CN207153485U - One kind is used for membrane for water treatment elastic fixing structure - Google Patents

One kind is used for membrane for water treatment elastic fixing structure Download PDF

Info

Publication number
CN207153485U
CN207153485U CN201720701382.XU CN201720701382U CN207153485U CN 207153485 U CN207153485 U CN 207153485U CN 201720701382 U CN201720701382 U CN 201720701382U CN 207153485 U CN207153485 U CN 207153485U
Authority
CN
China
Prior art keywords
membrane
water treatment
clip
clips
fixing structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720701382.XU
Other languages
Chinese (zh)
Inventor
郝建文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720701382.XU priority Critical patent/CN207153485U/en
Application granted granted Critical
Publication of CN207153485U publication Critical patent/CN207153485U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

The utility model discloses one kind to be used for membrane for water treatment elastic fixing structure.Including membrane for water treatment body, membrane for water treatment body includes the first half clips and the second half clips;The first half surfaces of clip one coordinate with membrane for water treatment body week side;One opposite flank of the first half clips is respectively equipped with a bearing;The second half clip end faces coordinate with membrane for water treatment body week side;The second half clip end faces are provided with the spacing guide pillar coordinated with bearing;Spring is combined with spacing guide pillar;The second half clip other ends are fixed with a seat board.The utility model is by using some fixations realized to the first half clips and the second half clips to membrane for water treatment structure, the elastic force that the first half clips and the second half clips pass through spring is realized and fastened, elastic stress buffering with structural strength, improves the stability that membrane for water treatment structure is fixed;Fixation to clip is realized by the base and mounting hole of setting, have it is easy for installation, it is vdiverse in function.

Description

One kind is used for membrane for water treatment elastic fixing structure
Technical field
The utility model belongs to membrane for water treatment technical field, is used for membrane for water treatment flexible fastening knot more particularly to one kind Structure.
Background technology
Reverse osmosis membrane is water process core component, is generally used for drinking pure equipment, industrial pure water equipment, and sewage Treated sewage reusing, usually using quartz filter, active carbon filter, accurate filter is as pretreatment, to counter-infiltration membrane element Part is protected, and the service life of reverse osmosis membrane is probably in 2--5, and when film water yield is small, salt rejection rate is low, and science is repeated Cleaning and regeneration also improve under endless sentiments condition, carry out replacing membrane component.
Water treatment facilities installation and debugging step:Water treatment facilities are come in place to equipment progress and solid by floor plan requirement It is fixed.Water treatment facilities install all membrane module, valve and the pipeline that are removed because of transport.To water treatment facilities Water inlet is analyzed, tested, and is as a result shown to meet inflow requirement, can be carried out water flowing debugging.Rotating to water pump is adjusted Whole, consistent with the motor sign direction of arrow is to rotate forward, if any phase sequence for exchanging two phase lines of reversion.Check water process Connect whether perfect, pressure gauge is complete, whether low pressure pipeline junction is close between all pipelines of equipment, it is whether short. Accurate filter drain valve is opened, starts pre-processing device, and adjust to output and be more than equipment inflow.Each pressure gauge of standard-sized sheet Switch and water intaking valve, concentrated water outlet valve, production water discharging valve.When there is water spilling, accurate filter drain valve is closed.Treat high-pressure pump Inlet pressure is more than 0.2MPa, starts high-pressure pump, while opens flush switch, starts scouring electromagnetic valve, runs 10 minutes, rinses Reverse osmosis membrane surface.Scouring electromagnetic valve is closed, and slowly adjusting device RO water intaking valves, RO concentrated water outlet valves reach intake pressure 0.6-1.2MPa and production water, dense draining ratio be 2:1, control before film and total pressure head is less than 0.3MPa after film, operation 15 minutes, And check whether each high and low pressure pipeline, instrument are working properly.The back with water inlet line for connecting EDI purifiers (is typically RO production Water).The production water of EDI purifiers is connected to all pipelines of the import of equipment for after-treatment.Connect all rows of EDI purifiers Water is to drainage system.Connect the concentrated water drainage system of EDI purifiers.It is external to all EDI purifiers according to relevant criterion Pipe installing supports.Check the fastener of all connecting cables on EDI purifiers, it is ensured that connection fastening.Check EDI water purification Whether membrane module power outlet connects in equipment, it is ensured that connection fastening.All dust covers on EDI purifiers are removed, and Connect all flexible pipes.The parameter such as debugging EDI manually, regulation intake pressure, production water-carrying capacity.By hand switch Close All, open Open automatic switch, equipment fully automatic operation.
Because membrane for water treatment is by the way of tile vertically installation, under unstable by hydraulic pressure, membrane for water treatment structure is made Destroyed into structure, also, it is poor to the structure cantilever mounting stability of membrane for water treatment.
Utility model content
The purpose of this utility model is that providing one kind is used for membrane for water treatment elastic fixing structure, by using some to first Half clip and the second half clips realize the fixation to membrane for water treatment structure, the bullet that the first half clips and the second half clips pass through spring Power, which is realized, to be fastened, and solves existing membrane for water treatment by the way of tile vertically installation, under unstable by hydraulic pressure, at water Reason membrane structure causes structure to destroy, also, to the structure cantilever mounting stability difference problem of membrane for water treatment.
In order to solve the above technical problems, the utility model is achieved through the following technical solutions:
The utility model is used for membrane for water treatment elastic fixing structure, including membrane for water treatment body, the water process for one kind Membrane body includes the first half clips and the second half clips;Wherein, the first half surface of clip one and membrane for water treatment body the week side of boss Face coordinates;One opposite flank of the first half clip is respectively equipped with a bearing;Wherein, the second half clip end face and the water Membrane body the week side of boss face is handled to coordinate;The second half clip end face is provided with the spacing guide pillar coordinated with bearing;Wherein, it is described Spring is combined with spacing guide pillar;The spring is located at bearing end face;Wherein, the second half clip other end is fixed with One seat board;With being mutually perpendicular on the second half clip positions on the seat board position.
Further, pressure ring and nut are combined with the spacing guide pillar.
Further, the surface of the first half clip and membrane for water treatment body fits is fixed with the first elastic plate;It is described The surface of the second half clips and membrane for water treatment body fits is fixed with the second elastic plate.
Further, first elastic plate and the second elastic plate use elastic rubber slab or wood based panel or plastic plate.
Further, the second half surface of clip one is provided with threading waist hole and shoulder hole;The seat board and the second half cards The T-shaped structure of hoop;Fixing hole is provided with the seat board.
Further, the first half surface of clip one is provided with hangers hole;The hangers hole coordinates with a cotton rope.
The utility model has the advantages that:
The utility model is consolidated by using some realized to the first half clips with the second half clips to membrane for water treatment structure Fixed, the first half clips are realized by the elastic force of spring with the second half clips and fastened, and are had the elastic stress buffering of structural strength, are carried The stability that high membrane for water treatment structure is fixed;Fixation to clip is realized by the base and mounting hole of setting, there is installation side Just, it is vdiverse in function.
Certainly, implement any product of the present utility model to it is not absolutely required to reach all the above advantage simultaneously.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, make required for being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the utility model, For those of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to these accompanying drawings Other accompanying drawings.
Fig. 1 is a kind of structural representation for membrane for water treatment elastic fixing structure of the present utility model;
Fig. 2 is the structural representation of the first half clips;
Fig. 3 is Fig. 2 structural front view;
Fig. 4 is the structural representation of the second half clips;
Fig. 5 is Fig. 4 structural front view;
Fig. 6 is Fig. 4 structural side view.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belong to the scope of the utility model protection.
In description of the present utility model, it is to be understood that term " perforate ", " on ", " under ", " thickness ", " top ", " in ", " length ", " interior ", indicating position or the position relationship such as " surrounding ", be for only for ease of description the utility model and simplification Description, rather than the component or element of instruction or hint meaning must have specific orientation, with specific azimuth configuration and behaviour Make, therefore it is not intended that to limitation of the present utility model.
Refer to shown in Fig. 1, the utility model is used for membrane for water treatment elastic fixing structure, including membrane for water treatment sheet for one kind Body 1, membrane for water treatment body 1 include the first half clips 2 and the second half clips 3;Pass through two pairs of the first half clips 2 and the second half clips 3 block membrane for water treatment body 1.
Wherein as shown in Figures 2 and 3, the 1 week side in the first half surfaces of clip 2 one and membrane for water treatment body coordinates;The first half One opposite flank of clip 2 is respectively equipped with a bearing 202;
Wherein as Figure 4-Figure 6,1 week side of the second half end faces of clip 3 and membrane for water treatment body coordinates;The second half clips 3 end faces are provided with the spacing guide pillar 303 coordinated with bearing 202;
Wherein, it is combined with spring 4 on spacing guide pillar 303;Spring 4 is located at the end face of bearing 202;
Wherein, the second half other ends of clip 3 are fixed with a seat board 301;On the position of seat board 301 with the second half clips 3 Put and be mutually perpendicular to.
Wherein, pressure ring 304 and nut 305 are combined with spacing guide pillar 303, the bullet limited by pressure ring 304 and nut 305 The elastic force of spring 4 realizes the first half clips 2 in the fastening of the second half clips 3.
Wherein, the surface that the first half clips 2 coordinate with membrane for water treatment body 1 is fixed with the first elastic plate 201;The second half cards The surface that hoop 3 coordinates with membrane for water treatment body 1 is fixed with the second elastic plate 302.
Wherein, the first elastic plate 201 and the second elastic plate 302 use elastic rubber slab or wood based panel or plastic plate, lead to Cross elastic rubber slab or wood based panel or plastic plate to contact with the surface of membrane for water treatment body 1, protect the surface of membrane for water treatment body 1 not By stress damage.
Wherein, the second half surfaces of clip 3 one are provided with threading waist hole 306 and shoulder hole 308;Seat board 301 and the second half clips 3 Form T-shaped structure;Fixing hole 307 is provided with seat board 301.
Wherein, the first half surfaces of clip 2 one are provided with hangers hole 203;The cotton rope of hangers hole 203 and one coordinates, will by cotton rope The first half clips 2 are connected with the second half clips 3 or are connected with support frame.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means It is contained in reference to specific features, structure, material or the feature that the embodiment or example describe of the present utility model at least one In embodiment or example.In this manual, the schematic representation of above-mentioned term is not necessarily referring to identical embodiment or Example.Moreover, specific features, structure, material or the feature of description can be in any one or more embodiments or example In combine in an appropriate manner.
The utility model preferred embodiment disclosed above is only intended to help and illustrates the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, it is only described embodiment also not limit the utility model.Obviously, according to this theory The content of bright book, it can make many modifications and variations.This specification is chosen and specifically describes these embodiments, is in order to preferably Principle and practical application of the present utility model is explained, so that skilled artisan can be best understood by and utilize this Utility model.The utility model is only limited by claims and its four corner and equivalent.

Claims (6)

1. one kind is used for membrane for water treatment elastic fixing structure, including membrane for water treatment body (1), it is characterised in that:The water process Membrane body (1) includes the first half clips (2) and the second half clips (3);
Wherein, the first half surface of clip (2) one coordinates with all sides of membrane for water treatment body (1);The first half clip (2) An opposite flank be respectively equipped with a bearing (202);
Wherein, the second half clip (3) end face coordinates with all sides of membrane for water treatment body (1);The second half clip (3) End face is provided with the spacing guide pillar (303) coordinated with bearing (202);
Wherein, it is combined with spring (4) on the spacing guide pillar (303);The spring (4) is located at bearing (202) end face;
Wherein, described the second half clip (3) other end is fixed with a seat board (301);With second on seat board (301) position It is mutually perpendicular on half clip (3) position.
2. one kind according to claim 1 is used for membrane for water treatment elastic fixing structure, it is characterised in that the spacing guide pillar (303) pressure ring (304) and nut (305) are combined with.
3. one kind according to claim 1 is used for membrane for water treatment elastic fixing structure, it is characterised in that the first half card The surface that hoop (2) coordinates with membrane for water treatment body (1) is fixed with the first elastic plate (201);The second half clip (3) with water The surface that reason membrane body (1) coordinates is fixed with the second elastic plate (302).
4. one kind according to claim 3 is used for membrane for water treatment elastic fixing structure, it is characterised in that first elasticity Plate (201) and the second elastic plate (302) use elastic rubber slab or wood based panel or plastic plate.
5. one kind according to claim 1 is used for membrane for water treatment elastic fixing structure, it is characterised in that the second half card (3) one surfaces of hoop are provided with threading waist hole (306) and shoulder hole (308);The seat board (301) forms T-shaped with the second half clips (3) Structure;Fixing hole (307) is provided with the seat board (301).
6. one kind according to claim 1 is used for membrane for water treatment elastic fixing structure, it is characterised in that the first half card (2) one surfaces of hoop are provided with hangers hole (203);The hangers hole (203) coordinates with a cotton rope.
CN201720701382.XU 2017-06-16 2017-06-16 One kind is used for membrane for water treatment elastic fixing structure Expired - Fee Related CN207153485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720701382.XU CN207153485U (en) 2017-06-16 2017-06-16 One kind is used for membrane for water treatment elastic fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720701382.XU CN207153485U (en) 2017-06-16 2017-06-16 One kind is used for membrane for water treatment elastic fixing structure

Publications (1)

Publication Number Publication Date
CN207153485U true CN207153485U (en) 2018-03-30

Family

ID=61711838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720701382.XU Expired - Fee Related CN207153485U (en) 2017-06-16 2017-06-16 One kind is used for membrane for water treatment elastic fixing structure

Country Status (1)

Country Link
CN (1) CN207153485U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108993158A (en) * 2018-07-20 2018-12-14 芜湖新瑟安智能科技有限公司 A kind of box membrane separation device
JP2019214031A (en) * 2018-06-14 2019-12-19 三浦工業株式会社 Water treatment device and water treatment device connection unit
CN113559719A (en) * 2021-09-26 2021-10-29 迈博瑞生物膜技术(南通)有限公司 Ultrafiltration membrane self-cleaning device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019214031A (en) * 2018-06-14 2019-12-19 三浦工業株式会社 Water treatment device and water treatment device connection unit
JP7110744B2 (en) 2018-06-14 2022-08-02 三浦工業株式会社 Water treatment equipment and water treatment equipment connection unit
CN108993158A (en) * 2018-07-20 2018-12-14 芜湖新瑟安智能科技有限公司 A kind of box membrane separation device
CN113559719A (en) * 2021-09-26 2021-10-29 迈博瑞生物膜技术(南通)有限公司 Ultrafiltration membrane self-cleaning device

Similar Documents

Publication Publication Date Title
CN207153485U (en) One kind is used for membrane for water treatment elastic fixing structure
CN103466753A (en) Seawater reverse osmosis desalination and seawater concentration method by using concentration polarization and periodic instantaneous flushing principle
CN205500933U (en) Water -saving dual water supply purifier that each other washes
CN2910907Y (en) Water treatment equipment able to recover total concentration water
CN204294125U (en) A kind of simple and practical membrane for water treatment testing arrangement
CN208200408U (en) A kind of countryside sewage treatment equipment being easily installed
CN203498183U (en) Reverse osmosis energy-saving water treatment system
CN105174645A (en) Practical waste water treatment energy-saving equipment and waste water treatment method
CN213834644U (en) Highly integrated ultrafiltration membrane device for wastewater treatment
CN104743703A (en) Unpowered emergency water purifier applicable to earthquake stricken areas
KR20070103096A (en) Second grade pure water production system
CN203556292U (en) Flat membrane reactor
CN208814774U (en) A kind of seawater gulf water pollution purifying processing device
CN203123841U (en) Multi-unit integrated detection equipment
CN205742351U (en) A kind of reverse automatic clearing apparatus of water-fetching head
CN205598978U (en) Air purge pipeline structure in ultrafiltration system
CN202022778U (en) Reverse osmosis or nanofiltration concentrated water recovery device for pipeline direct drinking water treatment system
CN211328938U (en) Reverse osmosis pipe for chemical production convenient to clearance
CN217230316U (en) Reverse osmosis pretreatment device
CN204779180U (en) Two membrane double -core integral type water treatments preparation system
CN204999690U (en) Waste water treatment tank aeration equipment convenient to adjust and maintain
CN2782665Y (en) Two-stage reverse osmosis water purifier for prenltrafilter
CN204509003U (en) Industrial sewage advanced purification system
CN207391204U (en) A kind of chemical industry wastewater ocean disposal equipment
CN103447960A (en) Pipeline system for grinding coolant central filtering and chip removing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20190616

CF01 Termination of patent right due to non-payment of annual fee