CN207193777U - A kind of U-shaped beam hole for hoist fast plugging device - Google Patents

A kind of U-shaped beam hole for hoist fast plugging device Download PDF

Info

Publication number
CN207193777U
CN207193777U CN201721192692.XU CN201721192692U CN207193777U CN 207193777 U CN207193777 U CN 207193777U CN 201721192692 U CN201721192692 U CN 201721192692U CN 207193777 U CN207193777 U CN 207193777U
Authority
CN
China
Prior art keywords
hammering
cylinder
hole
diameter
shaped beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721192692.XU
Other languages
Chinese (zh)
Inventor
刘博�
王鹏
苏建国
杨鲁波
李海伟
王硕
董旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering Co Ltd Of Middle Tie Shisiju Group 5th
Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Engineering Co Ltd Of Middle Tie Shisiju Group 5th
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Co Ltd Of Middle Tie Shisiju Group 5th filed Critical Engineering Co Ltd Of Middle Tie Shisiju Group 5th
Priority to CN201721192692.XU priority Critical patent/CN207193777U/en
Application granted granted Critical
Publication of CN207193777U publication Critical patent/CN207193777U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of U-shaped beam hole for hoist fast plugging device, including rubber plugging block, hammer, gag lever post;Rubber plugging block is that lower end diameter is small, the big trapezoidal cylinder shape structure of upper end diameter;Hammer includes hammering cylinder, spacing hole, hammering handle, hammering cylinder is boring, the cylindrical iron structure of outer closures, spacing hole is arranged on hammering cylinder upper zone, level is through hammering cylinder diameter, one is set every a segment distance, hammering handle is iron semicircular ring handle, is welded with hammer top surface;Gag lever post is circular iron, can be run through in insertion spacing hole.

Description

A kind of U-shaped beam hole for hoist fast plugging device
Technical field
It the utility model is related to one kind and be used for civil engineering bridge technology field, be more particularly to a kind of U-shaped beam hole for hoist Fast plugging device.
Background technology
With the fast development of China's track traffic cause, as the important component of urban rail transit construction, bridge is built If corresponding development is also obtained.U-shaped beam forms "U" shaped thin walled aperture section as one kind by bottom plate, web and flange plate Novel bridge structure type, because its have lightweight construction, excellent noise reduction effect, building height are low, space availability ratio is high, driving The advantages that safety, good appearance it is more and more extensive be applied to Construction of Urban Rail Traffic in.
Construct for city track traffic U ellbeam, after general more common beam body machines in precast beam field, it is carried out On-site hoisting is set up.However, prefabrication of beam lifting erection construction is, it is necessary near U-shaped beam end fulcrum, bottom plate Varying-thickness region Default lifting duct, to facilitate beam body anchoring lifting.After the completion of beam body lifting, lifting duct need to be carried out at concrete closure Reason, to ensure its globality.
For hole for hoist blocking technology, generally use will be slightly larger than the bamboo slab rubber of lifting channel diameter, be hanged by steel wire rope It is hung in below duct, so as to complete concreting closure processing as template.Although such a method is relatively inexpensive, hole is also given Road plugging construction brings inconvenience, is mainly reflected in the following aspects:(1) bamboo slab rubber makes, and steel wire rope colligation construction is numerous It is trivial.(2) bamboo slab rubber is placed on beam bottom, and because now beam body has set up completion, beam bottom bamboo slab rubber is placed more inconvenient.(3) bamboo glue Easily there is spillage by steel wire Suspending fixation, seal and less stable in concreting, process of vibrating in plate.
So under this background, exploitation one kind, which possesses, disclosure satisfy that U-shaped beam lifting duct fast plugging device and construction Method, have great practical value.
Utility model content
The purpose of this utility model is to solve the deficiency of above-mentioned existing tradition lifting duct blocking technology, in existing skill It is preoperative to put, there is provided a kind of U-shaped beam lifting duct fast plugging device and construction method.
To achieve these goals, the utility model uses following technical measures:
A kind of U-shaped beam lifts duct fast plugging device, including rubber plugging block, hammer and gag lever post, described rubber Glue plugging block is the cylindrical structural that a longitudinal section is inverted trapezoidal;Described hammer includes hammering cylinder, spacing hole and hammering Handle, the hammering cylinder are upper and lower side closing, the cylindrical structural of inner hollow, and spacing hole is arranged on hammering cylinder middle and upper part area Domain, the spacing hole horizontal is through hammering cylinder, and the axis of spacing hole overlaps with hammering the diameter of cylinder, in the vertical side of hammering cylinder One spacing hole is set every a segment distance upwards;Described hammering handle welds with hammer top surface;Described gag lever post is Circular iron, its length are slightly less than spacing bore dia slightly larger than hammering cylinder diameter about 15cm, spacing shank diameter, and it is limited through insertion In the hole of position.
Further, described hammering cylinder is iron structure.
Further, described hammering handle is semi-circular shape handle made of iron.
Further, the lower end diameter of described rubber plugging block is slightly less than lifting channel diameter, and upper end diameter is slightly larger than Channel diameter about 5mm is lifted, so that rubber plugging block can stopper lifting duct.
Further, described hammering cylinder wall thickness is about 1cm, and external diameter is slightly less than lifting channel diameter, upper handle For semilune structure, hammered with facilitating hammering cylinder to be lifted.
Further, described hammering cylinder spacing hole every 4cm in the middle part of hammering cylinder by upwards, setting one, spacing hole is straight Footpath is about 8mm.
Further, described gag lever post penetrates relevant position hammering cylinder spacing hole, played anti-according to closure thickness requirement Only hammer the excessive effect of rubber plugging block displacement.
Duct fast plugging device construction method, including following steps are lifted to described U-shaped beam:
Step 1:The less lower end of rubber plugging block diameter is placed in hole for hoist.
Step 2:(it is typically designed requirement closure thickness according to required closure thickness and is not less than U-shaped girder span midsole plate thickness), Gag lever post is inserted in corresponding hammering cylinder spacing hole, and ensures the exposed hammering segment distance of cylinder one in gag lever post both ends.
Step 3:Lifting hammering cylinder, it is vertical to hammer rubber plugging block, until rubber plugging block reaches corresponding in lifting duct Position.
Step 4:Into lifting duct, the slightly expanded concrete of perfusion label identical with beam body, duct inner concrete vibrate Afterwards, floating top surface concrete, duct plugging construction is completed.
The utility model has advantages below relative to prior art:
(1) block rubber convenient material drawing, it is in light weight, can mass customization processing;
(2) it is simple to operate to hammer cylinder, and there is stopping means (spacing hole and gag lever post), can meet that difference pours thickness and hung Dress drift hits construction;Particularly by the way that on the vertical direction of hammering cylinder, a spacing hole is set every a segment distance, due to The height of spacing hole is different, therefore, can meet the different hammering constructions for pouring thickness hole for hoist.
(3) block block rubber seal and stability is preferable, concreting process not spillage, so as to further ensure Concreting blocks quality;
(4) the utility model is simple in construction, and material usage is less, and substantially increases efficiency of construction, saves construction Time, there is good engineering economy.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are these Some embodiments of utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also Other accompanying drawings can be obtained according to these accompanying drawings.
Fig. 1 is that U-shaped beam lifts hole site facade arrangement schematic diagram;
Fig. 2 is that U-shaped beam lifts hole site fulcrum Varying-thickness section arrangement schematic diagram;
Fig. 3 is U-shaped beam hole for hoist plugging device operating diagram;
In figure:1- rubber plugging blocks, 2- hammers, 3- gag lever posts, 4- hammering cylinders, 5- spacing holes, 6- hammering handles, 7- are hung Fill duct.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, there are the following problems in existing hole for hoist blocking technology:(1) bamboo slab rubber makes, Steel wire rope colligation construction is cumbersome.(2) bamboo slab rubber is placed on beam bottom, and because now beam body has set up completion, beam bottom bamboo slab rubber is placed It is more inconvenient.(3) bamboo slab rubber is held in concreting, process of vibrating by steel wire Suspending fixation, seal and less stable Easily there is spillage.In order to solve technical problem as above, present applicant proposes a kind of U-shaped beam hole for hoist fast plugging device and apply Work method.
Below in conjunction with accompanying drawing 1,2,3, structure of the present utility model is further described.
The utility model provides one kind and lifts duct blocking technology relative to tradition, possesses and disclosure satisfy that U-shaped hole for hoist Filling concrete closure, new fast plugging device and construction method.
With reference to shown in Fig. 1~Fig. 3, U-shaped beam lifting duct fast plugging device specifically includes rubber plugging block 1, hammer 2nd, gag lever post 3,
Rubber plugging block 1 is that lower end diameter is small, and (i.e. longitudinal section is inverted trapezoidal knot to the big trapezoidal cylinder shape structure of upper end diameter Structure);Described hammer 2 includes hammering cylinder 4, spacing hole 5, hammering handle 6, and hammering cylinder 4 is upper and lower side closing, hollow cylinder The iron structure of shape, spacing hole 5 are arranged on hammering cylinder 4 upper zone, and level is set through the hammering diameter of cylinder 4 every a segment distance One is put, can meet that difference pours the hammering construction of thickness hole for hoist.
Hammering handle 6 is iron semicircular ring handle, is welded with hammer top surface;Described gag lever post 3 is circular iron, its Length is slightly less than spacing bore dia slightly larger than hammering cylinder diameter about 15cm, diameter, in insertion spacing hole.
With reference to shown in Fig. 3, the lower end diameter of rubber plugging block 1 is slightly less than the lifting diameter of duct 7, and upper end diameter is slightly larger than lifting The diameter about 5mm of duct 7, so that rubber plugging block can stopper lifting duct 7.
With reference to shown in Fig. 3, the hammering wall thickness of cylinder 4 is about 1cm, and external diameter is slightly less than the lifting diameter of duct 7, and top hammering carries Hand 6 is semilune structure, to facilitate the hammering lifting hammering of cylinder 4.
With reference to shown in Fig. 3, hammering cylinder spacing hole 5 every 4cm in the middle part of hammering cylinder by upwards, setting one, the diameter of spacing hole 5 About 8mm.
With reference to shown in Fig. 3, gag lever post 3 penetrates relevant position hammering cylinder spacing hole 5, played anti-according to closure thickness requirement Only hammer the excessive effect of displacement.
Duct fast plugging device construction method, including following steps are lifted to described U-shaped beam:
Step 1:The less lower end of the diameter of rubber plugging block 1 is placed in hole for hoist 7.
Step 2:(it is typically designed requirement closure thickness according to required closure thickness and is not less than U-shaped girder span midsole plate thickness), Gag lever post 3 is inserted in corresponding hammering cylinder spacing hole 5, and ensures the exposed hammering segment distance of cylinder 4 one in the both ends of gag lever post 3.
Step 3:Lifting hammering cylinder 4, it is vertical to hammer rubber plugging block 1, until rubber plugging block 1 reaches in lifting duct 7 Relevant position.
Step 4:Into lifting duct 7, the slightly expanded concrete of perfusion label identical with beam body, duct inner concrete vibrate Afterwards, floating top surface concrete, duct plugging construction is completed.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model Within enclosing.

Claims (7)

1. a kind of U-shaped beam hole for hoist fast plugging device, it is characterised in that including rubber plugging block, hammer and gag lever post, institute The rubber plugging block stated is the cylindrical structural that a longitudinal section is inverted trapezoidal;Described hammer includes hammering cylinder, spacing hole With hammering handle, the hammering cylinder is upper and lower side closing, the cylindrical structural of inner hollow, and spacing hole, which is arranged on, to be hammered in cylinder Portion region, the spacing hole horizontal is through hammering cylinder, and the axis of spacing hole overlaps with hammering the diameter of cylinder, in the perpendicular of hammering cylinder Nogata sets a spacing hole every a segment distance upwards;Described hammering handle welds with hammer top surface;Described is spacing Bar is circular iron, and its length is slightly less than spacing bore dia slightly larger than the cm of hammering cylinder diameter about 15, diameter, and it is limited through insertion In the hole of position.
A kind of 2. U-shaped beam hole for hoist fast plugging device as claimed in claim 1, it is characterised in that described rubber closure Block lower end diameter is slightly less than lifting channel diameter, and upper end diameter is slightly larger than the lifting mm of channel diameter about 5, so that rubber blocks Block can stopper lifting duct.
A kind of 3. U-shaped beam hole for hoist fast plugging device as claimed in claim 1, it is characterised in that described hammering cylinder cylinder Wall thickness is about 1 cm, and external diameter is slightly less than lifting channel diameter, and upper handle is semilune structure, to facilitate hammering cylinder lift hammer Hit.
A kind of 4. U-shaped beam hole for hoist fast plugging device as claimed in claim 1, it is characterised in that described hammering cylinder limit Position hole every 4 cm in the middle part of hammering cylinder by upwards, setting one, spacing bore dia is about 8 mm.
A kind of 5. U-shaped beam hole for hoist fast plugging device as claimed in claim 1, it is characterised in that described spacing pole-footing According to closure thickness requirement, relevant position hammering cylinder spacing hole is penetrated, playing prevents from hammering the excessive effect of rubber plugging block displacement.
6. a kind of U-shaped beam hole for hoist fast plugging device as claimed in claim 1, it is characterised in that described hammering cylinder is Iron structure.
A kind of 7. U-shaped beam hole for hoist fast plugging device as claimed in claim 1, it is characterised in that described hammering handle For semi-circular shape handle made of iron.
CN201721192692.XU 2017-09-15 2017-09-15 A kind of U-shaped beam hole for hoist fast plugging device Active CN207193777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721192692.XU CN207193777U (en) 2017-09-15 2017-09-15 A kind of U-shaped beam hole for hoist fast plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721192692.XU CN207193777U (en) 2017-09-15 2017-09-15 A kind of U-shaped beam hole for hoist fast plugging device

Publications (1)

Publication Number Publication Date
CN207193777U true CN207193777U (en) 2018-04-06

Family

ID=61789454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721192692.XU Active CN207193777U (en) 2017-09-15 2017-09-15 A kind of U-shaped beam hole for hoist fast plugging device

Country Status (1)

Country Link
CN (1) CN207193777U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542036A (en) * 2017-09-15 2018-01-05 中铁十四局集团第五工程有限公司 A kind of U-shaped beam hole for hoist fast plugging device and construction method
CN109488765A (en) * 2019-01-07 2019-03-19 武汉船用机械有限责任公司 The stopple and installation method in blade lifting hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542036A (en) * 2017-09-15 2018-01-05 中铁十四局集团第五工程有限公司 A kind of U-shaped beam hole for hoist fast plugging device and construction method
CN107542036B (en) * 2017-09-15 2024-06-25 中铁十四局集团第五工程有限公司 Quick plugging device for U-shaped beam lifting hole and construction method
CN109488765A (en) * 2019-01-07 2019-03-19 武汉船用机械有限责任公司 The stopple and installation method in blade lifting hole
CN109488765B (en) * 2019-01-07 2020-11-03 武汉船用机械有限责任公司 Hole plug of blade hoisting hole and mounting method

Similar Documents

Publication Publication Date Title
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN107165272A (en) Prestressing force assembly concrete frame joint attachment structure and its construction method
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN108999076A (en) A kind of the class socket joint connection structure and its construction method of column and adjacent members
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN207193777U (en) A kind of U-shaped beam hole for hoist fast plugging device
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN106437033B (en) A kind of steel core concrete column embedded column base
CN208701729U (en) A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap
CN106869386A (en) A kind of recycled concrete superposed beam of high-strength construction waste and its construction method
CN109403366A (en) A kind of assembly concrete-filled steel tube pile foundation and its construction method
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN208668252U (en) Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame
CN103835728B (en) Method for pouring concrete into mid-board arch crown of multi-arch tunnel
CN206800164U (en) A kind of railway overhead station platform girder construction
CN207959224U (en) A kind of prefabricated pile extension cast-in-place node anchor structure of foundation pit enclosure structure
CN109577206A (en) Hollow High Pier formwork system and construction method
CN107542036A (en) A kind of U-shaped beam hole for hoist fast plugging device and construction method
CN106930308A (en) Pile tube and cushion cap attachment structure
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN108999077A (en) The circumferential weld connection structure and its circumferential weld connection method of prefabricated stand column and adjacent members
CN110158475A (en) A kind of prefabricated assembled bridge substructure and its construction method
CN103498572B (en) The construction method of the additional clamping plate beam of stone structure and clamping plate post ruggedized construction
CN208604479U (en) A kind of class socket joint connection structure of column and adjacent members
CN211735071U (en) Hollow high pier turnover mould system