CN207158259U - A kind of Ceramic Tiles pipeline right-angled bend device - Google Patents
A kind of Ceramic Tiles pipeline right-angled bend device Download PDFInfo
- Publication number
- CN207158259U CN207158259U CN201720826269.4U CN201720826269U CN207158259U CN 207158259 U CN207158259 U CN 207158259U CN 201720826269 U CN201720826269 U CN 201720826269U CN 207158259 U CN207158259 U CN 207158259U
- Authority
- CN
- China
- Prior art keywords
- ceramic tiles
- lifting body
- swing arm
- cylinder
- angled bend
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000919 ceramic Substances 0.000 title claims abstract description 71
- 230000007246 mechanism Effects 0.000 claims abstract description 59
- 239000011449 brick Substances 0.000 claims abstract description 21
- 238000005096 rolling process Methods 0.000 claims description 12
- 230000001360 synchronised effect Effects 0.000 claims description 8
- 239000003638 chemical reducing agent Substances 0.000 claims description 6
- 238000003825 pressing Methods 0.000 claims description 3
- 230000035807 sensation Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
The utility model discloses a kind of Ceramic Tiles pipeline right-angled bend device, including frame, conveying mechanism, lifting body and brick-pushing mechanism;Conveying mechanism and lifting body are respectively fixed on the machine frame, and lifting body is located on the conveying direction of conveying mechanism, and for the Ceramic Tiles bag on conveying mechanism to be jacked up;Brick-pushing mechanism is fixed in frame, and is arranged on the direction vertical with the conveying direction of conveying mechanism, and positioned at the top of lifting body, the Ceramic Tiles bag for lifting body to be jacked up is pushed to next section of pipeline.The Ceramic Tiles bag on conveying mechanism is jacked up by lifting body, Ceramic Tiles bag is pushed on next section of pipeline along the direction vertical with the conveying direction of conveying mechanism by lifting body again, whole course of conveying is stablized quick, it is neat complete to ensure that Ceramic Tiles bag remains able to after right-angled bend, the right-angled bend demand of ceramic brick bat, piled bricks, brick bag can be taken into account simultaneously, greatly improve the utilization rate and production efficiency of equipment.
Description
Technical field
Ceramic tile production transportation art is the utility model is related to, is filled more particularly to a kind of Ceramic Tiles pipeline right-angled bend
Put.
Background technology
In recent years, the development of Chinese china industry was swift and violent, and the competition of ceramic product is also more and more fierce, improved automation
Production efficiency of equipment also turns into the key of competition.In the production process of ceramic automation equipment, links whether at a high speed, have
The operation of effect has been largely fixed the height of production efficiency.Interim process requirements when wherein, due to ceramic tile production
Or the limitation in place, during Ceramic Tiles bag (pile or monolithic) conveys through pipeline, it is necessary to by Ceramic Tiles bag (pile or list
Piece) carry out right-angled bend after, then be transported to next process.And Ceramic Tiles bag (pile or monolithic) when carrying out right-angled bend whether
Smoothly, determine stability that Ceramic Tiles bag (pile or monolithic) conveys on the conveyor line and next process whether normal operation.
In the prior art, enter for Ceramic Tiles bag (pile or monolithic) in the conveying of right-angled bend, generally use cone rod structure
Row right-angled bend or the structure combined using roller group and conveyor elevator carry out right-angled bend.Can be to list although boring rod structure
Individual Ceramic Tiles carry out right-angled bend, but the right-angled bend to Ceramic Tiles bag does not apply to but, and Ceramic Tiles bag is carried out directly by boring rod
After angle is turned, originally neat Ceramic Tiles bag meeting entanglement, causes the irregular of piled bricks.Roller group and the knot of conveyor elevator combination
Although structure also can carry out right-angled bend to single ceramic brick, equally inapplicable to Ceramic Tiles bag, Ceramic Tiles bag is defeated in lifting
When sending band band conveying, due to the effect of inertia, the irregular of Ceramic Tiles bag is also resulted in, so as to cause next process can not be just
Often operation.
Utility model content
Based on this, the purpose of this utility model is, there is provided a kind of Ceramic Tiles pipeline right-angled bend device, it has can
It is neat complete to ensure that Ceramic Tiles bag remains able to after right-angled bend, ceramic brick bat, piled bricks, the right angle of brick bag can be taken into account simultaneously
Turning demand, the advantages of utilization rate and production efficiency of equipment can be improved.
The utility model is realized by following scheme:A kind of Ceramic Tiles pipeline right-angled bend device, including frame,
Conveying mechanism, lifting body and brick-pushing mechanism;The conveying mechanism and lifting body are separately fixed in the frame, and described
Lifting body is located on the conveying direction of the conveying mechanism, and for the Ceramic Tiles bag on the conveying mechanism to be jacked up;Institute
State brick-pushing mechanism to be fixed in the frame, and be arranged on the direction vertical with the conveying direction of the conveying mechanism, and position
In the top of the lifting body, the Ceramic Tiles bag for the lifting body to be jacked up is pushed to next section of pipeline.
Compared to prior art, the utility model is jacked up the Ceramic Tiles bag on conveying mechanism by lifting body, then is led to
Lifting body is crossed to be pushed to Ceramic Tiles bag on next section of pipeline along the direction vertical with the conveying direction of conveying mechanism, it is whole
Individual course of conveying is stablized quick, it is ensured that Ceramic Tiles bag remains able to that neatly completely, pottery can be taken into account simultaneously after right-angled bend
Tile, piled bricks, the right-angled bend demand of brick bag, greatly improve the utilization rate and production efficiency of equipment.
Further, the conveying mechanism includes support frame, driving pulley, driven pulley, conveyer belt, reductor, chain
And sprocket wheel;Support frame as described above is fixed in the frame;The driving pulley and driven pulley are separately fixed at support frame as described above
Both sides;The conveyer belt is laid between the driving pulley and driven pulley;The reductor passes through the chain and chain
Wheel is connected with the driving pulley, and drives the driving pulley to rotate.
Further, the lifting body includes support STATEMENT OF FEDERALLY SPONSORED and jacking part;The jacking part joins positioned at the support
The top of moving part, and pumped under the drive of the support STATEMENT OF FEDERALLY SPONSORED;
The support STATEMENT OF FEDERALLY SPONSORED includes bearing, jacking cylinder, two rotating shafts, the first long arm swing, first connecting rod, the second length pendulum
Arm, second connecting rod, the first short swing arm and the second short swing arm;The bearing is fixed in the frame;The jacking cylinder is fixed
On the bearing;Two shaft parallel is relative, and the first length pendulum has been respectively articulated with below described two rotating shafts one end
Arm;It is connected in different rotating shafts between relative first long arm swing by the first connecting rod, one of them described
One long arm swing is connected with the output end of the jacking cylinder, with the driving lower swing of the jacking cylinder, and then drives two turns
Axle synchronous rotary;Lower section in the middle part of two rotating shaft has also been respectively articulated with second long arm swing;Relative institute in different rotating shafts
State and be connected by the second connecting rod between the second long arm swing, so that two rotating shafts consolidate synchronous rotary;In two rotating shaft
The described first short swing arm is respectively articulated with above one end relative with first long arm swing, and the first short swing arm is with two
The rotation of rotating shaft and pump;The other end of two rotating shaft has been respectively articulated with the described second short swing arm, and described
Two short swing arms pump with the rotation of two rotating shafts;The both ends of the jacking part respectively with the described first short swing arm and the
Two short swing arms are hinged.
Further, first long arm swing is be hinged with the described first short swing arm and shape has angle;The angle is 80-
100 degree.
Further, the jacking part includes rolling wheel support frame, 12 poles, jointing, six roots of sensation roller shaft, multiple
Roller;Every two poles are one group and are each passed through the rolling wheel support frame and are fixed on the rolling wheel support frame;Positioned at described
The lower end of one group of pole of rolling wheel support frame one end is hinged with the described first short swing arm, positioned at the rolling wheel support frame other end
The lower end of one group of pole is then hinged with the described second short swing arm respectively, and remaining pole passes through the jointing and described two turns
Axis connection;Be connected a roller shaft above every group of pole;Multiple rollers are installed on every roller shaft.
Further, the brick-pushing mechanism includes walking component and push component;
The walking component includes two support bars, two guide shafts, slide, timing belt, driving wheel, driven pulley and walking and slowed down
Machine;Two support bar is parallel relative and is fixed in the frame;The both ends of two guide shaft are separately fixed at described two
On strut;The both ends of the slide are set on two guide shaft by guide holder, and are slided along two guide shaft;The synchronization
Band is fixed by timing belt pressing plate and the slide;The driving wheel and driven pulley are separately fixed at the two of two support bar
Side;The timing belt is laid between the driving wheel and driven pulley;The driving speed reducer drives the driving wheel to rotate, institute
State driving wheel and drive the synchronous Tape movement again, and then drive the slide to move back and forth on the guide shaft;
The push component is arranged on the slide, and under Ceramic Tiles bag is pushed under the promotion on the slide
One section of pipeline.
Further, it is described push component include cylinder, cylinder hinge, cylinder mounting seat, connector, swing arm, small axle, turn
Axle and push pedal;The cylinder mounting seat is fixed on the slide;The cylinder is fixed on the gas by the cylinder hinge
In cylinder mounting seat;The connector is connected with the cylinder, and one end of the swing arm is connected by the small axle and the connector
Connect, the other end is hinged the rotating shaft;The push pedal is set in the cylinder mounting seat by the rotating shaft, and in the cylinder
With put in the presence of swing arm or put.
Compared to prior art, the utility model is jacked up the Ceramic Tiles bag on conveying mechanism by lifting body, then is led to
Lifting body is crossed to be pushed to Ceramic Tiles bag on next section of pipeline along the direction vertical with the conveying direction of conveying mechanism, it is whole
Individual course of conveying is stablized quick, it is ensured that Ceramic Tiles bag remains able to that neatly completely, pottery can be taken into account simultaneously after right-angled bend
Tile, piled bricks, the right-angled bend demand of brick bag, greatly improve the utilization rate and production efficiency of equipment.
In order to more fully understand and implement, the utility model is described in detail below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the front view in the utility model Ceramic Tiles pipeline right-angled bend device embodiment;
Fig. 2 is the side view in the utility model Ceramic Tiles pipeline right-angled bend device embodiment;
Fig. 3 is the top view in the utility model Ceramic Tiles pipeline right-angled bend device embodiment;
Fig. 4 is the front view of conveying mechanism;
Fig. 5 is the side view of conveying mechanism;
Fig. 6 is the top view of conveying mechanism;
Fig. 7 is front view when lifting body jacks up upwards;
Fig. 8 is side view when lifting body jacks up upwards;
Fig. 9 is top view when lifting body jacks up upwards;
Figure 10 be lifting body back down to original position when front view;
Figure 11 is front view when brick-pushing mechanism pushes away brick;
Figure 12 is side view when brick-pushing mechanism pushes away brick;
Figure 13 is top view when brick-pushing mechanism pushes away brick;
Figure 14 is front view when brick-pushing mechanism prepares to return to original place.
Embodiment
Please refer to Fig. 1 to Fig. 3, Fig. 1 is in the utility model Ceramic Tiles pipeline right-angled bend device embodiment
Front view;Fig. 2 is the side view in the utility model Ceramic Tiles pipeline right-angled bend device embodiment;Fig. 3 is that this practicality is new
Top view in type Ceramic Tiles pipeline right-angled bend device embodiment, wherein hollow arrow represent the transporter of Ceramic Tiles bag
To.The Ceramic Tiles pipeline right-angled bend device includes frame 1, conveying mechanism 2, lifting body 3 and brick-pushing mechanism 4.It is described defeated
Mechanism 2 and lifting body 3 is sent to be separately fixed in the frame 1, and the lifting body 3 is located at the defeated of the conveying mechanism 2
Send on direction, and for the Ceramic Tiles bag on the conveying mechanism 2 to be jacked up;The brick-pushing mechanism 4 is fixed on the frame 1
On, and be arranged on the direction vertical with the conveying direction of the conveying mechanism 2, and positioned at the top of the lifting body 3, use
Next section of pipeline is pushed in the Ceramic Tiles bag for jacking up the lifting body 3.
Please refer to Fig. 4 to Fig. 6, Fig. 4 is the front view of conveying mechanism;Fig. 5 is the side view of conveying mechanism;Fig. 6 is
The top view of conveying mechanism.
The conveying mechanism 2 includes support frame 21, driving pulley 22, driven pulley 23, conveyer belt 24, reductor 25, chain
Bar 26 and sprocket wheel 27.Support frame as described above 21 is fixed in the frame 1;The driving pulley 22 and driven pulley 23 are fixed respectively
In the both sides of support frame as described above 21;The conveyer belt 24 is laid between the driving pulley 22 and driven pulley 23;It is described to subtract
Fast machine 25 is connected by the chain 26 and sprocket wheel 27 with the driving pulley 22, and drives the driving pulley 22 to rotate, institute
State driving pulley 22 drives conveyer belt 24 thereon to work again, conveys the Ceramic Tiles bag being positioned on conveyer belt 24 so as to realize
To the position of lifting body 3.
Please refer to Fig. 7 to Figure 10, Fig. 7 is front view when lifting body jacks up upwards;Fig. 8 is that lifting body is upward
Side view during jack-up;Fig. 9 is top view when lifting body jacks up upwards;Figure 10 be lifting body back down to original position when
Front view.
The lifting body 3 includes support STATEMENT OF FEDERALLY SPONSORED 31 and jacking part 32;The jacking part 32 links positioned at the support
The top of part 31, and pumped under the drive of the support STATEMENT OF FEDERALLY SPONSORED 31.
The support STATEMENT OF FEDERALLY SPONSORED 31 includes bearing 311, jacking cylinder 312, two rotating shafts 313, the first long arm swing 314, first
Connecting rod 315, the second long arm swing 316, second connecting rod 317, the first short 318 and second short swing arm 319 of swing arm.The bearing 311 is solid
It is scheduled in the frame 1;The jacking cylinder 312 is fixed on the bearing 311.Two rotating shaft 313 is parallel relative, and institute
State and first long arm swing 314 has been respectively articulated with below the one end of two rotating shaft 313;Relative the first length pendulum in different rotating shafts
It is connected between arm 314 by the first connecting rod 315, one of them described first long arm swing 314 passes through flake joint 310
It is connected with the output end of the jacking cylinder 312, with the driving lower swing of the jacking cylinder 312, and then drives two rotating shafts
313 synchronous rotaries.The lower section at the middle part of two rotating shaft 313 has also been respectively articulated with second long arm swing 316, and in different rotating shafts
It is connected between relative second long arm swing 316 by the second connecting rod 317, so that two rotating shafts 313 are firm synchronous
Rotation.The described first short pendulum has been respectively articulated with two rotating shaft 313 above one end relative with first long arm swing 314
Arm 318;The first short swing arm 318 pumps with the rotation of two rotating shafts 313.The other end of two rotating shaft 313
The described second short swing arm 319 is respectively articulated with, and the second short swing arm 319 is up and down reciprocatingly transported with the rotation of two rotating shafts 313
It is dynamic.The both ends of the jacking part 32 are be hinged with the described first short 318 and second short swing arm 319 of swing arm respectively.
The jacking part 32 includes rolling wheel support frame 321,12 poles 322, jointing 323, six roots of sensation roller shafts
324th, multiple rollers 325;Every two poles 322 are one group and are each passed through the support frame 321 of roller 325 and are fixed on the rolling
Take turns on 325 support frames 321.It is short positioned at the lower end of one group of pole 322 of described one end of 325 support frame of roller 321 and described first
Swing arm 318 is be hinged, positioned at the other end of 325 support frame of roller 321 one group of pole 322 lower end then respectively with described second
Short swing arm 319 is be hinged, and remaining pole 322 is connected by the jointing 323 with two rotating shaft 313.Every group of pole 322
Top be connected an axle 324 of roller 325;Multiple rollers 325 are installed on every roller shaft 324, in the utility model,
5 rollers are installed on every roller shaft.The axis of rotation drives the first short 318 and second short swing arm of swing arm about 319
It is reciprocal to transport, and pumping for the first short 318 and second short swing arm 319 of swing arm, drive again on the pole 322
Lower reciprocating motion, and then drive roller 325 to pump, Ceramic Tiles bag is jacked up and returned to original place so as to realize.
In the utility model, first long arm swing 314 is be hinged with the described first short swing arm 318 and shape has angle;Institute
It is 80-100 degree to state angle.Preferably, the angle is 90 degree.In the utility model, the jointing 323 connects for flake
Head.
Please refer to Figure 11 to Figure 14, Figure 11 is front view when brick-pushing mechanism pushes away brick;Figure 12 is that brick-pushing mechanism pushes away brick
When side view;Figure 13 is top view when brick-pushing mechanism pushes away brick;Figure 14 is front view when brick-pushing mechanism prepares to return to original place.
The brick-pushing mechanism 4 includes walking component 41 and push component 42;The push component 42 is arranged on the walking
On component 41, and Ceramic Tiles bag is pushed to next section of pipeline under the promotion on the walking component 41.
It is described walking component 41 include two support bars 411, two guide shafts 412, slide 413, timing belt 414, driving wheel 415,
Driven pulley 416 and driving speed reducer 417.Two support bar 411 is parallel relative and is fixed in the frame 1;Described two lead
The both ends of axle 412 are separately fixed on two support bar 411;The both ends of the slide 413 are set in institute by guide holder 418
State on two guide shafts 412, and slided along two guide shaft 412;The timing belt 414 by the pressing plate of timing belt 414 with it is described
Slide 413 is fixed;The driving wheel 415 and driven pulley 416 are separately fixed at the both sides of two support bar 411;The synchronization
Band 414 is laid between the driving wheel 415 and driven pulley 416;The driving speed reducer 417 drives 415 turns of the driving wheel
Dynamic, the driving wheel 415 drives the timing belt 414 to move again, and then drives the slide 413 on the guide shaft to move back
It is dynamic.
The push component 42 includes cylinder 421, cylinder hinge 422, cylinder mounting seat 423, connector 424, swing arm
425th, small axle 426, rotating shaft 427 and push pedal 428.The cylinder mounting seat 423 is fixed on the slide 413;The cylinder 421
It is fixed on by the cylinder hinge 422 in the cylinder mounting seat 423;The flake joint is connected with the cylinder 421, institute
The one end for stating swing arm 425 is connected by the small axle 426 with the connector 424, and the other end is hinged the rotating shaft 427;It is described
Push pedal 428 is set in the cylinder mounting seat 423 by the rotating shaft, and in the presence of the cylinder 421 and swing arm 425
Put or put.
In use, Ceramic Tiles bag is placed on the conveyer belt 24 of conveying mechanism 2, it is by conveyer belt 24 that Ceramic Tiles bag is defeated
It is sent to the position of lifting body 3;The roller 325 of lifting body 3 again jacks up Ceramic Tiles bag, meanwhile, the cylinder of push component 42
421 promote the pendulum of push pedals 428 to fall, and drive push pedal 428 by the driving speed reducer 417 of walking mechanism, and then by Ceramic Tiles bag edge
The direction vertical with the conveying direction of conveying mechanism 2 to be pushed on next section of pipeline, realize the right-angled bend of Ceramic Tiles bag
Conveying.
Compared to prior art, the utility model is jacked up the Ceramic Tiles bag on conveying mechanism by lifting body, then is led to
Lifting body is crossed to be pushed to Ceramic Tiles bag on next section of pipeline along the direction vertical with the conveying direction of conveying mechanism, it is whole
Individual course of conveying is stablized quick, it is ensured that Ceramic Tiles bag remains able to that neatly completely, pottery can be taken into account simultaneously after right-angled bend
Tile, piled bricks, the right-angled bend demand of brick bag, greatly improve the utilization rate and production efficiency of equipment.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.
Claims (7)
- A kind of 1. Ceramic Tiles pipeline right-angled bend device, it is characterised in that:Including frame, conveying mechanism, lifting body and push away Brick mechanism;The conveying mechanism and lifting body are separately fixed in the frame, and the lifting body is located at the conveying On the conveying direction of mechanism, and for the Ceramic Tiles bag on the conveying mechanism to be jacked up;The brick-pushing mechanism is fixed on described In frame, and it is arranged on the direction vertical with the conveying direction of the conveying mechanism, and is located at the top of the lifting body, Ceramic Tiles bag for the lifting body to be jacked up is pushed to next section of pipeline.
- 2. Ceramic Tiles pipeline right-angled bend device according to claim 1, it is characterised in that:The conveying mechanism includes Support frame, driving pulley, driven pulley, conveyer belt, reductor, chain and sprocket wheel;Support frame as described above is fixed in the frame; The driving pulley and driven pulley are separately fixed at the both sides of support frame as described above;The conveyer belt is laid on the driving pulley Between driven pulley;The reductor is connected by the chain and sprocket wheel with the driving pulley, and drives the active Belt wheel rotates.
- 3. Ceramic Tiles pipeline right-angled bend device according to claim 1, it is characterised in that:The lifting body includes Support STATEMENT OF FEDERALLY SPONSORED and jacking part;The jacking part is located at the top of the support STATEMENT OF FEDERALLY SPONSORED, and in the band of the support STATEMENT OF FEDERALLY SPONSORED Pumped under dynamic;The support STATEMENT OF FEDERALLY SPONSORED includes bearing, jacking cylinder, two rotating shafts, the first long arm swing, first connecting rod, the second long arm swing, the Two connecting rods, the first short swing arm and the second short swing arm;The bearing is fixed in the frame;The jacking cylinder is fixed on described On bearing;Two shaft parallel is relative, and first long arm swing has been respectively articulated with below described two rotating shafts one end;It is different It is connected in rotating shaft between relative first long arm swing by the first connecting rod, one of them described first long arm swing It is connected with the output end of the jacking cylinder, with the driving lower swing of the jacking cylinder, and then drives two rotating shafts synchronously to revolve Turn;Lower section in the middle part of two rotating shaft has also been respectively articulated with second long arm swing;Relative second length in different rotating shafts It is connected between swing arm by the second connecting rod, so that two rotating shafts consolidate synchronous rotary;With described in two rotating shaft The described first short swing arm is respectively articulated with above the relative one end of one long arm swing, and the first short swing arm is with the rotation of two rotating shafts Then pump;The other end of two rotating shaft has been respectively articulated with the described second short swing arm, and the second short swing arm Pumped with the rotation of two rotating shafts;It is described jacking part both ends respectively with the described first short swing arm and the second short swing arm It is be hinged.
- 4. Ceramic Tiles pipeline right-angled bend device according to claim 3, it is characterised in that:First long arm swing with The first short swing arm is be hinged and shape has angle;The angle is 80-100 degree.
- 5. Ceramic Tiles pipeline right-angled bend device according to claim 3, it is characterised in that:The jacking part includes rolling Wheeling supporting frame, 12 poles, jointing, six roots of sensation roller shaft, multiple rollers;Every two poles are each passed through described for one group Rolling wheel support frame is simultaneously fixed on the rolling wheel support frame;Positioned at the lower end of one group of pole of described rolling wheel support frame one end and institute The first short swing arm is stated to be hinged, positioned at the rolling wheel support frame other end one group of pole lower end then respectively with the described second short pendulum Arm is hinged, and remaining pole is connected by the jointing with two rotating shaft;It is connected above every group of pole one Roller shaft;Multiple rollers are installed on every roller shaft.
- 6. Ceramic Tiles pipeline right-angled bend device according to claim 1, it is characterised in that:The brick-pushing mechanism includes Walking component and push component;The walking component includes two support bars, two guide shafts, slide, timing belt, driving wheel, driven pulley and driving speed reducer;Institute It is parallel relative and be fixed in the frame to state two support bars;The both ends of two guide shaft are separately fixed at two support bar On;The both ends of the slide are set on two guide shaft by guide holder, and are slided along two guide shaft;The synchronous band logical Timing belt pressing plate is crossed to fix with the slide;The driving wheel and driven pulley are separately fixed at the both sides of two support bar;Institute Timing belt is stated to be laid between the driving wheel and driven pulley;The driving speed reducer drives the driving wheel to rotate, the master Driving wheel drives the synchronous Tape movement again, and then drives the slide to move back and forth on the guide shaft;The push component is arranged on the slide, and Ceramic Tiles bag is pushed into next section under the promotion on the slide Pipeline.
- 7. Ceramic Tiles pipeline right-angled bend device according to claim 6, it is characterised in that:The push component includes Cylinder, cylinder hinge, cylinder mounting seat, connector, swing arm, small axle, rotating shaft and push pedal;The cylinder mounting seat is fixed on described On slide;The cylinder is fixed in the cylinder mounting seat by the cylinder hinge;The connector connects with the cylinder Connect, one end of the swing arm is connected by the small axle with the connector, and the other end is hinged the rotating shaft;The push pedal passes through The rotating shaft is set in the cylinder mounting seat, and has been put in the presence of the cylinder and swing arm or put.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720826269.4U CN207158259U (en) | 2017-07-10 | 2017-07-10 | A kind of Ceramic Tiles pipeline right-angled bend device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720826269.4U CN207158259U (en) | 2017-07-10 | 2017-07-10 | A kind of Ceramic Tiles pipeline right-angled bend device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207158259U true CN207158259U (en) | 2018-03-30 |
Family
ID=61710934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720826269.4U Expired - Fee Related CN207158259U (en) | 2017-07-10 | 2017-07-10 | A kind of Ceramic Tiles pipeline right-angled bend device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207158259U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111689136A (en) * | 2020-06-29 | 2020-09-22 | 阳城县天一陶瓷有限公司 | Horizontal-direction vertical-turning conveying device for multilayer ceramic tiles |
CN113120793A (en) * | 2021-04-20 | 2021-07-16 | 中承国际工程有限公司 | Lifting device is used in building templates production |
CN114291539A (en) * | 2021-12-31 | 2022-04-08 | 广西欧神诺陶瓷有限公司 | Unilateral brick pushing method and unilateral intelligent brick pushing system |
CN114684588A (en) * | 2022-03-16 | 2022-07-01 | 高安罗斯福陶瓷有限公司 | Automatic separating discharging system and process for color separation mark |
-
2017
- 2017-07-10 CN CN201720826269.4U patent/CN207158259U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111689136A (en) * | 2020-06-29 | 2020-09-22 | 阳城县天一陶瓷有限公司 | Horizontal-direction vertical-turning conveying device for multilayer ceramic tiles |
CN113120793A (en) * | 2021-04-20 | 2021-07-16 | 中承国际工程有限公司 | Lifting device is used in building templates production |
CN114291539A (en) * | 2021-12-31 | 2022-04-08 | 广西欧神诺陶瓷有限公司 | Unilateral brick pushing method and unilateral intelligent brick pushing system |
CN114291539B (en) * | 2021-12-31 | 2023-12-26 | 广西欧神诺陶瓷有限公司 | Unilateral brick pushing method and unilateral intelligent brick pushing system |
CN114684588A (en) * | 2022-03-16 | 2022-07-01 | 高安罗斯福陶瓷有限公司 | Automatic separating discharging system and process for color separation mark |
CN114684588B (en) * | 2022-03-16 | 2024-05-07 | 高安罗斯福陶瓷有限公司 | Automatic separation discharging system and process for color separation marks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207158259U (en) | A kind of Ceramic Tiles pipeline right-angled bend device | |
CN206871997U (en) | Part transloading equipment | |
CN203740203U (en) | Upward-suction-type horizontal carton opening mechanism | |
CN104724475B (en) | A kind of glass tube conveying device | |
CN203975928U (en) | Sprocket wheel tube pulling unit | |
CN205419018U (en) | Roller conveying device with transfer portion | |
CN203268842U (en) | Wool top bag conveying device | |
CN202864218U (en) | Air cylinder lifting platform used for glass conveyer | |
CN105109742B (en) | A kind of split type automatic feeding system of dried noodle weighting machine | |
CN206327862U (en) | Unfired brick conveyer adobe laterally turning-over device | |
CN208932372U (en) | It is a kind of for shift conveying adobe transfer device | |
CN205328240U (en) | Novel pile up neatly upset device | |
CN104438256A (en) | Steel drum rotation cleaning machine | |
CN210709672U (en) | Rolling tile packaging equipment | |
CN209620641U (en) | A kind of brick-laying machine | |
CN107792680A (en) | A kind of angle steel automatic stacking machine | |
CN205294152U (en) | Rotatory dislocation device is carried in adobe | |
CN206142394U (en) | Magnesia PLASTIC LAMINATED piles up uses transfer chain | |
CN204847073U (en) | Trigger on wet base | |
CN205187248U (en) | Feeder convenient to feeding | |
CN220596031U (en) | Sand stone material conveyor with adjustable elasticity | |
CN109835795A (en) | A kind of building machinery with the lifting device for charging process | |
CN212953114U (en) | Brick stack disassembling equipment | |
CN211746533U (en) | Automatic dumpling picking device | |
CN209008981U (en) | Ceramic tile swings material-pulling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180330 |