A kind of transport system Download PDFInfo
- Publication number
- CN207293401U CN207293401U CN201721214661.XU CN201721214661U CN207293401U CN 207293401 U CN207293401 U CN 207293401U CN 201721214661 U CN201721214661 U CN 201721214661U CN 207293401 U CN207293401 U CN 207293401U
- Authority
- CN
- China
- Prior art keywords
- area
- stacking
- round belt
- close
- conveyer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Structure Of Belt Conveyors (AREA)
Abstract
A kind of transport system, including round belt conveyer, by the connection of round belt supply unit head and the tail and circulation conveying;Stacking conveyor, including be linked in sequence first material Accreditation Waiting Area, first material delivery area, pending district;De-stacking conveyer, including second material delivery area, the material landing area being linked in sequence;Artificial conveyance machine, including second material Accreditation Waiting Area, the 3 material delivery area being linked in sequence;At least there are at one for the stacking conveyor, the de-stacking conveyer and the artificial conveyance machine.A kind of transport system and carrying method of the utility model realize the circulation conveying of cylinder material using expansible round belt conveyer, and use can change the integrated conveying that the stacking conveyor of quantity, de-stacking conveyer, artificial conveyance machine realize different processes from round belt conveyer to fetching, and the degree of automation is high and scalability is strong.
Description
Technical field
Conveyors system field is the utility model is related to, more specifically to a kind of transport system.
Background technology
Conveyors system can ceaselessly convey material along route, and the loading of its operating mechanism and unloading are all to transport
Carried out during row, thus the startup of conveyer, braking number are few;Meanwhile transported bulk cargo is uniformly distributed in carrying structure
On part, transported member material similarly conveys in a continuous manner according to a certain order.
Existing transport system is conveyed for the material of regular shape mostly, is conveyed for the material of cylindrical shape
Difficulty, it is difficult to accomplish full automation;Existing transport system is often individually designed according to processes such as stacking or de-stackings, to meet
Working procedures, which are carried out at the same time, need to use more strip transmission lines, and integrated level is poor;Existing transport system is fixed production capacity design, can not
The quantity of conveying material is increased or reduced according to production requirement.
Utility model content
The utility model provides a kind of transport system, a kind of conveying of the utility model in view of the deficiencies of the prior art
System realizes the circulation conveying of cylinder material using expansible round belt conveyer, and use can change quantity stacking it is defeated
Send machine, de-stacking conveyer, artificial conveyance machine to realize the integrated conveying of different processes to fetching from round belt conveyer, automate journey
Degree is high and scalability is strong.
The concrete technical scheme of the utility model is as follows:A kind of transport system, including round belt conveyer, are conveyed single by round belt
First head and the tail connection and circulation conveying;
Stacking conveyor, including be linked in sequence first material Accreditation Waiting Area, first material delivery area, pending district, it is described
Coiling cylinder on the round belt conveyer is transmitted to the pending district for stacking by stacking conveyor;
De-stacking conveyer, including the second material delivery area that is linked in sequence, material slide area, and the de-stacking conveyer is by sky
Cylinder, which is transmitted on the round belt conveyer, returns to coil shop progress winding process;
Artificial conveyance machine, including second material Accreditation Waiting Area, the 3 material delivery area being linked in sequence, the artificial conveyance machine
In the presence of unlatching and stop button, small lot packing or inspection for coiling cylinder;
At least there are at one for the stacking conveyor, the de-stacking conveyer and the artificial conveyance machine.
Material is conveyed as coiling cylinder and empty cylinder, is positioned over circulation conveying on the round belt conveyer;Circulation conveying side
Formula can be that the round belt supply unit is surrounded loop wire by the conveyer with transition arc, or parallel by setting two
And the round belt supply unit straight line group that conveying direction is opposite, respectively set one in the tail end of conveying straight line group conveying direction and turn over
Material is turned to another conveying straight line group from a conveying straight line group and realizes circulation conveying by rotation mechanism;The stacking conveying
Machine, the de-stacking conveyer and the artificial conveyance machine can set many places according to throughput requirements in the round belt conveyer side,
The round belt conveyer also can increase round belt supply unit to lengthen the delivered length of the round belt conveyer according to throughput requirements.
As the preferred of the utility model:The first material Accreditation Waiting Area side of the stacking conveyor is close to the circle
Band conveyer side;
The material of the de-stacking conveyer slides area side close to the round belt conveyer side;
The second material Accreditation Waiting Area side of the artificial conveyance machine is close to the round belt conveyer side.
Coiling cylinder on the round belt conveyer is transferred to the first material Accreditation Waiting Area of the stacking conveyor
Or the second material Accreditation Waiting Area of the artificial conveyance machine, the empty cylinder on the de-stacking conveyer finally pass through the material
Enter the round belt conveyer after sliding area, therefore the first material Accreditation Waiting Area, the material slide area and the second material
Accreditation Waiting Area is close to the round belt conveyer side.
As the preferred of the utility model:The transport system further includes roller conveyor, and the roller conveyor is linear
It is arranged at the pending district and second material delivery area lower section.
The roller conveyor is the pallet of free cylinder for conveying empty pallet and code;Empty pallet is transported to the stacking
The pending district side of conveyer, by robot by the coiling cylinder stacking in the pending district into empty pallet;Code has
The pallet of empty cylinder is transported to the second material delivery area side of the de-stacking conveyer, by robot to pallet Internal Code
It is carried to after good empty cylinder de-stacking on the second material delivery area.
As the preferred of the utility model:It is equipped with the first material Accreditation Waiting Area close at the first material delivery area
First blocking mechanism, the material slide and the second blocking mechanism, second thing are equipped with close at the round belt conveyer in area
Material is equipped with the 3rd blocking mechanism close at the 3 material delivery area on Accreditation Waiting Area.
First blocking mechanism is automatically controlled with second blocking mechanism by control system, the 3rd blocking mechanism
Manually control.
As the preferred of the utility model:The round belt conveyer lower section and the first material Accreditation Waiting Area, described second
Material Accreditation Waiting Area junction is provided with tipper, and the tipper possesses lifts backward described first material etc. by cylindrical material
Treat area or the action that second material Accreditation Waiting Area upset is toppled over.
As the preferred of the utility model:The pending district is provided with first close to opening in the destination county that material conveys
Close, the 3 material delivery area is provided with second close to switch in the destination county that material conveys.
As the preferred of the utility model:The pending district is provided with first close to switch one end close to described first and pushes away
Neat mechanism, the 3 material delivery area are provided with the second Tui Qi mechanisms close to described second close to switch one end.
As the preferred of the utility model:The round belt supply unit includes mirror image and sets intilted transmission wheel group,
The action that wheel group possesses adjustment spacing is transmitted described in both sides, the angle of inclination of the transmission wheel group possesses the folder between horizontal plane
The scope that angle is adjusted between 30 ° ~ 80 °.
As the preferred of the utility model:On the stacking conveyor, the de-stacking conveyer and the artificial conveyance machine
The supporting rod for driving interval by driving-chain moves, and has the peace of the different spacing for supporting rod installation on the driving-chain
Fill seat.
In conclusion the utility model has the advantages that:
The transport system of the utility model realizes the circulation conveying of cylinder material using expansible round belt conveyer, and
And can to change the stacking conveyor of quantity, de-stacking conveyer, artificial conveyance machine different to fetching realization from round belt conveyer for use
The integrated conveying of process, the degree of automation is high and scalability is strong.
Brief description of the drawings
Fig. 1 is the stereogram of one embodiment of the utility model;
Fig. 2 is the top view of one embodiment of the utility model;
Fig. 3 is the left view of the utility model round belt conveyer;
Fig. 4 is the left view of the utility model stacking conveyor;
Fig. 5 is the left view of the utility model de-stacking conveyer;
Fig. 6 is the left view of the utility model artificial conveyance machine;
In figure, 1- round belts conveyer, 1-1- round belts supply unit, 1-1-1- transmission wheel group, 2- stacking conveyors, 2-1- the
One material Accreditation Waiting Area, the first blocking mechanisms of 2-1-1-, 2-2- first materials delivery area, 2-3- pending districts, 2-3-1- first connect
Nearly switch, the first Tui Qi of 2-3-2- mechanisms, 3- de-stackings conveyer, 3-1- second materials delivery area, 3-2- materials slide area, 3-2-
The second blocking mechanisms of 1-, 4- artificial conveyances machine, 4-1- second materials Accreditation Waiting Area, the 3rd blocking mechanisms of 4-1-1-, the 3rd things of 4-2-
Expect the close switch in delivery area, 4-2-1- second, the second Tui Qi of 4-2-2- mechanisms, 5- roller conveyors, 6- tippers.
Embodiment
Below in conjunction with attached drawing, by specific embodiment, the utility model is described in further detail.
As shown in Figure 1, Figure 2, a kind of transport system, including:
Round belt conveyer 1, by the connection of round belt supply unit 1-1 head and the tail and circulation conveying;
Stacking conveyor 2, including the first material Accreditation Waiting Area 2-1, first material delivery area 2-2, pending being linked in sequence
Coiling cylinder on round belt conveyer 1 is transmitted to the pending district 2-3 for stacking by area 2-3, stacking conveyor 2;
De-stacking conveyer 3, including the second material delivery area 3-1, the material that are linked in sequence slide area 3-2, de-stacking conveyer 3
Empty cylinder is transmitted on round belt conveyer 1 and returns to coil shop progress winding process;
Artificial conveyance machine 4, including second material Accreditation Waiting Area 4-1, the 3 material delivery area 4-2 being linked in sequence, it is manually defeated
Machine 4 is sent to there is unlatching and stop button, small lot packing or inspection for coiling cylinder;
At least there are at one for stacking conveyor 2, de-stacking conveyer 3 and artificial conveyance machine 4.
Material is conveyed as coiling cylinder and empty cylinder, is positioned over circulation conveying on round belt conveyer 1;Circulation conveying mode can
To be that round belt supply unit 1-1 surrounded loop wire by the conveyer with transition arc, or by set two it is parallel and defeated
The round belt supply unit 1-1 straight line groups that direction is opposite are sent, one tipper is respectively set in the tail end of conveying straight line group conveying direction
Material is turned to another conveying straight line group from a conveying straight line group and realizes circulation conveying by structure;Stacking conveyor 2, de-stacking are defeated
Send machine 3 many places can be set in 1 side of round belt conveyer according to throughput requirements with artificial conveyance machine 4, round belt conveyer 1 also can basis
Throughput requirements increase round belt supply unit 1-1 to lengthen the delivered length of round belt conveyer 1.
As shown in Figure 1, Figure 2, the first material Accreditation Waiting Area 2-1 sides of stacking conveyor 2 are close to 1 side of round belt conveyer;De-stacking
The material of conveyer 3 slides area 3-2 sides close to 1 side of round belt conveyer;The second material Accreditation Waiting Area 4-1 of artificial conveyance machine 4
Side is close to 1 side of round belt conveyer.
Coiling cylinder on round belt conveyer 1 is transferred to the first material Accreditation Waiting Area 2-1 or manually defeated of stacking conveyor 2
Send the second material Accreditation Waiting Area 4-1 of machine 4, the empty cylinder on de-stacking conveyer 3 finally enters round belt after material slides area 3-2
Conveyer 1, therefore first material Accreditation Waiting Area 2-1, material slide area 3-2 and second material Accreditation Waiting Area 4-1 close to 1 side of round belt conveyer
Face.
As shown in Figure 1, Figure 2, transport system further includes roller conveyor 5, and roller conveyor 5 is linearly arranged at pending district 2-3
With second material delivery area 3-1 lower sections.
Roller conveyor 5 is the pallet of free cylinder for conveying empty pallet and code;Empty pallet is transported to stacking conveyor 2
Pending district 2-3 sides, by robot by the coiling cylinder stacking on pending district 2-3 into empty pallet;Code is free cylinder
Pallet is transported to the second material delivery area 3-1 sides of de-stacking conveyer 3, is torn open by the robot empty cylinder good to pallet Internal Code
It is carried to after pile on the 3-1 of second material delivery area.
As shown in Figure 1, Figure 2, the first blocking mechanism is equipped with the 2-1 of first material Accreditation Waiting Area close at the 2-2 of first material delivery area
2-1-1, material slide and the second blocking mechanism 3-2-1, second material Accreditation Waiting Area 4-1 are equipped with close at round belt conveyer 1 on area 3-2
On the 3rd blocking mechanism 4-1-1 is equipped with close at the 4-2 of 3 material delivery area.
First blocking mechanism 2-1-1 and the second blocking mechanism 3-2-1 is automatically controlled by control system, the 3rd blocking mechanism 4-
1-1 is manually controlled.
As shown in Figure 1, Figure 2, Fig. 3, the lower section of round belt conveyer 1 are handed over first material Accreditation Waiting Area 2-1, second material Accreditation Waiting Area 4-1
The place of connecing is provided with tipper 6, and tipper 6 possesses lifts backward first material Accreditation Waiting Area 2-1 or second material by cylindrical material
The action that 4-1 upsets in Accreditation Waiting Area are toppled over.
Tipper 6 is arranged at the centre of 1 both sides of round belt conveyer conveying round belt, two during lifting at support base combination forming V-shape
The cylindrical material that will be positioned on conveying round belt jacks up, and is lifted after certain altitude close to first material Accreditation Waiting Area 2-1 or the
The support base of two material Accreditation Waiting Areas 4-1 sides downwardly turns under the action of position-limit mechanism, cylindrical material is tumbled to first
On material Accreditation Waiting Area 2-1 or second material Accreditation Waiting Area 4-1;Tipper 6 is controlled by sensor and control system, when sensor detects
It is coiling cylinder and the first material Accreditation Waiting Area 2-1 opposite with tipper 6 or second material Accreditation Waiting Area 4-1 to the top of tipper 6
Control system control tipper 6 is lifted and rotary movement during upper no material;Tipper 6 may also be disposed on two and be arranged in parallel
Conveying straight line group conveying direction tail end, while set sensor to be detected, when material is located at 6 top of tipper by thing
Material is turned to another conveying straight line group, so as to fulfill the circulation conveying of material.
As shown in Figure 1, Figure 2, Fig. 4, Fig. 6, pending district 2-3 are provided with first close to switch 2-3- in the destination county that material conveys
1,3 material delivery area 4-2 are provided with second close to switch 4-2-1 in the destination county that material conveys.
First receives inductive signal close to switch 2-3-1 when material is transported to pending district 2-3 terminals, then sends out signal
Send to control system, control system closes down the transportation work of stacking conveyor 2, and machine people sends letter number when material stacking is completed
To control system, control system restarts the transportation work of stacking conveyor 2;Material is transported to 3 material delivery area 4-2
Second receives inductive signal close to switch 4-2-1 during terminal, then sends the signal to control system, control system is closed down manually
The transportation work of conveyer 4, manually sends a signal to control system after material is processed, and control system restarting is manually defeated
Send the transportation work of machine 4.
As shown in Figure 1, Figure 2, Fig. 4, Fig. 6, pending district 2-3 are provided with first close to switch 2-3-1 one end close to first and push away together
Mechanism 2-3-2,3 material delivery area 4-2 are provided with the second Tui Qi mechanisms 4-2-2 close to second close to switch 4-2-1 one end.
First receives inductive signal close to switch 2-3-1 when material is transported to pending district 2-3 terminals, then sends out signal
Send to control system, control system controls the first Tui Qi mechanisms 2-3-2 actions to push away material and flushes for stacking at the same time;Material conveys
Inductive signal is received to during the 4-2 terminals of 3 material delivery area second close to switch 4-2-1, then sends the signal to control system
System, control system control the second Tui Qi mechanisms 4-2-2 actions to push away material and flush for artificial treatment at the same time.
As Fig. 3, round belt supply unit 1-1 include mirror image and set intilted transmission wheel group 1-1-1, both sides transmission wheel group
1-1-1 possesses the action of adjustment spacing, the angle of inclination of transmission wheel group 1-1-1 possess angle between horizontal plane 30 ° ~
The scope adjusted between 80 °.
Transmission wheel group 1-1-1 can be adjusted according to the diameter of transmission cylindrical shape material, the bigger adjustment spacing of diameter
Bigger, the angle between horizontal plane is smaller;To ensure the stationarity of material transferring, particularly reduce material and conveyed by round belt
The vibration that unit 1-1 joints produce, angle of inclination is adjusted to close to 45 °, and is adjusted transmission wheel group 1-1-1 and be directed toward cylinder
Material center is preferred solution.
As shown in Figure 1, Figure 2, Fig. 4, Fig. 5, Fig. 6, by transmission on stacking conveyor 2, de-stacking conveyer 3 and artificial conveyance machine 4
Chain drives the supporting rod movement at interval, has the mounting base of the different spacing for supporting rod installation on driving-chain.
Adjacent support bar group is used to support laterally disposed cylindrical material into support lattice;Spacing between supporting rod
All the time the diameter less than cylindrical shape material is adjusted to, and can be adjusted according to the diameter of the cylindrical shape material of transmission, diameter is got over
Big spacing is bigger, is absorbed in cylindrical shape material deeper in support lattice, transmission is more stablized.
Embodiment described above is only that the preferred embodiment of the utility model is described, not new to this practicality
The spirit and scope of type are defined.Without departing from the design concept of the present utility model, ordinary people in the field is to this
The all variations and modifications that the technical solution of utility model is made, should fall within the protection scope of the present utility model, this practicality
New claimed technology contents, have all been recorded in detail in the claims.
Claims (9)
- A kind of 1. transport system, it is characterised in that including:Round belt conveyer(1), by round belt supply unit(1-1)Head and the tail connection and circulation conveying;Stacking conveyor(2), including the first material Accreditation Waiting Area being linked in sequence(2-1), first material delivery area(2-2), wait to locate Manage area(2-3);De-stacking conveyer(3), including the second material delivery area being linked in sequence(3-1), material slide area(3-2);Artificial conveyance machine(4), including the second material Accreditation Waiting Area being linked in sequence(4-1), 3 material delivery area(4-2);The stacking conveyor(2), the de-stacking conveyer(3)With the artificial conveyance machine(4)At least there are at one.
- A kind of 2. transport system according to claim 1, it is characterised in that:The stacking conveyor(2)Described first Material Accreditation Waiting Area(2-1)Side is close to the round belt conveyer(1)Side;The de-stacking conveyer(3)The material slide area(3-2)Side is close to the round belt conveyer(1)Side;The artificial conveyance machine(4)The second material Accreditation Waiting Area(4-1)Side is close to the round belt conveyer(1)Side.
- A kind of 3. transport system according to claim 1, it is characterised in that:The transport system further includes roller conveyor (5), the roller conveyor(5)Linearly it is arranged at the pending district(2-3)With the second material delivery area(3-1)Under Side.
- A kind of 4. transport system according to claim 1, it is characterised in that:The first material Accreditation Waiting Area(2-1)On connect The nearly first material delivery area(2-2)Place is equipped with the first blocking mechanism(2-1-1), the material landing area(3-2)It is upper close The round belt conveyer(1)Place is equipped with the second blocking mechanism(3-2-1), the second material Accreditation Waiting Area(4-1)It is upper close described 3 material delivery area(4-2)Place is equipped with the 3rd blocking mechanism(4-1-1).
- A kind of 5. transport system according to claim 1, it is characterised in that:The round belt conveyer(1)Lower section with it is described First material Accreditation Waiting Area(2-1), the second material Accreditation Waiting Area(4-1)Junction is provided with tipper(6), the tipper (6)Possess and cylindrical material is lifted into the backward first material Accreditation Waiting Area(2-1)Or the second material Accreditation Waiting Area(4-1)Turn over Turn the action toppled over.
- A kind of 6. transport system according to claim 1, it is characterised in that:The pending district(2-3)Conveyed in material Destination county be provided with first close to switch(2-3-1), the 3 material delivery area(4-2)Set in the destination county of material conveying Second is equipped with close to switch(4-2-1).
- A kind of 7. transport system according to claim 6, it is characterised in that:The pending district(2-3)Close to described the One close switch(2-3-1)One end is provided with the first Tui Qi mechanisms(2-3-2), the 3 material delivery area(4-2)Close to institute Second is stated close to switch(4-2-1)One end is provided with the second Tui Qi mechanisms(4-2-2).
- A kind of 8. transport system according to claim 1, it is characterised in that:The round belt supply unit(1-1)Including mirror As setting intilted transmission wheel group(1-1-1), transmission wheel group described in both sides(1-1-1)Possess the action of adjustment spacing, institute State transmission wheel group(1-1-1)Angle of inclination possess the scope that the angle between horizontal plane is adjusted between 30 ° ~ 80 °.
- A kind of 9. transport system according to claim 1, it is characterised in that:The stacking conveyor(2), the de-stacking it is defeated Send machine(3)With the artificial conveyance machine(4)On by driving-chain drive the supporting rod at interval to move, have on the driving-chain and supply The mounting base of the different spacing of the supporting rod installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721214661.XU CN207293401U (en) | 2017-09-21 | 2017-09-21 | A kind of transport system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721214661.XU CN207293401U (en) | 2017-09-21 | 2017-09-21 | A kind of transport system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207293401U true CN207293401U (en) | 2018-05-01 |
Family
ID=62442923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721214661.XU Active CN207293401U (en) | 2017-09-21 | 2017-09-21 | A kind of transport system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207293401U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107512546A (en) * | 2017-09-21 | 2017-12-26 | 湖州南浔德奥机械设备有限公司 | A kind of induction system and carrying method |
CN108373048A (en) * | 2018-05-14 | 2018-08-07 | 浙江荣平建材科技有限公司 | A kind of bituminized shingle automatic stacking transport system |
-
2017
- 2017-09-21 CN CN201721214661.XU patent/CN207293401U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107512546A (en) * | 2017-09-21 | 2017-12-26 | 湖州南浔德奥机械设备有限公司 | A kind of induction system and carrying method |
CN108373048A (en) * | 2018-05-14 | 2018-08-07 | 浙江荣平建材科技有限公司 | A kind of bituminized shingle automatic stacking transport system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107512546A (en) | A kind of induction system and carrying method | |
US6253906B1 (en) | Sequential release control for a zoned conveyor system | |
CN207293401U (en) | A kind of transport system | |
JPH05330641A (en) | Load transportation device | |
CN101326103B (en) | Method and apparatus for transporting rolls during packing | |
CN106218948A (en) | The full-automatic packaging system of autoclave aerated concrete building block | |
CN103407794A (en) | Fully-automatic brick packing and unloading method for sintered bricks | |
CN106241397A (en) | Autoclave aerated concrete building block pallet-free stacking and stacking technology | |
CN107512528A (en) | A kind of band lattice chain transfer | |
JP2004075365A (en) | High-rise warehouse and stored article conveying method for high-rise warehouse | |
JPH0790968B2 (en) | Method and device for automatically transporting tubular products | |
KR100725865B1 (en) | Turn-up apparatus of tire | |
CN104670832B (en) | Conveying system with remote double-load function | |
JP4217975B2 (en) | Transport device | |
CN101657305B (en) | Method for transporting and shaking blanks | |
CN110382380A (en) | Method and apparatus for segregating articles | |
GB2044712A (en) | Apparatus for Changing the Orientation of Articles on a Conveyor | |
CN111301967B (en) | Intelligent cargo loading system | |
CN207258684U (en) | A kind of carrying double-layer conveyer for logistics | |
CN207293308U (en) | A kind of band lattice chain transfer | |
JPH07300226A (en) | Conveying direction shifting device for conveyed object | |
JP2532680Y2 (en) | Article transfer equipment | |
JP2517648Y2 (en) | belt conveyor | |
JPH0661836U (en) | Alignment and transport device for cylindrical objects | |
JP2004075343A (en) | Carrying in/out system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 313000 No. 1188, dongma South Road, Nanxun Economic Development Zone, Huzhou City, Zhejiang Province Patentee after: HUZHOU DEAO MACHINERY EQUIPMENT Co.,Ltd. Address before: 313000 Nanlin Road 598, Nanxun Town, Huzhou City, Zhejiang Province Patentee before: HUZHOU NANXUN DEAO MACHINERY EQUIPMENT Co.,Ltd. |
|
CP03 | Change of name, title or address |