CN207164220U - A kind of EC motors/blower fan dispatches from the factory automatic detection test device - Google Patents

A kind of EC motors/blower fan dispatches from the factory automatic detection test device Download PDF

Info

Publication number
CN207164220U
CN207164220U CN201721092664.0U CN201721092664U CN207164220U CN 207164220 U CN207164220 U CN 207164220U CN 201721092664 U CN201721092664 U CN 201721092664U CN 207164220 U CN207164220 U CN 207164220U
Authority
CN
China
Prior art keywords
test
motors
load
blower fan
test cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721092664.0U
Other languages
Chinese (zh)
Inventor
李敬妙
孙磊
王会闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tongye Electrical Manufacturing Co Ltd
Original Assignee
Shijiazhuang Tongye Electrical Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tongye Electrical Manufacturing Co Ltd filed Critical Shijiazhuang Tongye Electrical Manufacturing Co Ltd
Priority to CN201721092664.0U priority Critical patent/CN207164220U/en
Application granted granted Critical
Publication of CN207164220U publication Critical patent/CN207164220U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

A kind of EC motors/blower fan automatic detection test device of dispatching from the factory includes D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf test cell, alternating current-direct current voltage-withstand test unit, industrial computer and power supply.Industrial computer control D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf test cell, startup, closing and the operational factor of alternating current-direct current voltage-withstand test unit, receive D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf test cell, the output data of alternating current-direct current voltage-withstand test unit.Using two sets of no-load/load measuring instrumentss, the input and output end gathered data simultaneously of EC blower fans/electric machine controller are realized, improves the promptness of data acquisition.Whole system realizes the Automated condtrol of system test overall process and the automatic feedback of test result of EC motors/blower fan, avoids the management risk and potential safety hazard of artificial detection.

