CN207161103U - A kind of internal model steel pipe support integral slipping structure - Google Patents

A kind of internal model steel pipe support integral slipping structure Download PDF

Info

Publication number
CN207161103U
CN207161103U CN201720692523.6U CN201720692523U CN207161103U CN 207161103 U CN207161103 U CN 207161103U CN 201720692523 U CN201720692523 U CN 201720692523U CN 207161103 U CN207161103 U CN 207161103U
Authority
CN
China
Prior art keywords
vertical rod
steel
shoulder pole
internal model
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720692523.6U
Other languages
Chinese (zh)
Inventor
张正金
张惠元
曾权仁
潘寿东
周通
章正贤
高永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201720692523.6U priority Critical patent/CN207161103U/en
Application granted granted Critical
Publication of CN207161103U publication Critical patent/CN207161103U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to building field, and in particular to a kind of internal model steel pipe support integral slipping structure.Including the support being made up of vertical rod, cross bar, cradle top and the jacking and collet of bottom are detachably arranged at respectively, the track on bottom plate, coordinates the support moving assembly for erecting support and making support be slid along track with track;The support moving assembly includes being inserted in the I-steel that the frame bottom is used to erect frame bottom cross bar, is vertical at the shoulder pole girder of I-steel bottom, and the wheel group coordinated on the shoulder pole girder with the track.The vertical rod bottom is provided with carrying sleeve of be socketed with the screw mandrel of the collet and diameter more than vertical rod main diameter along vertical rod length direction, and the collet also includes the adjustment swivel nut of the carrying sleeve bottom is spirally connected and be butted on the screw mandrel.Internal model steel pipe support integral slipping technology.This technology effectively shortens the time built needed for internal mould supporter, accelerates construction speed, while saved project cost.

Description

A kind of internal model steel pipe support integral slipping structure
Technical field
The invention belongs to building field, and in particular to a kind of internal model steel pipe support integral slipping structure.
Background technology
The slope excavating load construction side wall and during top plate in subaqueous tunnel, existing most economical feasible scheme is to use waterproof Punching split bolt, i.e., for supporting multi-point punching split bolt between the outer stupefied support of external mold and internal mould supporter system Connection, then carries out concreting, this method carry out next section pour when need internal mould supporter integral demounting and then exist Next section is built, and engineering time length, intensity is big, and efficiency is low.What internal mould supporter was typically formed using steel pipe support and bowl buckle support Sectional shelf-unit.Existing the applicant is used without to pull bar formwork system, but still suffers from that internal mould supporter stress is larger, and rod member used is more, Take that to tear speed open slow, and worker's labor intensity when adjusting support is big.
The content of the invention
The purpose of the present invention is to provide a kind of internal model steel pipe support integral slipping structure regarding to the issue above.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of internal model steel pipe support integral slipping structure, including the support being made up of vertical rod, cross bar, removably set respectively Jacking and collet in cradle top and bottom, the track on bottom plate, coordinate with track for erecting support and making support The support moving assembly slid along track;The support moving assembly includes being inserted in the frame bottom for erecting support bottom The I-steel of portion's cross bar, the shoulder pole girder of I-steel bottom is vertical at, and coordinated on the shoulder pole girder with the track Wheel group.
Preferably, the vertical rod bottom is big provided be socketed with the screw mandrel of the collet and diameter along vertical rod length direction In the carrying sleeve of vertical rod main diameter, the collet also includes the carrying sleeve bottom is spirally connected and be butted on the screw mandrel Adjust swivel nut.
Preferably, also it is removably attached to the splicing sleeve between the collet and the vertical rod respectively by both ends Pipe is connected the stage to be formed and the connector connection on the screw mandrel position of adjustment swivel nut bottom with vertical rod.
Preferably, the connector, which is both ends, is set around steel wire on screw mandrel and vertical rod, or both ends are with can be caught in The collar of bayonet socket on the screw mandrel and vertical rod, centre are the steel bar of two collars of connection or the part that is connected together of connecting rope.
Preferably, when being steel bar among the part that is connected together, the collar of bottom is integrally affixed with the steel bar, top The collar be adjustably connected with the steel bar, be also fixed with the outside of the collar and engage and in ring with the steel bar interference The small collar of opening provided with one layer of anti-skid rubber cushion, the steel bar top are densely covered with anti-skid bulge, and the projection is salient point or edge Steel bar is circumferential and horizontally disposed a plurality of double wedge circle.
Preferably, shoulder pole girder both ends plan vertical is set up in shoulder pole girder length direction balanced support steel bar, institute Balanced support steel bar at least both ends are stated removably to be connected with vertical rod.
It is used to pass roller preferably, the wheel group is resisted against on the shoulder pole soffit including top plate, bottom is open And the wheel carrier frame of direction along ng a path both ends open.
Preferably, a roller is symmetrically respectively provided with the openend of wheel carrier frame two, on the outside of the wheel carrier frame both sides side plate Symmetrical each solid welding has two spacer bars erected, coordinates wheel carrier frame top plate to be formed between the spacer bar of the same side and is used for Positioning sets up the notch of shoulder pole girder.
Preferably, the spacer bar positioned at wheel carrier frame both sides is gradually outward-dipping from perpendicular to track length from top to bottom Direction is looked in inverted splayed.
Preferably, top at least exceeds the shoulder pole girder position between the corresponding spacer bar of wheel carrier frame both sides Spacing be more than the bottom steel plate width of the I-steel, middle part, which corresponds to the shoulder pole girder region and is connected with, pins down steel bar;Positioned at same Between the spacer bar of side the bar shaped ring set that the spacer bar is entangled at both ends is also associated with the top of shoulder pole girder.
In summary, the invention has the advantages that:
1st, internal model steel pipe support integral slipping technology.This technology effectively shortens the time built needed for internal mould supporter, adds Fast construction speed, while project cost has been saved, improve labor strength.
2nd, the application realizes the integral slipping of internal model steel pipe support by shaped steel, track, wheel group etc., with accelerate construct into Degree, mitigate labor strength.
3rd, the application supports big moving assembly simple in construction, stress equalization, support force, Stability Analysis of Structures, easy for installation, sliding Efficiency high, cost are low.
Brief description of the drawings
Fig. 1 is the application structural representation;
Fig. 2 is that the application supports moving assembly structural representation one;
Fig. 3 is that the application supports moving assembly structural representation two.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.
Embodiment one:
A kind of internal model steel pipe support integral slipping method takes the internal model steel pipe support integral slipping structure of composition, including by standing The support that bar 1, cross bar 2 form, is detachably arranged at cradle top and the jacking 3 and collet 4 of bottom, on bottom plate respectively Track 7, coordinate the support moving assembly for erecting support and making support be slid along track with track;The support moving assembly The I-steel 5 for erecting frame bottom cross bar including being inserted in the frame bottom to be used for, it is vertical at the shoulder pole of I-steel bottom Beam 6, and the wheel group coordinated on the shoulder pole girder with the track.
The vertical rod bottom is provided be socketed with the screw mandrel 41 of the collet and diameter along vertical rod length direction and is more than vertical rod The carrying sleeve 11 of main diameter, the collet also include the adjustment of the carrying sleeve bottom is spirally connected and be butted on the screw mandrel Swivel nut 42, also it is removably attached to the carrying sleeve between the collet and the vertical rod respectively by both ends and connects with vertical rod Connect the stage to be formed and the connector connection on the screw mandrel position of adjustment swivel nut bottom.
The connector is that both ends are set around steel wire on screw mandrel and vertical rod, or both ends be with can be caught in the screw mandrel and The collar of bayonet socket in vertical rod, centre are the steel bar 12 of two collars of connection or the part that is connected together of connecting rope;It is described to be connected together When being steel bar among part, the collar of bottom is integrally affixed with the steel bar, and the collar at top adjustably coordinates with the steel bar Connection, the collar outside are also fixed with the small set of opening for engaging with the steel bar interference and one layer of anti-skid rubber cushion being provided with ring Ring 12, the steel bar top are densely covered with anti-skid bulge, and the projection is salient point or circumferential along steel bar and horizontally disposed a plurality of convex Gear ring.Spacing between the upper and lower collar is adjusted by the anti-skid bulge of the small collar and the different height position on steel bar top, with Suitable for the carrying sleeve of different height.
Shoulder pole girder both ends plan vertical is set up in shoulder pole girder length direction balanced support steel bar 61, the balance branch Support steel bar at least both ends are removably connected with vertical rod.The center of balanced support steel bar along its length and shoulder pole girder it is affixed or by Shoulder pole girder is withstood, and both ends are detachably affixed from different vertical rods again, and then causes the branch of shoulder pole girder and I-steel to whole support Support force is balanced, stably, improves support strength, while also ensures that wheel group produces less lateral holdback force, ensures that sliding is smooth Carry out.
The wheel group is resisted against on the shoulder pole soffit including top plate, bottom is open is used to passing roller 62 and along track The wheel carrier frame 63 of direction both ends open, a roller, the wheel carrier frame both sides side are symmetrically respectively provided with the openend of wheel carrier frame two Symmetrical each solid welding has two spacer bars erected 67 on the outside of plate, and wheel carrier frame top plate is coordinated between the spacer bar of the same side Form the notch 64 that shoulder pole girder is set up for positioning.
Said structure is installed, is easy for construction, while also in that has shoulder pole girder and I-beam above-mentioned relatively stable and easy Build mode and can just be applicable the simple wheel group installation fit system such as above-mentioned notch, that is, do well out of shoulder pole girder and I-beam it Between and shoulder pole girder and I-beam the connection stress equalization between support, firm respectively, just making only need to be at the middle part of shoulder pole girder If a wheel group quickly and easily frame nested structure, without locking mechanism, without respectively setting a wheel group at shoulder pole girder both ends, can also be protected Card wheel group is moved drives whole support to slide surely.
Internal model steel pipe support integral slipping method, comprises the following steps:
First, the vertical rod of the collet of support and support is fixed, prevents collet scrapes underplate concrete when support slides from making Into rod member damage and deformation of timbering;
2nd, the jacking of support and the lateral support of support are loosened, the roof plate template positioned at top is fallen on support, and directly Connect and be placed on support and can be slid with support;
3rd, attachment rail, correspond on bottom plate together with mid-stent respectively sets with both sides;
4th, frame bottom is located at the gap location respective carter of support and is longitudinally therethrough 3 I-steel, and is jacked using jack Longitudinal I-steel;I-steel withstands on a row cross bar bottom vertical with I-steel.
5th, shoulder pole girder is set in I-steel bottom, the wheel group that then installation coordinates with track under shoulder pole girder;
6th, steel wire rope pulls support integral slipping.Hoist engine can be used to drive steel wire rope to pull support integral slipping, sliding During to set special messenger command and observe support walking situation, it is ensured that safety.
The application slides afterwards using jack to coordinate in place by the above method removes wheel group, shoulder pole girder, longitudinal I-steel Deng, and absolute altitude and bed die are adjusted, after passed examination can assembling reinforcement, pour side wall and concrete roof.
The application carries out jacking support by I-steel to whole support, then by shoulder pole girder come balance bracket and wheel group Between stress, with ensure wheel group producing balanced forces do not tilt, inclined silhouette ring sliding, improve integral support sliding stability and peace Quan Xing.
Merogenesis is carried out for a section by 6 ~ 12 m to support before above-mentioned steps three.
The height that jack jacks in the step 4 is about 10cm from the ground.To reduce the pulling force of hoist engine, to internal model Support carries out merogenesis, it is ensured that firm efficiently mobile.
I-steel is fixed with support by connection member after I-steel penetrates frame bottom in the step 4, Shoulder pole girder is propped up in the step 5 equally shoulder pole girder and support are fixed with connection member behind I-beam bottom.
Embodiment two:
It is unlike the embodiments above be in the spacer bar positioned at wheel carrier frame both sides from top to bottom gradually it is outward-dipping from Looked over perpendicular to track length direction in inverted splayed;The top between the corresponding spacer bar of wheel carrier frame both sides Spacing at least beyond the shoulder pole girder position is more than the bottom steel plate width of the I-steel, and middle part corresponds to the shoulder pole girder region It is connected with and pins down steel bar 66;Both ends set residence is also associated with the top of shoulder pole girder between the spacer bar of the same side State the bar shaped ring set 65 of spacer bar.
Inverted splayed ensures that I-steel will not be got to, and ensures that I-steel is directly arranged in splayed, while also can be right Shoulder pole girder is positioned with respect to the docking position of I-steel, ensures the stress equalization of whole support system, and it is convenient to install again.
Embodiment three:
The height unlike the embodiments above for being in the jack jacking in the step 4 is about 8cm from the ground.
Example IV:
The height unlike the embodiments above for being in the jack jacking in the step 4 is about 12cm from the ground.
Internal model steel pipe support integral slipping technology.This technology effectively shortens the time built needed for internal mould supporter, accelerates Construction speed, while project cost has been saved, improve labor strength.

Claims (10)

  1. A kind of 1. internal model steel pipe support integral slipping structure, it is characterised in that:Including by vertical rod(1), cross bar(2)The branch of composition Frame, cradle top and the jacking of bottom are detachably arranged at respectively(3)And collet(4), the track on bottom plate(7), with rail Road coordinates the support moving assembly for erecting support and making support be slid along track;The support moving assembly includes being inserted in The frame bottom is used for the I-steel for erecting frame bottom cross bar(5), it is vertical at the shoulder pole girder of I-steel bottom(6), with And the wheel group coordinated on the shoulder pole girder with the track.
  2. A kind of 2. internal model steel pipe support integral slipping structure according to claim 1, it is characterised in that:Vertical rod bottom edge Vertical rod length direction is provided with the screw mandrel with the collet(41)Be socketed and diameter is more than the carrying sleeve of vertical rod main diameter (11), the collet with the screw mandrel also including being spirally connected and being butted on the adjustment swivel nut of the carrying sleeve bottom(42).
  3. A kind of 3. internal model steel pipe support integral slipping structure according to claim 2, it is characterised in that:The collet with it is described The carrying sleeve is also removably attached between vertical rod respectively by both ends to be connected the stage to be formed with vertical rod and be located at Adjust the connector connection on the screw mandrel position of swivel nut bottom.
  4. A kind of 4. internal model steel pipe support integral slipping structure according to claim 3, it is characterised in that:The connector is two End is set around steel wire on screw mandrel and vertical rod, or both ends be the collar with the bayonet socket that can be caught in the screw mandrel and vertical rod, in Between for connection two collars steel bar(12)Or the part that is connected together of connecting rope.
  5. A kind of 5. internal model steel pipe support integral slipping structure according to claim 4, it is characterised in that:The part that is connected together When centre is steel bar, the collar of bottom is integrally affixed with the steel bar, and the collar at top adjustably coordinates company with the steel bar Connect, the small collar of opening for engaging with the steel bar interference and one layer of anti-skid rubber cushion being provided with ring is also fixed with the outside of the collar (13), the steel bar top is densely covered with anti-skid bulge, and the projection is salient point or circumferential along steel bar and horizontally disposed a plurality of convex Gear ring.
  6. A kind of 6. internal model steel pipe support integral slipping structure according to claim 1, it is characterised in that:The shoulder pole girder both ends Plan vertical is set up in shoulder pole girder length direction balanced support steel bar(61), the balanced support steel bar at least both ends and vertical rod Removably it is connected.
  7. A kind of 7. internal model steel pipe support integral slipping structure according to claim 1, it is characterised in that:The wheel group includes top Plate, which is resisted against on the shoulder pole soffit, bottom is open is used to pass roller(62)And the wheel carrier frame of direction along ng a path both ends open (63).
  8. A kind of 8. internal model steel pipe support integral slipping structure according to claim 7, it is characterised in that:The wheel carrier frame two is opened A roller is symmetrically respectively provided with mouth end, the symmetrical each solid welding in wheel carrier frame both sides side plate outside there are two spacer bars erected (67), coordinate wheel carrier frame top plate to form the notch for setting up shoulder pole girder for positioning between the spacer bar of the same side(64).
  9. A kind of 9. internal model steel pipe support integral slipping structure according to claim 8, it is characterised in that:Positioned at wheel carrier frame both sides Spacer bar from top to bottom gradually outward-dipping looked over from perpendicular to track length direction in inverted splayed.
  10. A kind of 10. internal model steel pipe support integral slipping structure according to claim 9, it is characterised in that:Positioned at wheel carrier frame two Top is at least more than the bottom steel plate of the I-steel beyond the spacing at the shoulder pole girder position between the corresponding spacer bar of side Width, middle part, which corresponds to the shoulder pole girder region and is connected with, pins down steel bar(66);Positioned at the meta of the spacer bar of the same side The bar shaped ring set for entangling the spacer bar in both ends is also associated with the top of shoulder pole girder(65).
CN201720692523.6U 2017-06-15 2017-06-15 A kind of internal model steel pipe support integral slipping structure Expired - Fee Related CN207161103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720692523.6U CN207161103U (en) 2017-06-15 2017-06-15 A kind of internal model steel pipe support integral slipping structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720692523.6U CN207161103U (en) 2017-06-15 2017-06-15 A kind of internal model steel pipe support integral slipping structure

Publications (1)

Publication Number Publication Date
CN207161103U true CN207161103U (en) 2018-03-30

Family

ID=61711728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720692523.6U Expired - Fee Related CN207161103U (en) 2017-06-15 2017-06-15 A kind of internal model steel pipe support integral slipping structure

Country Status (1)

Country Link
CN (1) CN207161103U (en)

Similar Documents

Publication Publication Date Title
CN101672011B (en) Steel tube arch rib vertical lifting method
CN105803947B (en) A kind of cast-in-situ box girder gate-type full framing whole lateral moving system and method for traversing
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN105926443A (en) Construction method for continuous rigid frame side span by first girder installation and then closure
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN106436573A (en) Construction method of bracket steel truss support of long-span upper beam of ultrahigh cable tower
CN106988229A (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method
CN107227814A (en) Sectional construction method for large cantilever concrete structure
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN102277836B (en) Construction method of tilting concrete tower base
CN113123800B (en) Construction method of starting base of large-diameter shield tunnel steel structure
CN107327307B (en) A kind of internal model steel pipe support integral slipping method and structure
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN207987749U (en) Ride cable-styled erection crane
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN205975365U (en) Cast -in -situ box girder combined type moving die carrier
CN207161103U (en) A kind of internal model steel pipe support integral slipping structure
CN108086168A (en) Ride cable-styled erection crane
CN110080117A (en) Portable simplified concrete barrier formwork vehicle and preparation method thereof
CN205604089U (en) Whole sideslip system of cast -in -situ box girder gate -type full framing
CN108644471B (en) Pipeline sliding transportation structure system on large-area water area and construction method thereof
CN109205475B (en) Device and method for assembling and disassembling girder type gantry crane in tunnel through connection of trusses

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20210615