CN207277848U - Metro Station Structure side wall punching block ruggedized construction - Google Patents

Metro Station Structure side wall punching block ruggedized construction Download PDF

Info

Publication number
CN207277848U
CN207277848U CN201721373153.6U CN201721373153U CN207277848U CN 207277848 U CN207277848 U CN 207277848U CN 201721373153 U CN201721373153 U CN 201721373153U CN 207277848 U CN207277848 U CN 207277848U
Authority
CN
China
Prior art keywords
side wall
steel pipe
pipe support
punching block
embedded bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721373153.6U
Other languages
Chinese (zh)
Inventor
彭勇志
汪树生
邓敏
周运志
宋梧阅
贺宏波
王平
迟荣景
***
刘磊磊
夏轶飞
李祥
葛长飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201721373153.6U priority Critical patent/CN207277848U/en
Application granted granted Critical
Publication of CN207277848U publication Critical patent/CN207277848U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of Metro Station Structure side wall punching block ruggedized construction, and position pre-embedded bolt is first poured in the structural slab of subway station and the concrete of side wall, is in horizontal side wall pre-embedded bolt and in vertical structural slab pre-embedded bolt respectively;Structural slab pre-embedded bolt installation fixing component is utilized on structural slab;The bottom of side wall punching block is installed on side wall pre-embedded bolt;Steel pipe support is set, steel pipe support is rotary structure at both ends, and the length of steel pipe support can be adjusted by rotation, one end installation of steel pipe support is on the fixing element, the other end is fixedly connected with the reserved component on side wall punching block using bolt, and gusseted is formed to side wall punching block using steel pipe support;Make side wall punching block in vertical by adjusting the length of steel pipe support.The utility model can accelerate side wall construction speed, it is ensured that station side wall concrete construction quality is totally good, controllable.

Description

Metro Station Structure side wall punching block ruggedized construction
Technical field
It the utility model is related to a kind of Metro Station Structure side wall punching block ruggedized construction.
Background technology
Most of subway station is in the busy location of urban transportation, and subway work disturbs greatly, therefore to work surrounding enviroment Phase requires very stringent.For subway station cut and cover tunneling, the progress of side wall construction determine the construction of agent structure plate into Degree, in the prior art, side wall template generally use is the big punching block of triangle, its complicated, installation reinforces cumbersome and precision not It is too high, construction efficiency is low, while because it is from great, lifting operation security risk is high.
Utility model content
The utility model is to avoid the shortcoming present in the above-mentioned prior art, there is provided a kind of Metro Station Structure side Wall punching block ruggedized construction, to realize that Metro Station Structure side wall punching block fast reliably reinforce by installation, accelerates side wall construction speed, Ensure station side wall concrete construction quality.
The utility model adopts the following technical scheme that to solve the above problems:
The characteristics of the utility model Metro Station Structure side wall punching block ruggedized construction is:Structural slab and side in subway station The concrete of wall first pours position pre-embedded bolt, is in horizontal side wall pre-embedded bolt and in the vertical pre-buried spiral shell of structural slab respectively Bolt;Structural slab pre-embedded bolt installation fixing component is utilized on the structural slab;It is pre- that the bottom of side wall punching block is installed on side wall Bury on bolt;Steel pipe support is set, and the steel pipe support is rotary structure at both ends, and can adjust steel pipe branch by rotation The length of support, on the fixing element, the reserved component on the other end and side wall punching block utilizes for one end installation of the steel pipe support Bolt is fixedly connected, and gusseted is formed to side wall punching block using the steel pipe support;Make by adjusting the length of steel pipe support Side wall punching block is in vertical.
The characteristics of the utility model Metro Station Structure side wall punching block ruggedized construction, lies also in:In same perpendicular, The steel pipe support is arranged in parallel to be formed to side wall punching block two for inside and outside twice, inside and outside twice steel pipe support for one is long and the other is short Gusseted on a different height position.
Compared with the prior art, the utility model has the beneficial effect that:
1st, the utility model is using pre-embedded bolt installation fixing component, and utilizes steel pipe support to Metro Station Structure side wall Punching block carries out quick reliable installation and reinforces, and effectively increases side wall construction speed.
2nd, the utility model enormously simplify structure side wall punching block by using the steel pipe support of both ends adjustable length Installation process, its is easy to adjust, and installation accuracy is higher than common punching block.
3rd, the utility model reduces punching block dead weight, its is convenient to assemble and disassemble, reduces lifting operation construction safety risk.
Brief description of the drawings
Fig. 1 is the utility model facade structures schematic diagram;
Fig. 2 is side wall punching block elevational schematic view in the utility model;
Fig. 3 is side wall punching block schematic top plan view in the utility model;
Figure label:1a side wall pre-embedded bolts, 1b structural slab pre-embedded bolts, 2 fixing components, 3 side wall punching blocks, 3a punching block works Word steel, 3b reserve component, 4 steel pipe supports, 4a right-hand screw caps, 4b left-hand screw caps.
Embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3, Metro Station Structure side wall punching block ruggedized construction is in subway station in the present embodiment The concrete of structural slab and side wall first pours position pre-embedded bolt, is in horizontal side wall pre-embedded bolt 1a and in vertical knot respectively Structure plate pre-embedded bolt 1b;Structural slab pre-embedded bolt 1b installation fixing components 2 are utilized on structural slab;By the bottom of side wall punching block 3 On side wall pre-embedded bolt 1a;Steel pipe support 4 is set, and steel pipe support 4 is rotary structure at both ends, and passes through rotational energy The length of steel pipe support 4 is enough adjusted, one end of steel pipe support 4 is installed in fixing component 2, on the other end and side wall punching block 3 The reserved component 3b being welded on punching block I-steel 3a is fixedly connected using bolt, and side wall punching block 3 is formed using steel pipe support 4 Gusseted;Make side wall punching block 3 in vertical by adjusting the length of steel pipe support 4.
In the present embodiment, the steel pipe support 4 in same perpendicular is arranged in parallel as inside and outside twice, inside and outside twice steel pipe Support 4 forms the gusseted on two different height positions to side wall punching block 3, in same shown in Fig. 2 for one is long and the other is short On side wall punching block 3, longitudinally spaced setting at least twice steel pipe support 4.
In specific implementation, steel pipe support 4 carries right-hand screw cap 4a in bottom, and left-hand screw cap 4b is carried on top;Work as rotation The middle part bar segment of steel pipe support 4, is relatively rotated between bar segment and right-hand screw cap 4a and left-hand screw cap 4b, is adjusted with this in the middle The length of whole steel pipe support 4, so as to adjust the verticality of side wall punching block 3.
The utility model is installed fixing component and is adjusted using both ends by the pre-embedded bolt in plate face concreting The steel pipe support of length, carries out quick reliable installation by Metro Station Structure side wall punching block and reinforces, can accelerate side wall construct into Degree, it is ensured that station side wall concrete construction quality is totally good, controllable.

Claims (2)

1. a kind of Metro Station Structure side wall punching block ruggedized construction, it is characterized in that:In the structural slab of subway station and mixing for side wall Solidifying soil first pours position pre-embedded bolt, is in horizontal side wall pre-embedded bolt (1a) and in vertical structural slab pre-embedded bolt respectively (1b);Structural slab pre-embedded bolt (1b) installation fixing component (2) is utilized on the structural slab;By the bottom of side wall punching block (3) On side wall pre-embedded bolt (1a);Steel pipe support (4) is set, the steel pipe support (4) is rotary structure at both ends, and The length of steel pipe support (4) can be adjusted by rotation, one end of the steel pipe support (4) is installed in fixing component (2), separately One end is fixedly connected with the reserved component (3b) on side wall punching block (3) using bolt, using the steel pipe support (4) to side wall steel Mould (3) forms gusseted;Make side wall punching block (3) in vertical by adjusting the length of steel pipe support (4).
2. Metro Station Structure side wall punching block ruggedized construction according to claim 1, it is characterized in that:In same perpendicular In, the steel pipe support (4) is arranged in parallel to be formed to side wall for inside and outside twice, inside and outside twice steel pipe support (4) for one is long and the other is short Gusseted of the punching block (3) on two different height positions.
CN201721373153.6U 2017-10-20 2017-10-20 Metro Station Structure side wall punching block ruggedized construction Active CN207277848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721373153.6U CN207277848U (en) 2017-10-20 2017-10-20 Metro Station Structure side wall punching block ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721373153.6U CN207277848U (en) 2017-10-20 2017-10-20 Metro Station Structure side wall punching block ruggedized construction

Publications (1)

Publication Number Publication Date
CN207277848U true CN207277848U (en) 2018-04-27

Family

ID=61981070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721373153.6U Active CN207277848U (en) 2017-10-20 2017-10-20 Metro Station Structure side wall punching block ruggedized construction

Country Status (1)

Country Link
CN (1) CN207277848U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629596A (en) * 2019-01-09 2019-04-16 中国水利水电第八工程局有限公司 Lid digs subway station side wall construction template system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629596A (en) * 2019-01-09 2019-04-16 中国水利水电第八工程局有限公司 Lid digs subway station side wall construction template system and construction method

Similar Documents

Publication Publication Date Title
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN211421173U (en) Multi-cabin comprehensive pipe gallery pull-rod-free template supporting system
CN103334379A (en) Construction method for hanging part of anti-collision guardrail on expressway
CN207794608U (en) A kind of adjustable support for shuttering of movement for groove construction column
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN109610817A (en) Cross beam falsework and its design and construction method
CN210917458U (en) City utility tunnel unilateral side mould frock subassembly
CN207277848U (en) Metro Station Structure side wall punching block ruggedized construction
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN204982673U (en) Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash
CN102767378B (en) Double-column type tunnel portal method for bent frame construction tunnel
CN206625260U (en) A kind of detachable late poured band support post
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN201794007U (en) Plate-pressing device for railway ballastless track plate
CN103967332A (en) Construction method of building site barrier
CN111778863A (en) Cantilever beam steel formwork system with adjustable cross slope
CN203730011U (en) Formwork limiting device
CN110273435A (en) A kind of construction of city open trench tunnel
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN204876558U (en) A locating support that is used for cast -in -place reversed beam side form board of going up
CN213927478U (en) Reinforcing device for concrete pouring
CN208815562U (en) A kind of capping beam rapid construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant