CN207139726U - A kind of steel construction process equipment - Google Patents

A kind of steel construction process equipment Download PDF

Info

Publication number
CN207139726U
CN207139726U CN201720889986.1U CN201720889986U CN207139726U CN 207139726 U CN207139726 U CN 207139726U CN 201720889986 U CN201720889986 U CN 201720889986U CN 207139726 U CN207139726 U CN 207139726U
Authority
CN
China
Prior art keywords
plate
endless glide
steel construction
clamping
slide bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720889986.1U
Other languages
Chinese (zh)
Inventor
张振海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JINWANFANG STEEL STRUCTURE CO Ltd
Original Assignee
TIANJIN JINWANFANG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JINWANFANG STEEL STRUCTURE CO Ltd filed Critical TIANJIN JINWANFANG STEEL STRUCTURE CO Ltd
Priority to CN201720889986.1U priority Critical patent/CN207139726U/en
Application granted granted Critical
Publication of CN207139726U publication Critical patent/CN207139726U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of steel construction process equipment, including upper endless glide, suspension mounting bracket, lower tray and lower endless glide;It possesses many advantages, such as good versatility, using flexible, small occupation area of equipment by the design of upper and lower slide rail, and the configuration of the suspension mounting bracket of general-purpose type, the steel construction process equipment in making this new.

Description

A kind of steel construction process equipment
Technical field
It the utility model is related to the technical field of steel construction processing, and in particular to a kind of steel construction processing unit (plant).
Background technology
Steel construction is that basic building block is made with shaped steel or steel plate in one kind, according to requirements, passes through welding or bolt connection The methods of, according to the load carrier of certain rule composition.Application of the steel construction in every engineering construction is extremely wide, such as steel Bridge, Steel-Structure Factory with Steel, steel-slag sand, various large-scale pipeline containers, skyscraper and tower rail mechanism etc..Because steel structure system has deadweight Gently, installation is easily, short construction period, anti-seismic performance are good, gain quick return for investment, the comprehensive advantage such as low in the pollution of the environment, is obtained in construction industry Extremely wide use is arrived.In order to improve the packaging efficiency of steel construction, accelerate building efficiency, steel construction bone of the prior art Frame is typically to be punched in factory, after bending and surface treatment;Directly transport building site to be assembled, this is just to steel construction Processing and processing propose higher requirement;Punch device of the prior art is usually not this kind of bar shaped of steel structure assembly Component carried out optimization design, often occurred life caused by equipment and product type and size mismatch in the process of reality Produce the problems such as the low, poor product quality of efficiency.
Utility model content
To achieve these goals, the utility model provides a kind of steel construction process equipment.
The steel construction process equipment is realized by the following technical solutions:
A kind of steel construction process equipment, including upper endless glide, suspension mounting bracket, lower tray and lower endless glide;Institute It is convex shape structure to state endless glide;The suspension mounting bracket includes connecting pole, top plate, connecting rod, slide bar, lower plate, lifting Post, bottom plate and installing plate;The convex shape slide opening of the upper opening matched with endless glide is provided with the connecting pole;The company Connect post to be connected with top plate top, the bottom of the top plate is provided with connecting rod, and the bottom of the connecting rod is connected with lower plate;It is described Lifting column is fixed on lower plate bottom, and its piston rod is connected with bottom plate;Lived by the slide opening being arranged in lower plate on the slide bar top Dynamic to be installed in lower plate, the lower end of slide bar is connected with bottom plate and installing plate, and limited block is provided with the top of the slide bar;The peace Multiple mounting holes are provided with loading board;The lower tray includes base, round table surface and clamping device;The base bottom leads to Arc chute is crossed to be slidably mounted in lower endless glide;The round table surface is arranged at the top of base, at round table surface center It is provided with fixing hole;The clamping device includes mounting post, installing plate and two clamping limbs;Clamping device can be turned by mounting post In the dynamic fixing hole being installed on table top;It is type that the upper surface of the installing plate, which is provided with two cross sections arranged in parallel, The slideway of type structure;The clamping limb is slidably mounted in slideway by the sliding block of its bottom;The sliding block of described two clampings it Between be provided with returning spring;Horizontal sliding bar is provided with one of clamping limb;It is provided with another clamping limb and is slided with level The slide opening that bar coordinates, the movable end of horizontal sliding bar are provided with external screw thread and the nut coordinated with it.
The steel construction process equipment of this new middle offer, it uses the design of suspension mounting bracket, and it can above circular orbit Upper slip, it is possible to achieve flexible movement within the specific limits, and multiple mounting holes are set on suspension mounting bracket, as needed The Steel structure equipment of processing installs different process equipments, and flexibility is strong and reduces the occupancy to operating space of planes, it also avoid The problem of circuit is arranged at ground around workbench and is easily trampled and pullled, adds operating space, decreases electric shock Danger, the job shop especially suitable for large-sized steel structure assembly;By lifting column and the Activities Design of slide bar, processing is set It is standby to be lifted relative to workbench, change distance, be adapted to the product of different volumes;By endless glide under setting, and The multiple lower trays that can be moved along it are set in lower endless glide;Can arbitrarily change lower tray part away from walk-off angle Degree, coordinates rotary clamping device, it is possible to achieve unconfined angle change, suitable for the fixation of all kinds of special-shaped steel structures And clamping;Clamping device is rotatablely connected by connecting pole and table top, according to circumstances can be rotated clamping device, be realized various angles The steel structure assembly of degree intersects, and improves using flexible;Table top sets two relative clamping limbs, and clamping limb passes through moveable Sliding block is arranged in slideway;The distance between two clamping limbs can be adjusted at any time, suitable for the product of different shape and structure Fixation;Two clamping limbs change distance by horizontal sliding bar and nut, and steel construction is held between two clamping limbs;Pass through Returning spring is provided between two clamping limbs, when unclamping nut, clamping limb recovers former distance automatically, unclamps steel construction, makes With conveniently;By further setting positioning sleeve, the height of mounting post can be adjusted, further improves using flexible.
Brief description of the drawings
Fig. 1 is the structure chart of steel construction process equipment in the utility model;
Fig. 2 is the structure chart that mounting bracket is hung in the utility model;
Fig. 3 is the top view of the utility model lower tray;
Fig. 4 is the structure chart of the utility model middle and lower part bracket;
Fig. 5 is the structure chart of clamping device in the utility model.
Embodiment
The technical solution of the utility model is described in detail below by specific embodiment, but this practicality is new The scope of type is not restricted by the embodiments.
Embodiment 1
As Figure 1-5, a kind of steel construction process equipment, including upper endless glide, suspension installation are present embodiments provided Frame, lower tray 102 and lower endless glide 101;The upper endless glide is convex shape structure;The suspension mounting bracket includes connecting Connect post 11, top plate 12, connecting rod 13, slide bar 14, lower plate 15, lifting column 16, bottom plate 18 and installing plate 19;On the connecting pole 11 It is provided with the convex shape slide opening 201 of the upper opening matched with upper endless glide;The connecting pole 11 is connected with the top of top plate 12, The bottom of the top plate 12 is provided with connecting rod 13, and the bottom of the connecting rod 13 is connected with lower plate 15;The lifting column 16 is solid Due to the bottom of lower plate 15, its piston rod 17 is connected with bottom plate 18;The top of slide bar 14 passes through the slide opening that is arranged in lower plate 15 It is movably installed in lower plate 15, the lower end of slide bar 14 is connected with bottom plate 18 and installing plate 19, and the top of the slide bar 14 is provided with Limited block;Multiple mounting holes 20 are provided with the installing plate 19;The lower tray 102 includes base 1, the and of round table surface 2 Clamping device;The bottom of base 1 is slidably mounted in lower endless glide 101 by arc chute;The round table surface 2 is set In the top of base 1, round table surface 2 is provided with fixing hole at center;The clamping device includes mounting post 31, the and of installing plate 32 Two clamping limbs 33;Clamping device is rotatably installed in the fixing hole on table top 2 by mounting post 31;The installing plate 32 Upper surface be provided with two cross sections arranged in parallel be convex structure slideway 36;The clamping limb 33 passes through its bottom Sliding block 34 be slidably mounted in slideway 36;Returning spring 35 is provided between the sliding block 34 of described two clampings 33;Wherein one Horizontal sliding bar 41 is provided with individual clamping limb 33;The slide opening coordinated with horizontal sliding bar 41 is provided with another clamping limb, it is horizontal The movable end of slide bar 41 is provided with external screw thread and the nut coordinated with it 43.
Embodiment above is only preferred embodiment of the present utility model, it should be pointed out that, for ordinary skill For people, what is carried out on the premise of the utility model is not departed from is partially improved, still in the scope of protection of the utility model it In.

Claims (1)

1. a kind of steel construction process equipment, including upper endless glide, suspension mounting bracket, lower tray and lower endless glide;It is described Upper endless glide is convex shape structure;It is described suspension mounting bracket include connecting pole, top plate, connecting rod, slide bar, lower plate, lifting column, Bottom plate and installing plate;The convex shape slide opening of the upper opening matched with endless glide is provided with the connecting pole;The connection Post is connected with top plate top, and the bottom of the top plate is provided with connecting rod, and the bottom of the connecting rod is connected with lower plate;The liter Drop post is fixed on lower plate bottom, and its piston rod is connected with bottom plate;The slide bar top is movable by the slide opening being arranged in lower plate It is installed in lower plate, the lower end of slide bar is connected with bottom plate and installing plate, and limited block is provided with the top of the slide bar;The installation Multiple mounting holes are provided with plate;The lower tray includes base, round table surface and clamping device;The base bottom passes through Arc chute is slidably mounted in lower endless glide;The round table surface is arranged at the top of base, and round table surface is set at center It is equipped with fixing hole;The clamping device includes mounting post, installing plate and two clamping limbs;Clamping device is rotatable by mounting post The fixing hole being installed on table top in;It is convex that the upper surface of the installing plate, which is provided with two cross sections arranged in parallel, The slideway of structure;The clamping limb is slidably mounted in slideway by the sliding block of its bottom;Between the sliding block of described two clampings It is provided with returning spring;Horizontal sliding bar is provided with one of clamping limb;It is provided with another clamping limb and horizontal sliding bar The slide opening of cooperation, the movable end of horizontal sliding bar are provided with external screw thread and the nut coordinated with it.
CN201720889986.1U 2017-07-21 2017-07-21 A kind of steel construction process equipment Expired - Fee Related CN207139726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720889986.1U CN207139726U (en) 2017-07-21 2017-07-21 A kind of steel construction process equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720889986.1U CN207139726U (en) 2017-07-21 2017-07-21 A kind of steel construction process equipment

Publications (1)

Publication Number Publication Date
CN207139726U true CN207139726U (en) 2018-03-27

Family

ID=61676323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720889986.1U Expired - Fee Related CN207139726U (en) 2017-07-21 2017-07-21 A kind of steel construction process equipment

Country Status (1)

Country Link
CN (1) CN207139726U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107297720A (en) * 2017-07-21 2017-10-27 天津市金万方钢结构有限公司 A kind of endless glide suspended steel structure process equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107297720A (en) * 2017-07-21 2017-10-27 天津市金万方钢结构有限公司 A kind of endless glide suspended steel structure process equipment

Similar Documents

Publication Publication Date Title
CN106584061B (en) Turret table formula steel construction assembles equipment
CN107042418B (en) Clamping device for machining
CN106826716A (en) Right angle slide rail type steel structure assembly platform
CN108422145B (en) Large-scale adjustable frame structure welding fixture
CN201165461Y (en) Three-dimensional localization vehicle
CN207139726U (en) A kind of steel construction process equipment
CN206484055U (en) A kind of multi-function steel structure perforating device
CN207139273U (en) A kind of steel construction processing equipment
CN203726483U (en) Pneumatic carrying mechanical arm
CN207139734U (en) A kind of steel construction processing unit (plant)
CN106735424B (en) Steel construction perforating device
CN207139229U (en) A kind of multi-function steel structure processing equipment
CN202910839U (en) Working table
CN107414699A (en) Hole pin positioning device for use
CN104191194A (en) Device for refrigerator compressor core to be automatically placed in shell
CN206484052U (en) A kind of rotating disk working platform type steel construction punch device
CN207139735U (en) A kind of steel construction annular machining support
CN107297720A (en) A kind of endless glide suspended steel structure process equipment
CN207139274U (en) A kind of steel construction annular processing platform
CN106694938B (en) Movable workbench type steel structure puncher
CN107498517A (en) A kind of endless glide formula steel construction processing equipment
CN206484053U (en) A kind of steel construction perforating device equipped with mobile work platform
CN106064272A (en) A kind of spot welding robot
CN206484510U (en) A kind of steel structure assembly operating platform
CN107297719A (en) A kind of endless glide formula steel construction machining support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20180721