CN207195832U - Building pipe mounting bracket - Google Patents

Building pipe mounting bracket Download PDF

Info

Publication number
CN207195832U
CN207195832U CN201721091135.9U CN201721091135U CN207195832U CN 207195832 U CN207195832 U CN 207195832U CN 201721091135 U CN201721091135 U CN 201721091135U CN 207195832 U CN207195832 U CN 207195832U
Authority
CN
China
Prior art keywords
support ring
bottom plate
lower support
riser
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721091135.9U
Other languages
Chinese (zh)
Inventor
王丙开
吕波
吴青东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201721091135.9U priority Critical patent/CN207195832U/en
Application granted granted Critical
Publication of CN207195832U publication Critical patent/CN207195832U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

Building pipe mounting bracket, including orthogonal bottom plate and riser, the left side edge of bottom plate is fixedly connected with the lower side edge of riser, lower mounting hole is offered on bottom plate, side mounting hole is offered on riser, bottom plate is provided with bearing, the spherical groove of open top is provided with bearing, the outline in the section vertically of spherical groove is in major arc structure, spheroid is rotatably connected in spherical groove, spheroid top is fixedly connected with supporting sleeve component, supporting sleeve component upper end is fixedly connected with the lower support ring of semicircular in shape, top one end of lower support ring is hinged with the upper support ring of semicircular in shape by hinge, upper support ring is connected with the other end of lower support ring by fastening bolt.The utility model is simple in construction, has stronger versatility, is not only convenient for adjusting height, and pipe laying process can be made more convenient, decreased the labor intensity of worker with 360 degree in the horizontal direction torsions.

Description

Building pipe mounting bracket
Technical field
The utility model belongs to building water supply and drainage technical field, more particularly to a kind of building pipe mounting bracket.
Background technology
In building water supply and drainage construction work, it is vertically arranged when having pipeline, it is horizontally disposed also to have pipeline, and pipeline is due to pipe Road has larger gravity, it is necessary to which pipeline is fixed.Conventional mounting bracket system by way of by multiple metal plate welds Into.It is generally necessary to after the data such as length of mounting bracket needed for measuring, Metal Cutting is carried out, is welded, due to mounting bracket Be installed as vacantly install, therefore, using field survey, it is interim cut and the processing mounting bracket such as weld by the way of, very much not Just, the efficiency of work is reduced, adds the intensity of work.Even in field survey and with targetedly processing, fix Bracket still can exist due on wall to be previously secured to or ground, during fixed support tube road and have between indivedual brackets and pipeline There is gap not have supporting role, pipeline is produced deflection and the defects of stress, worker will also enter again in installation process Row is corrected, and this also results in the reduction of operating efficiency, the increase of labor intensity.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided a kind of labor intensity is small, can the actual thing of root Feelings carry out the adjustment of height and horizontal all directions, improve the building pipe mounting bracket of operating efficiency.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Building pipe mounting bracket, including phase Mutually vertical bottom plate and riser, the left side edge of bottom plate, along being fixedly connected, offer lower installation with the lower side of riser on bottom plate Hole, side mounting hole is offered on riser, bottom plate is provided with bearing, and the spherical groove of open top is provided with bearing, spherical groove The outline in section vertically is in major arc structure, and spheroid is rotatably connected in spherical groove, and spheroid top is fixedly connected with Supporting sleeve component, supporting sleeve component upper end are fixedly connected with the lower support ring of semicircular in shape, top one end of lower support ring It is hinged with the upper support ring of semicircular in shape by hinge, the inwall of upper support ring and lower support ring is fixedly installed upper semi-circle respectively Rubber washer and lower half circle rubber washer, the holding holes of circle are formed between upper semi-circle rubber washer and lower half circle rubber washer, Upper support ring is connected with the other end of lower support ring by fastening bolt.
Bearing includes left mounting seat and right mounting seat, and left mounting seat is fastenedly connected by left connecting bolt with bottom plate, right peace Dress seat is fastenedly connected by right connecting bolt with bottom plate, offers one and half ball grooves in left mounting seat and right mounting seat respectively, and two Individual half ball groove or so is correspondingly formed described spherical groove.
Supporting sleeve component includes setting of casing, upper sleeve pipe and stud, under setting of casing along the radial direction of spheroid set and under Its lower end at the top of spheroid with being fixedly connected, and upper sleeve upper end is fixedly connected with lower support ring bottom centre position, upper sleeve pipe Center line by the center of circle of lower support ring, be fixedly installed six prism dops in the middle part of stud, stud is above six prism dops Part thread rotary orientation with the thread rotary orientation of the part below six prism dops on the contrary, the top of stud is stretched into and is threadedly coupled In upper sleeve pipe, the bottom of stud is stretched into and is threaded in setting of casing.
Connected between riser right flank and bottom plate upper side by the stiffener plate of triangle.
Bearing rib is provided between upper sleeve upper end outer circumference surface and lower support ring bottom.
Using above-mentioned technical proposal, in pipe laying operation, it is to be ensured that pipeline keep level or plumbness, first exist Rule on wall or ground, several the utility model are uniformly fixed on wall or ground along line, if along level side During to pipe laying, the side mounting hole on riser is penetrated into expansion bolt fixed on wall or by the lower mounting hole of bottom plate Expansion bolt is penetrated fixed on ground;If vertically during pipe laying, riser and bottom plate are overturn 90 °, make riser Plumbness is in bottom plate, expansion bolt is used by the lower peace on the side mounting hole or bottom plate on riser according to actual conditions Hole is filled to be fixed on wall.All upper support rings are opened, upper support ring open top, then placed pipeline to be installed Into upper support ring, clamping each six prisms dop respectively using spanner rotates stud, due to the upper and lower part of stud Thread rotary orientation on the contrary, when stud rotates, the upper sleeve pipe and setting of casing that are threadedly coupled with stud can and meanwhile in opposite direction It is mobile, if setting of casing is worked day and night, plane can be blocked using another spanner in the relative plane of tube side part milling of trapping, hindered Only setting of casing rotates, and each lower support ring is supported pipeline, can so compensate bottom plate or side plate in wall The position of fixed installation on wall or ground.Further, since setting of casing lower end is rotatably connected on left mounting seat and the right side by spheroid In mounting seat, can so make stud, upper sleeve pipe and setting of casing it is equal 360 ° rotation, pipeline is fully supported after inclination, avoid because The situation for being unable to excellent support to sleeve pipe is caused to occur for error caused by the mounting base on wall or ground or riser.Most Upper support ring is turned on pipeline afterwards, turning fastening bolt using spanner makes upper support ring live pipeline with lower support ring lock ring.
Bearing in the utility model uses left mounting seat and right mounting seat separately manufacturing, and passes through left connecting bolt respectively Be fixed on right connecting bolt on bottom plate, be so easy to manufacture bearing, and be easily installed spheroid, spheroid and spherical groove inwall it Between there is certain frictional force, to ensure that supporting sleeve component, upper support ring and lower support ring when not acted on by external force, can protect It is fixed to keep steady.
Upper semi-circle rubber washer and lower half circle rubber washer play a part of that pipeline can be clamped, and protective conduit not by Damage.Certainly, because upper sleeve pipe, upper support ring and lower support ring are structure as a whole, can be changed according to the pipeline of various outer diameter Upper sleeve pipe, upper support ring and lower support ring, the utility model is so set to have more certain versatility.
Stiffener plate plays a part of strengthening bonding strength between bottom plate and riser.
Bearing rib plays a part of the upper bonding strength between sleeve pipe and lower support ring bottom of enhancing.
In summary, the utility model is simple in construction, has stronger versatility, is not only convenient for adjusting height, Er Qieke With 360 degree in the horizontal direction torsions, make pipe laying process more convenient, decrease the labor intensity of worker.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in figure 1, building pipe mounting bracket of the present utility model, including orthogonal bottom plate 1 and riser 2, bottom The left side edge of plate 1, along being fixedly connected, offers lower mounting hole 3, side is offered on riser 2 with the lower side of riser 2 on bottom plate 1 Mounting hole 4, bottom plate 1 are provided with bearing, and the spherical groove of open top, the section vertically of spherical groove are provided with bearing Outline be in major arc structure, spheroid 5 is rotatably connected in spherical groove, the top of spheroid 5 is fixedly connected with supporting sleeve component, branch Support set tube assembly upper end is fixedly connected with the lower support ring 6 of semicircular in shape, and top one end of lower support ring 6 is be hinged by hinge 7 There is a upper support ring 8 of semicircular in shape, the inwall of upper support ring 8 and lower support ring 6 is fixedly installed upper semi-circle rubber washer 9 respectively With lower half circle rubber washer 10, circular holding holes 11 are formed between upper semi-circle rubber washer 9 and lower half circle rubber washer 10, on The other end of support ring 8 and lower support ring 6 is connected by fastening bolt 12.
Bearing includes left mounting seat 13 and right mounting seat 14, and left mounting seat 13 is fastened by left connecting bolt 15 with bottom plate 1 Connection, right mounting seat 14 are fastenedly connected with bottom plate 1 by right connecting bolt 16, opened respectively in left mounting seat 13 and right mounting seat 14 Provided with one and half ball grooves, two and half ball grooves or so are correspondingly formed described spherical groove.
Supporting sleeve component includes setting of casing 17, upper sleeve pipe 18 and stud 19, along the radial direction of spheroid 5 under setting of casing 17 Set and the lower end of setting of casing 17 is fixedly connected with the top of spheroid 5, the upper upper end of sleeve pipe 18 is consolidated with the lower bottom centre position of support ring 6 Fixed connection, the center line of upper sleeve pipe 18 are fixedly installed six prism dops 20 by the center of circle of lower support ring 6, the middle part of stud 19, The thread rotary orientation of part of the stud 19 above six prism dops 20 and the thread rotary orientation phase of the part below six prism dops 20 Instead, the top of stud 19 is stretched into and is threaded in sleeve pipe 18, and the bottom of stud 19 is stretched into and is threaded in setting of casing In 17.
Connected between the right flank of riser 2 and the upper side of bottom plate 1 by the stiffener plate 21 of triangle.
Bearing rib 22 is provided between the upper upper end outer circumferential face of sleeve pipe 18 and the lower bottom of support ring 6.
In pipe laying operation, it is to be ensured that pipeline keep level or plumbness, first rule on wall or ground, Several the utility model are uniformly fixed on wall or ground along line, if in the horizontal direction pipe laying when, will be vertical Side mounting hole 4 on plate 2 penetrates expansion bolt and is fixed on wall or will penetrate expansion bolt in the lower mounting hole 3 of bottom plate 1 Fixed on ground;If vertically during pipe laying, riser 2 and bottom plate 1 are overturn into 90 °, make riser 2 and bottom plate 1 equal In plumbness, expansion bolt is used by the lower mounting hole 3 on the side mounting hole 4 or bottom plate 1 on riser 2 according to actual conditions Fixed on wall.All upper support rings 8 are opened, the upper open top of support ring 8, are then placed into pipeline to be installed In upper support ring 8, clamping each six prisms dop 20 respectively using spanner rotates stud 19, due to stud 19 top and For the thread rotary orientation of bottom on the contrary, when stud 19 rotates, the upper sleeve pipe 18 and setting of casing 17 that are threadedly coupled with stud 19 can simultaneously Move in opposite direction, if setting of casing 17 is worked day and night, another can be used in the relative plane of the sidepiece milling of setting of casing 17 Spanner blocks plane, prevents the 19 1 pieces of rotations of setting of casing 17 and stud, each lower support ring 6 is supported pipe Road, it can so compensate the position of the fixed installation of bottom plate 1 or side plate on wall or ground.Further, since under setting of casing 17 End is rotatably connected in left mounting seat 13 and right mounting seat 14 by spheroid 5, can so be made stud 19, upper sleeve pipe 18 and be trapped 17 equal 360 ° of rotations of pipe, fully support pipeline, avoid because in mounting base 1 on wall or ground or riser 2 after inclination Caused error causes the situation for being unable to excellent support to sleeve pipe to occur.Finally upper support ring 8 is turned on pipeline, using pulling Hand, which turns fastening bolt 12, makes support ring 8 live pipeline with the lower lock ring of support ring 6.
Bearing in the utility model uses left mounting seat 13 and the separately manufacturing of right mounting seat 14, and passes through left connection respectively Bolt 15 and right connecting bolt 16 are fixed on bottom plate 1, are so easy to manufacture bearing, and are easily installed spheroid 5, spheroid 5 with There is certain frictional force between spherical groove inwall, with ensure supporting sleeve component, upper support ring 8 and lower support ring 6 not by When external force acts on, it can keep stable.
Upper semi-circle rubber washer 9 and lower half circle rubber washer 10 play a part of that pipeline can be clamped, and protective conduit It is injury-free.Certainly, because upper sleeve pipe 18, upper support ring 8 and lower support ring 6 are structure as a whole, according to the pipeline of various outer diameter Sleeve pipe 18, upper support ring 8 and lower support ring 6 can be replaced with, the utility model is had more certain versatility.
Stiffener plate 21 plays a part of strengthening bonding strength between bottom plate 1 and riser 2.
Bearing rib 22 plays a part of the upper bonding strength between sleeve pipe 18 and the lower bottom of support ring 6 of enhancing.
The present embodiment is not that the shape to the present invention, material, structure etc. make any formal limitation, every according to this hair Any simple modification, equivalent change and modification that bright technical spirit is made to above example, belongs to the technology of the present invention side The protection domain of case.

Claims (5)

1. building pipe mounting bracket, it is characterised in that:Including orthogonal bottom plate and riser, the left side edge of bottom plate is with standing The lower side of plate offers lower mounting hole, side mounting hole is offered on riser, bottom plate is provided with branch along being fixedly connected on bottom plate Seat, is provided with the spherical groove of open top in bearing, and the outline in the section vertically of spherical groove is in major arc structure, ball Spheroid is rotatably connected in shape groove, spheroid top is fixedly connected with supporting sleeve component, and supporting sleeve component upper end is fixedly connected There is the lower support ring of semicircular in shape, top one end of lower support ring is hinged with the upper support ring of semicircular in shape, upper branch by hinge Pushing out ring and the inwall of lower support ring are fixedly installed upper semi-circle rubber washer and lower half circle rubber washer, upper semi-circle rubber blanket respectively Enclose between lower half circle rubber washer and form the holding holes of circle, the other end of upper support ring and lower support ring passes through fastening bolt Connection.
2. building pipe mounting bracket according to claim 1, it is characterised in that:Bearing includes left mounting seat and right installation Seat, left mounting seat are fastenedly connected by left connecting bolt with bottom plate, and right mounting seat is fastenedly connected by right connecting bolt with bottom plate, One and half ball grooves, two and half ball grooves or so are offered in left mounting seat and right mounting seat respectively and are correspondingly formed described spherical groove.
3. building pipe mounting bracket according to claim 1, it is characterised in that:Supporting sleeve component include setting of casing, Upper sleeve pipe and stud, set along the radial direction of spheroid under setting of casing and setting of casing lower end at the top of spheroid with being fixedly connected, on Sleeve upper end is fixedly connected with lower support ring bottom centre position, and the center line of upper sleeve pipe passes through the center of circle of lower support ring, stud Middle part is fixedly installed six prism dops, below the thread rotary orientation and six prism dops of part of the stud above six prism dops Part thread rotary orientation on the contrary, the top of stud is stretched into and is threaded in sleeve pipe, the bottom of stud is stretched into and screw thread It is connected in setting of casing.
4. building pipe mounting bracket according to claim 1, it is characterised in that:Riser right flank and bottom plate upper side it Between connected by the stiffener plate of triangle.
5. building pipe mounting bracket according to claim 3, it is characterised in that:Upper sleeve upper end outer circumference surface and lower branch Pushing out ring is provided with bearing rib between bottom.
CN201721091135.9U 2017-08-29 2017-08-29 Building pipe mounting bracket Expired - Fee Related CN207195832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721091135.9U CN207195832U (en) 2017-08-29 2017-08-29 Building pipe mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721091135.9U CN207195832U (en) 2017-08-29 2017-08-29 Building pipe mounting bracket

Publications (1)

Publication Number Publication Date
CN207195832U true CN207195832U (en) 2018-04-06

Family

ID=61795894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721091135.9U Expired - Fee Related CN207195832U (en) 2017-08-29 2017-08-29 Building pipe mounting bracket

Country Status (1)

Country Link
CN (1) CN207195832U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109595395A (en) * 2018-10-08 2019-04-09 禹超 A kind of oil and gas pipeline fixing device for installing
CN111196262A (en) * 2018-11-19 2020-05-26 宝沃汽车(中国)有限公司 Pipeline installing support and vehicle
CN113028144A (en) * 2021-02-09 2021-06-25 海洋石油工程股份有限公司 Temporary suspension device for installation of deepwater vertical pipe
CN114233934A (en) * 2021-12-23 2022-03-25 中铁十九局集团第三工程有限公司 Fixed point bracket device and method for pipeline type high gas tunnel construction
CN114658925A (en) * 2022-04-14 2022-06-24 扬州中远海运重工有限公司 Temporary pipeline fixing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109595395A (en) * 2018-10-08 2019-04-09 禹超 A kind of oil and gas pipeline fixing device for installing
CN111196262A (en) * 2018-11-19 2020-05-26 宝沃汽车(中国)有限公司 Pipeline installing support and vehicle
CN111196262B (en) * 2018-11-19 2021-09-07 宝沃汽车(中国)有限公司 Pipeline installing support and vehicle
CN113028144A (en) * 2021-02-09 2021-06-25 海洋石油工程股份有限公司 Temporary suspension device for installation of deepwater vertical pipe
CN114233934A (en) * 2021-12-23 2022-03-25 中铁十九局集团第三工程有限公司 Fixed point bracket device and method for pipeline type high gas tunnel construction
CN114233934B (en) * 2021-12-23 2023-10-27 中铁十九局集团第三工程有限公司 Fixed-point bracket device and method for pipeline type high-gas tunnel construction
CN114658925A (en) * 2022-04-14 2022-06-24 扬州中远海运重工有限公司 Temporary pipeline fixing device

Similar Documents

Publication Publication Date Title
CN207195832U (en) Building pipe mounting bracket
CN209448367U (en) A kind of cable testing bridge bracket
CN209339329U (en) A kind of civil construction concrete embedded part
CN213902382U (en) Novel survey and drawing sighting rod fixed balance support
CN209782121U (en) electromechanical device installation device
CN203347260U (en) Supporting fixing system for installation of assembly-type dwelling prefabricated component (PC)
CN212510207U (en) Damping device for mining machinery
CN105421630A (en) Metal curtain wall hitching assembly
CN211738563U (en) Anti-seismic support and hanger with locking function
CN104481190B (en) Equipment is installed and is accurately positioned with the fixed support of baseline
CN211228520U (en) Foundation pit supporting structure
CN202621411U (en) Auxiliary tool for automobile windshield rubber coating
JP2015171300A (en) Photovoltaic generation apparatus
CN214889698U (en) Comprehensive pipeline anti-seismic support hanging bracket for large building
CN210767831U (en) Civil engineering construction support
CN209512853U (en) A kind of mobile mapping platform
CN205035812U (en) Stull formula bearing structure simply fixes a position
CN208375960U (en) A kind of material carrying mechanism of pipeline production
CN207033008U (en) A kind of antidetonation suspension and support for building
CN207092970U (en) Jumbolter support base and coal mine roadway support meanss
CN211525702U (en) Fire hose support with inclination convenient to adjust
CN1143704A (en) Steel skeleton column inverse mounting construction method and device
CN214836440U (en) Supporting device for preventing tunnel settlement deformation
CN214368199U (en) Pipeline bracket for building construction
CN110553125A (en) Level gauge supporting device for engineering measurement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406

Termination date: 20180829

CF01 Termination of patent right due to non-payment of annual fee