Description

A kind of EC motors/blower fan dispatches from the factory automatic detection test device
Technical field
The present invention relates to motor/fan test technical field, and in particular to a kind of EC motors/blower fan dispatch from the factory automatic detection survey Trial assembly is put.
Background technology
EC(Electrical Commutation electronics commutations, abbreviation EC)Motor/blower fan needs after the completion of the manufacturing To be tested before dispatching from the factory, to detect it for country or the compliance of professional standard.Prior art, which needs to rely on, manually to be made The test event as defined in detection device one by one examination criteria, tedious process, and controller input and output end can not be accomplished Data detect simultaneously.In addition, EC motors/blower fan dispatch from the factory before test, it is necessary to be carried out under energization running status, manual testing deposits In potential safety hazard.
The content of the invention
The application provides a kind of EC motors/blower fan and dispatched from the factory automatic detection test device, can realize the straight of EC motors/blower fan Leakage resistance test, megger test and alternating current-direct current voltage-withstand test, and no-load/load test and the anti-electricity of EC motors/blower fan Gesture is tested, and realizes the Automated condtrol of test process and the automatic feedback of test result.The technical scheme of the application is such as Under:
A kind of EC motors/blower fan dispatches from the factory automatic detection test device, including:D.C. resistance test cell, for testing EC The D.C. resistance of the winding of motor/blower fan;Megger test unit, between the winding and shell of EC motors/blower fan Load a DC voltage and detect the insulaion resistance between the winding and shell of the EC motors/blower fan;No-load/load test is single Member, for the electrical parameter in EC motors described in EC empty load of motor runtime tests, while gather the controller of the EC motors The data of input and output end;For the electrical parameter in EC blower fans described in EC fans load runtime tests, while gather institute State the input of the controller of EC blower fans and the data of output end;Back-emf test cell, for breaking in the EC motors/blower fan Electric moment tests its back-emf;Alternating current-direct current voltage-withstand test unit, for being loaded between the controller and shell of EC motors/blower fan One DC voltage and the leakage current for detecting the EC motors/blower fan;Add between the winding and shell of the EC motors/blower fan Carry an alternating voltage and detect the leakage current of the EC motors/blower fan;Industrial computer, for controlling the D.C. resistance test single Member, megger test unit, no-load/load test cell, back-emf test cell, alternating current-direct current voltage-withstand test unit open Dynamic, closing and operational factor, receive the D.C. resistance test cell, megger test unit, no-load/load test list The output data of member, back-emf test cell and alternating current-direct current voltage-withstand test unit;Power supply, it is single for being tested for the D.C. resistance Member, megger test unit, no-load/load test cell, back-emf test cell, alternating current-direct current voltage-withstand test unit and industry control Machine provides working power, and provides test power supply for the EC motors/blower fan.
Further, D.C. resistance test cell includes instrument for measuring DC resistance.
Further, megger test unit includes the pressure-resistant Insulation Resistance Tester of alternating current-direct current.
Further, no-load/load test cell includes two sets of power meter/voltameters, sensors.
Further, back-emf test cell includes Hall sensor and ammeter.
Further, alternating current-direct current voltage-withstand test unit includes the pressure-resistant Insulation Resistance Tester of alternating current-direct current.
Further, alternating current-direct current voltage-withstand test unit also includes overcurrent protective device, and the overcurrent protective device is used for The leakage current cuts off the survey loaded between the controller or winding and shell of the EC motors/blower fan when reaching a setting value Try voltage.
Further, power supply includes:220V single phase alternating current power supplies and air switch with ground wire, the 220V single phase acs Power supply connects the D.C. resistance test cell, megger test unit, no-load/load test cell, anti-electricity through air switch The power input of gesture test cell, alternating current-direct current voltage-withstand test unit and industrial computer;380V three-phase alternating-current supplies, the second air are opened Close and pressure regulator, the 380V three-phase alternating-current supplies connect the power supply of EC motors/blower fan through the second air switch and pressure regulator successively Input.
Further, D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf are surveyed Examination unit and alternating current-direct current voltage-withstand test unit are communicated by 232 interfaces with the industrial computer respectively.
Further, device also includes rack, operating desk, feed roller, discharge roller;The D.C. resistance test cell, absolutely Edge resistance test unit, no-load/load test cell, back-emf test cell, alternating current-direct current voltage-withstand test unit and industrial computer Main frame is integrally disposed in the rack and corresponding test port is drawn into rack by lead;The display of the industrial computer It is arranged on a panel of rack;The operating desk is arranged on the front of the panel of the display equipped with industrial computer on rack, The keyboard and mouse of the industrial computer are arranged on the operating desk;The feed roller and discharge roller are arranged on the one of the rack Side.
Dispatch from the factory automatic detection test device according to above-mentioned EC motors/blower fan, D.C. resistance is surveyed due to being configured with industrial computer Try unit, megger test unit, no-load/load test cell, back-emf test cell and alternating current-direct current voltage-withstand test unit Startup, closing and operational factor automatically controlled, and the test the data obtained of above test cell is automatically transmitted to work Control machine stores and display so that realizes the Automated condtrol of overall process for the system test of EC motors/blower fan and test is tied The automatic feedback of fruit, avoid the management risk and potential safety hazard of artificial detection.Particularly no-load/load test cell, change Prior art can not detect the situation of data simultaneously in the input and output end of the controller of EC motors/blower fan.In addition, hand over DC break down voltage test cell is additionally arranged on the basis of prior art only carries out the industrial frequency withstand voltage test of motor/fan body The DC break down voltage of the controller of EC motors/blower fan is tested.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is the structural representation of embodiment two.
Embodiment
The present invention is described in further detail below by embodiment combination accompanying drawing.Surveyed in EC motors/blower fan Before examination, required various detecting instruments are all connected into lead, the unlatching of various detecting instruments is uniformly controlled by computer, closed And service data, and collecting test data, staff's hot line job can be avoided, improves the complete machine detection of EC motors/blower fan Security, and whole test events are once completed, improve operating efficiency.
Embodiment one:
Based on above inventive concept, embodiment one provides a kind of EC motors/blower fan and dispatched from the factory automatic detection test device, please With reference to figure 1, it includes D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf test Unit, alternating current-direct current voltage-withstand test unit, industrial computer and power supply.It should be noted that do not occur power supply in Fig. 1.
D.C. resistance test cell is used for the D.C. resistance for testing the winding of EC motors/blower fan.In a specific real-time mode In, D.C. resistance test cell is TH2516 type instrument for measuring DC resistance.
Megger test unit is used to load a DC voltage between the winding and shell of EC motors/blower fan and detect Insulaion resistance between the winding and shell of EC motors/blower fan.In a specific real-time mode, megger test unit is TH9201 type alternating current-direct currents are pressure-resistant Insulation Resistance Tester.When carrying out megger test, in the winding and shell of EC motors/blower fan Between the DC voltage that is loaded be 500V or 1000V.
No-load/load test cell is used for the electrical parameter in EC empty load of motor runtime test EC motors, while gathers institute State the input of the controller of EC motors and the data of output end;It is additionally operable to the electricity in EC fans load runtime test EC blower fans Parameter, while gather the input of the controller of EC blower fans and the data of output end.In a specific embodiment, no-load/load Test cell includes 1 set of ZWD433B voltameter, sensor and 1 set of WT330 power meters, Hall sensor.ZWD433B voltameters, Sensor is used for electrical parameter of the Mersure Controler input from common frequency power network, including power, electric current, voltage, frequency; WT330 power meters, Hall sensor are used for the electrical parameter of Mersure Controler output, including power, electric current, voltage, frequency.When When EC electrical powers are run, data acquisition instructions are simultaneously emitted by power meter and voltameter by industrial computer, then power meter and electricity Scale acts simultaneously, data acquisition, and by the data feedback of collection to industrial computer.No-load/load test cell is in EC wind Machine be powered operation when test to the electrical parameters of EC blower fans, electric parameters testing phase when principle is run with it to EC electrical powers Together, to avoid repeating, will not be repeated here.
Back-emf test cell is used to test its back-emf in EC motors/blower fan power-off.In a specific real-time mode, Back-emf test cell includes Hall sensor and ammeter.
Alternating current-direct current voltage-withstand test unit is used to load a DC voltage simultaneously between the controller and shell of EC motors/blower fan The leakage current of EC motors/blower fan is detected, and loads an alternating voltage between the winding and shell of EC motors/blower fan and examines Survey the leakage current of EC motors/blower fan.In a specific real-time mode, alternating current-direct current voltage-withstand test unit is TH9201 type alternating current-direct currents Pressure-resistant Insulation Resistance Tester.For protection equipment, avoid leakage current excessive and EC motors/blower fan and test equipment are caused to damage Bad, in another specific real-time mode, alternating current-direct current voltage-withstand test unit is additionally arranged overcurrent protective device.Overcurrent protective device is used for The alternating voltage loaded when leakage current reaches a setting value between the winding and shell of cut-out test EC motors/blower fan, i.e., Cut off the work of alternating current-direct current voltage-withstand test unit.During alternating current-direct current voltage-withstand test, the institute between the winding and shell of EC motors/blower fan The alternating voltage of loading, according to the relevant criterion requirement of electromechanical testing.
Industrial computer is used to controlling D.C. resistance test cell, megger test unit, no-load/load test cell, anti- Startup, closing and the operational factor of potential test unit, alternating current-direct current voltage-withstand test unit, receive D.C. resistance test cell, absolutely Edge resistance test unit, no-load/load test cell, the output number of back-emf test cell and alternating current-direct current voltage-withstand test unit According to.D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf test cell and alternating current-direct current Voltage-withstand test unit is communicated by 232 interfaces with industrial computer respectively.
Power supply is used for for D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf Test cell, alternating current-direct current voltage-withstand test unit and industrial computer provide working power, and provide test electricity for EC motors/blower fan Source.In an embodiment, power supply includes 220V single phase alternating current power supplies and air switch with ground wire, for for direct current Hinder test cell, megger test unit, no-load/load test cell, back-emf test cell, alternating current-direct current voltage-withstand test list Member and industrial computer provide working power.220V single phase alternating current power supplies connect D.C. resistance test cell, insulaion resistance through air switch Test cell, no-load/load test cell, back-emf test cell, the power supply of alternating current-direct current voltage-withstand test unit and industrial computer are defeated Enter end.Power supply also includes 380V three-phase alternating-current supplies, the second air switch and pressure regulator, for providing survey for EC motors/blower fan Try power supply.380V three-phase alternating-current supplies connect the power input of EC motors/blower fan through the second air switch and pressure regulator successively.
EC motors/blower fan that embodiment one is provided dispatches from the factory automatic detection test device can be to the whole of EC motors/blower fan Machine, including motor/fan body and controller, are tested.Before testing, the wiring of each test equipment is accomplished manually, is It is electric in test device, then control work and the operational factor of each test equipment one by one by industrial computer, be automatically performed test.One Aspect, improve the operating efficiency of test;On the other hand, artificial hot line job is avoided, improves the security of detection work.
Embodiment two:
Embodiment two provides a kind of EC motors/blower fan and dispatched from the factory automatic detection test device, includes the whole of embodiment one Component or unit, and annexation is identical with embodiment one, to avoid repeating, will not be repeated here.What embodiment two was provided EC motors/blower fan automatic detection test device of dispatching from the factory also includes rack 1, operating desk 2, feed roller 3 and discharge roller 4, refer to figure 2.D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf test cell, alternating current-direct current are resistance to The main frame of pressure test cell and industrial computer is integrally disposed in rack 1 and draws rack by lead by corresponding test port. The display 5 of industrial computer is arranged on a panel of rack 1.Operating desk 2 is arranged on the display that industrial computer is housed on rack 1 The front of 5 panel.The keyboard and mouse of industrial computer are arranged on operating desk 2.Feed roller 3 and discharge roller 4 are arranged on rack 1 Side.
Use above specific case is illustrated to the present invention, is only intended to help and is understood the present invention, not limiting The system present invention.For those skilled in the art, according to the thought of the present invention, can also make some simple Deduce, deform or replace.

Claims (10)

  1. The automatic detection test device 1. a kind of EC motors/blower fan dispatches from the factory, it is characterised in that including:
    D.C. resistance test cell, the D.C. resistance of the winding for testing EC motors/blower fan;
    Megger test unit, for loading a DC voltage between the winding and shell of EC motors/blower fan and detecting institute State the insulaion resistance between the winding and shell of EC motors/blower fan;
    No-load/load test cell, for the electrical parameter in EC motors described in EC empty load of motor runtime tests, while gather institute State the input of the controller of EC motors and the data of output end;For in EC blower fans described in EC fans load runtime tests Electrical parameter, while gather the input of controller and the data of output end of the EC blower fans;
    Back-emf test cell, for testing its back-emf in the EC motors/blower fan power-off;
    Alternating current-direct current voltage-withstand test unit, for loading a DC voltage between the controller and shell of EC motors/blower fan and examining Survey the leakage current of the EC motors/blower fan;An alternating voltage is loaded between the winding and shell of the EC motors/blower fan simultaneously Detect the leakage current of the EC motors/blower fan;
    Industrial computer, for controlling the D.C. resistance test cell, megger test unit, no-load/load test cell, anti- Startup, closing and the operational factor of potential test unit, alternating current-direct current voltage-withstand test unit, it is single to receive the D.C. resistance test Member, megger test unit, no-load/load test cell, back-emf test cell and alternating current-direct current voltage-withstand test unit it is defeated Go out data;
    Power supply, for for the D.C. resistance test cell, megger test unit, no-load/load test cell, back-emf Test cell, alternating current-direct current voltage-withstand test unit and industrial computer provide working power, and provide test for the EC motors/blower fan Power supply.
  2. The automatic detection test device 2. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that the direct current Resistance test cell includes instrument for measuring DC resistance.
  3. The automatic detection test device 3. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that the insulated electro Resistance test cell includes the pressure-resistant Insulation Resistance Tester of alternating current-direct current.
  4. The automatic detection test device 4. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that described unloaded/negative Carrying test cell includes two sets of power meter/voltameters, sensors.
  5. The automatic detection test device 5. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that the back-emf Test cell includes Hall sensor and ammeter.
  6. The automatic detection test device 6. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that the alternating current-direct current Voltage-withstand test unit includes the pressure-resistant Insulation Resistance Tester of alternating current-direct current.
  7. The automatic detection test device 7. EC motors/blower fan as claimed in claim 6 dispatches from the factory, it is characterised in that the alternating current-direct current Voltage-withstand test unit also includes overcurrent protective device, and the overcurrent protective device is used to reach a setting value in the leakage current When cut off the test voltage loaded between the controller or winding and shell of the EC motors/blower fan.
  8. The automatic detection test device 8. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that the power supply bag Include:
    220V single phase alternating current power supplies and air switch with ground wire, the 220V single phase alternating current power supplies connect described straight through air switch Leakage resistance test cell, megger test unit, no-load/load test cell, back-emf test cell, alternating current-direct current is pressure-resistant survey Try the power input of unit and industrial computer;
    380V three-phase alternating-current supplies, the second air switch and pressure regulator, the 380V three-phase alternating-current supplies are successively through the second air Switch and pressure regulator connect the power input of EC motors/blower fan.
  9. The automatic detection test device 9. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that the direct current Hinder test cell, megger test unit, no-load/load test cell, back-emf test cell and alternating current-direct current voltage-withstand test Unit is communicated by 232 interfaces with the industrial computer respectively.
  10. The automatic detection test device 10. EC motors/blower fan as claimed in claim 1 dispatches from the factory, it is characterised in that also including machine Cabinet, operating desk, feed roller, discharge roller;The D.C. resistance test cell, megger test unit, no-load/load test are single The main frame of member, back-emf test cell, alternating current-direct current voltage-withstand test unit and industrial computer is integrally disposed in the rack and passed through Corresponding test port is drawn rack by lead;The display of the industrial computer is arranged on a panel of rack;The behaviour The front of the panel of the display equipped with industrial computer on rack is arranged on as platform, the keyboard and mouse of the industrial computer are arranged on institute State on operating desk;The feed roller and discharge roller are arranged on the side of the rack.
CN201721092664.0U 2017-08-29 2017-08-29 A kind of EC motors/blower fan dispatches from the factory automatic detection test device Active CN207164220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721092664.0U CN207164220U (en) 2017-08-29 2017-08-29 A kind of EC motors/blower fan dispatches from the factory automatic detection test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721092664.0U CN207164220U (en) 2017-08-29 2017-08-29 A kind of EC motors/blower fan dispatches from the factory automatic detection test device

Publications (1)

Publication Number Publication Date
CN207164220U true CN207164220U (en) 2018-03-30

Family

ID=61718800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721092664.0U Active CN207164220U (en) 2017-08-29 2017-08-29 A kind of EC motors/blower fan dispatches from the factory automatic detection test device

Country Status (1)

Country Link
CN (1) CN207164220U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508362A (en) * 2018-04-10 2018-09-07 青岛艾普智能仪器有限公司 A kind of motor comprehensive test instrument device test module
CN108872857A (en) * 2018-07-26 2018-11-23 中国大唐集团科学技术研究院有限公司西北分公司 A kind of generator scene mixing pressure test device and method
CN111075743A (en) * 2019-11-27 2020-04-28 宁波奥克斯电气股份有限公司 Automatic test method and test device for fan reliability
CN112198431A (en) * 2020-09-30 2021-01-08 广东奥科伟业科技发展有限公司 Opening and closing curtain motor test system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508362A (en) * 2018-04-10 2018-09-07 青岛艾普智能仪器有限公司 A kind of motor comprehensive test instrument device test module
CN108872857A (en) * 2018-07-26 2018-11-23 中国大唐集团科学技术研究院有限公司西北分公司 A kind of generator scene mixing pressure test device and method
CN111075743A (en) * 2019-11-27 2020-04-28 宁波奥克斯电气股份有限公司 Automatic test method and test device for fan reliability
CN112198431A (en) * 2020-09-30 2021-01-08 广东奥科伟业科技发展有限公司 Opening and closing curtain motor test system
CN112198431B (en) * 2020-09-30 2024-04-16 广东奥科伟业科技发展有限公司 Motor test system for opening and closing curtain

Similar Documents

Publication Publication Date Title
CN207164220U (en) A kind of EC motors/blower fan dispatches from the factory automatic detection test device
CN101330224B (en) Uninterrupted power source
CN104515928B (en) The apparatus and method that earth fault position in electric motor drive system determines
EP2482411A1 (en) Drive Failure Protection
RU2014103627A (en) SYSTEM, COMPUTER SOFTWARE PRODUCT AND METHOD FOR DETECTING INTERNAL MALFUNCTIONS OF WINDING OF THE SYNCHRONOUS GENERATOR
EP2737328A1 (en) Systems and apparatus for fault detection in dc power sources using ac residual current detection
CN207473070U (en) A kind of energy-saving direct-current power source aging experimental rig
CN102890247B (en) Testing system of uninterruptible power supply and testing method thereof
CN103105557A (en) Method and device of high-tension switch cabinet multi-fault diagnosis
CN105548763A (en) Electric automobile and test system for electric automobile
CN203337792U (en) Motor type test system
EP2390619A1 (en) Gap-measuring apparatus and method
CN114518534A (en) Control method and controller
CN105866704A (en) Special test load box for UPSs (uninterruptable power supplies)
CN206339630U (en) A kind of low voltage motor test system
CN213600804U (en) Comprehensive environment testing system of four-quadrant frequency converter
CN102226773B (en) Test bench for X-ray detection apparatuses
CN205844502U (en) A UPS power special test load box
KR20160058276A (en) Portable Multifunctional Diagnosis Apparatus For Battery Energy Storage System
CN108631322A (en) Electrical load selectivity off-grid system and method
CN210270042U (en) Direct current defect eliminating device
CN108475916A (en) Power inverter and power supply system
CN221351626U (en) Mining explosion-proof high-voltage combined frequency converter test device
CN207232276U (en) Universal breaker, air switch, overcurrent protective device high-current test frock
CN104701817B (en) Motor control assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant