CN207177428U - The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight - Google Patents
The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight Download PDFInfo
- Publication number
- CN207177428U CN207177428U CN201720322112.8U CN201720322112U CN207177428U CN 207177428 U CN207177428 U CN 207177428U CN 201720322112 U CN201720322112 U CN 201720322112U CN 207177428 U CN207177428 U CN 207177428U
- Authority
- CN
- China
- Prior art keywords
- market
- road
- overline bridge
- bicycle parking
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
A kind of tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight, across road, comprising:Car with four seats the library, a market body, four overline bridges, eight stair, four sets of laneway type pilers, four lifting elevators;It is in "+" font on top view, build idle space of the crossroad far from road surface certain altitude in, every road can accesses dolly;Solve many problems of " parking difficulty ", " building garage hardly possible ", " looking for parking stall hardly possible ", " driver does shopping difficult " and " it is difficult that pedestrian crosses road at the parting of the ways " simultaneously.
Description
Technical field
Vehicle parking equipment is the utility model is related to, belongs to dolly multi-storied garage.
Background technology
Largely enter the age of family in face of dolly, now dolly recoverable amount socially increasingly increases in geometry degree
It is long, cause substantial amounts of dolly in city nowhere to stop, it is difficult to form parking;Simultaneously current all kinds of multi-storied garages take city
Free space is very big, if the newly-built garage for solution " parking difficulty " problem, then newly-built garage will certainly be with substantial amounts of business
Domain is robbed with house building, enterprises and institutions, institutional settings, green coverage, public place and robs the useful space, is made already crowded
City can't bear the heavy load, cause bicycle parking storage capacity in city not increase, formed in city simultaneously in the presence of " parking difficulty " and " building garage
The difficult situation of hardly possible ";Crossroad is to gather around to hinder location the most serious especially in city:Substantial amounts of dolly is concentrated herein
Urgent need builds garage bicycle parking, substantial amounts of pedestrian converges transverse direction and crosses road, it is necessary to build overline bridge of passing by one's way, or build underpass herein,
And because urban land limitation can not solve, form city big problem urgently to be resolved hurrily.
The content of the invention
Therefore, the utility model provides a kind of tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight, overlook
It is in "+" font on figure, build idle space of the crossroad far from road surface certain altitude in, is provided simultaneously with dolly access, driver exists
Market is done shopping nearby crosses the multi-functional of road with pedestrian by overline bridge;All installation liftings on the right side of four roads at the parting of the ways
Elevator, every road can access dolly, so as to effectively solve bicycle parking, road inconvenience in pick-ups, and the road in city
On cruise look for parking stall caused by congestion in road problem;Therefore can in city newly-built certain amount this car of the present utility model
Storehouse, and solve " parking difficulty ", " build garage hardly possible ", " look for parking stall difficult ", " driver does shopping difficult " and " pedestrian's mistake at the parting of the ways simultaneously
Many problems of road hardly possible ".
Realization of the present utility model:
The utility model includes:Car with four seats the library, a market body, four overline bridges, eight stair, four sets of laneway type stackings
Machine, four lifting elevators.
Garage body, market body and overline bridge are the overhead for building road in across framework;Garage body includes:Bottom, bicycle parking layer, top
Layer;Garage body, the frame body of market body and overline bridge isolate column and road on both sides of the road vertical of center line by building the opposite road of garage in
Post is supported;Each support intercolumniation is connected by crossbeam, and crossbeam upper layer is formed with horizontal panel;Relative to every at crossroad
Road has a seat coach the library and overline bridge, and four roads share car with four seats the library and four overline bridges;On bottom per seat coach the library
Horizontal panel longitudinal direction(I.e. with the orthogonal direction relative to this road traffic direction, similarly hereinafter)The right-hand member to keep to the side is respectively formed with lifting and carried
The machine of liter operation hole;The longitudinal rail being provided with bottom horizontal panel in laneway type piler, carrier-and-stacker is provided with thereon,
Longitudinal rail supporting and constraint carrier-and-stacker make linear longitudinal movement;Bicycle parking layer is built on bottom, the beam column of bicycle parking layer and bottom
Structure is corresponding, and bicycle parking layer horizontal panel is reserving tunnel breach along longitudinal central axis line, longitudinally current for carrier-and-stacker;Bicycle parking layer
Along the right-hand member longitudinally to keep to the side, the horizontal panel inner surface position projected upward corresponding to bottom lifting elevator operation hole vertical
Put, there is the installation position of lifting lifting power and deceleration of motion part.
Market body build the central part surrounded by car with four seats the library and overline bridge in, connects through crossover-passing and garage body phase;Market
Body is made up of market Stall, market second floor, market stair and market top layer;Market building is used between market Stall and market second floor
Ladder connection;Market top layer is that planar structure is built on the second floor of market, is fixed by post and beam.
The car with four seats the library of the utility model narration and the electromechanics and control system all same of supporting lane stacker;
Four overline bridges and elevator all same of description.
The bottom of garage body, market Stall be below overline bridge crossroad road passage space;Per seat coach the library
Bottom, be formed with overline bridge between garage body and market Stall.
Four overline bridges are close to form back-shaped passage, another side and the plane on garage body bottom of overline bridge around market body surrounding
Connection;At every overline bridge handing-over angle, a half space is all had, its plane is docked with half space;In half space and ground
Stair are installed, plane is docked with half space on stair between face.
The number of plies of the bicycle parking layer of garage body is 1 to 5;Top layer is built on bicycle parking layer, and top panel is flat-head type structure, and place has
Rainwater slope;Top layer is corresponding with bicycle parking layer, bottom beam column construction.
All layers of garage body, market body and overline bridge are made entirety, or are assembled entirety by respective part, its structure
It is concrete structure, or steel structure.
Parking stall is all disposed with garage body bottom horizontal panel, bicycle parking layer horizontal panel, parking stall includes:Light rail and height
In the dolly supporting plane of light section rail level.
The utility model run Transport Vehicle and the supporting equipment of control be in the market using relatively broad mature and reliable
Laneway type piler a complete set of equipment, wherein:The Transport Vehicle human-computer dialogue window of control system is IC-card either man-machine interface;
Bottom is from the baseplane of Transport Vehicle to lift stroke terminal plane, and its lifting part is separately with lifting elevator.
Lifting hoist installation of the present utility model is under the bicycle parking layer horizontal panel of bottom;The volume of left and right ends
Cylinder capstan winch, and power section, close to bicycle parking layer horizontal panel, around reel capstan winch, down each connection lifts elevator to wirerope
Platform, lifting diverse location position sensor be housed, its elevating movement has vertical track constraint, for ease of express, accompanying drawing
Middle omission vertical track.
Lifting elevator of the present utility model includes:Motor, speed change gear, reel capstan winch.
Carrier-and-stacker described in the utility model includes:Stacking support, stacking vertical undercarriage, rail wheel;And laneway type stacking
Machine includes:Carrier-and-stacker, longitudinal rail, control system, man-machine interface.
Stacking vertical undercarriage in carrier-and-stacker is arranged on stacking support, can carry out vertical fortune relative to stacking support
It is dynamic;Carrier-and-stacker can be on bottom the flat lengthwise movement of the enterprising water-filling of longitudinal rail, this two operations do not interfere with each other, and are formed independent
Or the motion of synthesis.
Traversing intelligent vehicle traveling is on light rail, by piercing small car bottom picking-up or release dolly, before carry
The horizontal operation entered or retreated.
By lifting above and below the elevating movement on elevator and the longitudinal horizontal movement and stacking vertical undercarriage of carrier-and-stacker
Vertical resultant motion, and traversing intelligent vehicle relative to the transverse direction on vehicle-carrying plate and parking stall(Road direction, similarly hereinafter)Motion is folded
Add, realize the three-dimensional motion of traversing intelligent vehicle on devices, held up plus traversing intelligent vehicle and discharge dolly, reach accurate
Quick bicycle parking and the target picked up the car.
Vehicle-carrying plate is mounted on the platform of lifting elevator, on stacking vertical undercarriage.
Longitudinal rail on bottom horizontal plane matches with the rail wheel of carrier-and-stacker;Parking stall and the light rail on vehicle-carrying plate
The same gauge of same specification, and match with the rail wheel of traversing intelligent vehicle.
Electrical connection is carried out inside laneway type piler complete equipment.
Laneway type piler is carried out and electrically connected with elevator, lifting elevator.
Laneway type piler is carried out with position sensor and electrically connected.
Laneway type piler, elevator, lifting elevator are carried out with power frequency supply electrically connect respectively.
The beneficial effects of the utility model are:First, the utility model is across the garage of city road crossing, does not account for
With the useful space in city, it build in above road from the idle space of road surface certain altitude, for especially crowded city cross
For crossing, substantial amounts of bicycle parking position can be increased newly with newly-built a certain amount of garage;2nd, due to building on city road crossing
It is empty so that zero distance is realized on the current upper road of bicycle parking, pick-up and dolly, so traffic jam can be reduced in Transport Vehicle;3rd, vehicle
As usual it is current on the crossroad of urban road, garage Transport Vehicle and road in the normal Transport Vehicle in road overhead, garage
Traffic is independent of each other;4th, dolly driver congestion problems caused by it can not find empty parking space and cruised on road are reduced;5th, exist
While solving the problems, such as Transport Vehicle, solves the problems, such as pedestrian's crossover-passing;6th, it is inconvenient to solve driver's shopping.
