CN207130633U - The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab - Google Patents

The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab Download PDF

Info

Publication number
CN207130633U
CN207130633U CN201721031870.0U CN201721031870U CN207130633U CN 207130633 U CN207130633 U CN 207130633U CN 201721031870 U CN201721031870 U CN 201721031870U CN 207130633 U CN207130633 U CN 207130633U
Authority
CN
China
Prior art keywords
bent cap
beam slab
pier stud
girder
bridge erector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721031870.0U
Other languages
Chinese (zh)
Inventor
陈向阳
王昌将
李磊
白雨东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shuzhijiaoyuan Technology Co Ltd
Original Assignee
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority to CN201721031870.0U priority Critical patent/CN207130633U/en
Application granted granted Critical
Publication of CN207130633U publication Critical patent/CN207130633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses the integrated Bridge Erector of a kind of Short/Medium Span Bridge pier stud, bent cap and beam slab, including girder, girder has auxiliary leg, front leg strut and rear support leg, moveable preceding overhead traveling crane and the car day after tomorrow is set to be used to assist transport and installation prefabricated components on girder, Bridge Erector has two working faces, leading face is used to set up pier stud and bent cap, and rear working face is used to set up beam slab.The mounting process of whole prefabricated components is set up by the utility model integration Bridge Erector, pier stud, bent cap and beam slab can be transported using built beam slab, it is not necessary to builder's road, do not influence surrounding traffic, work efficiency is fast, precision is high, low cost.The utility model integration Bridge Erector can be assembled in the roadbed section near bridge, and the installation of beam slab can make full use of Precast Pier Columns and bent cap grouting slurry intensity process to carry out.

Description

The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab
Technical field
The utility model belongs to technical field of bridge engineering, and in particular to a kind of Short/Medium Span Bridge pier stud, bent cap and beam The integrated Bridge Erector of plate.
Background technology
Concrete structure can use cast-in-place and prefabricated construction, beam slab (such as T beams, the combination small box girder of conventional overhead bridge And cored slab) prefabricated assembled construction is typically used, and the pier stud and bent cap in substructure all use cast-in-place construction.Traditional Pier stud and the cast-in-place building technology of bent cap are because work high above the ground process is more, and cost is high, and risk is big, and quality is difficult to ensure card.In bustling city Region, cast-in-place construction can adversely affect to periphery traffic and environmental protection, and contradiction is more prominent.
To shorten construction period, reduce to surrounding enviroment and traffic impact, reduce security risk, it is ensured that construction quality, adopt Assembled technology can be given full play to the full precast assembly scheme such as pier stud, bent cap, beam slab in component production standard, in-site installation just Prompt, construction energy-conserving and environment-protective etc. advantage, reduces the influence to environment and resident trip, lifts bridge construction project quality and peace Total quality, civilized construction are horizontal.
Prefabricated construction can be constructed simultaneously with superstructure and substructure, and streamlined operation, the duration is controllable, Ke Yi Beam field is prefabricated, and the interference being subject to is smaller, and precision is high, it is possible to reduce to the environment and traffic impact in work area, it is possible to reduce makees in high-altitude Industry.Precast construction is wider in building field utilization, but just starts to apply in elevated bridge, is even more to have no in bridge on highway Use, being primarily due to prefabricated bridge pier column and bent cap needs to carry out lifting construction using large-scale truck crane or tyre crane, Highway conventional construction sidewalk can not meet large-scale crane construction requirement, it is therefore desirable to build sidewalk and the lifting of higher standard Platform, so as to be added significantly to operating expenses.
The content of the invention
In view of above-mentioned, the utility model provides the integration bridge formation of a kind of Short/Medium Span Bridge pier stud, bent cap and beam slab Machine, to install pier stud, bent cap and beam slab successively, it is not necessary to builder's road, do not influence surrounding traffic.
The integrated Bridge Erector of a kind of Short/Medium Span Bridge pier stud, bent cap and beam slab, include the girder of truss-like;
The girder front portion by auxiliary leg be supported on n-th+3 across cushion cap on, should be across not yet being installed on its cushion cap Pier stud and bent cap;In the middle part of girder by front leg strut be supported on n-th+2 across pier stud bent cap on, pier should be installed on its cushion cap across Post and bent cap but beam slab is not yet erected between with (n+1)th;Girder rear portion by rear support leg be supported on n-th across with (n+1)th across it Between beam slab on, n-th across with (n+1)th across install on respective cushion cap pier stud and bent cap and two across bent cap on erected Beam slab, n are the natural number more than 0.
Further, moveable preceding overhead traveling crane and rear overhead traveling crane are provided with the girder, for assisting transport and installation pre- Pier stud, bent cap and beam slab processed.
Further, the girder possesses two working faces, and the leading face between auxiliary leg and front leg strut is used In installation pier stud and bent cap, the rear working face between front leg strut and rear support leg is used to install beam slab.
Further, the auxiliary leg is fixed using concrete bracket or steel construction anchor ear with cushion cap.
The Precast Pier Columns, bent cap and beam slab, it can be transported by having installed on beam slab.
Different from traditional Bridge Erector only with a working face, the utility model Bridge Erector has two working faces, Leading face is used to set up pier stud and bent cap, and rear working face is used to set up beam slab.Upper one after installing, integration is built bridge Machine is moved to next across and being transported pier stud to leading face using forward and backward overhead traveling crane and be rotatably mounted to position;Then the day before yesterday is utilized Bent cap is transported to leading face and is rotatably mounted to position by car;Finally beam slab is transported to rear working face using forward and backward overhead traveling crane It is installed in place;Complete new one after the installation of pier stud, bent cap and beam slab mobile Bridge Erector to next collapse continue to install.
The mounting process of whole prefabricated components is set up by the utility model integration Bridge Erector, built beam can be utilized Plate transports pier stud, bent cap and beam slab, it is not necessary to builder's road, does not influence surrounding traffic, work efficiency is fast, precision is high, low cost.This Utility model integration Bridge Erector can be assembled in the roadbed section near bridge, and the installation of beam slab can make full use of Precast Pier Columns Carried out with bent cap grouting slurry intensity process.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model integration Bridge Erector.
Wherein:1-girder, 2-auxiliary leg, 3-front leg strut, 4-rear support leg, 5-preceding overhead traveling crane, 6-rear overhead traveling crane, 7- Pier stud, 8-bent cap, 9-beam slab, 10-cushion cap.
Embodiment
In order to more specifically describe the utility model, below in conjunction with the accompanying drawings and embodiment is to of the present utility model Technical scheme is described in detail.
As shown in figure 1, the utility model integration Bridge Erector includes girder 1, girder 1 has auxiliary leg 2, front leg strut 3 With 4 three supporting legs of rear support leg, moveable preceding overhead traveling crane 5 and rear overhead traveling crane 6 is set on girder 1 to be used to assist to transport and install prefabricated structure Part.
Crane's major girder 1 is primary load bearing structure, is steel truss structure;Auxiliary leg 2, which is supported on, to be needed to install pier stud The side of construction bearing platform 10, it can be fixed by concrete bracket or steel construction anchor ear;Front leg strut 3 be supported on installed pier stud 7 and The front side of bent cap 8, rear support leg 4, which is supported on, has installed the top of beam slab 9.Moveable preceding overhead traveling crane 5 and rear overhead traveling crane 6 are set on girder 1, used In assistance installation Precast Pier Columns, bent cap and beam slab;Leading face between auxiliary leg 2 and front leg strut 3 is used to install pier Post and bent cap, the rear working face between front leg strut 3 and rear support leg 4 are used to install beam slab.
Different from traditional Bridge Erector only with a working face, the utility model Bridge Erector has two working faces, Leading face is used to set up pier stud and bent cap, and rear working face is used to set up beam slab.Upper one after installing, integration is built bridge Machine is moved to next across and being transported pier stud to leading face using forward and backward overhead traveling crane and be rotatably mounted to position;Then the day before yesterday is utilized Bent cap is transported to leading face and is rotatably mounted to position by car;Finally beam slab is transported to rear working face using forward and backward overhead traveling crane It is installed in place;Complete new one after the installation of pier stud, bent cap and beam slab mobile Bridge Erector to next collapse continue to install.
The above-mentioned description to embodiment is understood that for ease of those skilled in the art and using this practicality It is new.Person skilled in the art obviously can easily make various modifications to above-described embodiment, and illustrating herein General Principle be applied in other embodiment without by performing creative labour.Therefore, the utility model is not limited to above-mentioned Embodiment, those skilled in the art according to announcement of the present utility model, all should by the improvement made for the utility model and modification Should be within the scope of protection of the utility model.

Claims (4)

1. the integrated Bridge Erector of a kind of Short/Medium Span Bridge pier stud, bent cap and beam slab, include the girder of truss-like;Its feature exists In:
The girder front portion by auxiliary leg be supported on n-th+3 across cushion cap on, should be across not yet installing pier stud on its cushion cap And bent cap;In the middle part of girder by front leg strut be supported on n-th+2 across pier stud bent cap on, should across installed on its cushion cap pier stud and Bent cap but beam slab is not yet erected between with (n+1)th;Girder rear portion is supported on n-th across (n+1)th between by rear support leg On beam slab, n-th across with (n+1)th across install on respective cushion cap pier stud and bent cap and two across bent cap on erected beam Plate, n are the natural number more than 0.
2. integrated Bridge Erector according to claim 1, it is characterised in that:The moveable day before yesterday is provided with the girder Car and rear overhead traveling crane, for assisting transport and installation Precast Pier Columns, bent cap and beam slab.
3. integrated Bridge Erector according to claim 1, it is characterised in that:The girder possesses two working faces, between Leading face between auxiliary leg and front leg strut is used to install pier stud and bent cap, the rear work between front leg strut and rear support leg Make face to be used to beam slab be installed.
4. integrated Bridge Erector according to claim 1, it is characterised in that:The auxiliary leg using concrete bracket or Steel construction anchor ear is fixed with cushion cap.
CN201721031870.0U 2017-08-17 2017-08-17 The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab Active CN207130633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721031870.0U CN207130633U (en) 2017-08-17 2017-08-17 The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721031870.0U CN207130633U (en) 2017-08-17 2017-08-17 The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab

Publications (1)

Publication Number Publication Date
CN207130633U true CN207130633U (en) 2018-03-23

Family

ID=61635129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721031870.0U Active CN207130633U (en) 2017-08-17 2017-08-17 The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab

Country Status (1)

Country Link
CN (1) CN207130633U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460830A (en) * 2017-08-17 2017-12-12 浙江省交通规划设计研究院 The full precast bridge of Mid and minor spans is without sidewalk scheme of architecture
CN112195798A (en) * 2020-08-21 2021-01-08 中交第二航务工程局有限公司 Segmental assembling integrated bridge girder erection machine and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460830A (en) * 2017-08-17 2017-12-12 浙江省交通规划设计研究院 The full precast bridge of Mid and minor spans is without sidewalk scheme of architecture
CN112195798A (en) * 2020-08-21 2021-01-08 中交第二航务工程局有限公司 Segmental assembling integrated bridge girder erection machine and construction method thereof

Similar Documents

Publication Publication Date Title
CN107460830A (en) The full precast bridge of Mid and minor spans is without sidewalk scheme of architecture
CN203049832U (en) Assembling type shear wall structure
CN107558378B (en) Bridge girder erection machine for erecting full precast girder and bridge girder erection method thereof
CN105256723A (en) Multi-girder section steel-doublelayer concrete bridge deck composite beam implementing technology
CN104097253A (en) Environment-friendly movable precast track beam formwork system in straddle type monorail transit
CN107740350A (en) The bridge pier column construction method and its passing method of full precast bridge Bridge Erector
CN102605719B (en) Construction method for splicing and erecting concrete precast beam sections
CN207130633U (en) The integrated Bridge Erector of Short/Medium Span Bridge pier stud, bent cap and beam slab
CN110093863A (en) A kind of double face integration Bridge Erector being not provided with front leg strut
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN109868726A (en) A kind of prefabricated assembled cylindricality bridge pier and its construction method
CN108842529A (en) The rapid splicing structure in streetcar track basis and construction method
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN103410104B (en) The bearing replacement method and apparatus of overhead road of city
CN116427281A (en) Pier column, capping beam and T beam integrated bridge girder erection machine installation construction method
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN212583040U (en) Prefabricated concrete pi-shaped beam for railway passenger station fabricated concrete canopy
CN203834338U (en) Integrated road and track bridge
CN210596966U (en) Large-span steel-concrete composite bridge structure
CN210395394U (en) Steel structure foundation for long-distance construction of large modular structure
CN105862598A (en) Guide beam non-moving lifting type construction method for tunnel-through operation of 24-meter first span of bridge erecting machine
CN102220808A (en) Beam lowering construction method of frame structure
CN206173812U (en) Novel construction of continuous beam displacement device of bridge
CN207027858U (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN111502119A (en) Prefabricated concrete pi-shaped beam for railway passenger station fabricated concrete canopy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 89 round City West Road, Xihu District, Hangzhou, Zhejiang

Patentee after: Zhejiang transportation planning and Design Research Institute Co., Ltd.

Address before: No. 89 round City West Road, Xihu District, Hangzhou, Zhejiang

Patentee before: Zhejiang Provincial Plan Design&Research Institute of Communications

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: No. 928, yuhangtang Road, Xihu District, Hangzhou City, Zhejiang Province 310030

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Address before: 310006 No. 89 West Ring Road, Hangzhou, Zhejiang, Xihu District

Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING DESIGN & RESEARCH Co.,Ltd.

CP03 Change of name, title or address