CN207261724U - Bifurcation structure, wash the dishes machine base and dish-washing machine - Google Patents

Bifurcation structure, wash the dishes machine base and dish-washing machine Download PDF

Info

Publication number
CN207261724U
CN207261724U CN201721210524.9U CN201721210524U CN207261724U CN 207261724 U CN207261724 U CN 207261724U CN 201721210524 U CN201721210524 U CN 201721210524U CN 207261724 U CN207261724 U CN 207261724U
Authority
CN
China
Prior art keywords
water
bleeder
diversing sheet
divide
bifurcation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721210524.9U
Other languages
Chinese (zh)
Inventor
袁波
宋行
赵洪图
赵建勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd
Original Assignee
Midea Group Co Ltd
Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201721210524.9U priority Critical patent/CN207261724U/en
Application granted granted Critical
Publication of CN207261724U publication Critical patent/CN207261724U/en
Priority to EP23200653.6A priority patent/EP4275575A3/en
Priority to PL18859446.9T priority patent/PL3673782T3/en
Priority to EP18859446.9A priority patent/EP3673782B1/en
Priority to EP23200656.9A priority patent/EP4275576A3/en
Priority to ES18859446T priority patent/ES2970623T3/en
Priority to PCT/CN2018/086013 priority patent/WO2019056764A1/en
Priority to US16/824,889 priority patent/US11490781B2/en
Priority to US17/949,719 priority patent/US11950742B2/en
Priority to US17/950,651 priority patent/US20230020814A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Washing And Drying Of Tableware (AREA)

Abstract

The utility model belongs to the technical field of household electrical appliance, there is provided and a kind of bifurcation structure, wash the dishes machine base and dish-washing machine, wherein, bifurcation structure is integrated on the base of dish-washing machine, and bifurcation structure includes dividing water hull body, water-division pipeline, dividing water assembly and sealing cover;Divide to have in water hull body and divide water cavity, divide water assembly to be contained in point water cavity, divide water hull body body to be equipped with least two bleeder, each bleeder is respectively with dividing water cavity to connect;Water-division pipeline is connected with each bleeder respectively through on base and at least two-way is set to per the one end of road water-division pipeline;Water assembly is divided to include wheel supporting item, shaft, impeller and water diversing sheet, water diversing sheet is driven by impeller and rotated with open or close bleeder.The utility model is integrated on base, compact-sized, assembling is simply and service life is high by the bifurcation structure set on base.

Description

Bifurcation structure, wash the dishes machine base and dish-washing machine
Technical field
The utility model belongs to the technical field of household electrical appliance, more particularly to a kind of bifurcation structure, washes the dishes and machine base and wash Bowl machine.
Background technology
In the prior art, dish-washing machine generally includes liner, cup and washing pump, and the diverse location in liner is equipped with gushing arm, Specifically, the lower spraying arm to sort successively from the bottom to top, middle gushing arm and upper gushing arm are usually provided with liner, cup is arranged on interior Courage bottom, the water outlet of washing pump are connected with lower spraying arm, middle gushing arm and upper gushing arm again, and in washing process, circulating washing water leads to Cross water cup module and flow into washing pump, then sprayed respectively by lower spraying arm, middle gushing arm and upper gushing arm, so as to wash tableware.
However, there are following technical problem for the dish-washing machine of the prior art:When the higher water of pressure is passed through pipeline by washing pump Lower spraying arm, middle gushing arm and upper gushing arm are sent to, usually also needs to water being diverted to lower spraying arm, middle gushing arm and upper gushing arm from washing pump, Prior art realization is mainly outer to push dynamic shunt valve to be turned on and off outlet conduit, and mechanical part is fragile, uses Service life is low, and there are difficulty for assembling.
Utility model content
The purpose of this utility model is to provide a kind of bifurcation structure, it is intended to solves machine base presence of washing the dishes in the prior art Mechanical part is fragile, technical problem that assembling is difficult.
The utility model is realized in this way a kind of bifurcation structure, is integrated on the base of dish-washing machine, including divide water hull Body, with the water-division pipeline for dividing water hull body to connect, be contained in and described divide dividing water assembly and divide water with described in water hull body Housing connects and for sealing the sealing cover for dividing water assembly;Have in described point of water hull body and divide water cavity, it is described to divide water assembly Be contained in it is described divide in water cavity, the bleeder for dividing water hull body body to be equipped with least two, each bleeder respectively with Described point of water cavity connection;The water-division pipeline is through on the base and being set at least two-way, water-division pipeline described in per road One end is connected with each bleeder respectively;Described point of water assembly include being installed on the wheel supporting item divided in water cavity, With it is described wheel supporting item be connected shaft, be matched with the shaft and around the shaft rotate impeller and be connected to institute The water diversing sheet on impeller is stated, the water diversing sheet is driven as the impeller rotates bleeder described in open or close.
Optimal technical scheme as the utility model:
Further, the water-division pipeline divides water hull body by integral forming with described.
Further, the wheel supporting item includes first for being connected to one end of the shaft and being located at the sealing cover Supporting part and be connected to the shaft the other end the second supporting part;The impeller is matched with the shaft and is located at institute State on the position between the first supporting part and second supporting part, the water diversing sheet is connected on first supporting part and position In the outside of the impeller, axial direction of the water diversing sheet along the impeller and side extension towards second supporting part is set Put.
Further, the bleeder includes the first bleeder and the second bleeder, first bleeder and described Two bleeders divide water cavity to connect with described;The water-division pipeline includes parallel arrangement of first water-division pipeline and the second distributive pipe Road, first water-division pipeline are tightly connected with first bleeder;Second water-division pipeline and second bleeder It is tightly connected.
Further, the water diversing sheet is detachably connected with first supporting part.
Further, the water diversing sheet includes being used to block the first water diversing sheet of first water-division pipeline and for keeping off The second water diversing sheet of the second water-division pipeline is stated in residence, and first water diversing sheet is arranged at intervals with second water diversing sheet.
Further, first water diversing sheet and/or second water diversing sheet are equipped with connector, are set on the connector There is connector, first supporting part is equipped with the contiguous block with the connector grafting.
Further, formed with connection rib at the connector, the contiguous block is equipped with what is coordinated with the connection rib Notch.
The another object of the utility model is to provide one kind and washes the dishes machine base, including above-mentioned bifurcation structure.
The another object of the utility model is to provide a kind of dish-washing machine, including above-mentioned bifurcation structure.
The utility model has the technical effect that relative to the prior art:By that water assembly will be divided to be integrated on base, structure Compact, during work, current force the impact force of impeller impeller to be rotated around wheel shaft, due to having water diversing sheet, wheel rotation on impeller When water diversing sheet can be driven to rotate, when water diversing sheet turns to certain position, current can be blocked, current cannot flow into wherein all the way or In the runner of the water-division pipeline of multichannel, when turning on, current can flow into runner, so as to have the function that a point water, assembling is simple, and prolongs Service life is grown.Therefore, compared with prior art, due to being to realize that nature divides water by water flow impact pressure, without external force Promote to be turned on and off outlet conduit, so as to overcome, mechanical part is fragile, assembles the technical problem there are difficulty.
The wash the dishes machine base and dish-washing machine of the utility model, due to the use of there is above-mentioned bifurcation structure, then so logical Cross the setting of bifurcation structure so that also so that wash the dishes machine base or dish-washing machine it is compact-sized, have the function that conveniently to divide water, fill With simple, and extend service life.
Brief description of the drawings
In order to illustrate more clearly of the technical solution of the utility model embodiment, below will to the utility model embodiment or Attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings described below is only Some embodiments of the utility model, for those of ordinary skill in the art, without creative efforts, Other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the explosive view for dividing water assembly for the bifurcation structure that the utility model embodiment provides;
Fig. 2 is the structure diagram for the bifurcation structure that the utility model embodiment provides;
Fig. 3 is the A-A profiles of the utility model Fig. 4;
Fig. 4 is the B-B profiles of the utility model Fig. 3.
Description of reference numerals:
In figure:1- bases, 2- divide water hull body, and 21- divides water cavity, 3- water-division pipelines, the first water-division pipelines of 31-, and 32- second divides Water lines, 4- divide water assembly, 41- wheel supporting items, the first supporting parts of 411-, the second supporting parts of 412-, 42- shafts, 43- impellers, 44- water diversing sheets, the first water diversing sheets of 441-, the second water diversing sheets of 442-, 5- sealing covers.
Embodiment
The embodiment of the utility model is described below in detail, the example of embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the utility model, and it is not intended that limit to the utility model System.
In the description of the utility model, it is to be understood that term " length ", " width ", " on ", " under ", " preceding ", The orientation or position relationship of the instruction such as " rear ", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer " are based on attached Orientation or position relationship shown in figure, are for only for ease of and describe the utility model and simplify to describe, rather than instruction or hint Signified device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this The limitation of utility model.
In addition, term " first ", " second " are only used for description purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the utility model, " multiple " are meant that two or two More than, unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be Mechanically connect or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be two The interaction relationship of connection or two elements inside element.For the ordinary skill in the art, can basis Concrete condition understands concrete meaning of the above-mentioned term in the utility model.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is further elaborated the utility model.
The utility model provides a kind of bifurcation structure, wash the dishes machine base 1 and dish-washing machine, divides water by what is set on base 1 Structure, is integrated on base 1, and compact-sized, assembling is simply and service life is high.
Attached drawing 1 is referred to attached drawing 4, the bifurcation structure, is integrated on the base 1 of dish-washing machine, including divide water hull body 2, with Water-division pipeline 3 that described point of water hull body 2 connects, be contained in and described divide dividing water assembly 4 and divide water hull with described in water hull body 2 Body 2 connects and for sealing the sealing cover 5 for dividing water assembly 4;Have in described point of water hull body 2 and divide water cavity 21, it is described to divide water Component 4 divides in water cavity 21 described in being contained in, the bleeder for dividing 2 body of water hull body to be equipped with least two, each described to divide water Mouth divides water cavity 21 to connect with described respectively;The water-division pipeline 3 is through on the base 1 and at least two-way is set to, per road institute The one end for stating water-division pipeline 3 is connected with each bleeder respectively;Described point of water assembly 4, which includes being installed on, described divides water cavity Wheel supporting item 41 in 21, the shaft 42 being connected with the wheel supporting item 41, be matched with the shaft 42 and around described turn The impeller 43 and the water diversing sheet 44 being connected on the impeller 43, the water diversing sheet 44 that axis 42 rotates are driven by the impeller 43 Rotate with bleeder described in open or close.
The bifurcation structure that the utility model embodiment provides, it is compact-sized by the way that water assembly 4 will be divided to be integrated on base 1, During work, current force the impact force of impeller 43 impeller 43 to be rotated around wheel shaft, due to having water diversing sheet 44, impeller 43 on impeller 43 During rotation water diversing sheet 44 can be driven to rotate, when water diversing sheet 44 turns to certain position, current can be blocked, current cannot flow into it In one or more water-division pipeline 3 runner in, when turning on, current can flow into runner, so as to have the function that a point water, assemble Simply, and service life is extended.Therefore, compared with prior art, due to being to realize that nature divides water by water flow impact pressure, without External force is needed to promote to be turned on and off outlet conduit, mechanical part is fragile so as to overcome, and assembles the technology there are difficulty Problem.
Preferably, the water-division pipeline 3 divides water hull body 2 to be integrally formed with described, in this way, to ensure point water hull body 2 with dividing Connective stability and reliability between water lines 3, and good airproof performance.Refinement ground, divides water hull body 2 to be located at the lower part of base 1, avoids Use to dish-washing machine impacts, at the same facilitate current from divide water hull body 2 flow out after enter back into upwards lower spraying arm, middle gushing arm and Upper gushing arm.It should be noted that washing pump, lower spraying arm, middle gushing arm and upper gushing arm are existing conventional techniques, not shown in figure.
Preferably, the bleeder includes the first bleeder and the second bleeder, first bleeder and described second Bleeder divides water cavity 21 to connect with described;The water-division pipeline 3 includes parallel arrangement of first water-division pipeline 31 and second point Water lines 32, first water-division pipeline 31 are tightly connected with first bleeder;Second water-division pipeline 32 with it is described Second bleeder is tightly connected, in this way, a point water is haveed the function that by two-way water-division pipeline 3, and easy to assembling.By dividing water hull Current are divided into two strands by body 2, meanwhile, the first water-division pipeline 31 of corresponding design, the second water-division pipeline 32, connect respectively on base 1 Divide water hull body 2, two strands of current drive gushing arm and lower spraying arm respectively.Specifically, when current are two-way, lower spraying arm will be driven Cross section of fluid channel product in first water-division pipeline 31 and driving between the second water-division pipeline 32 of gushing arm is 2:7.Further, may be used also Merging middle gushing arm and upper gushing arm using water all the way, when gushing arm and upper gushing arm are merged using water all the way in the middle, the first distributive pipe Road 31 and with, upper gushing arm water route (being dated in figure) cross section of fluid channel product the ratio between be.In addition, the first water-division pipeline 31 and lower spraying arm Connection, when the second water-division pipeline 32 is connected with upper gushing arm, by the first water-division pipeline 31 for driving lower spraying arm and drives upper gushing arm Cross section of fluid channel product between second water-division pipeline 32 is 2:7.Certainly, between the first water-division pipeline 31 and the second water-division pipeline 32 Cross section of fluid channel product ratio can also be set to 1 according to actual conditions:5~2:Any one value in 7, here, will not enumerate.
Further, the water diversing sheet 44 include being used for blocking the first water diversing sheet 441 of first water-division pipeline 31 with And for blocking the second water diversing sheet 442 of second water-division pipeline 32, first water diversing sheet 441 and second water diversing sheet 442 are arranged at intervals, and impeller 43 can drive the first water diversing sheet 441 and the first water diversing sheet 441 to rotate at the same time when rotating, when first point of water Piece 441 can block when either the first water diversing sheet 441 is turned at the first water-division pipeline 31 or at the second water-division pipeline 32 respectively Current at first water-division pipeline 31 or at the second water-division pipeline 32, current cannot flow into the first water-division pipeline 31 runner or In the runner of second water-division pipeline 32, when turning on, current can be flowed into corresponding runner, so as to have the function that conveniently to divide water.
In addition, it should be noted that, the quantity of water diversing sheet 44 can be set according to the actual requirements, for example, can be two, three It is a, or be more than three.In addition, the quantity of water-division pipeline 3 is unrestricted, water-division pipeline 3 for convenient except driving respectively Beyond water spray when a gushing arm rotates, other purposes current are also used as, wherein, the quantity of water-division pipeline 3 can be according to reality Border demand setting, such as can be two, three, or be more than three, accordingly, the quantity of gushing arm can also according to point The increase of the quantity of water flow passage and increased, to help enhancing cleaning performance.It can be contacted between each two water-division pipeline 3, It can not also contact, preferably two water-division pipelines 3 link together, with the intensity that enhancing is overall.
In addition, base 1 is equipped with the first perforation and the second perforation through base 1;First water-division pipeline 31 is by first Perforation is along the longitudinal direction of base 1 respectively to extending above and below bottom;Second water-division pipeline 32 is perforated along base 1 by second Longitudinal direction respectively to extending above and below base 1.Preferably, the first water-division pipeline 31, the second water-division pipeline 32 be and bottom Seat 1 is integrally formed, by the design of one, to ensure the intensity of the first water-division pipeline 31 and the second water-division pipeline 32, Jin Erbao What card had had divides water to act on.
Preferably, attached drawing 1, attached drawing 3 and attached drawing 4 are referred to, the wheel supporting item 41 includes being connected to the shaft 42 One end and the first supporting part 411 at the sealing cover 5 and be connected to the shaft 42 the other end the second support Portion 412;The impeller 43 is matched with the shaft 42 and is located at first supporting part 411 and second supporting part 412 Between position on, the water diversing sheet 44 is connected on first supporting part 411 and positioned at the outside of the impeller 43, described Water diversing sheet 44 along the impeller 43 axial direction and be extended towards the side of second supporting part 412, in this way, passing through One supporting part 411 and the second supporting part 412 coordinate jointly, so as to ensure that current force the impact force of impeller 43 in impeller 43 around wheel During axis rotates, water diversing sheet 44 is driven to rotate when impeller 43 rotates, when water diversing sheet 44 turns to certain position, to block Current, so as to successfully divide water by water flow impact pressure.
Further, the water diversing sheet 44 is detachably connected with first supporting part 411.It is to be appreciated that water diversing sheet 44 can make independent part, so as to when being rotated by impeller 43 water diversing sheet 44 can be driven to rotate, divide naturally by water flow impact pressure Water.
Preferably, first water diversing sheet 441 and/or second water diversing sheet 442 are equipped with connector, the connector Connector is equipped with, first supporting part 411 is equipped with the contiguous block with the connector grafting.First water diversing sheet 441 and/or second water diversing sheet 442 be equipped with connector, it is possible to understand that ground, first water diversing sheet 441 be equipped with connection Head;Alternatively, second water diversing sheet 442 is equipped with connector;Alternatively, first water diversing sheet 441 and second water diversing sheet Connector is equipped with 442, by the setting of connector, facilitates the first water diversing sheet 441, the second water diversing sheet 442 and the first support The Fast Installation in portion 411.Further, it is equipped with and the connection formed with connection rib, the contiguous block at the connector The notch that rib coordinates, by connecting the cooperation of rib and notch, when the first water diversing sheet 441 or the second water diversing sheet 442 are respectively with being connected When block connects, coordinate and more consolidate, prevent from coming off.
In addition, per road water-division pipeline 3 except with divide water hull body 2 to be integrally formed with for, can also respectively by sealing ring with Each bleeder is tightly connected, in this way, divide water hull body 2 to be assembled together by sealing ring and base 1, different water-division pipelines 3 Seal respectively, have the function that a point water, and easy to assembling, i.e., under the sealing function of multiple sealing rings, each sealing ring only pin Water-division pipeline 3 all the way is sealed, can effectively prevent leak at the water-division pipeline 3 on every road, when one of water-division pipeline 3 When there is leak, in this way, not influencing another water route, leak risk point is effectively reduced, it is reliable effective.
In addition, dividing water hull body 2 to be also designed to the structure changed the direction of a stream of water, divide the inner cavity of water hull body 2 there are current Runner, there is the inclined face in a direction at water (flow) direction mutation, which can allow current to have when changing direction Effect reduces the loss of fluid energy, and can reduce a point volume for the inner cavity of water hull body 2, reduces static water flow in inner cavity, in addition, Whole water flow passage can be designed as ramp structure, can avoid water residual in the lumen.Accordingly, the structure of water assembly 4 is divided to set It is calculated as and divide the inner-cavity structure of water hull body 2 to match, to realize corresponding function.
Preferably, bifurcation structure designs the sidepiece in the position of close cup, that is, being arranged on cup, in order to which recirculated water leads to Cross cup flow into washing pump, by the shunting of bifurcation structure after, then respectively pass through lower spraying arm, middle gushing arm and upper gushing arm spray.
The one kind that the utility model also provides washes the dishes machine base 1, including above-mentioned bifurcation structure.
In addition, the utility model also provides a kind of dish-washing machine, including above-mentioned bifurcation structure.
It should be noted that due to can relate to above-mentioned bifurcation structure on base 1 and dish-washing machine, then by dividing water knot The setting of structure so also so that wash the dishes machine base 1 or dish-washing machine it is compact-sized, have the function that conveniently to divide water, assembling is simple, And extend service life.
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all in this practicality All any modification, equivalent and improvement made within new spirit and principle etc., should be included in the guarantor of the utility model Within the scope of shield.

Claims (10)

1. a kind of bifurcation structure, is integrated on the base of dish-washing machine, it is characterised in that including dividing water hull body, dividing water hull with described The water-division pipeline of body connection, be contained in and described divide dividing water assembly and divide water hull body be connected and be used for close with described in water hull body Divide the sealing cover of water assembly described in envelope;Have in described point of water hull body and divide water cavity, it is described to divide water assembly to be contained in described to divide water cavity Interior, the bleeder for dividing water hull body body to be equipped with least two, each bleeder divides water cavity to connect with described respectively;Institute Water-division pipeline is stated through on the base and being set at least two-way, the one end of water-division pipeline described in per road respectively with each institute State bleeder connection;Described point of water assembly includes being installed on the wheel supporting item divided in water cavity, is connected with the wheel supporting item Shaft, the impeller that is matched with the shaft and is rotated around the shaft and the water diversing sheet that is connected on the impeller, The water diversing sheet is driven as the impeller rotates bleeder described in open or close.
2. bifurcation structure as claimed in claim 1, it is characterised in that the water-division pipeline with it is described divide water hull body one into Type.
3. bifurcation structure as claimed in claim 1, it is characterised in that the wheel supporting item includes being connected to the one of the shaft End and the first supporting part at the sealing cover and be connected to the shaft the other end the second supporting part;The leaf Wheel is matched with the position in the shaft and between first supporting part and second supporting part, the water diversing sheet It is connected on first supporting part and positioned at the outside of the impeller, axial and direction of the water diversing sheet along the impeller The side of second supporting part is extended.
4. bifurcation structure as claimed in claim 3, it is characterised in that the bleeder includes the first bleeder and second point of water Mouthful, first bleeder and second bleeder divide water cavity to connect with described;The water-division pipeline includes parallel set The first water-division pipeline and the second water-division pipeline, first water-division pipeline and first bleeder are tightly connected;Described Two water-division pipelines are tightly connected with second bleeder.
5. the bifurcation structure as described in claim 3 or 4, it is characterised in that the water diversing sheet and first supporting part are removable Unload connection.
6. bifurcation structure as claimed in claim 5, it is characterised in that the water diversing sheet includes being used to block first point of water First water diversing sheet of pipeline and the second water diversing sheet for blocking second water-division pipeline, first water diversing sheet with it is described Second water diversing sheet is arranged at intervals.
7. bifurcation structure as claimed in claim 6, it is characterised in that first water diversing sheet and/or second water diversing sheet Connector is equipped with, the connector is equipped with connector, and first supporting part is equipped with the company with the connector grafting Connect block.
8. bifurcation structure as claimed in claim 7, it is characterised in that formed with connection rib, the connection at the connector Block is equipped with the notch coordinated with the connection rib.
The machine base 9. one kind washes the dishes, it is characterised in that including such as claim 1-8 any one of them bifurcation structure.
10. a kind of dish-washing machine, it is characterised in that including such as claim 1-8 any one of them bifurcation structure.
CN201721210524.9U 2017-09-20 2017-09-20 Bifurcation structure, wash the dishes machine base and dish-washing machine Active CN207261724U (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
CN201721210524.9U CN207261724U (en) 2017-09-20 2017-09-20 Bifurcation structure, wash the dishes machine base and dish-washing machine
PCT/CN2018/086013 WO2019056764A1 (en) 2017-09-20 2018-05-08 Dishwasher and base assembly
EP18859446.9A EP3673782B1 (en) 2017-09-20 2018-05-08 Dishwasher and base assembly
PL18859446.9T PL3673782T3 (en) 2017-09-20 2018-05-08 Dishwasher and base assembly
EP23200653.6A EP4275575A3 (en) 2017-09-20 2018-05-08 Dishwasher and base assembly
EP23200656.9A EP4275576A3 (en) 2017-09-20 2018-05-08 Dishwasher and base assembly
ES18859446T ES2970623T3 (en) 2017-09-20 2018-05-08 Dishwasher and base set
US16/824,889 US11490781B2 (en) 2017-09-20 2020-03-20 Dishwasher and base component
US17/949,719 US11950742B2 (en) 2017-09-20 2022-09-21 Dishwasher water channel, base for dishwasher, and dishwasher
US17/950,651 US20230020814A1 (en) 2017-09-20 2022-09-22 Connection structure and dishwasher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721210524.9U CN207261724U (en) 2017-09-20 2017-09-20 Bifurcation structure, wash the dishes machine base and dish-washing machine

Publications (1)

Publication Number Publication Date
CN207261724U true CN207261724U (en) 2018-04-20

Family

ID=61922078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721210524.9U Active CN207261724U (en) 2017-09-20 2017-09-20 Bifurcation structure, wash the dishes machine base and dish-washing machine

Country Status (1)

Country Link
CN (1) CN207261724U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112603224A (en) * 2020-12-15 2021-04-06 火星人厨具股份有限公司 Water distribution system of dish washing machine and control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112603224A (en) * 2020-12-15 2021-04-06 火星人厨具股份有限公司 Water distribution system of dish washing machine and control method thereof

Similar Documents

Publication Publication Date Title
CN104783749B (en) For the spray arm component of dish-washing machine and the dish-washing machine with it
CN105926238A (en) Impeller washing machine
CN109645922B (en) Double-spraying mechanism and dish washing machine
CN207261724U (en) Bifurcation structure, wash the dishes machine base and dish-washing machine
CN208659274U (en) Bifurcation structure, wash the dishes machine base and dish-washing machine
CN107374549B (en) Water distribution cover, water distribution structure, dish washing machine base and dish washing machine
CN107348926A (en) Bifurcation structure, wash the dishes machine base and dish-washing machine
CN200939421Y (en) Luminous rotary fountain
CN208355409U (en) Dishwasher water passage, wash the dishes machine base and dish-washing machine
CN115628233A (en) Guide vane structure and open type water pump and cleaning machine
CN208355376U (en) Bifurcation structure, wash the dishes machine base and dish-washing machine
CN107411681B (en) Point water cover, bifurcation structure, wash the dishes machine base and dish-washing machine
CN208910169U (en) Water supply device and shoe washing machine for shoe washing machine
CN115444343A (en) Assembly structure and cleaning machine of open water pump
CN208355403U (en) Point water cover, bifurcation structure, wash the dishes machine base and dish-washing machine
CN204589641U (en) Rotary drum washing machine water inflowing box assembly
CN2360035Y (en) Washing pump of bowl-washing machines
CN208831250U (en) Centrifugal pump
CN109381132A (en) A kind of high-altitude cleaning robot
CN217852830U (en) A water conservancy diversion seat and rivers system, cleaning machine for cleaning machine
CN214578285U (en) Wear-resistant automobile pull rod assembly
CN220529959U (en) Cleaning machine
CN108814513A (en) Gushing arm component and washing electric appliance
CN204998496U (en) Automobile windscreen washer
CN106050648B (en) Disc pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant