CN207232351U CN201721004516.9U CN201721004516U CN207232351U CN 207232351 U CN207232351 U CN 207232351U CN 201721004516 U CN201721004516 U CN 201721004516U CN 207232351 U CN207232351 U CN 207232351U
Authority
CN
China
Prior art keywords
alternating
charging pile
current charging
simulator
programmable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721004516.9U
Other languages
Chinese (zh)
Inventor
王文彬
范瑞祥
李琼
蒙天骐
张弢
徐广腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201721004516.9U priority Critical patent/CN207232351U/en
Application granted granted Critical
Publication of CN207232351U publication Critical patent/CN207232351U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The utility model discloses a kind of alternating-current charging pile electric fault simulation system,It is characterized in that,The system comprises alternating-current charging pile,Programmable AC Power Source,Charging interface fault simulator,Secondary centralized control system,Wherein,The Programmable AC Power Source is arranged at the input terminal of the alternating-current charging pile,The charging interface fault simulator is arranged at the output terminal of the alternating-current charging pile,The secondary centralized control system is connected to the Programmable AC Power Source and the charging interface fault simulator by data-in port,The data collection terminal mouth of the secondary centralized control system is respectively arranged at the Programmable AC Power Source,At each key point in the connecting path of the alternating-current charging pile and the charging interface fault simulator,To gather and monitor the operating status of the key point,Solve real simulation inspection of the prior art shortage to alternating-current charging pile under various harsh conditions,It is unable to the actual performance of alternating-current charging pile and lacks the means of testing of standardization,It is and further,The problem of making the electric automobile of user bring security risk in use.

Description

A kind of alternating-current charging pile electric fault simulation system
Technical field
It the utility model is related to New-energy electric vehicle testing field, more particularly to a kind of alternating-current charging pile electric fault mould Plan system.
Background technology
With the progressively development of New-energy electric vehicle Industry globalization, electric automobile mainly relies on alternating-current charging pile use Conduction pattern provides AC power as power supply unit, at present, Electric Vehicle's Alternating for the electric automobile with Vehicular charger The typical problem of charging pile, reality factor and itself there are the problem of, urgent demand is proposed to detection business, if should Electric automobile product wants large-scale development, its charger must have complete test, its quality just can guarantee that, the safety of automobile It can just be protected, the product of automotive grade could sustainable development.
At present, the detection of electric vehicle alternating-current charging pile relates generally to the sides such as electric property, interoperability, communication uniformity Face.Can wherein electrical safety detection involves alternating-current charging pile ensure the person and equipment safety when there is extreme case, because This it is particularly important that.Such as charging pile output overcurrent of problem caused by electrical safety, charging pile output ground connection, connection exception etc. are asked Topic.On the one hand these problems bring serious threat to personal safety and equipment safety, the stabilization of power grids, on the other hand greatly reduce The experience of user, harmful effect is brought to society.
At present, although type experiment can be carried out before alternating-current charging pile puts goods on the market, the existing safety control in prior art System processed is used to detect the electric safe condition of alternating-current charging pile and control with high safety in real time, but the detection to its function is only limitted to The verification of signal rank, lacks to the real simulation inspection under various harsh conditions, it is impossible to ensures such as some high-pressure and low-pressure mistakes Actual performance in the actual charging application of vehicle of electric safety control system in the case of Asia and charged to alternating-current charging pile , there is the means of testing of standardization in the problems such as voltage and current run into journey, and further, influences the usage experience of user, make electricity The electric security risk in electrical automobile field is difficult to effectively solve.
The content of the invention
The embodiment of the present application solves prior art shortage by providing a kind of alternating-current charging pile electric fault simulation system To real simulation inspection of the alternating-current charging pile under various harsh conditions, it is impossible to the actual performance of alternating-current charging pile and shortage rule The means of testing of generalized, and further, the problem of making the electric automobile of user bring security risk in use.
The embodiment of the present application provides a kind of alternating-current charging pile electric fault simulation system, and the system comprises AC charging Stake, Programmable AC Power Source, charging interface fault simulator, secondary centralized control system, wherein, the Programmable AC Power Source is set In the input terminal of the alternating-current charging pile, the charging interface fault simulator is arranged at the output terminal of the alternating-current charging pile, The secondary centralized control system is connected to the Programmable AC Power Source and charging interface event by data-in port Hinder simulator, the data collection terminal mouth of the secondary centralized control system is respectively arranged at the Programmable AC Power Source, the exchange At each key point in the connecting path of charging pile and the charging interface fault simulator, to gather and monitor the key The operating status of point.
Further, the Programmable AC Power Source includes three-phase power grid voltage source module, and the connection three-phase electricity The rectification circuit of net voltage source module, and the inverter circuit of the connection rectification circuit.
Further, be additionally provided between the three-phase power grid voltage source module and the rectification circuit transformer circuit with And three-phase reactor circuit, it is additionally provided with buffer resistance between the rectification circuit and the inverter circuit.
Further, the charging interface fault simulator includes Electric Vehicle's Alternating interface circuit simulator, and load And short-circuit impedance simulator two parts.
Further, the load and short-circuit impedance simulator include short switch, resistance adjustment switch and resistance.
Further, the secondary centralized control system further includes control unit and backstage industrial personal computer, described control unit with The data collection terminal mouth connection of the secondary centralized control system, the industrial personal computer are connected with described control unit, wherein, it is described secondary The data of the data collection terminal mouth collection of centralized control system can be sent into described control unit, after carrying out data mart modeling processing, then send Enter the backstage industrial personal computer.
Alternating-current charging pile electric fault simulation system, including alternating-current charging pile are provided in the embodiment of the present application, may be programmed and hand over Galvanic electricity source, charging interface fault simulator, secondary centralized control system, the programmable friendship of the input terminal by being arranged on alternating-current charging pile Galvanic electricity source can export the alternating voltage of needs, and the charging interface fault simulator is arranged at the output of the alternating-current charging pile End, can gather Programmable AC Power Source, the friendship with the fault of analog charge interface side finally by secondary centralized control system The data at each key point in the connecting path of current charge stake and the charging interface fault simulator, such as voltage, electric current Or other specification, the operating status of whole path can be monitored.
Brief description of the drawings
Fig. 1 is a kind of module map of alternating-current charging pile electric fault simulation system in the embodiment of the present application;
Fig. 2 is the structure diagram of Programmable AC Power Source 102 in the embodiment of the present application;
Fig. 3 is the electrical block diagram of Programmable AC Power Source 102 in the embodiment of the present application;
Fig. 4 is the schematic diagram of charging interface fault simulator 103 in the embodiment of the present application.
Embodiment
Completed by National Energy Board《Electric automobile charging infrastructure construction plan》Draft proposed, by 2020:I State's electric charging station quantity will reach 1.2 ten thousand, and charging pile reaches 4,500,000;The close mark of the ratio of electric automobile and electrically-charging equipment 1 matched somebody with somebody:1.This greatly promotes the construction of electric automobile electrically-charging equipment.At present, the typical problem of electric vehicle alternating-current charging pile, existing Real factor and itself there are the problem of, urgent demand is proposed to detection business.The detection of electric vehicle alternating-current charging pile Relate generally to electric property, interoperability, communication uniformity etc..Wherein electrical safety detection involves alternating-current charging pile and exists Occur to ensure the person and equipment safety during extreme case, therefore it is particularly important that.
The embodiment of the present application solves prior art shortage by providing a kind of alternating-current charging pile electric fault simulation system To real simulation inspection of the alternating-current charging pile under various harsh conditions, it is impossible to the actual performance of alternating-current charging pile and shortage rule The means of testing of generalized, and further, the electric automobile of user is brought security risk in use.
Problem caused by electrical safety is mainly the following performance:
1st, charging pile output overcurrent:Charging pile output interface causes charging pile to damage because the even short circuit of certain reason overcurrent Ruin.
2nd, it is grounded:Charging pile output ground connection causes personal injury accident without disconnection in time.
3rd, connection is abnormal:If charging pile joint and electric automobile charging connector connect generation problem in charging process, May cause to overcharge, arcing the problems such as.
As shown in Figure 1, the utility model provides a kind of alternating-current charging pile electric fault simulation system 100, the system Including alternating-current charging pile 101, Programmable AC Power Source 102, charging interface fault simulator 103, secondary centralized control system 104, its In, the Programmable AC Power Source 102 is arranged at the input terminal of the alternating-current charging pile 101, the charging interface fault simulation Device 103 is arranged at the output terminal of the alternating-current charging pile 101, and the secondary centralized control system 104 is distinguished by data-in port The Programmable AC Power Source 102 and the charging interface fault simulator 103 are connected to, the secondary centralized control system 104 Data collection terminal mouth is respectively arranged at the Programmable AC Power Source 102, the alternating-current charging pile 101 and the charging interface At each key point in the connecting path of fault simulator 103, to gather and monitor the operating status of the key point.
Alternating-current charging pile 101 is uses conduction pattern to provide the special of AC power for the electric automobile with Vehicular charger Use power supply unit.
Programmable AC Power Source 102 is connected on the input terminal of alternating-current charging pile 101, for simulating grid;Charging interface failure Simulator 103 is connected on the output terminal of alternating-current charging pile 101, for simulating all kinds of output failures.Secondary centralized control system gathered data And the operation of Programmable AC Power Source and charging interface fault simulator is controlled, it is the control core of package unit.
Wherein, key point is the test point preset, in such as Fig. 1, can set the key point of two detections, crucial Point 1 is arranged on the connecting path between Programmable AC Power Source 102 and alternating-current charging pile 101, and key point 2 is arranged on exchange and fills On connecting path between electric stake 101 and charging interface fault simulator 103, in key point, three-phase voltage can be gathered, electricity The relevant parameters such as stream.
Further, as shown in Fig. 2, the Programmable AC Power Source 102 includes three-phase power grid voltage source module 1021, with And the rectification circuit 1022 of the connection three-phase power grid voltage source module 1021, and the inversion of the connection rectification circuit 1022 Circuit 1023.
Further, as shown in figure 3, between the three-phase power grid voltage source module 1021 and the rectification circuit 1022 Transformer circuit and three-phase reactor circuit are additionally provided with, between the rectification circuit 1022 and the inverter circuit 1023 also It is provided with buffer resistance.
Rectification circuit 1022, by three-phase reactor, is accessed in three-phase power grid voltage source 1021 after transformer isolation. Buffer resistance is added between finishing circuit 1022 and inverter circuit 1023, reduces and DC voltage is rushed in power grid power up Hit.By controlling rectification module, steady dc voltage inverter circuit control output voltage waveforms are obtained, are joined by setting Number, exports the alternating voltage of needs.
As AC power, system is separately adjustable mutually using three-phase voltage output, can free band carry and be activated individually, can be with Export stable AC power.The power supply isolates alternating-current charging pile electric fault simulation system with external electrical network, reduces to electricity The impact of net.
During test, by the setting and programme-control of software, Programmable AC Power Source can be disturbed with simulating grid, including electricity Pressure is fallen, including brownout, overtension, and voltage change curve is programmed.Programmable AC Power Source can produce Raw three-phase symmetrical temporarily drops, temporarily rises or interrupt.
It is exemplary, such as overcurrent protection experiment can be provided:Charging pile connects charging interface fault simulator, adjusts to specified Work under load.Analog AC charging pile output overcurrent failure, alternating-current charging pile should cut off out-put supply immediately.
Such as table 1, the measurement result and data exported by secondary centralized control system:
Further, as shown in figure 4, the charging interface fault simulator 103 includes Electric Vehicle's Alternating interface circuit Simulator 1041, and load and 1042 two parts of short-circuit impedance simulator.
Further, the load and short-circuit impedance simulator include short switch, resistance adjustment switch and resistance.Load And load and short trouble of the short-circuit impedance simulator when using resistance simulation electric automobile DC charging.Resistor switching device is adopted With D.C. contactor, it can be achieved that constant pressure, constant current isotype.
In practice, such as residual current protecting function test can be carried out:Charging pile connects charging interface fault simulation Device, adjusts and works under nominal load, and analog AC charging pile output phase line and shell short circuit, check that alternating-current charging pile should be immediately Cut off input power.
Such as table 2, the measurement result and data exported by secondary centralized control system:
For another example sudden-stop function is tested:Charging pile connects charging interface fault simulator, adjusts work under nominal load Make.By scram button, alternating-current charging pile should cut off out-put supply immediately and send alarm prompt.
For another example protection against electric shock is tested:Charging pile connects charging interface fault simulator, the nonisulated shell access of charging pile Charging interface fault simulator, tests charging interface conductor to the resistance of earth point, it is impossible to more than 0.1 Ω with fault simulator
For another example connection abnormal test:Charging pile connects charging interface fault simulator, adjusts work under nominal load Make.The connection of analog charge attachment device confirms that contact disconnects, and carries out charging operations, and alternating-current charging pile should cannot start charging;Hand over Current charge stake is charged under adjusting to nominal load, and the connection of analog charge attachment device confirms that contact disconnects, and checks that exchange is filled Electric stake should cut off out-put supply immediately and send alarm prompt.Further, it is single to further include control for the secondary centralized control system 104 Member and backstage industrial personal computer, described control unit are connected with the data collection terminal mouth of the secondary centralized control system, the industrial personal computer It is connected with described control unit, wherein, the data of the data collection terminal mouth collection of the secondary centralized control system can be sent into the control Unit processed, after carrying out data mart modeling processing, is re-fed into the backstage industrial personal computer.
The utility model, which is directed to, to be needed to detect working characteristics of the alternating-current charging pile under external fault condition, is surveyed with reference to more than Method for testing, analyzes the working condition of alternating-current charging pile.The output data of charging pile is recorded, the fault simulation moment is carried out Contrast, analysis, assess working characteristics of the alternating-current charging pile in external fault condition.
The utility model have developed the package unit based on above inventive method, and Programmable AC Power Source can be by the system Isolate with power grid, and simulating grid abnormal conditions, generation three-phase temporarily rises, temporarily drop and both combinations;Charging interface failure mould Intend device, being capable of analog AC charging pile charging interface failure and Vehicular charger failure;Secondary centralized control system integrates related resource, Control management Programmable AC Power Source, charging interface fault simulator, monitor each operating status, realize to flow, resource, synthesis The unified management of information, data, report, and codes and standards.All there is obvious characteristic in terms of practicality and originality.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation Property concept, then can make these embodiments other change and modification.So appended claims be intended to be construed to include it is excellent Select embodiment and fall into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these modification and variations.

Claims (6)

1. a kind of alternating-current charging pile electric fault simulation system, it is characterised in that the system comprises alternating-current charging pile, may be programmed AC power, charging interface fault simulator, secondary centralized control system, wherein, the Programmable AC Power Source is arranged at the friendship The input terminal of current charge stake, the charging interface fault simulator is arranged at the output terminal of the alternating-current charging pile, described secondary Centralized control system is connected to the Programmable AC Power Source and the charging interface fault simulator by data-in port, The data collection terminal mouth of the secondary centralized control system is respectively arranged at the Programmable AC Power Source, the alternating-current charging pile and At each key point in the connecting path of the charging interface fault simulator, to gather and monitor the operation shape of the key point State.
2. alternating-current charging pile electric fault simulation system as claimed in claim 1, it is characterised in that the programmable alternating current Source includes three-phase power grid voltage source module, and the rectification circuit of the connection three-phase power grid voltage source module, and connection institute State the inverter circuit of rectification circuit.
3. alternating-current charging pile electric fault simulation system as claimed in claim 2, it is characterised in that the three-phase power grid voltage Transformer circuit and three-phase reactor circuit, the rectification circuit and institute are additionally provided between source module and the rectification circuit State and be additionally provided with buffer resistance between inverter circuit.
4. alternating-current charging pile electric fault simulation system as claimed in claim 1, it is characterised in that the charging interface failure Simulator includes Electric Vehicle's Alternating interface circuit simulator, and load and short-circuit impedance simulator two parts.
5. alternating-current charging pile electric fault simulation system as claimed in claim 4, it is characterised in that load and the short circuit resistance Anti- simulator includes short switch, resistance adjustment switch and resistance.
6. alternating-current charging pile electric fault simulation system as claimed in claim 1, it is characterised in that the secondary centralized control system Control unit and backstage industrial personal computer are further included, described control unit and the data collection terminal mouth of the secondary centralized control system connect Connecing, the industrial personal computer is connected with described control unit, wherein, the data of the data collection terminal mouth collection of the secondary centralized control system Described control unit can be sent into, after carrying out data mart modeling processing, is re-fed into the backstage industrial personal computer.
CN201721004516.9U 2017-08-11 2017-08-11 A kind of alternating-current charging pile electric fault simulation system Active CN207232351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721004516.9U CN207232351U (en) 2017-08-11 2017-08-11 A kind of alternating-current charging pile electric fault simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721004516.9U CN207232351U (en) 2017-08-11 2017-08-11 A kind of alternating-current charging pile electric fault simulation system

Publications (1)

Publication Number Publication Date
CN207232351U true CN207232351U (en) 2018-04-13

Family

ID=61857541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721004516.9U Active CN207232351U (en) 2017-08-11 2017-08-11 A kind of alternating-current charging pile electric fault simulation system

Country Status (1)

Country Link
CN (1) CN207232351U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112737068A (en) * 2020-12-26 2021-04-30 重庆国翰能源发展有限公司 Charging pile, protection control system and method thereof, storage medium and terminal
CN113219279A (en) * 2021-04-21 2021-08-06 成都艾默泰克科技有限公司 New energy automobile alternating current charging test system and test method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112737068A (en) * 2020-12-26 2021-04-30 重庆国翰能源发展有限公司 Charging pile, protection control system and method thereof, storage medium and terminal
CN113219279A (en) * 2021-04-21 2021-08-06 成都艾默泰克科技有限公司 New energy automobile alternating current charging test system and test method

Similar Documents

Publication Publication Date Title
CN106226610B (en) A kind of direct-current charging interface of electric automobile test macro and test method
CN103954925B (en) A kind of fault oscillograph dynamic testing method based on RTDS real-time simulation
CN103529708B (en) The pre-operation analogue system of power distribution network and simulating analysis
CN110927482A (en) Automatic hybrid test system and method for distribution automation feeder terminal equipment
CN206673990U (en) A kind of detecting system of communication message
CN203398755U (en) Three-phase earth leakage protection and power-off automatic recovery apparatus
CN103996099A (en) Method for conducting intelligent evaluation on student operation in training system
CN103197271A (en) Testing method for maximum metal condition (MMC) topological flexible direct-current transmission testing platform
CN107688128A (en) Method of testing, device, computer-readable recording medium and the computer equipment of subway direct current protecting device
CN109613348A (en) A kind of high-voltaghe compartment tooling automatic detection device
CN109031980A (en) A kind of emulation test method and system of the valve control device based on FPGA
CN207232351U (en) A kind of alternating-current charging pile electric fault simulation system
CN109782732A (en) A kind of half circuit control device test platform in kind
CN107367701A (en) A kind of alternating-current charging pile electric fault analogy method
CN203135572U (en) Transformer substation DC device state monitoring system
CN211528583U (en) Portable insulation monitoring device
CN204925274U (en) BMS is at ring testing arrangement
CN203339659U (en) Single-phase electric leakage protection and power supply automation recovery device
CN204649868U (en) Low-voltage electric cable pair verifies instrument
CN210427707U (en) Integrated insulation detection's on-vehicle machine test system that charges
CN102759712B (en) Battery testing device and testing method thereof
CN202177679U (en) One-point grounding detection device for secondary coil neutral wire of voltage transformer
CN207366659U (en) A kind of direct-current charging post electric fault simulation system
CN203929928U (en) The anti-isolated island energy of a kind of grid-connected converter force checking device
CN107515343A (en) A kind of off-board charger electric fault simulation system

Legal Events