CN207194952U - A kind of flood mine working bottom plate is harnessed the river structure - Google Patents

A kind of flood mine working bottom plate is harnessed the river structure Download PDF

Info

Publication number
CN207194952U
CN207194952U CN201720939944.4U CN201720939944U CN207194952U CN 207194952 U CN207194952 U CN 207194952U CN 201720939944 U CN201720939944 U CN 201720939944U CN 207194952 U CN207194952 U CN 207194952U
Authority
CN
China
Prior art keywords
foundation ditch
bottom plate
steel pipe
drainpipe
harnessed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720939944.4U
Other languages
Chinese (zh)
Inventor
李万涛
许长新
焦永富
刘辉
谢道雄
贲勇
董明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HBIS Co Ltd
Original Assignee
HBIS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HBIS Co Ltd filed Critical HBIS Co Ltd
Priority to CN201720939944.4U priority Critical patent/CN207194952U/en
Application granted granted Critical
Publication of CN207194952U publication Critical patent/CN207194952U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

It the utility model is related to a kind of flood mine working bottom plate to harness the river structure, belong to underground mine roadway construction equipment technical field.Technical scheme is:Include tunnel(1), concrete(2), drainage layer(3), drainpipe(4), cement steel pipe(5), immersible pump(7)And foundation ditch(8), in tunnel(1)Bottom plate below be provided with foundation ditch(8), cement steel pipe(5)It is arranged vertically on foundation ditch(8)It is interior, drainpipe(4)It is located at cement steel pipe(5)It is interior, drainpipe(4)Lower end be provided with immersible pump(7), the foundation ditch(8)Bottom be provided with drainage layer(3), drainage layer(3)Top is provided with concrete(2).The beneficial effects of the utility model are:Underground mine roadway floor can effectively be administered and go out water problems.

Description

A kind of flood mine working bottom plate is harnessed the river structure
Technical field
It the utility model is related to a kind of flood mine working bottom plate to harness the river structure, belong to underground mine roadway construction equipment skill Art field.
Background technology
During underground mine roadway construction, due to unpredictable Complex Hydrogeological Conditions, it is frequently encountered prominent The situation of water burst is sent out, method of prevent floods by water control need to be used to administer water burst.Pre grouting from the working face technology is to administer the effective measures of water burst, extensively Apply in underground mine waterproof.
During roadway construction, such as broke-out diseases after explosion, water burst can be gushed out along crack, now take working face again Pre-pouring grout, slip casting medium will spray in the presence of high pressure along the crack of water burst, and slip casting does not reach the effect being pre-designed. The mode of the problem is solved more using manually wall for grouting is poured, water burst is first blocked, is then re-used as rock plug and is operated Face pre-pouring grout., then should not the slip casting by the way of casting concrete wall for grouting, it is necessary to study such as roadway floor water outlet after explosion A kind of structure for solving flood mine bottom plate water burst, realizes that water burst is effectively administered.
Utility model content
The utility model purpose is to provide a kind of flood mine working bottom plate and harnessed the river structure, can realize roadway floor water burst Effective improvement, solve background technology present in problem.
The technical solution of the utility model is:
A kind of flood mine working bottom plate is harnessed the river structure, comprising tunnel, concrete, drainage layer, drainpipe, cement steel pipe, Immersible pump and foundation ditch, foundation ditch is provided with below the bottom plate in tunnel, cement steel pipe is arranged vertically in foundation ditch, and drainpipe is located at cement In steel pipe, the lower end of drainpipe is provided with immersible pump, and the bottom of the foundation ditch is provided with drainage layer, concrete is provided with above drainage layer.
The drainage layer of the bottom of foundation ditch is debris.
The immersible pump is located at the bottom of foundation ditch.
The side of the foundation ditch is to be sloped downwardly arrangement along to the bottom plate two in tunnel.
The angle of inclination of the foundation ditch side is 45 degree.
The lower end of the cement steel pipe and drainpipe is located at the bottom of foundation ditch, and the upper end of cement steel pipe and drainpipe is located at lane Above the bottom plate in road.
Using the utility model, after larger water burst occurs in underground mine working bottom plate, in the lower section water burst of roadway floor Point nearby digs a foundation ditch, and cement steel pipe and immersible pump are installed in foundation ditch, sets discharge pipe line.Accumulated in the bottom of foundation ditch Bulk debris pours plain concrete as drainage layer at the top of drainage layer.Construction finally by the immersible pump in cement steel pipe and Drainpipe is withdrawn from, and inwardly pours into fast hardening concrete.After the intensity that above structure reaches curing period and design, you can in concrete Surface is given a farfetched interpretation downwards inlet well, is organized pre-pouring grout and is administered water burst.
The beneficial effects of the utility model are:Underground mine roadway floor can effectively be administered and go out water problems.
Brief description of the drawings
Fig. 1 is the utility model section view;
Fig. 2 is the utility model top view;
In figure:Tunnel 1, concrete 2, drainage layer 3, drainpipe 4, cement steel pipe 5, water burst water level 6, immersible pump 7, foundation ditch 8.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
Referring to the drawings 1,2, a kind of flood mine working bottom plate is harnessed the river structure, includes tunnel 1, concrete 2, drainage layer 3, row Water pipe 4, cement steel pipe 5, immersible pump 7 and foundation ditch 8, are provided with foundation ditch 8 below the bottom plate in tunnel 1, and cement steel pipe 5 is arranged vertically on In foundation ditch 8, drainpipe 4 is located in cement steel pipe 5, and the lower end of drainpipe 4 is provided with immersible pump 7, and the bottom of the foundation ditch 8 is provided with filter Water layer 3, the top of drainage layer 3 are provided with concrete 2.
In the present embodiment, when underground mine working bottom plate occur larger water burst after, first tunnel 1 bottom plate lower section Near issue, along the both sides in tunnel 1 according to 45 degree of angles, excavate obliquely, form a foundation ditch 8, foundation ditch 8 is trapezoidal, base The upper surface in hole 8 is less than lower surface, can improve the bearing capacity of concrete.Bulk debris is accumulated in the bottom of foundation ditch 8, in foundation ditch A cement steel pipe 5 is installed at tunnel center in 8, and water burst can be flowed into cement steel pipe 5 along bulk debris.In cement steel pipe One immersible pump 7 of installation and drainpipe 4, water burst are discharged in time, it is ensured that do not influence concrete pouring construction in 5.Then to base Casting concrete in hole 8, until the height of design, when concrete completion maintenance reaches design strength, by cement steel pipe 5 Immersible pump 7 is withdrawn from, and pours fast hardening concrete into it immediately, then can carry out perforation slip casting operation in concrete surface.

Claims (6)

  1. The structure 1. a kind of flood mine working bottom plate is harnessed the river, it is characterised in that include tunnel(1), concrete(2), drainage layer(3)、 Drainpipe(4), cement steel pipe(5), immersible pump(7)And foundation ditch(8), in tunnel(1)Bottom plate below be provided with foundation ditch(8), cement Steel pipe(5)It is arranged vertically on foundation ditch(8)It is interior, drainpipe(4)It is located at cement steel pipe(5)It is interior, drainpipe(4)Lower end be provided with diving Pump(7), the foundation ditch(8)Bottom be provided with drainage layer(3), drainage layer(3)Top is provided with concrete(2).
  2. The structure 2. a kind of flood mine working bottom plate according to claim 1 is harnessed the river, it is characterised in that the foundation ditch(8)Bottom The drainage layer in portion(3)For debris.
  3. The structure 3. a kind of flood mine working bottom plate according to claim 1 or 2 is harnessed the river, it is characterised in that the immersible pump (7)It is located at foundation ditch(8)Bottom.
  4. The structure 4. a kind of flood mine working bottom plate according to claim 3 is harnessed the river, it is characterised in that the foundation ditch(8)'s Side is along to tunnel(1)Bottom plate two be sloped downwardly arrangement.
  5. The structure 5. a kind of flood mine working bottom plate according to claim 4 is harnessed the river, it is characterised in that the foundation ditch(8)Side The angle of inclination in face is 45 degree.
  6. The structure 6. a kind of flood mine working bottom plate according to claim 1 is harnessed the river, it is characterised in that the cement steel pipe (5)And drainpipe(4)Lower end be located at foundation ditch(8)Bottom, cement steel pipe(5)And drainpipe(4)Upper end be located at tunnel(1) Bottom plate above.
CN201720939944.4U 2017-07-31 2017-07-31 A kind of flood mine working bottom plate is harnessed the river structure Expired - Fee Related CN207194952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720939944.4U CN207194952U (en) 2017-07-31 2017-07-31 A kind of flood mine working bottom plate is harnessed the river structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720939944.4U CN207194952U (en) 2017-07-31 2017-07-31 A kind of flood mine working bottom plate is harnessed the river structure

Publications (1)

Publication Number Publication Date
CN207194952U true CN207194952U (en) 2018-04-06

Family

ID=61799664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720939944.4U Expired - Fee Related CN207194952U (en) 2017-07-31 2017-07-31 A kind of flood mine working bottom plate is harnessed the river structure

Country Status (1)

Country Link
CN (1) CN207194952U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115404888A (en) * 2022-10-08 2022-11-29 中建八局装饰工程有限公司 Deep foundation pit bottom water burst treatment method for finished main body structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115404888A (en) * 2022-10-08 2022-11-29 中建八局装饰工程有限公司 Deep foundation pit bottom water burst treatment method for finished main body structure
CN115404888B (en) * 2022-10-08 2023-11-07 中建八局装饰工程有限公司 Deep foundation pit bottom water treatment method for finished main body structure

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
WO2008061415A1 (en) A hydraulic sliding insertion panel and its using method
CN206706792U (en) Deep foundation pit precipitation well construction
CN108005111B (en) Vertical shaft construction method used as underground stereo garage
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN112746849B (en) Shaft water-carrying digging and building method
CN108331000A (en) Caisson sinking construction method
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
WO2021243995A1 (en) Deep foundation pit retaining wall structure and construction method for underground space structure
CN105625420B (en) A kind of extension type support with manually dug piles construction and its construction method
CN205422815U (en) Big flood underground mine tunnel waterwall
CN102839691A (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN207194952U (en) A kind of flood mine working bottom plate is harnessed the river structure
CN203768925U (en) Seal device for dewatering well in foundation pit
CN210712963U (en) Drainage structure of basement bottom plate post-cast strip
CN202450501U (en) Bricking drainage structure for stilling pool
CN108867225B (en) Method for processing water falling hole in karst landform road subgrade range
CN109339006B (en) Efficient cone-type hydraulic power absorption well and construction method thereof
CN208949889U (en) Deep basal pit karst base lime rock stratum groundwater treatment system
CN107419811A (en) The method and its structure of basement bottom board support pile and spilled water hole waterproofing and leakage-stopping
CN206815338U (en) Hydraulic sheeting operation fluidic device
CN208088305U (en) A kind of foundation pit water burst fast plugging device
CN207348086U (en) A kind of retaining wall for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406