communication bar.
Background technology
Communication tower is being set up, it is necessary to pour pedestal below tower body, communication tower is being fixed on pedestal.According to communication tower Size, pedestal can be provided in the foundation pit of pre- digging and be embedded in underground, can also be set directly on ground.Existing communication The pedestal of tower is typically to use an entirety of concrete cast in situs in the position for building communication tower, when communication tower tower body needs When replacing position, original place can only be discarded in by pouring integral pedestal, can not be moved to replace position.Also, the function of communication tower It is single.
Utility model content
To solve the above-mentioned problems, the purpose of this utility model is to provide a kind of reasonable firm, the assembling side of tower-base structure Just tower body is integrated with the intelligence communication bar of multiple functions.
In order to realize above-mentioned purpose, the utility model employs following technical solution:
A kind of intelligence communication bar, including tower body and column foot, the main basal base of column foot including reinforced concrete structure, secondary pedestal and Connecting seat, main basal base include the identical main basal base prefabricated section of three sizes, and each main basal base prefabricated section is set up in parallel and by long spiral shell Bar connects;Crab-bolt that is multiple longitudinally disposed and being distributed in the horizontal plane with circumference array is fixed with connecting seat, connecting seat is set Positioned at the top of middle prefabricated section, the centre position in the prefabricated section is simultaneously molded with the prefabricated section formed by integrally casting;Secondary base Seat is placed directly within above main basal base, and secondary pedestal includes the identical secondary pedestal prefabricated section of four structures, and secondary pedestal prefabricated section is in cube Body, secondary pedestal prefabricated section staggeredly splices to be set around connecting seat, and the long side and short side of adjacent two secondary pedestal prefabricated sections are direct Adjacent, the communication tower pedestal after the completion of assembly, the outer edge of secondary pedestal aligns with the outer edge of main basal base, and the height of connecting seat is high In the height of secondary pedestal prefabricated section;The of length no more than 10m of tower body, tower body include the first tower connected by casing from bottom to top Bar, the second tower bar, the 3rd tower bar and the 4th tower bar, the tower bar for forming tower body is pipe of the caliber in 0.1-0.3m, described First tower bar, the second tower bar, the length ratio of the 3rd tower bar and the 4th tower bar are 3:3:3:1;The lower end of first tower bar is equipped with method Blue plate, which, which is equipped with, is used to be fixed on the connecting seat of column foot with the matched flange hole of crab-bolt on column foot, the first tower bar On;First tower bar is equipped with charging pile, and installing advertisement board and monitoring probe in the second tower bar, billboard and monitoring probe are away from ground Height is between 3.5m-6m, and the 3rd tower bar is equipped with long-armed street lamp and galianconism street lamp, and long-armed street lamp and galianconism street lamp is set respectively In the front and rear sides of the 3rd tower bar, galianconism street lamp is located at the lower section of long-armed street lamp, and long-armed street lamp and galianconism street lamp is apart from ground height For degree between 6.5-9m, the 4th tower bar is equipped with antenna system.
Above-mentioned communication tower pedestal, point two layers of setting, main basal base and secondary pedestal are by various sizes of standardization prefabricated section splicing Shaping, the volume of single prefabricated section, weight reduce, and pour the time and shorten, are conducive to shorten construction period, especially relatively large The more aobvious advantage of communication tower.The main basal base prefabricated section of lower floor is connected as a single entity by long bolt, can guarantee that the stability of pedestal, upper strata Secondary pedestal prefabricated section is placed directly within the stability of increase connecting seat above main basal base, and the dead weight of secondary pedestal prefabricated section is sufficiently large, secondary The stability for the Base body that other connection structure can ensure after the completion of assembly need not be set between pedestal and main basal base. For the diameter of tower body between 0.1-0.3m, the height of tower body is no more than 10m, ensures tower body intensity in itself and each functional component The realizability of function.It is logical using being highly arranged on according to it that tower body is divided into the functional component such as multistage tower bar, charging pile, billboard Assembled after believing on the different tower bodies of tower, communication tower is easy to assembly.The function part such as combined charging stake, billboard on communication tower Part, enriches the function of communication tower, improves the practicality of communication tower.
Preferably, be embedded with the first reinforced frame in connecting seat, the second reinforced frame is embedded with main basal base prefabricated section, first Reinforced frame bottom extends to the prefabricated second reinforced frame lower part in the block of the main basal base being connected with connecting seat.Connecting seat and main basal base Prefabricated section is set by said structure, is conducive to increase the intensity of connecting seat and the prefabricated block part connection structure of main basal base.
Preferably, the crab-bolt is respectively connected with nut up and down, each crab-bolt coordinates the nut to be connected to two annular anchors On plate, the anchor slab is welded and fixed with the first reinforced frame.
Preferably, secondary pedestal prefabricated section is equipped with hanging ring.Carried easy to the lifting to secondary pedestal prefabricated section.
Preferably, leave splicing seams between adjacent secondary pedestal prefabricated section and between secondary pedestal prefabricated section and connecting seat Gap, and rely on the width in gap between 0-0.6m.Splicing is reserved by the size for the longer side and a shorter side for setting secondary base unit Gap, makes secondary pedestal prefabricated section that certain deviation may be present when mounted and nor affects on the stability after subsequent installation communication tower, Ease of assembly.
Preferably, being equipped with lightning rod at the top of the 4th tower bar, ground connection band iron is equipped with the first tower bar.
Preferably, billboard is liquid crystal display, billboard is connected with base station by wireless network, is controlled by base station The advertisement putting of billboard.
Above-mentioned communication tower pedestal, point two layers of setting, main basal base and secondary pedestal are by various sizes of standardization prefabricated section splicing Shaping, the volume of single prefabricated section, weight reduce, and pour the time and shorten, are conducive to shorten construction period, especially relatively large The more aobvious advantage of communication tower.And tower body is integrated with multiple functions, the practicality of communication tower is improved.
Brief description of the drawings
Fig. 1 is the side structure schematic diagram of the utility model column foot.
Fig. 2 is the structure diagram of the utility model main basal base and connecting seat.
Fig. 3 is the structure diagram of connecting seat and connected main basal base prefabricated section.
Fig. 4 is the diagrammatic cross-section of Fig. 3.
Fig. 5 is the splicing construction schematic diagram of secondary pedestal.
Fig. 6 is the structure diagram of the utility model tower body.
Fig. 7 is the sectional view of the first tower bar bottom in the utility model.
Wherein:1st, column foot, 11, main basal base, 111, main basal base prefabricated section, the 1111, second reinforced frame, 112, connecting hole, 12, Secondary pedestal, 121, secondary pedestal prefabricated section, 1211, hanging ring, 13, connecting seat, 131, crab-bolt, the 132, first reinforced frame, 14, long spiral shell Bar, 2, tower body, the 21, first tower bar, 211, charging pile, 212, feeder hole, 213, ground connection band iron, the 22, second tower bar, 221, advertisement Board, 222, monitoring probe, the 23, the 3rd tower bar, 231, galianconism street lamp, 232, long-armed street lamp, 233, entrance hole, the 24, the 4th tower bar, 241st, antenna system, 25, flanged plate, 251, support plate, 252, flange hole.
Embodiment
The preferred embodiment of this patent is described in further detail below in conjunction with the accompanying drawings.
A kind of intelligence communication bar, including column foot 1 and tower body 2, column foot as shown in Figs. 1-5, including main basal base 11, secondary pedestal 12 and connecting seat 13, main basal base 11 includes the identical main basal base prefabricated section 111 of three sizes, and main basal base prefabricated section 111 is equipped with Run through the connecting hole 112 of main basal base prefabricated section from side, multiple main basal base prefabricated sections are set up in parallel and are connected by long bolt 14. The main basal base prefabricated section upper surface is in elongated rectangular shape, and the length, width and height size of main basal base prefabricated section 111 is in 54m* in the present embodiment 18m*6m, each main basal base prefabricated section have very big dead weight in itself.
The upper surface of connecting seat 13 is equal to or less than the square of 111 short side of main basal base prefabricated section in the length of side.Connecting seat 13 On be fixed with it is multiple longitudinally disposed and in the horizontal plane with circumference array be distributed crab-bolt 131, during connecting seat 13 is arranged in Between main basal base prefabricated section 111 top, the centre position in the prefabricated section simultaneously with the prefabricated section formed by integrally casting be molded.Main base Seat 11, secondary pedestal 12 and connecting seat 13 are reinforced concrete structures, and the first reinforced frame 132, main base are embedded with connecting seat 13 The second reinforced frame 1111 is embedded with seat prefabricated section 111,132 bottom of the first reinforced frame extends to the main base being connected with connecting seat Second reinforced frame, 1111 lower part in seat prefabricated section.First reinforced frame, the 132 lower face periphery and 1111 upper end of the second reinforced frame Between face, reinforcing angle is welded between 132 lower face periphery of the first reinforced frame and the second reinforced frame 1111.The crab-bolt 131 Nut is respectively connected with up and down, and each crab-bolt 131 coordinates the nut to be connected on two annular anchor slabs, the anchor slab and the first reinforcing bar Frame 1111 is welded and fixed.
Secondary pedestal 12 includes the identical secondary pedestal prefabricated section 121 of four structures, and secondary pedestal prefabricated section 121 is arranged on main basal base On 11, secondary pedestal prefabricated section 121 is in cube, and secondary pedestal prefabricated section 121 staggeredly splices to be set around connecting seat, adjacent two The long side and short side direct neighbor of secondary pedestal prefabricated section, the off(-)center of each pair pedestal prefabricated section, advantageously ensure that logical in installation Base body uniform force after letter tower.In order to easy to assembly, while ensure the intensity of communication tower pedestal, adjacent secondary pedestal is prefabricated Splicing gap A between block 121 and between secondary pedestal prefabricated section and connecting seat is between 0-0.6m.After the completion of assembly, secondary base The outer edge of seat 12 aligns with the outer edge of main basal base 11, and the height of connecting seat 13 is higher than the height of secondary pedestal prefabricated section 121.This The length, width and height size of secondary pedestal prefabricated section 121 is in 36*17.5*5 in embodiment, and the dead weight of secondary pedestal prefabricated section 121 is larger, secondary base Between seat prefabricated section 121 and main basal base prefabricated section 111 and connecting seat 13 in addition other link structures need not be set, pass through secondary pedestal The dead weight of prefabricated section can keep the stability of communication tower pedestal.
Secondary pedestal 12 is directly born against on main basal base 11, other connection structures are not provided between secondary pedestal and main basal base.Due to The unit volume of main basal base prefabricated section and secondary pedestal prefabricated section is larger, and main basal base prefabricated section and secondary pedestal prefabricated section are at the construction field (site) Directly pour, also, in order to lift conveniently, hole for hoist is equipped with secondary pedestal prefabricated section, metal hanging ring is embedded with hole for hoist. And since main basal base prefabricated section is arranged below, smooth after the completion of assembly in order to ensure, main basal base prefabricated section directly passes through rope Rope etc. coordinates with loop wheel machine to be carried.
Two layers of setting of above-mentioned column foot point, main basal base and secondary pedestal are single by various sizes of standardization prefabricated section spicing forming type Volume, the weight of a prefabricated section reduce, and transport and lifting are convenient, the more aobvious advantage of especially relatively large communication tower.
Tower body 2 as shown in Figure 6 and Figure 7, its of length no more than 10m, tower body include what is connected by casing from bottom to top First tower bar 21, the second tower bar 22, the 3rd tower bar 23 and the 4th tower bar 24, the tower bar for forming tower body are caliber in 0.1-0.3m Pipe, first tower bar 21, the second tower bar 22, the length ratio of the 3rd tower bar 23 and the 4th tower bar 24 are 3:3:3:1. The lower end of first tower bar 21 is equipped with flanged plate 25, which, which is equipped with, is used for and the matched flange hole of crab-bolt on column foot 252, the first tower bar 21 is fixed on the connecting seat of column foot, and support plate 251 is equipped between 25 and first tower bar 21 of flanged plate.
First tower bar is equipped with charging pile 211, and charging pile 211 is connected with distribution box and base station.Charging pile is installed on the It is smaller apart from ground location in one tower bar, it is convenient to charge for electrical equipment.Installing advertisement board 221 and monitoring in second tower bar 22 Probe 222, monitoring probe 222 is connected by wireless network with base station, and communication tower is nearby monitored.Preferably billboard 21 For liquid crystal display, billboard 21 is connected by wireless network with base station, and the advertisement putting of billboard is controlled by base station.Advertisement The height of board generally selects 2m or so, and billboard 21 and monitoring probe 222 are arranged in the second tower bar, exist away from ground level Between 3.5m-6m, monitoring probe is set to cover sufficiently large monitoring range, and the visual field of billboard is preferable.In 3rd tower bar 23 Equipped with long-armed street lamp 32 and galianconism street lamp 231, the 3rd tower bar 23 is equipped with entrance hole 233, connects with long-armed street lamp and galianconism street lamp Lead and it is pierced by the electric wire tower body connect from entrance hole 233.Long-armed street lamp 232 and galianconism street lamp 231 are separately positioned on the 3rd tower The front and rear sides of bar 23, long-armed street lamp 232 and galianconism street lamp 231 apart from ground level between 6.5-9m, and galianconism street lamp 231 Positioned at the lower section of long-armed street lamp 232.Set long-armed street lamp 232 and galianconism street lamp 231 to coordinate, the illumination range of light can be increased, Illuminating effect is more preferably.4th tower bar 24 is equipped with antenna system 241, and the top of the 4th tower bar 24 is equipped with lightning rod, the first tower bar 21 It is interior to be equipped with ground connection band iron 13.The functional components such as the above-mentioned monitoring probe for needing lead, from tower body interior cabling.
For the diameter of tower body between 0.1-0.3m, the height of tower body is no more than 10m, ensures tower body intensity in itself and each The realizability of functional component function.Tower body is divided into the functional component such as multistage tower bar, charging pile, billboard and uses height according to it Assembled after being arranged on the different tower bodies of communication tower, communication tower is easy to assembly.Combined charging stake, billboard etc. on communication tower Functional component, enriches the function of communication tower, improves the practicality of communication tower.

Claims (7)

1. a kind of intelligence communication bar, including tower body and column foot, it is characterised in that column foot includes the main basal base of reinforced concrete structure (11), secondary pedestal(12)And connecting seat(13), main basal base(11)Including the identical main basal base prefabricated section of three sizes(111), respectively Main basal base prefabricated section is set up in parallel and by horizontally disposed long bolt(14)Connection;Connecting seat(13)On be fixed with multiple longitudinal directions The crab-bolt for setting and being distributed in the horizontal plane with circumference array(131), connecting seat(13)The main basal base for being arranged in centre is pre- Clamp dog(111)Top, the centre position in the prefabricated section simultaneously with the prefabricated section formed by integrally casting be molded;Secondary pedestal(12)Directly It is pressed in above main basal base, secondary pedestal includes the identical secondary pedestal prefabricated section of four structures(121), secondary pedestal prefabricated section is in cube Body, secondary pedestal prefabricated section, which staggeredly splices, surrounds connecting seat(13)Set, the long side and short side of adjacent two secondary pedestal prefabricated sections Direct neighbor, the communication tower pedestal after the completion of assembly, the outer edge of secondary pedestal align with the outer edge of main basal base, the height of connecting seat Height of the degree higher than secondary pedestal prefabricated section;The of length no more than 10m of tower body, tower body include first connected by casing from bottom to top Tower bar(21), the second tower bar(22), the 3rd tower bar(23)With the 4th tower bar(24), the tower bar that forms tower body is caliber in 0.1- The pipe of 0.3m, first tower bar(21), the second tower bar(22), the 3rd tower bar(23)With the 4th tower bar(24)Length it Than for 3:3:3:1;The lower end of first tower bar is equipped with flanged plate(25), the flanged plate(25)It is equipped with and is used for and the crab-bolt on column foot Matched flange hole(252), the first tower bar(21)It is fixed on the connecting seat of column foot;First tower bar is equipped with charging pile(211), Second tower bar(22)Upper installing advertisement board(221)And monitoring probe(222), billboard(221)And monitoring probe(222)Away from ground Height is between 3.5m-6m, the 3rd tower bar(23)It is equipped with long-armed street lamp(232)With galianconism street lamp(231), long-armed street lamp (232)With galianconism street lamp(231)It is separately positioned on the 3rd tower bar(23)Front and rear sides, galianconism street lamp(231)Positioned at long-armed road Lamp(232)Lower section, long-armed street lamp(232)And galianconism street lamp(231)Apart from ground level between 6.5-9m, the 4th tower bar (24)It is equipped with antenna system(241).
2. a kind of intelligence communication bar according to claim 1, it is characterised in that the first reinforced frame is embedded with connecting seat (132), the second reinforced frame is embedded with main basal base prefabricated section(1111), the first reinforced frame(132)Bottom extends to and connects The main basal base prefabricated section of seat connection(111)In the second reinforced frame(1111)Lower part.
A kind of 3. intelligence communication bar according to claim 2, it is characterised in that the crab-bolt(131)It is respectively connected with up and down Nut, each crab-bolt coordinate the nut to be connected on two annular anchor slabs, the anchor slab and the first reinforced frame(132)Welding is solid It is fixed.
A kind of 4. intelligence communication bar according to claim 1, it is characterised in that secondary pedestal prefabricated section(121)It is equipped with and hangs Ring(1211).
A kind of 5. intelligence communication bar according to claim 1, it is characterised in that adjacent secondary pedestal prefabricated section(121)It Between and secondary pedestal prefabricated section(121)With connecting seat(13)Between leave splicing gap, and by gap width in 0-0.6m Between.
A kind of 6. intelligence communication bar according to claim 1, it is characterised in that the 4th tower bar(24)Top is equipped with lightning-arrest Pin, the first tower bar(21)It is interior to be equipped with ground connection band iron(213).
A kind of 7. intelligence communication bar according to claim 1, it is characterised in that billboard(221)For liquid crystal display, extensively Accuse board(221)It is connected by wireless network with base station, the advertisement putting of billboard is controlled by base station.
CN201721007165.7U 2017-08-11 2017-08-11 A kind of intelligence communication bar Expired - Fee Related CN207296567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721007165.7U CN207296567U (en) 2017-08-11 2017-08-11 A kind of intelligence communication bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721007165.7U CN207296567U (en) 2017-08-11 2017-08-11 A kind of intelligence communication bar

Publications (1)

Publication Number Publication Date
CN207296567U true CN207296567U (en) 2018-05-01

Family

ID=62443739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721007165.7U Expired - Fee Related CN207296567U (en) 2017-08-11 2017-08-11 A kind of intelligence communication bar

Country Status (1)

Country Link
CN (1) CN207296567U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019208134A (en) * 2018-05-29 2019-12-05 富士通株式会社 Antenna fixed mount, base station, and base station installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019208134A (en) * 2018-05-29 2019-12-05 富士通株式会社 Antenna fixed mount, base station, and base station installation method

Similar Documents

Publication Publication Date Title
CN102359302A (en) Extra-high voltage large-span iron tower assembling method
CN103375033A (en) Integrated communication base station
CN103132766A (en) Truss for lifting power transmission line tower connecting leg and erection method
CN207296567U (en) A kind of intelligence communication bar
CN204418201U (en) Base station modularization prefabricated foundation
CN117537289A (en) Multifunctional solar intelligent street lamp system
CN210483094U (en) Inverted triangular pipe truss lifting device
CN207348585U (en) Intelligence communication bar
CN204609435U (en) The auxiliary tower that hoists of emergent repairing tower
CN207796872U (en) A kind of solar street lamp structure
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN205500636U (en) Water conservancy project component handling device
CN205990820U (en) A kind of industrial working Assembled enclosing wall
CN211312514U (en) Movable ground anchor device for mounting conical section of steel structure cooling tower
CN209686977U (en) A kind of wisdom communication tower
CN209799529U (en) communication tower prefabricated base convenient for wiring
CN203271221U (en) Self-standing type ground combined derrick with equipment platform
CN205894833U (en) Box -like base of matrix system of communication tower
CN205077519U (en) Protection device of inspection shaft well lid
CN205976431U (en) Tube -shape structures hydraulic pressure slipform promotes construction platform
JPH05286694A (en) Construction method and crane for assembling external type steel tower
CN205172123U (en) Multi -functional camouflage communication tower
CN205421021U (en) Integral hoisting roof beam sand box that falls
CN219430838U (en) Internal supporting type hanging die structure of concrete well ring
CN210482296U (en) Construction equipment of airport parking apron and ground anchor pit mold thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501