Prior art keywords
floating dock
well structure
valve member
dock
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720845155.4U
Other languages
Chinese (zh)
Inventor
杨俊华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd
Original Assignee
Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd filed Critical Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd
Priority to CN201720845155.4U priority Critical patent/CN207129098U/en
Application granted granted Critical
Publication of CN207129098U publication Critical patent/CN207129098U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model provides a kind of floating dock ballast cabin structure, dock floor, pontoon deck, ship hull plate and hull inner panel surround ballast tank, multiple water pumps and multiple valve members are provided with the ballast tank, all water pump and valve member centralized arrangements, all water pumps and valve member are trapped among in a separate space by the well structure that encloses of upper open-ended, the bottom margin for enclosing well structure is tightly connected with dock floor, and the height for enclosing well structure is more than the water pump and valve member of extreme higher position.The utility model normally rises and falls on the premise of operation not influenceing floating dock, the pump-out of ballast tank when greatly reducing maintenance water pump and valve member, shortens time;Silt covering and corrode to relevant device is reduced, it is simple in construction effective.

Description

A kind of floating dock ballast cabin structure
Technical field
It the utility model is related to a kind of floating dock ballast cabin structure.
Background technology
At present, the arrangement form of floating dock pump room mainly has two types, and one kind is set in the topside floating body of floating dock One dry cabin not intake when sinking, does centralized arrangement draining pump, motor and various valves in cabin, is referred to as the cloth of " dry pump room " Put form;Another is that on safety deck refer to the attached drawing 1, motor drive installation is arranged on into dock bottom by vertical water pump In ballast tank 4, it is connected between motor 100 and water pump 4 with a root long axle 101, it is water pump 4, collector pipe, each in addition to motor 100 Kind valve member 5 (water intaking valve, draining valve and distributing valve etc.) works in the water of ballast tank 4, and this arrangement form is referred to as " wet pump Cabin " form.
Wet pump room arrangement form has the volume for saving ballast tank, reduces construction weight, and ballast tank is symmetrical, is easy to management etc. excellent Point;But draining pump be present and valve member is easily corroded, and the shortcomings that inconvenience maintenance;And dry pump room advantage and disadvantage just with wet pump room On the contrary, the arrangement form of dry pump room and the arrangement form of wet pump room need to choose according to the difference of shipyard.
Absorbed water when the water pump and valve member of wet pump room are safeguarded and overhauled, it is necessary to which floating dock is risen floating to work, now Still there is residual water in ballast tank, typically about 1m~1.5m is high, it usually needs further drains water.Due to floating dock ballast tank General area is all larger, occupies more than the 90% of floating box structure, and water level is not high, and the pump at floating dock itself draws water to residual water It is less efficient, if drawn water using stripping pump, because its discharge capacity is limited, even if carrying out draining to single ballast tank, also Long period.Many sludge can be gathered with the increase of usage time, floating dock ballast tank bottom simultaneously, cover and corrode water pump and Valve member.Therefore how to be easy to the maintenance of water pump and valve member and maintenance is those skilled in the art's technical problems to be solved.
Utility model content
The technical problems to be solved in the utility model is to provide what a kind of valve member that can be easy to water pump was safeguarded and overhauled Floating dock ballast cabin structure, to overcome the defects of prior art.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical scheme that:A kind of floating dock ballast cabin structure, Dock floor, pontoon deck, ship hull plate and hull inner panel surround ballast tank, and multiple water pumps and multiple are provided with the ballast tank All water pumps and valve member are trapped among an independent sky by valve member, all water pump and valve member centralized arrangements, the well structure that encloses of upper open-ended Between in, the bottom margin for enclosing well structure and dock floor are tightly connected, and the height for enclosing well structure is more than extreme higher position Water pump and valve member.
Preferably, the well structure that encloses is arc, and two sides of arc are tightly connected with ship hull plate respectively, arc The bottom margin of shape plate is tightly connected with dock floor.
Preferably, the height for enclosing well structure is 1.5m~2m.
Preferably, the well structure that encloses is provided with multiple stiffeners.
Further, the stiffener is vertically arranged.
Further, the spacing between the stiffener is 500mm~900mm.
Preferably, the well structure that encloses is provided with the bracket being connected with dock floor.
Preferably, described enclose is respectively equipped with vertical ladder inside and outside well structure.
As described above, a kind of floating dock ballast cabin structure of the utility model, has the advantages that:
When floating dock normally sinks and floated, due to enclosing well structure only lower part watertight, top is unlimited, and floating dock is floated Operation and sinking operation are normally carried out;When it is time for repair, after floating dock floats up to work drinking water, residual water is general in ballast tank For 1m or so, personnel, which need to only drain the ballast water enclosed in well structure, can carry out the maintenance of water pump and valve member, preliminary preparation Time is greatly decreased.The utility model normally rises and falls on the premise of operation not influenceing floating dock, ensures ballast tank volume, significantly The pump-out of ballast tank when reducing maintenance water pump and valve member, shortens time;Reduce silt to relevant device cover and it is rotten Erosion, it is simple in construction effective.
Brief description of the drawings
Fig. 1 is implementation structure chart of the wet pump room on floating dock.
Fig. 2 is overlooking the structure diagram of the present utility model.
Fig. 3 is side, sectional view of the present utility model.
Fig. 4 is the schematic diagram that well structure is enclosed in the utility model.
Fig. 5 is to enclose well structure construction profile in the utility model.
In figure:
The pontoon deck of 1 dock floor 2
The hull inner panel of 31 ship hull plate 32
The water pump of 4 ballast tank 5
The annular of 6 valve member 7 encloses well structure
The bracket of 71 stiffener 72
The 73 vertical panels of purlin 74
The major axis of 100 motor 101
Embodiment
Structure, ratio, size depicted in Figure of description etc., only to coordinate the content disclosed in specification, with Understand for those skilled in the art and read, be not limited to the enforceable qualifications of the utility model, therefore do not have skill Essential meaning in art, the modification of any structure, the change of proportionate relationship or the adjustment of size, do not influenceing the utility model institute Under the effect of producing and the purpose that can reach, the model that can cover in the technology contents disclosed in the utility model all should be fallen In enclosing.Meanwhile cited such as " on ", " under ", "front", "rear", " centre " term in this specification, it is merely convenient to describe Understand, and be not used to limit the enforceable scope of the utility model, its relativeness is altered or modified, without substantive change Under technology contents, when being also considered as the enforceable category of the utility model.
As shown in figure 1, a kind of floating dock ballast cabin structure of the utility model, dock floor 1, pontoon deck 2, ship hull plate 31 and hull inner panel 32 surround ballast tank 4, the utility model is applied to the arrangement form of " wet pump room ";It is described with reference to Fig. 1-Fig. 5 Multiple water pumps 5 and multiple valve members 6, all water pump 5 and valve member 6 centralized arrangements are provided with ballast tank 4, upper open-ended encloses well structure 7 are trapped among all water pumps 5 and valve member 6 in an independent space, and the bottom margin for enclosing well structure 7 and dock floor 1 are close Envelope connection, that is, it is semi-enclosed structure to enclose well structure 7;The height for enclosing well structure 7 is more than the water pump 5 and valve member of extreme higher position 6。
The well structure 7 that encloses of the present embodiment can be made up of or by closing coaming plate and side plate 31 Annular coaming plate is separately formed;It is arc, two sides of arc and ship hull plate 31 that well structure 7 is enclosed described in the present embodiment It is tightly connected, bottom margin and the dock floor 1 of arc are tightly connected, i.e., arc, ship hull plate 31 and dock floor 1 enclose Into the separate space of an only upper opening.Arc is watertight structure, and various pipings are through place using welding or watertight connector Ensure watertight.Below by arc surround enclose well area exemplified by the utility model is illustrated.
With reference to Fig. 1-Fig. 5, structural principle of the present utility model is:
1st, floating dock normally sinks operation, and when the water level in ballast tank 4 is higher than the height H of arc, water covers arc, Water level continues to rise, ballast water intercommunication inside and outside arc, therefore arc does not influence the water of ballast tank 4, nor affects on floating dock Sinking operation.
2nd, when floating dock floats up to operating draft, the water level decreasing of ballast tank 4, typically to 1m~1.5m or so, according to mould Intend experiment, arc highly highly adds 0.5m or so, therefore arc height for residual water in the working condition ballast tank of floating dock For 1.5m~2m.When the water level decreasing of ballast tank 4 is to above-mentioned height, the water level for enclosing well area remains as H, but encloses well area Area is much smaller than whole ballast tank 4, therefore floating dock is floated almost without influence.
3rd, maintenance water pump 5 and valve member 6, maintenance personal is such as needed only the water enclosed in well area to be evacuated into arc with drip pump Shape plate is outer, allows and encloses well area and form relatively dry maintenance section.
4th, enclosing the water in well area can extract out in time, therefore enclose the also less alluvial of the silt in well area.
As shown in Figure 4 and Figure 5, the arc in the utility model is provided with multiple stiffeners 71, and stiffener 71 can be horizontal Can also be vertically arranged to setting, it is in the present embodiment that stiffener 71 is vertically arranged.Further, the stiffener on arc 71 spacing can be consistent with the stiffener spacing at floating dock, can also combine the unified consideration of surrounding structure, and its intensity can bear 2m hydraulic pressure The lateral load of head, the spacing between stiffener 71 in the present embodiment is 500mm~900mm.
With reference to figure 4 and Fig. 5, in addition, arc is provided with the vertical purlin 73 parallel with stiffener 71, the top sides of arc The panel 74 of edge, the top of arc are additionally provided with the bracket 72 being connected with panel 74, and the bottom of arc is provided with and dock floor 1 The bracket 72 of connection.The structural strength of stiffener 71, the thickness of arc and stiffener according to corresponding arc height H water Pressure head carries out calculating selection, such as the thickness t=(3.9*s*H of arc0.5+ 2.5mm) mm, stiffener modulus of section W=(3.5* s*H2)cm3;Wherein s is the aggregate spacing of stiffener, wherein 3.9,3.5 be to refer to coefficient as defined in classification society.
Enter for ease of personnel, vertical ladder is respectively equipped with inside and outside the arc.
In summary, a kind of floating dock ballast cabin structure of the utility model, on the premise of ballast tank volume is ensured, it is easy to Water pump and valve member are safeguarded and overhauled.So the utility model effectively overcomes some practical problems of the prior art So as to have very high value and using meaning.
Above-mentioned embodiment only illustrative principle of the present utility model and its effect are new not for this practicality is limited Type.The utility model also has many aspects to be improved on the premise of without prejudice to overall thought, for being familiar with this technology Personage all can carry out modifications and changes to above-described embodiment without prejudice under spirit and scope of the present utility model.Therefore, Such as those of ordinary skill in the art is without departing from the spirit disclosed in the utility model and institute under technological thought All equivalent modifications completed or change, should be covered by claim of the present utility model.

Claims (8)

1. a kind of floating dock ballast cabin structure, dock floor (1), pontoon deck (2), ship hull plate (31) and hull inner panel (32) Ballast tank (4) is surrounded, multiple water pumps (5) and multiple valve members (6) are provided with the ballast tank (4), it is characterised in that:All water pumps (5) and all water pumps (5) and valve member (6) are trapped among an independence by valve member (6) centralized arrangement, the well structure (7) that encloses of upper open-ended In space, the bottom margin for enclosing well structure (7) and dock floor (1) are tightly connected, it is described enclose well structure (7) height it is big Water pump (5) and valve member (6) in extreme higher position.
A kind of 2. floating dock ballast cabin structure according to claim 1, it is characterised in that:The well structure (7) that encloses is arc Shape plate, two sides of arc are tightly connected with ship hull plate (31) respectively, bottom margin and the dock floor (1) of arc It is tightly connected.
A kind of 3. floating dock ballast cabin structure according to claim 1, it is characterised in that:The height for enclosing well structure (7) Spend for 1.5m~2m.
A kind of 4. floating dock ballast cabin structure according to claim 1, it is characterised in that:Described enclose sets on well structure (7) There are multiple stiffeners (71).
A kind of 5. floating dock ballast cabin structure according to claim 4, it is characterised in that:The stiffener (71) is vertical Set.
A kind of 6. floating dock ballast cabin structure according to claim 5, it is characterised in that:Between the stiffener (71) Spacing is 500mm~900mm.
A kind of 7. floating dock ballast cabin structure according to claim 1, it is characterised in that:Described enclose sets on well structure (7) There is the bracket (72) being connected with dock floor (1).
A kind of 8. floating dock ballast cabin structure according to claim 1, it is characterised in that:It is described to enclose the interior of well structure (7) Outer both sides are respectively equipped with vertical ladder.
CN201720845155.4U 2017-07-12 2017-07-12 A kind of floating dock ballast cabin structure Active CN207129098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720845155.4U CN207129098U (en) 2017-07-12 2017-07-12 A kind of floating dock ballast cabin structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720845155.4U CN207129098U (en) 2017-07-12 2017-07-12 A kind of floating dock ballast cabin structure

Publications (1)

Publication Number Publication Date
CN207129098U true CN207129098U (en) 2018-03-23

Family

ID=61634248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720845155.4U Active CN207129098U (en) 2017-07-12 2017-07-12 A kind of floating dock ballast cabin structure

Country Status (1)

Country Link
CN (1) CN207129098U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109533223A (en) * 2019-01-02 2019-03-29 烟台龙港泵业股份有限公司 A kind of automatic sweeping pump installation of vertical dual circuit
CN111661240A (en) * 2020-05-26 2020-09-15 大连船舶重工集团有限公司 Independent ballast tank with ballast pump cabin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109533223A (en) * 2019-01-02 2019-03-29 烟台龙港泵业股份有限公司 A kind of automatic sweeping pump installation of vertical dual circuit
CN111661240A (en) * 2020-05-26 2020-09-15 大连船舶重工集团有限公司 Independent ballast tank with ballast pump cabin

Similar Documents

Publication Publication Date Title
CN207129098U (en) A kind of floating dock ballast cabin structure
CN2820957Y (en) Downward spleeping type rotary bear-trap gate
CN215817998U (en) Photovoltaic power plant on water
CN107600307A (en) Oil carrier
CN206750075U (en) Ship wheel house lowering or hoisting gear
CN105151226B (en) The anti-blocking seabed intake system of high-speed craft anticreep
CN202828041U (en) Steel concrete combination box type floating dock door
CN205046612U (en) Building rainwater collection and utilization device
CN212728467U (en) Deep sea fish culture box with space grid structure
CN206993032U (en) A kind of floating box type solar panels mounting bracket waterborne
CN2507912Y (en) Float box type automatic gate for overfall dam
CN205350550U (en) Waterproof cable crane span structure
CN207039512U (en) photovoltaic bracket mounting structure
CN208251717U (en) One kind being completely filled with steel bar concrete basin
CN217870789U (en) Same-layer drainage water seal part of micro-drop plate
CN212464350U (en) Energy-saving irrigation device
CN203462564U (en) Water-draining beam laminating well for connecting water-draining box culvert with sea area
CN217561477U (en) Float for monitoring water quality
CN203362224U (en) Main-auxiliary water tank for hanging scaffolds
CN203188326U (en) Device for waste water to flow into toilet bowl automatically after flush of toilet bowl
CN220602657U (en) Water level monitor
CN103469883B (en) A kind of draining stoplog well be connected with marine site for Box-shaped Drainage Culvert
CN214301953U (en) Tailing backwater safety pontoon water intake device
CN207968379U (en) Frost heave cracking photovoltaic bracket ruggedized construction
CN113636506B (en) A material hoisting device for road and bridge construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant