CN207279145U - Plumbing installation and air conditioner for air conditioner - Google Patents

Plumbing installation and air conditioner for air conditioner Download PDF

Info

Publication number
CN207279145U
CN207279145U CN201720985317.4U CN201720985317U CN207279145U CN 207279145 U CN207279145 U CN 207279145U CN 201720985317 U CN201720985317 U CN 201720985317U CN 207279145 U CN207279145 U CN 207279145U
Authority
CN
China
Prior art keywords
sebific duct
plumbing installation
locating part
section
air conditioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720985317.4U
Other languages
Chinese (zh)
Inventor
王飞
付裕
丁爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Priority to CN201720985317.4U priority Critical patent/CN207279145U/en
Application granted granted Critical
Publication of CN207279145U publication Critical patent/CN207279145U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Duct Arrangements (AREA)

Abstract

The utility model belongs to air-conditioning technical field, and in particular to a kind of plumbing installation and air conditioner for air conditioner.In order to solve the problems, such as that the hose in existing composite connecting pipe causes to damage with circumferential component generation collision friction and causes secondary refrigerant leakage, the plumbing installation of the utility model includes metal tube section and the sebific duct section being connected with each other, the plumbing installation further includes at least one locating part being fixed on the air conditioner, and the sebific duct section passes through the locating part.By the technical solution of the utility model, i.e., at least one locating part is fixed on air conditioner, sebific duct section is passed through the locating part.So; sebific duct section can rock in the region that locating part is limited; on the one hand collision friction between sebific duct section and its circumferential component is avoided, plays the purpose of Protection glue tube section, on the other hand sebific duct is effectively discharged because of the mechanical energy that internal refrigerant flows and produces.

Description

Plumbing installation and air conditioner for air conditioner
Technical field
The utility model belongs to air-conditioning technical field, and in particular to a kind of plumbing installation and air conditioner for air conditioner.
Background technology
Since air-conditioner hose part uses copper pipe or steel pipe so that usually appearance vibration is big in air conditioner operational process, answers A problem that power is concentrated.In order to avoid above-mentioned unfavorable condition, air-conditioner hose part generally use bending and molding is process, this Sample not only increases the holistic cost of air conditioner, but also the space for occupying air-conditioner hose part further increases.
At present, some air-conditioner hose parts have used composite connecting pipe.Two of the composite connecting pipe uses metal material (be used for and other pipelines are attached, such as weld), centre is hose.The structure not only saves material cost, therein soft Tube portion can also effectively absorb the vibration produced in air conditioner operational process and stress.But the vibration can be released into machine Tool moves, and causes sebific duct to swing back and forth, and sebific duct easily produces collision friction with its circumferential component in swing process and causes to damage, Cause secondary refrigerant leakage.
Based on this, spy proposes the utility model.
Utility model content
It has been hose and periphery in the existing composite connecting pipe of solution to solve the above problem of the prior art The problem of part produces collision friction and causes to damage and cause secondary refrigerant leakage, the utility model provide a kind of pipeline dress Put, it includes the metal tube section being connected with each other and sebific duct section, and the plumbing installation, which further includes, to be fixed on the air conditioner At least one locating part, the sebific duct section passes through the locating part.
In the preferred embodiment of above-mentioned plumbing installation, the locating part is cyclic structure, the cyclic structure it is interior Footpath is more than the outside diameter of the sebific duct section, so that the sebific duct section can rock in the locating part.
In the preferred embodiment of above-mentioned plumbing installation, the hardness of the locating part is less than the hard of the sebific duct section Degree.
In the preferred embodiment of above-mentioned plumbing installation, the locating part is fixed on the chassis of institute's outdoor unit of the air conditioner On.
In the preferred embodiment of above-mentioned plumbing installation, the plumbing installation includes at least two sebific duct sections, The metal tube section is arranged between two sebific duct sections;The number of the locating part is greater than or equal to the sebific duct section Number.
In the preferred embodiment of above-mentioned plumbing installation, the plumbing installation includes at least two metal areas under control Section, the sebific duct section are arranged between two metal tube sections.
In the preferred embodiment of above-mentioned plumbing installation, the metal tube section is copper pipe or steel pipe.
In the preferred embodiment of above-mentioned plumbing installation, the sebific duct section is heat safe rubber tube.
In the preferred embodiment of above-mentioned plumbing installation, the metal tube section bending and molding.
The utility model additionally provides a kind of air conditioner, including plumbing installation, and the plumbing installation is any one of above-mentioned The plumbing installation.
By the optimal technical scheme of the utility model, i.e., at least one ring-type locating part is fixed on air conditioner, makes glue Tube section passes through the ring-type locating part.So, sebific duct section can rock in the region that ring-type locating part is limited, and one Aspect avoids collision friction between sebific duct section and its circumferential component, plays the purpose of Protection glue tube section, on the other hand also Sebific duct is set to avoid the mechanical energy because mechanical energy caused by the flowing of internal refrigerant effectively discharges and conduct to metal tube and glue The connecting portion of pipe and the problem of cause Joint failure.
Brief description of the drawings
Fig. 1 is a kind of structure diagram that the plumbing installation for air conditioner of the utility model is assemblied on air conditioner;
Fig. 2 is a kind of STRUCTURE DECOMPOSITION signal that the plumbing installation for air conditioner of the utility model is assemblied on air conditioner Figure.
Embodiment
The preferred embodiment of the utility model described with reference to the accompanying drawings.It should be understood by those skilled in the art that It is that these embodiments are used only for explaining the technical principle of the utility model, it is not intended that limit the protection of the utility model Scope.For example, although each component in attached drawing is drawn with special ratios, but what this proportionate relationship was merely exemplary, Those skilled in the art as needed can make adjustment it, to adapt to specific application scenario.
Referring to Figures 1 and 2, Fig. 1 is that the plumbing installation for air conditioner of the utility model is assemblied in one on air conditioner Kind structure diagram;Fig. 2 is a kind of structure point that the plumbing installation for air conditioner of the utility model is assemblied on air conditioner Solve schematic diagram.As depicted in figs. 1 and 2, the plumbing installation of the utility model includes metal tube section 1 and the sebific duct area being connected with each other Section 2, plumbing installation further includes at least one locating part 3 being fixed on air conditioner, and sebific duct section 2 passes through locating part 3.In this reality Apply in example, locating part 3 is cyclic structure, and the internal diameter of the cyclic structure is more than the outside diameter of sebific duct section 2, so that the sebific duct section 2 Can small range is carried out in locating part 3 it rock.That is, there is certain rock in the region that locating part 3 is limited Space so that sebific duct section 2 can be rocked in space and rocked at this after passing through locating part 3, to prevent that sebific duct is fixed Under situation, the mechanical energy of compressor is delivered to the link position of metal section 1 and sebific duct section 2, and causes metal section 1 and glue The Joint failure of tube section 2 and leakage.
The plumbing installation of the utility model, including at least two metal tube sections 1, sebific duct section 2 is arranged at two metals Between tube section 1 (as illustrated in figs. 1 and 2).In addition, sebific duct section 2 can also at least set two, metal tube section 1 is set Between two sebific duct sections 2.In other words, the plumbing installation of the utility model, metal tube section 1 and sebific duct section 2 are alternating Set, i.e., one end of one end connection rubber tube section 2 of metal tube section 1, the other end of sebific duct section 2 connect another metal tube One end of section 1, the other end of another metal tube section 1 connect one end of another sebific duct section 2, are sequentially connected, and are formed Plumbing installation with multiple metal tube sections 1 and sebific duct section 2.It should be noted that since the both ends of plumbing installation are usual Need to be attached (as welded) with other pipelines, therefore, the both ends of plumbing installation ensure to be metal tube section 1.The pipeline Device can use bending and molding, i.e., according to the practical application scene of plumbing installation, by metal tube section 1 be bent into suitably this The structure that scape uses.
With continued reference to Fig. 1 and Fig. 2, in the present embodiment, plumbing installation is assemblied in outdoor unit of the air conditioner.Wherein, it is spacing Part 3 can be secured by bolts on bottom plate of outdoor unit 4.It is clear from fig. 2 that locating part 3 can be soldered to one On sheet metal, then the both ends of sheet metal are fixed on bottom plate of outdoor unit 4 using bolt, so that locating part 3 also is secured to On bottom plate of outdoor unit 4.In addition, locating part 3 can also use any other effective fixed form, for example weld, is hinged, The mode such as it is integrally formed, no longer describes one by one herein.
The plumbing installation of the utility model not only reduces pipe by the way of sebific duct section replaces part metals tube section The usage amount of metal (such as copper) in road, can also cancel the auxiliary materials such as damping rubber block on air-conditioner hose, so as to reduce Work flow, has saved cost.But made since sebific duct easily produces collision friction in swing process with its circumferential component Into damage, cause secondary refrigerant leakage.And in the present embodiment, after sebific duct section 2 is passed through locating part 3, on the one hand, sebific duct section 2 It can only rock in the range of the restriction of locating part 3, so as to avoid collision friction between sebific duct section 2 and its circumferential component, rise To the purpose of Protection glue tube section 2.On the other hand sebific duct is also enable effectively to be released because of mechanical energy caused by the flowing of internal refrigerant Put, avoid the problem of mechanical energy conducts the connecting portion to metal tube and sebific duct and causes Joint failure.
Further, the hardness of locating part 3 should be less than the hardness of sebific duct section 2.The scope limited due to sebific duct in locating part 3 When inside rocking, will inevitably collide friction with locating part 3.Selected due to the hardness of locating part 3 and be less than sebific duct section 2 The hardness of middle sebific duct, so when both collide friction, be subject to frictionally damage will be locating part 3, so as to effectively reduce The damage of sebific duct section 2, extends the service life of plumbing installation.
It will be appreciated to those of skill in the art that the number of locating part 3 can be equal to the number of sebific duct section 2, also may be used With the number more than sebific duct section 2.Specifically, when the sebific duct section 2 in plumbing installation is one, can use to a limit Position part 3, can also use two locating parts 3;When the sebific duct section 2 in plumbing installation is multiple, at least ensure each sebific duct Section passes through a locating part 3, so as to play the collision friction for preventing sebific duct and miscellaneous part, and avoids sebific duct section in sky Between unordered vibration, be effectively protected sebific duct section 2.
Although above-mentioned illustrate so that plumbing installation is assemblied in air-conditioner outdoor unit as an example, in some cases, this The plumbing installation of utility model can also be applied to the other parts of air conditioner.In the present embodiment, the metal tube of plumbing installation Section 1 can use copper pipe or steel pipe;The sebific duct section 2 of plumbing installation can use heat safe rubber tube.Art technology Personnel can also select the material of other matters according to practical situations, these protection models without departure from the utility model Enclose.
On the other hand, the utility model additionally provides a kind of air conditioner, it includes plumbing installation, which is above-mentioned In the plumbing installation mentioned.Details are not described herein.
So far, have been combined preferred embodiment shown in the drawings and describe the technical solution of the utility model, still, this Field technology personnel are it is easily understood that the scope of protection of the utility model is expressly not limited to these embodiments. Without departing from the utility model principle on the premise of, those skilled in the art can make correlation technique feature equivalent change Or replace, the technical solution after these are changed or replace it is fallen within the scope of protection of the utility model.

Claims (10)

1. a kind of plumbing installation for air conditioner, the plumbing installation includes metal tube section and the sebific duct area being connected with each other Section, it is characterised in that the plumbing installation further includes at least one locating part being fixed on the air conditioner, the sebific duct area Section passes through the locating part.
2. plumbing installation according to claim 1, it is characterised in that the locating part is cyclic structure, the ring-type knot The internal diameter of structure is more than the outside diameter of the sebific duct section, so that the sebific duct section can rock in the locating part.
3. plumbing installation according to claim 2, it is characterised in that the hardness of the locating part is less than the sebific duct section Hardness.
4. plumbing installation according to claim 3, it is characterised in that the locating part is fixed on the outdoor of the air conditioner On the chassis of machine.
5. plumbing installation according to any one of claim 1 to 4, it is characterised in that the plumbing installation is included at least Two sebific duct sections, the metal tube section are arranged between two sebific duct sections;The number of the locating part be more than or Equal to the number of the sebific duct section.
6. plumbing installation according to any one of claim 1 to 4, it is characterised in that the plumbing installation is included at least Two metal tube sections, the sebific duct section are arranged between two metal tube sections.
7. plumbing installation according to any one of claim 1 to 4, it is characterised in that the metal tube section is copper pipe Or steel pipe.
8. plumbing installation according to any one of claim 1 to 4, it is characterised in that the sebific duct section is high temperature resistant Rubber tube.
9. plumbing installation according to any one of claim 1 to 4, it is characterised in that the metal tube section is bent into Type.
10. a kind of air conditioner, including plumbing installation, it is characterised in that the plumbing installation is any one of claim 1-9 institutes The plumbing installation stated.
CN201720985317.4U 2017-08-08 2017-08-08 Plumbing installation and air conditioner for air conditioner Active CN207279145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720985317.4U CN207279145U (en) 2017-08-08 2017-08-08 Plumbing installation and air conditioner for air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720985317.4U CN207279145U (en) 2017-08-08 2017-08-08 Plumbing installation and air conditioner for air conditioner

Publications (1)

Publication Number Publication Date
CN207279145U true CN207279145U (en) 2018-04-27

Family

ID=61986993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720985317.4U Active CN207279145U (en) 2017-08-08 2017-08-08 Plumbing installation and air conditioner for air conditioner

Country Status (1)

Country Link
CN (1) CN207279145U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107490220A (en) * 2017-08-08 2017-12-19 青岛海尔空调器有限总公司 Plumbing installation and air conditioner for air conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107490220A (en) * 2017-08-08 2017-12-19 青岛海尔空调器有限总公司 Plumbing installation and air conditioner for air conditioner

Similar Documents

Publication Publication Date Title
KR20050112960A (en) Piping fixing apparatus
CN102767923A (en) Throttling device and air conditioner adopting same
CN208845368U (en) Pulsation and vibration control apparatus
CN207279145U (en) Plumbing installation and air conditioner for air conditioner
CN209944573U (en) Air conditioner outdoor unit and air conditioner
CN107490220A (en) Plumbing installation and air conditioner for air conditioner
CN204555101U (en) Air-conditioner outdoor unit and pipe arrangement, air-conditioner
JP2005083732A (en) Piping device for air conditioner
CN207268353U (en) Plumbing installation and air conditioner for air conditioner
CN202303694U (en) Connection pipe of air conditioner
CN204853733U (en) Air conditioning assembly
CN202734368U (en) Throttling system and air conditioner using same
CN107726593A (en) The noise reduction system and air conditioner of air-conditioner outdoor unit
CN205066258U (en) Vehicle air conditioner's low pressure pipeline structure
CN203501390U (en) Tubing structure and air conditioner
CN211823288U (en) Capillary component and refrigerating system
CN206695264U (en) Shock absorbing pipe and air conditioner
CN209181127U (en) A kind of New Refrigerating idle call shock absorbing pipe
CN206073527U (en) A kind of structure and its air-conditioner of being easy to evacuation to add coolant
CN207816612U (en) A kind of recovery type heat enthalpy difference laboratory
CN209877299U (en) Flexible damping device for high-pressure pipe of air-conditioning scroll compressor
CN212005993U (en) Low-leakage, low-noise and anti-vibration split air conditioner system
CN217130496U (en) Four-way valve for automobile air conditioner
CN201827559U (en) Extendable connecting pipe and air conditioner using same
CN202442454U (en) Pipeline connecting structure and air conditioner with same

Legal Events

Date Code Title Description
GR01 Patent grant