CN207277305U - A kind of equipment for burying soil pressure cell - Google Patents

A kind of equipment for burying soil pressure cell Download PDF

Info

Publication number
CN207277305U
CN207277305U CN201721165426.8U CN201721165426U CN207277305U CN 207277305 U CN207277305 U CN 207277305U CN 201721165426 U CN201721165426 U CN 201721165426U CN 207277305 U CN207277305 U CN 207277305U
Authority
CN
China
Prior art keywords
pressure cell
soil pressure
long tube
hard long
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721165426.8U
Other languages
Chinese (zh)
Inventor
尹长权
李明英
侯晋芳
王健
张帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd, Tianjin Harbor Engineering Quality Inspection Center Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201721165426.8U priority Critical patent/CN207277305U/en
Application granted granted Critical
Publication of CN207277305U publication Critical patent/CN207277305U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a kind of equipment for burying soil pressure cell, including grouting pump, perfusion mortar to pump, and the grout outlet of grouting pump connects a hard long tube by high-pressure hose, and first switch pipe valve is set in the grout outlet of grouting pump;The grout outlet of perfusion mortar pump connects hard long tube by high-pressure hose, and second switch pipe valve is set in the grout outlet of perfusion mortar pump;Hard long tube is inserted into drilling, makes hard long tube lower nozzle deeply to the foot of hole for placing soil pressure cell.The place of embedded soil pressure cell is being needed to carry out holing with slurry wall protection first, and soil pressure cell and stent that rate is set are put into the hole being drilled;High concentration slurry is replaced with low concentration mud, is then turned on perfusion mortar pump, starts to inject embedding material, during embedding material is injected, gradually lifts hard long tube, until drilling is filled embedding material.

Description

A kind of equipment for burying soil pressure cell
Technical field
The utility model belongs to ground technical field of construction, and in particular to a kind of landfill material for being suitable for embedded soil pressure cell Material and its method for embedding and its burial equipment.
Background technology
In City Subway Station or high-building construction, narrow space, ambient boundary complicated condition is various.Deep basal pit is opened Dig safe mass, duration and the cost for directly affecting whole engineering.Modern deep basal pit is frequently with ground-connecting-wall, suspended wall campshed, steel plate The compound gear shield forms such as stake, supporting use deep-mixed pile cut-pff wall, cause periphery to build to prevent undisturbed soil destruction outside foundation pit Build thing damage and the safe handling of various pipelines.The change of the soil pressure of retaining structure and crater wall interface different depth is engineering project Risk assessment must survey project with control, generally directly be measured using soil pressure cell.However, severe work on the spot environment makes to bury If soil pressure cell survival rate it is relatively low, the data distortion measured, confidence level is difficult to ensure that, directly influences the accurate of Monitoring Result The differentiation and evaluation of property and reliability.To find out its cause, mainly have at 2 points:
When a kind of no effective soil pressure cell method for embedding, at present, the side for the embedded soil lateral pressure box that drills Method is as follows, drills on soil after wall, the soil pressure cell that then rate is set is put into the hole being drilled, and then uses fine sand Tamp, this method needs secondary drilling, and fine sand tamps very difficult, and construction cost is higher, and drill can cause it is native around There is soil arching effect in body, thus cause surrounding soil internal stress redistribution, act on arch after or arch on soil pressure It is delivered in arch springing and surrounding soil, causes test result inaccurate.
Two are the absence of a kind of material of suitable soil pressure cell landfill, and it is smaller that original soil pressure cell buries hole remaining space, in addition Mud effect in drilling, make can not directly or pumping backfill fine sand, therefore, it is necessary to improve embedding material property, 1) needs are 1 There are enough pumping flows in writing brush footpath, 2) easy draining, quick gain in strength characteristic are needed, 3) structure cannot be formed Body, can not intensity it is too low, influence soil pressure cell stress, strength characteristics is preferably close to fine sand, 4) it is cheap.According to investigation, mesh It is preceding in the former drilling of pressure cell, also nobody used other embedding materials.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, there is provided a kind of to be suitable for filling out for embedded soil pressure cell Bury material and its method for embedding and its burial equipment.
The utility model is achieved through the following technical solutions:
A kind of embedding material for being suitable for embedded soil pressure cell, including following raw material by weight:Cement 0.08- 0.12 part, 0.16-0.28 parts of bentonite, 4.6-4.8 parts of fine sand, 1.5-1.6 parts of water;Above raw material are uniformly mixed this is made Embedding material.
A kind of equipment for burying soil pressure cell, including grouting pump, perfusion mortar pump, the grout outlet of grouting pump pass through height Press hose to connect a hard long tube, first switch pipe valve is set in the grout outlet of grouting pump;The grout outlet of perfusion mortar pump passes through High-pressure hose connects hard long tube, and second switch pipe valve is set in the grout outlet of perfusion mortar pump;Hard long tube is inserted into brill Kong Zhong, makes hard long tube lower nozzle deeply to the foot of hole for placing soil pressure cell.Further, the hard long tube is preferably Steel pipe.
The place of embedded soil pressure cell is being needed to carry out holing with slurry wall protection, and the soil pressure cell and branch that rate is set first Frame is put into the hole being drilled;Then, the grout outlet of grouting pump is connected into a hard long tube by hose, hard long tube is inserted into In drilling, make hard long tube lower nozzle that to foot of hole, high concentration slurry deeply is replaced with low concentration mud;Then sand will be irrigated The grout outlet of stock pump is connected on hard long tube by hose, opens perfusion mortar pump, is started to inject embedding material, is filled in injection In materials process, hard long tube is gradually lifted, until drilling is filled embedding material.
The advantages of the utility model and have the beneficial effect that:
The embedding material of the utility model, has following advantage, meets the requirement of soil pressure cell embedding material.
1st, there are enough pumping flows in 1 writing brush footpath;
2nd, easy draining, have quick gain in strength characteristic;
3rd, structure is not formed, strength characteristics is close to fine sand;
4th, it is cheap.
The inbuilt method of soil pressure cell is carried out using above-mentioned embedding material and equipment, same hole landfill is realized, improves survey Test result accuracy, improves the inbuilt efficiency of soil pressure cell.
Brief description of the drawings
Fig. 1 is to carry out soil pressure cell burial and construction structure diagram.
Fig. 2 is to carry out soil pressure cell burial and construction structure diagram.
In figure:1 soil pressure cell, 2 supporting racks, 3 soil pressure cell surveys line, 4 mud, 5 hard long tubes, 6 high-pressure hoses, 7 switches Pipe valve, 8 switch pipe valves, 9 grouting pumps, 10 high-pressure hoses, 11 perfusion mortars pump, 12 embedding materials.
Embodiment
The technical solution of the utility model is further illustrated with reference to specific embodiment.
Embodiment one:
A kind of embedding material for being suitable for embedded soil pressure cell, is mixed by cement, bentonite, fine sand, water etc., referring to Table 1, is the experimental data and experimental result of 7 kinds of different ratios that the present embodiment provides, is drawn according to experimental result:It is cement, swollen It is 0.1 to moisten soil, fine sand, the mass ratio of water:0.2:4.7:When 1.5, the embedding material matched somebody with somebody be provided simultaneously with good mobility, The characteristic such as fugitive, of low cost, meets soil pressure cell and fills out after good draining characteristics, quick gain in strength and shaping Bury the requirement of material.
Table 1:The embedding material experiment table of embodiment one
Above test material, cement is Q32.5 cement, (granular mass of the particle diameter more than 0.075mm exceedes gross mass to fine sand 85%), different types of fine sand needs small range adjustment cement, the dosage of bentonite and water.
Embodiment two:
A kind of embedding material for being suitable for embedded soil pressure cell, is mixed by cement, bentonite, fine sand, water etc., referring to Table 2, is the experimental data and experimental result of 5 kinds of different ratios that the present embodiment provides, is drawn according to experimental result:It is cement, swollen It is 0.12 to moisten soil, fine sand, the mass ratio of water:0.28:4.7:When 1.6, the embedding material matched somebody with somebody is provided simultaneously with good flowing Property, the characteristic such as fugitive, of low cost after good draining characteristics and shaping, meet the requirement of soil pressure cell embedding material;Water Mud, bentonite, fine sand, the mass ratio of water are 0.1:0.2:4.7:When 1.5, the embedding material matched somebody with somebody is provided simultaneously with good stream The characteristic such as fugitive, of low cost, meets the requirement of soil pressure cell embedding material after dynamic property, good draining characteristics and shaping; Cement, bentonite, fine sand, the mass ratio of water are 0.08:0.16:4.7:When 1.5, the embedding material matched somebody with somebody is provided simultaneously with well Mobility, good draining characteristics, the characteristic such as fugitive, of low cost after quick gain in strength and shaping, meet soil The requirement of pressure cell embedding material;
Table 2:Two embedding material of embodiment tests table
Embodiment three:
A kind of embedding material for being suitable for embedded soil pressure cell, is mixed by cement, bentonite, fine sand, water etc., referring to Table 3, is the experimental data and experimental result of 5 kinds of different ratios that the present embodiment provides, is drawn according to experimental result:It is cement, swollen It is 0.11 to moisten soil, fine sand, the mass ratio of water:0.25:4.6:When 1.5, the embedding material matched somebody with somebody is provided simultaneously with good flowing Property, the characteristic such as fugitive, of low cost after good draining characteristics and shaping, meet the requirement of soil pressure cell embedding material;Water Mud, bentonite, fine sand, the mass ratio of water are 0.1:0.2:4.7:When 1.5, the embedding material matched somebody with somebody is provided simultaneously with good stream The characteristic such as fugitive, of low cost, meets the requirement of soil pressure cell embedding material after dynamic property, good draining characteristics and shaping; Cement, bentonite, fine sand, the mass ratio of water are 0.1:0.16:4.8:When 1.5, the embedding material matched somebody with somebody is provided simultaneously with well Mobility, good draining characteristics, the characteristic such as fugitive, of low cost after quick gain in strength and shaping, meet soil The requirement of pressure cell embedding material;
Table 3:Three embedding material of embodiment tests table
It is as follows that the inbuilt method of soil pressure cell is carried out using above-mentioned embedding material and equipment:
1) as shown in figure attached drawing 1, the place of embedded soil pressure cell is being needed to carry out the drilling of 4 retaining wall of high concentration slurry first, And the soil pressure cell 1 that rate is set is attached on supporting rack 2, it is then placed in the hole being drilled, from 2 side of supporting rack by soil pressure cell Survey line 3 draws ground;
2) as shown in figure attached drawing 2, the grout outlet of grouting pump 9 is connected into a hard long tube 5 by high-pressure hose 6, and set First switch pipe valve 7;The grout outlet of perfusion mortar pump 11 is connected on hard long tube 5 by high-pressure hose 10 at the same time, and is set Second switch pipe valve 8;
3) hard long tube 5 is inserted into drilling, makes 5 lower nozzle of hard long tube deeply to foot of hole, the hard length Pipe is preferably steel pipe, if aperture allows the drilling rod of drilling machine can be used to replace;
4) grouting pump 9 is opened, switch pipe valve 7 is opened, turns off the switch pipe valve 8, with the mud borehole cleaning of low concentration, is replaced highly concentrated Mud is spent, but ensures borehole wall-protection state, it is impossible to collapse hole;
5) switch pipe valve 8 is opened, turns off the switch pipe valve 7, opens perfusion mortar pump 11, starts to inject embedding material 12, note During entering, hard long tube is gradually lifted, the mud 4 of low concentration is replaced with embedding material 12, until drilling is filled landfill material Material 12, completes soil pressure cell and buries work.
Exemplary description is done to the utility model above, it should which explanation, is not departing from the core of the utility model In the case of the heart, any simple deformation, modification or other skilled in the art can not spend creative work etc. The scope of protection of the utility model is each fallen within replacing.

Claims (2)

  1. A kind of 1. equipment for burying soil pressure cell, it is characterised in that:Pumped including grouting pump, perfusion mortar, grouting pump goes out Starch mouth and one hard long tube is connected by high-pressure hose, first switch pipe valve is set in the grout outlet of grouting pump;Perfusion mortar pump Grout outlet connects hard long tube by high-pressure hose, and second switch pipe valve is set in the grout outlet of perfusion mortar pump;Hard is grown Pipe is inserted into drilling, makes hard long tube lower nozzle deeply to the foot of hole for placing soil pressure cell.
  2. 2. the equipment for burying soil pressure cell described in application claim 1, it is characterised in that:The hard long tube is preferably Steel pipe.
CN201721165426.8U 2017-09-12 2017-09-12 A kind of equipment for burying soil pressure cell Expired - Fee Related CN207277305U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721165426.8U CN207277305U (en) 2017-09-12 2017-09-12 A kind of equipment for burying soil pressure cell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721165426.8U CN207277305U (en) 2017-09-12 2017-09-12 A kind of equipment for burying soil pressure cell

Publications (1)

Publication Number Publication Date
CN207277305U true CN207277305U (en) 2018-04-27

Family

ID=61990806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721165426.8U Expired - Fee Related CN207277305U (en) 2017-09-12 2017-09-12 A kind of equipment for burying soil pressure cell

Country Status (1)

Country Link
CN (1) CN207277305U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816029A (en) * 2017-09-12 2018-03-20 中交天津港湾工程研究院有限公司 A kind of embedding material and its method for embedding for being applied to embedded soil pressure cell

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816029A (en) * 2017-09-12 2018-03-20 中交天津港湾工程研究院有限公司 A kind of embedding material and its method for embedding for being applied to embedded soil pressure cell

Similar Documents

Publication Publication Date Title
CN102444118A (en) Construction method for grouting reinforcement of sleeve valve pipe
CN102691296A (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN104534167A (en) Drag reduction method of thixotropic slurry
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN107178077B (en) karst area karst cave overburden grouting reinforcement structure and design method thereof
CN107246007A (en) A kind of construction method CFG
CN207277305U (en) A kind of equipment for burying soil pressure cell
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN105401606A (en) Deep drawing pipe type inclination correcting method and deep drawing device
CN204715341U (en) A kind of Grouting Pipe for miscellaneous fill stratum
CN107816029A (en) A kind of embedding material and its method for embedding for being applied to embedded soil pressure cell
CN207672562U (en) A kind of geotechnical engineering construction cast-in-place pile bottom mud jacking valve
CN106013046B (en) Varying stress path well point plastic strip vacuum preloading seepage consolidation hierarchical loading method
CN105970909B (en) Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method
CN205917709U (en) Integral type well dotted arranges house steward vacuum system
CN105926577B (en) Vacuum preloading seepage consolidation method
CN202099795U (en) Crushed stone pile for reinforcing extremely soft soil foundation
CN201495538U (en) Grouting complete equipment for foundation treatment
CN205314093U (en) Foundation pit supporting structure of pile
CN103175664A (en) Model test device and test method for sealing performance of joints of check valves
CN105862714A (en) Soft foundation water cover type integrated well point plastic strip vacuum system
CN105862719A (en) Reinforced foundation
CN106013047B (en) Underwater vacuum preloading seepage consolidation method
CN202611671U (en) PVC screen pipe for underground well
CN105970910A (en) Well point plastic draining pipe film coating type vacuum preloading and dewatering preloading combined power consolidation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427