Brief description of the drawings
Fig. 1 is that axle of the present utility model surveys schematic diagram.
Fig. 2 is vertical view schematic diagram of the present utility model.
Fig. 3 is main view schematic diagram of the present utility model.
Fig. 4 is the axle survey schematic diagram of the present utility model dismantled after garage body top layer, market top layer.
Fig. 5 be dismounting garage body top layer of the present utility model, bicycle parking layer, the parking stall on bicycle parking layer and dolly, market top layer,
Axle after market second floor and part market stair surveys schematic diagram.
In figure:1. bottom;2. bicycle parking layer;3. top layer;4. stair;5. market top layer;6. dolly;7. overline bridge;8. car
Position;9. longitudinal rail;10. stacking support;11. stacking vertical undercarriage;12. vehicle-carrying plate;13. wirerope;14. traversing intelligence
Car;15. lift elevator;16. market second floor;17. market Stall;18. market stair.
Embodiment
Embodiment 1:According to the width of city road crossing, select of the present utility model across road height and width
Degree, each upright post basic is handled well, makes each column, between the cylinder of each Self-stabilised post at left and right sides of road, with now
The form poured is by garage body bottom(1)Column it is cast-in-place to be overall by crossbeam.
In garage body bottom(1)After transverse beam curing period, reaches, cast-in-place overline bridge(7);Make business successively on this basis
Field Stall(17), market second floor(16), and in market Stall(17)With market second floor(16)Between make market stair(18);
Market second floor(16)Organizational system market top layer after curing period reaches(5).
Garage body bicycle parking layer(2)It is in bottom(1)Upper plane relevant position on, according to it is cast-in-place or assembling method system
Into;Top layer(3)And according to bicycle parking layer(2)Method be made.
Overline bridge(7)Half space be also made of according to it is cast-in-place or assembling method.
Longitudinal rail is installed in bottom upper horizontal plane(9), and laneway type piler and debugging a complete set of equipment are installed.
Installation lifting elevator(15):Wirerope is installed(13)Reel capstan winch, and power section, each it is arranged on garage body
Bicycle parking layer(3)The interior surface of top panel;End reel capstan winch each connects lifting wirerope(13), wirerope(13)The other end it is each
From with lifting elevator(15)Platform connects;In lifting elevator(15)Each self installation vehicle-carrying plate on platform(12);Lifting lifting
Machine(15)Up and down motion have that vertical is track restrained, for ease of expression, vertical track is omitted in accompanying drawing;Lift elevator(15)'s
Shut down exact position and be each equipped with position sensor, to provide position signalling to control system.
In garage body bottom(1)Both sides before and after the longitudinal axis position of horizontal panel, symmetrically assemble longitudinal rail(9), and
In stacking support installed above(10);Stacking vertical undercarriage is installed in the above again(11).
In overline bridge(7)Half space on ground stair are installed respectively(4), the stair of this example 1(4)It is ramp type handrail electricity
Ladder, it is for pedestrians.
Escalator slope escalator must be opened using preceding.
Bicycle parking:Motion and the bayonet socket of the control system in control machine equipment in translation garage are inserted with IC-card by bicycle parking people,
System reads bicycle parking signal, and red warning lamp is bright, dolly(6)Into parking mouth, emergency lock is put down;Then system is according to parking stall(8)
Vacant information, it is determined that specific parking stall(8);Operation program:1st, dolly(6)Into;2nd, according to voice message, bicycle parking person is by dolly
(6)Drive in storage, and be parked in lifting elevator(15)Upper vehicle-carrying plate(12)On accurate location;3rd, bicycle parking person leaves;4th, lifting carries
The machine of liter(15)Start and rise, when in vehicle-carrying plate thereon(12)Reach purpose parking stall(8)Upper horizontal plane plate, lift elevator
(15), lane stacker stacking vertical undercarriage(11)Upper vehicle-carrying plate(12)Light rail docking plane when, lifting lifting
Machine(15)Stop;5th, traversing intelligent vehicle(14)Carry dolly(6)Pass through vehicle-carrying plate(12), by lifting elevator(15)Upper arrival
Stacking vertical rises and falls vehicle frame(11)On;6th, carrier-and-stacker is along longitudinal rail(9)Horizontal movement, dolly(6)It is sent to system and selectes car
Position(8)Longitudinal accurate location;7th, traversing intelligent vehicle(14)Carry dolly(6)Pass through vehicle-carrying plate(12), drive to parking stall(8)'s
On light rail;8th, traversing intelligent vehicle(13)By dolly(6)It is sent to parking stall(8)On the accurate location of car supporting plane, release is small
Car(6)Playback;9th, red warning lamp is gone out, and emergency lock is opened.
Pick up the car:Motion and the bayonet socket of the control system in control machine equipment in translation garage are inserted with IC-card by bicycle parking people,
System reads pick-up signal, and the red warning lamp of pick-up is bright, and emergency lock is put down;Then system is according to the information of the bicycle parking, it is determined that
Specific parking stall(8), operation program:1st, traversing intelligent vehicle(14)Pass through vehicle-carrying plate(12)Into parking stall(8);2nd, traversing intelligent vehicle
(14)Carry dolly(6)Pass through vehicle-carrying plate(12), by parking stall(8)Reach the stacking vehicle frame of lane stacker(11)On;3rd, pass through
The stacking vertical undercarriage of lane stacker(11)Vertical motion, and the horizontal movement of carrier-and-stacker will be loaded with dolly(6)'s
Traversing intelligent vehicle(14)The lifting elevator of layer horizontal panel where being sent to bicycle parking(15)Run the accurate location in hole;4th, it is traversing
Intelligent vehicle(14)Carry dolly(6)Pass through vehicle-carrying plate(12), reach lifting elevator(15)On vehicle-carrying plate(12)On, and discharge
Dolly(6)Playback;5th, elevator is lifted(15)Drop to and reach garage body bottom(1)Pick-up plane;6th, system is confirmed to reach and taken
Behind facing position, pick-up person enters;7th, according to voice message, pick-up person is by dolly(6)Outbound is driven, red warning lamp is bright, small
Car(6)Roll parking mouth away from;8th, red warning lamp is gone out, and emergency lock is opened.
Whole system in bicycle parking, pick up the car in run action in, it is all linked with one another, in the operation of each program, in line with not doing
The principle related to, and safety interlock is carried out, can be with isolated operation, to save the time.
Intelligent travelling platform(14)By storage battery power supply, motor driving;Intelligent travelling platform(14)On battery by fixing
Juice point charges at any time.
For safety, emergency lock is the facility installed additional in addition, and signal realization action is gathered using photovoltaic, not with this
Utility model directly connects, so not expressing on the diagram.
Above-described simply specific embodiment of the present utility model, the example above illustrate not to reality of the present utility model
Matter Composition of contents limits, and the those of ordinary skill of affiliated technology after reading this specification can be to above-mentioned embodiment
Make an amendment or deform, without departing from spirit and scope of the present utility model.
Claims (4)
1. a kind of tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight, is in "+" font on top view, build cross in
Idle space of the crossing far from road surface certain altitude;Comprising:Car with four seats the library, a market body, four overline bridges(7), eight stair
(4), four sets of laneway type piler, four lifting elevators(15);It is characterized in that:Garage body, market body and overline bridge(7)It is to build in
The overhead of road is across framework;Garage body includes:Bottom(1), bicycle parking layer(2), top layer(3);Garage body, market body and overline bridge
(7)Frame body isolate the column of the column and road of center line on both sides of the road by building the opposite road of garage in and supported;Each support intercolumniation
It is connected by crossbeam, crossbeam upper layer is formed with horizontal panel;There is a seat coach the library relative to every road at crossroad
And overline bridge(7), four roads share car with four seats the libraries and four overline bridges(7);Per the bottom of seat coach the library(1)Upper horizontal plane plate is indulged
Lifting elevator is respectively formed with to the right-hand member to keep to the side(15)Run hole;In bottom(1)Laneway type piler is installed on horizontal panel
In longitudinal rail(9), carrier-and-stacker is installed thereon;Bicycle parking layer(2)It build bottom in(1)On, bicycle parking layer(2)With bottom
(1)Beam column construction it is corresponding, bicycle parking layer(2)Horizontal panel is reserving tunnel breach along longitudinal central axis line;Bicycle parking layer(2)Edge
The right-hand member longitudinally to keep to the side, corresponding to bottom(1)Lift elevator(15)Table in the horizontal panel that operation hole vertical projects upward
Face position, there is the installation position of lifting lifting power and deceleration of motion part;Market body is built in by car with four seats the library and overline bridge(7)Enclose
Into central part, through crossover-passing(7)Connect with garage body phase;Market body is by market Stall(17), market second floor(16), market building
Ladder(18)And market top layer(5)Formed;Market Stall(17)With market second floor(16)Between use market stair(18)Connection;Business
Field top layer(5)Market second floor is built in for planar structure(16)On, fixed by post and beam;The bottom of garage body(1), market Stall
(17)With overline bridge(7)Below be crossroad road passage space;Per the bottom of seat coach the library(1), against garage body with
Market Stall(17)Between be formed with overline bridge(7);Four overline bridges(7)It is close to form back-shaped passage, overline bridge around market body surrounding(7)
Another side and garage body bottom(1)Upper plane connection;Every overline bridge(7)Join at angle, all have a half space, it is flat
Docked with half space in face;Stair are installed between half space and ground(4), stair(4)Upper plane is docked with half space;
The bicycle parking layer of garage body(2)The number of plies be 1 to 5;Top layer(3)It build bicycle parking layer in(2)On, top panel is flat-head type structure;Top
Layer(3)With bicycle parking layer(2), bottom(1)Beam column construction is corresponding;All layers of garage body, market body and overline bridge(7)Entirety is made,
Or be assembled entirety by respective part, its structure is concrete structure, or steel structure;Stair(4)It is ramp type handrail elevator;
Electrical connection is carried out inside laneway type piler complete equipment;Laneway type piler and elevator, lifting elevator(15)Implementation is electrically connected
Connect;Laneway type piler is carried out with position sensor and electrically connected;Laneway type piler, elevator, lifting elevator(15)Respectively with
Power frequency supply carries out electrical connection.
2. the tower wagon storehouse of cross road according to claim 1 crossing tunnel stacking layers market overline bridge eight, it is characterized in that:Garage
Body bottom(1)Horizontal panel, bicycle parking layer(2)Parking stall is all disposed with horizontal panel(8), parking stall(8)Including:Light rail and height
In the dolly of light section rail level(6)Supporting plane.
3. the tower wagon storehouse of cross road according to claim 1 crossing tunnel stacking layers market overline bridge eight, it is characterized in that:Rising
Elevator drops(15)Platform on, stacking vertical undercarriage(11)On be mounted on vehicle-carrying plate(12).
4. the tower wagon storehouse of cross road according to claim 1 crossing tunnel stacking layers market overline bridge eight, it is characterized in that:Bottom
(1)Longitudinal rail on horizontal plane(9)Match with the rail wheel of carrier-and-stacker;Parking stall(8)With vehicle-carrying plate(12)On light section
The same gauge of rail same specification, and with traversing intelligent vehicle(14)Rail wheel match.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720322112.8U CN207177428U (en) | 2017-03-30 | 2017-03-30 | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720322112.8U CN207177428U (en) | 2017-03-30 | 2017-03-30 | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207177428U true CN207177428U (en) | 2018-04-03 |
Family
ID=61732438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720322112.8U Expired - Fee Related CN207177428U (en) | 2017-03-30 | 2017-03-30 | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207177428U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836954A (en) * | 2017-03-30 | 2017-06-13 | 湖北赛尔智能科技股份有限公司 | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight |
-
2017
- 2017-03-30 CN CN201720322112.8U patent/CN207177428U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836954A (en) * | 2017-03-30 | 2017-06-13 | 湖北赛尔智能科技股份有限公司 | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106337580A (en) | Stacking single-layer over-bridge garage crossing road tunnel | |
CN103147600B (en) | Method for using miniature open stereo garage arranged by narrow and small roadside | |
CN100411940C (en) | Multiplexing method of traffic road space and its upper vehicle | |
CN106545206A (en) | Across road translation bilateral access garage | |
CN207177428U (en) | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight | |
CN207194548U (en) | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge four | |
CN110886168A (en) | Rapid public transportation system based on double-layer viaduct | |
CN207194549U (en) | The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge eight | |
CN106930586A (en) | Across road vertical lift translation individual layer overline bridge garage | |
CN207194547U (en) | The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge four | |
CN207194550U (en) | The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge eight | |
CN207194551U (en) | The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge four | |
CN207194572U (en) | The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge four | |
CN207194600U (en) | The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge eight | |
CN106836954A (en) | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight | |
CN107035181A (en) | The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge four | |
CN107035183A (en) | The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge eight | |
CN107035182A (en) | The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge four | |
CN106884556A (en) | The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge four | |
CN107035185A (en) | The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge eight | |
CN204139677U (en) | The underground garage that roadside strip people car is upper and lower altogether | |
CN204826804U (en) | Big -and -middle -sized vehicle stereo garage with overhaul layer | |
CN106907052A (en) | The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge eight | |
CN107035184A (en) | The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge four | |
CN209324085U (en) | Overhead parking field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180403 Termination date: 20200330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |