A kind of external hanging type baffle prestress anchorage cable peg board retaining wall Download PDFInfo
- Publication number
- CN207260183U CN207260183U CN201721154845.1U CN201721154845U CN207260183U CN 207260183 U CN207260183 U CN 207260183U CN 201721154845 U CN201721154845 U CN 201721154845U CN 207260183 U CN207260183 U CN 207260183U
- Authority
- CN
- China
- Prior art keywords
- hanging type
- external hanging
- type baffle
- retaining wall
- bored concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of external hanging type baffle prestress anchorage cable peg board retaining wall, including more bored concrete piles, anchor cable, external hanging type baffle and the Guan Liang on bored concrete pile top, upper outside of the external hanging type baffle plate setting in bored concrete pile, anchor cable is arranged on the external hanging type baffle between bored concrete pile, external hanging type baffle is equipped with least row's anchor cable, and spilled water hole is additionally provided with external hanging type baffle.The utility model structure is with the obvious advantage in security, applicability, construction conveniency, the feature of environmental protection, economical and beautiful etc., there is preferable application prospect in urban road construction:The bored concrete pile of peg board retaining wall avoids excavating pile using the circular cross-section for facilitating drilling construction;Earth-retaining function and Landscape retaining wall demand between grout pile are met by the setting of external hanging type baffle at the same time;By the way that the setting of prestress anchorage cable strictly controls peg board retaining wall wall top displacement on external hanging type baffle between grout pile, existing building is protected.
Description
Technical field
It the utility model is related to a kind of stake plate type retaining wall, more particularly to a kind of external hanging type prestress anchorage cable peg board earth-retaining
Wall.
Background technology
Stake plate type retaining wall is developed by anchor pile, is most applied to earlier than the seventies in last century in cut slope, often
Using cantilevered peg board wall construction, after with the accumulation of experience, be gradually available for the supporting of embankment.The height of stake plate type retaining wall can
From the limitation of general retaining wall height, and due to the use of pile foundation, it is strong in the poor Regional suitability of geological conditions.
Common stake plate type retaining wall generally uses borehole pile, and ancestor's break is every borehole, then pours pile foundation, treats that pile foundation reaches
Breast boards is installed again after to design requirement.Such a construction method to general embankment supporting or mountain area cutting supporting strong applicability, but
The supporting to form highway cut is excavated for city existing building plot there are obvious shortcoming, is in particular in following several respects:
1st, the presence of plot existing building determines that supporting construction excavation construction is limited, and the displacement limit in digging process to foundation pit top
System is tighter;2nd, the deep excavation construction infection scope of earthen foundation is larger;3rd, supporting construction will be used as highway cut barricade forever in itself
Exist long, its alien invasion has certain landscape requirement.
Utility model content
For problems of the prior art, the utility model provides a kind of external hanging type baffle prestress anchorage cable peg board
Retaining wall, can strictly control peg board retaining wall wall top displacement.
Technical solution according to the present utility model, the external hanging type baffle prestress anchorage cable peg board retaining wall, including more
Bored concrete pile, anchor cable, external hanging type baffle and the Guan Liang on bored concrete pile top, the external hanging type baffle plate setting is outside the top of bored concrete pile
Side, anchor cable are arranged on the external hanging type baffle between bored concrete pile, and external hanging type baffle is equipped with least row's anchor cable, external hanging type baffle
On be additionally provided with spilled water hole.
Further, the anchor cable is prestress anchorage cable.
Further, the anchor cable includes anchoring section and free segment, and the upper thickness of earth covering of the anchoring section is at least 4m.
Further, the angle between the anchor cable and horizontal plane is more than 10 °.
Further, the anchored end of free segment is equipped with anchoring reinforcement block in external hanging type baffle inner wall on the anchor cable.
Further, the section of the bored concrete pile is circle.
Further, a diameter of 800-1500mm of the bored concrete pile.
Compared with prior art, structure of the present invention is in security, applicability, construction conveniency, the feature of environmental protection, economical and beautiful etc.
Aspect is with the obvious advantage, there is preferable application prospect in urban road construction:The bored concrete pile of peg board retaining wall is drilled using convenient
The circular cross-section of construction, avoids excavating pile;By the setting of external hanging type baffle meet at the same time between grout pile earth-retaining function with
Landscape retaining wall demand;By the way that the setting of prestress anchorage cable strictly controls peg board retaining wall wall top on external hanging type baffle between grout pile
Displacement, protects existing building.
Brief description of the drawings
Fig. 1 is cross-sectional configuration schematic diagram of the present invention.
Fig. 2 is planar structure schematic diagram of the present invention.
Description of reference numerals:1st, bored concrete pile;2nd, Guan Liang;3rd, external hanging type baffle;4th, anchor cable;41st, anchoring section;42nd, free segment;
5th, spilled water hole;6th, reinforcement block is anchored.
Embodiment
With reference to specific embodiments and the drawings, the invention will be further described.
As shown in Figure 1 and Figure 2:A kind of external hanging type prestress anchorage cable peg board retaining wall, more bored concrete piles 1, anchor cable 4, external hanging type
The Guan Liang 2 on 1 top of baffle 3 and bored concrete pile.External hanging type baffle 3 is arranged on the upper outside of bored concrete pile 1, and anchor cable 4 is arranged on perfusion
Between stake 1 on external hanging type baffle 3, external hanging type baffle 3 is equipped with least row's anchor cable 4, and spilled water hole is additionally provided with external hanging type baffle 3
5.Specifically, anchor cable 4 is prestress anchorage cable, it includes anchoring section 41 and free segment 42, wherein, the upper thickness of earth covering of anchoring section 41
At least 4m.Angle between each row's anchor cable 4 and horizontal plane is generally higher than 10 °.The anchored end of free segment 42 is plug-in on anchor cable 4
3 inner wall of formula baffle is equipped with anchoring reinforcement block, strengthens partial result.The section of bored concrete pile 1 can be circle, be avoided that excavation into
Stake, its a diameter of 800-1500mm.
The construction method of the utility model external hanging type prestress anchorage cable peg board retaining wall is as follows:A. cast-in-situ bored pile 1 is carried out
Construction, the buried depth of 1 pile of bored concrete pile are determined according to the factor such as soil pressure, building load, anchorage depth after wall;B. bore
After hole pouring pile is constructed, Guan Liang 2 of constructing;C. plot is excavated;D. after below ground certain depth is excavated to, carry out plug-in
The construction of formula baffle 3 and tensioning first row anchor cable 4;E. continue to excavate downwards, layering progress external hanging type baffle 3 is constructed and stretch-draw anchor
4 until excavation construction is completed.Wherein, anchor cable 4 should avoid building basis and be anchored, and anchorage cable anchoring section should avoid being arranged on element
Banket, in the unfavorable geology such as mud soil property,
Embodiment 1:Cutting depth is 6m or so, and the quantity of anchor cable 4 on facade grow from top to bottom by totally three rows, suitable Guan Liang 2
Spend direction anchor cable 4 to set together by 1.5m spacing, the length of 15m, wherein anchoring segment length 10m, applies prestressing force 180KN.With
Peg board retaining wall overhead height is H, and wherein 4 tensioning of first row anchor cable is highly H-0.3m, and angle with horizontal plane is 15 °;Second
The tensioning of row's anchor cable 4 is highly H-3.3m, and angle with horizontal plane is 15 °;The tensioning of 3rd row's anchor cable 4 is highly H-5.8m, with
Horizontal plane angle is 20 °.External hanging type baffle 3 using thickness 35cm armored concrete panel, its surface can hanging plate do feature wall,
Spilled water hole 5 is opened up at 3 distance from bottom ground 30cm of external hanging type baffle.Bored concrete pile 1 is the cylindrical stake that diameter of section is 1m.Second
The anchored end for arranging free segment 42 on 4 and the 3rd row's anchor cable 4 of anchor cable is equipped with anchoring reinforcement block on 3 inner wall of external hanging type baffle.
The structure of the utility model is in security, applicability, construction conveniency, the feature of environmental protection, economical and beautiful etc. advantage
Substantially, there is preferable application prospect in urban road construction:The bored concrete pile of peg board retaining wall is using the circle for facilitating drilling construction
Tee section, avoids excavating pile;Earth-retaining function and Landscape retaining wall between grout pile are met by the setting of external hanging type baffle at the same time
Demand;By the way that the setting of prestress anchorage cable strictly controls peg board earth-retaining wall top displacement on external hanging type baffle between grout pile, protection
Existing building.
Claims (7)
1. a kind of external hanging type baffle prestress anchorage cable peg board retaining wall, it is characterised in that including more bored concrete piles(1), anchor cable
(4), external hanging type baffle(3)And bored concrete pile(1)The Guan Liang on top(2), the external hanging type baffle(3)It is arranged on bored concrete pile(1)'s
Upper outside, anchor cable(4)It is arranged on bored concrete pile(1)Between external hanging type baffle(3)On, external hanging type baffle(3)It is equipped with least
One row's anchor cable(4), external hanging type baffle(3)On be additionally provided with spilled water hole(5).
2. external hanging type baffle prestress anchorage cable peg board retaining wall according to claim 1, it is characterised in that the anchor cable
(4)For prestress anchorage cable.
3. external hanging type baffle prestress anchorage cable peg board retaining wall according to claim 1 or 2, it is characterised in that the anchor
Rope(4)Including anchoring section(41)And free segment(42), the anchoring section(41)Upper thickness of earth covering be at least 4m.
4. external hanging type baffle prestress anchorage cable peg board retaining wall according to claim 1, it is characterised in that respectively arrange anchor cable
(4)Angle between horizontal plane is more than 10 °.
5. external hanging type baffle prestress anchorage cable peg board retaining wall according to claim 3, it is characterised in that the anchor cable
(4)Upper free segment(42)Anchored end in external hanging type baffle(3)Inner wall is equipped with anchoring reinforcement block(6).
6. external hanging type baffle prestress anchorage cable peg board retaining wall according to claim 1, it is characterised in that the bored concrete pile
(1)Section for circle.
7. external hanging type baffle prestress anchorage cable peg board retaining wall according to claim 6, it is characterised in that the bored concrete pile
(1)A diameter of 800-1500mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721154845.1U CN207260183U (en) | 2017-09-11 | 2017-09-11 | A kind of external hanging type baffle prestress anchorage cable peg board retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721154845.1U CN207260183U (en) | 2017-09-11 | 2017-09-11 | A kind of external hanging type baffle prestress anchorage cable peg board retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207260183U true CN207260183U (en) | 2018-04-20 |
Family
ID=61920382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721154845.1U Active CN207260183U (en) | 2017-09-11 | 2017-09-11 | A kind of external hanging type baffle prestress anchorage cable peg board retaining wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207260183U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235490A (en) * | 2018-11-16 | 2019-01-18 | 青岛业高建设工程有限公司李沧分公司 | Retaining wall and its construction method |
CN109930612A (en) * | 2019-03-23 | 2019-06-25 | 驿涛项目管理有限公司 | A kind of environment-friendly type municipal works slope reinforcement device |
CN110847220A (en) * | 2019-10-21 | 2020-02-28 | 重庆市发成科技开发有限公司 | Method for replacing column by stealing foot of concrete retaining wall |
CN114922017A (en) * | 2022-01-17 | 2022-08-19 | 兰州交通大学 | Newly-built cantilever type retaining wall-existing pile sheet wall roadbed slope wide integrated configuration |
-
2017
- 2017-09-11 CN CN201721154845.1U patent/CN207260183U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235490A (en) * | 2018-11-16 | 2019-01-18 | 青岛业高建设工程有限公司李沧分公司 | Retaining wall and its construction method |
CN109235490B (en) * | 2018-11-16 | 2024-05-03 | 青岛业高建设工程有限公司 | Retaining wall and construction method thereof |
CN109930612A (en) * | 2019-03-23 | 2019-06-25 | 驿涛项目管理有限公司 | A kind of environment-friendly type municipal works slope reinforcement device |
CN110847220A (en) * | 2019-10-21 | 2020-02-28 | 重庆市发成科技开发有限公司 | Method for replacing column by stealing foot of concrete retaining wall |
CN114922017A (en) * | 2022-01-17 | 2022-08-19 | 兰州交通大学 | Newly-built cantilever type retaining wall-existing pile sheet wall roadbed slope wide integrated configuration |
CN114922017B (en) * | 2022-01-17 | 2024-02-06 | 兰州交通大学 | Newly-built cantilever type retaining wall-existing stake board wall roadbed group wide integrated configuration |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207260183U (en) | A kind of external hanging type baffle prestress anchorage cable peg board retaining wall | |
CN202969392U (en) | Complex geology deep excavation pit combined support | |
CN106638673B (en) | A kind of construction method of compound retaining structure | |
CN105525627B (en) | A kind of two-way anchor fixed board retaining wall and its construction method | |
CN106498953A (en) | Cut slope composite supporting construction and its construction method | |
CN109826667A (en) | The I-shaped checkdam of coal mine underground reservoir | |
CN110924433A (en) | Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum | |
CN107503257A (en) | One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method | |
CN105464074B (en) | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method | |
CN207109475U (en) | It is close to mountain high-filled subgrade stabilization and Deformation control structure | |
CN105155548B (en) | A kind of drag-line double-row pile (wall) supporting construction | |
CN206034454U (en) | Supporting construction | |
CN103114595A (en) | Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch | |
CN112281868A (en) | Support system and method combining temporary foundation pit support and permanent slope support | |
CN117646437A (en) | Side slope and foundation pit double-row pile supporting structure and construction method | |
CN207211158U (en) | Assembled pile board wall foundation pit supporting construction | |
CN109403349A (en) | A kind of upper flexible and lower rigid system of deep foundation pit support and its construction method | |
CN110939142A (en) | Roadbed structure for side slope | |
CN206220104U (en) | A kind of Frozen Soil Cylinder Foundation Supported with Composite Soil Nailing system | |
CN114032932B (en) | Construction method of hybrid retaining structure | |
CN212316951U (en) | Roadbed structure for side slope | |
CN206873466U (en) | One kind is used for footrill flume section safeguard structure | |
CN210421152U (en) | Anchor road shoulder retaining wall | |
CN210482331U (en) | Supporting structure of side slope | |
CN209323534U (en) | A kind of upper flexible and lower rigid system of deep foundation pit support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |