CN207128037U - Isolation railings for road cement post process units - Google Patents

Isolation railings for road cement post process units Download PDF

Info

Publication number
CN207128037U
CN207128037U CN201721080198.4U CN201721080198U CN207128037U CN 207128037 U CN207128037 U CN 207128037U CN 201721080198 U CN201721080198 U CN 201721080198U CN 207128037 U CN207128037 U CN 207128037U
Authority
CN
China
Prior art keywords
cement
cell body
welded
baffle plate
lower section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721080198.4U
Other languages
Chinese (zh)
Inventor
宋良友
于孟文
秦光明
李绍宾
石丰功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Keda Infrastructure Co Ltd
Original Assignee
Shandong Keda Infrastructure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Keda Infrastructure Co Ltd filed Critical Shandong Keda Infrastructure Co Ltd
Priority to CN201721080198.4U priority Critical patent/CN207128037U/en
Application granted granted Critical
Publication of CN207128037U publication Critical patent/CN207128037U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model discloses a kind of isolation railings for road cement post process units, including cement cell body, cement cell body is welded with handle, support base and fixed mount, the bottom plate center of fixed mount is provided with perforation, the hole that perforation is provided with cement cell body bottom plate is on a vertical curve, the lower section of fixed mount is provided with reinforcing bar baffle plate, side is respectively provided with a connecting seat before and after the both ends of reinforcing bar baffle plate, two connecting seats are welded with lever below the end of support base, the homonymy of two support bases is respectively welded with a semicircular rolling frame, groove is provided with above the both ends of cement cell body, on the same vertical plane of groove hole is provided with positioned at cement tub body bottom plate center, groove and hole is movable is connected with cement baffle plate, cement cell body is positioned on vibration table and worked, the lower section of vibration table is fixed with oscillating column pump with bolt.The inside cement of the cement post of the utility model production is evenly distributed, and edge should not damage brokenly angle, and the quality of production is good, efficiency high.

Description

Isolation railings for road cement post process units
Technical field
It the utility model is related to a kind of highway process units, and in particular to a kind of isolation railings for road is produced with cement post Device.
Background technology
At present, isolation railings for road is all to put template well on the ground with cement post, then places steel reinforcement cage, injects cement, Deng cement it is somewhat solid after template lifted taken away, this preparation method wastes time and energy, and the cement of the cement post produced is not It is enough uniform, and edge is easily broken fast when template lifts.
Utility model content
The defects of the purpose of this utility model exists aiming at prior art, there is provided a kind of production efficiency is high, production matter Measure, conveniently isolation railings for road cement post process units.
Its technical scheme is:A kind of isolation railings for road cement post process units, including cement cell body, the cement tub The both ends of body are respectively welded with two handles, and support base is welded with below handle, welds and sets below the centre position of cement cell body There is fixed mount, the bottom plate center of fixed mount is provided with perforation, and the hole that perforation is provided with cement cell body bottom plate is in a vertical curve On, the lower section of fixed mount is welded on cement cell body provided with reinforcing bar baffle plate, and side is respectively provided with a connection before and after the both ends of reinforcing bar baffle plate Seat is welded on reinforcing bar baffle plate and cement cell body, and two connecting seats are welded with lever, two branch below the end of support base The homonymy of support seat is respectively welded with a semicircular rolling frame, and the both ends of cement cell body are connected bar and strengthen fixing, cement cell body Both ends above be provided with groove, be provided with hole positioned at cement tub body bottom plate center on the same vertical plane of groove, groove and hole can Flexible connection is provided with cement baffle plate, and cement baffle plate both sides are welded with cross bar insertion groove and are connected, welded below cement baffle plate There is montant insertion hole to be connected, cement cell body is positioned on vibration table and worked, and vibrates each fixed welding in table both ends of table There are the first rectangular block and the second rectangular block, the intermediate gaps just gapless placement two of two the first rectangular blocks and the second rectangular block Individual connecting seat, two levers are just stuck in the side of the first rectangular block and the second rectangular block away from vibration table center, vibrate table Lower section is fixed with oscillating column pump with bolt, and oscillating column pump is connected with attaching plug.
Steel reinforcement cage handle is overlapped with above the cement cell body, is welded below steel reinforcement cage handle and is provided with two bending claws.
The utility model compared with prior art, has advantages below:It is reasonable in design, simple in construction, it is practical.This The inside cement of the cement post of utility model production is evenly distributed, and edge should not damage brokenly angle, and the quality of production is good, efficiency It is high.
Brief description of the drawings
Fig. 1 is a kind of front view of the cement cell body of embodiment of the utility model;
Fig. 2 is a kind of left view of the cement cell body of embodiment of the utility model;
Fig. 3 is a kind of top view of the cement cell body of embodiment of the utility model;
Fig. 4 is a kind of structure chart of the cement baffle plate of embodiment of the utility model;
Fig. 5 is a kind of structure chart of the steel reinforcement cage handle of embodiment of the utility model;
Fig. 6 is a kind of structure chart of the vibration table of embodiment of the utility model.
Embodiment
Reference picture 1-6, a kind of isolation railings for road cement post process units, including cement cell body 1, the cement cell body 1 both ends are respectively welded with two handles 2, and the lower section of handle 2 is welded with support base 3, welded below the centre position of cement cell body 1 Provided with fixed mount 4, the bottom plate center of fixed mount 4 is provided with perforation, and the hole 11 that perforation is provided with the bottom plate of cement cell body 1 is at one On vertical curve, the lower section of fixed mount 4 is welded on cement cell body 1 provided with reinforcing bar baffle plate 5, and side is respectively set before and after the both ends of reinforcing bar baffle plate 5 There is a connecting seat 6 to be welded on reinforcing bar baffle plate 5 and cement cell body 1, two connecting seats 6 weld below the end of support base 3 Lever 7 is connected to, the homonymy of two support bases 3 is respectively welded with a semicircular rolling frame 8, and the both ends of cement cell body 1 are connected Bar 10 is strengthened fixing, and is provided with groove 9 above the both ends of cement cell body 1, is located at the bottom plate of cement tub body 1 on 9 same vertical plane of groove Center is provided with hole 11, groove 9 and hole 11 is movable is connected with cement baffle plate 12, and the both sides of cement baffle plate 12 are welded with cross bar 13 insertion grooves 9 are connected, and the lower section of cement baffle plate 12 is welded with the insertion hole 11 of montant 14 and is connected, and cement cell body 1 is put It is placed on vibration table 17 and works, the table both ends of vibration table 17 are respectively fixedly welded with the first rectangular block 20 and the second rectangular block 21, Just gapless places two connecting seats 6 to the intermediate gaps of two the first rectangular blocks 20 and the second rectangular block 21, and two levers 7 are just The first rectangular block 20 and the second side of the rectangular block 21 away from vibration table 17 center are stuck in well, and the lower section of vibration table 17 is consolidated with bolt Surely there is oscillating column pump 18, oscillating column pump 18 is connected with attaching plug 19.
The top of cement cell body 1 is overlapped with steel reinforcement cage handle 15, and the welding of the lower section of steel reinforcement cage handle 15 is provided with two bending claws 16。
When specifically used, cement cell body 1 is placed on the first rectangular block vibrated on table 17 by connecting seat 6 and lever 7 20 and second rectangular block 21 intermediate gaps at, two levers 7 are just stuck in the first rectangular block 20 and the second rectangular block 21 is remote The side at the center of table 17 is vibrated, keeps cement cell body 1 stable not traversing, the cross bar 13 on cement baffle plate 12 is then embedded in groove 9, montant 14 is embedded in hole 11, and then the steel reinforcement cage woven is placed in cement cell body 1, with curved on steel reinforcement cage handle 15 Pawl 16 hooks steel reinforcement cage, and steel reinforcement cage handle 15 is overlapped on edge on cement cell body 1, steel reinforcement cage is kept vacant state, then with flat Straight steel bar vertical penetrates the perforation at hole 11 and the bottom plate center of fixed mount 4, is put down above straight reinforcing bar with the upper of cement cell body 1 Face is equally high, and lower section is blocked by reinforcing bar baffle plate 5, then toward joints cement in cement cell body 1, plugs in, in oscillating column pump 18 Cement is set to be evenly distributed under effect, then two personal hand-held handles 2 lift cement cell body 1 is positioned over ground by support base 3, Then carrying out rolling by semicircular rolling frame 8 makes cement post back-off on the ground, then lifts cement cell body 1, water Mud baffle plate 12 comes off therewith, then gently takes cement baffle plate 12 away from cement post with hand, protects cement post corner not Collided with damage, after cement post is completely solid, the straight steel bar bending for being blocked reinforcing bar baffle plate 5 with hammer is bent, for water The mounting of separation net between mud column.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (2)

1. a kind of isolation railings for road cement post process units, including cement cell body(1), it is characterised in that:The cement tub Body(1)Both ends be respectively welded with two handles(2), handle(2)Lower section be welded with support base(3), cement cell body(1)Centre Welding is provided with fixed mount below position(4), fixed mount(4)Bottom plate center be provided with perforation, perforation with cement cell body(1)On bottom plate The hole being provided with(11)On a vertical curve, fixed mount(4)Lower section be provided with reinforcing bar baffle plate(5)It is welded on cement cell body(1), Reinforcing bar baffle plate(5)Both ends before and after side be respectively provided with a connecting seat(6)It is welded on reinforcing bar baffle plate(5)With cement cell body(1)On, two Individual connecting seat(6)Close to support base(3)End below be welded with lever(7), two support bases(3)Homonymy be respectively welded with one Individual semicircular rolling frame(8), cement cell body(1)Both ends be connected bar(10)Strengthen fixing, cement cell body(1)Both ends on Side is provided with groove(9), groove(9)It is located at cement tub body on same vertical plane(1)Bottom plate center is provided with hole(11), groove(9) And hole(11)It is movable to be connected with cement baffle plate(12), cement baffle plate(12)Both sides are welded with cross bar(13)Embedded groove (9)It is connected, cement baffle plate(12)Lower section is welded with montant(14)Embedded hole(11)It is connected, cement cell body(1)Put It is placed in vibration table(17)Upper work, vibrate table(17)Table both ends be respectively fixedly welded with the first rectangular block(20)With the second rectangle Block(21), two the first rectangular blocks(20)With the second rectangular block(21)Intermediate gaps just gapless place two connecting seats (6), two levers(7)Just it is stuck in the first rectangular block(20)With the second rectangular block(21)Away from vibration table(17)The one of center Side, vibrate table(17)Lower section be fixed with oscillating column pump with bolt(18), oscillating column pump(18)It is connected with attaching plug(19).
2. isolation railings for road according to claim 1 cement post process units, it is characterised in that:The cement cell body (1)Top is overlapped with steel reinforcement cage handle(15), steel reinforcement cage handle(15)Lower section welding is provided with two bending claws(16).
CN201721080198.4U 2017-08-28 2017-08-28 Isolation railings for road cement post process units Active CN207128037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721080198.4U CN207128037U (en) 2017-08-28 2017-08-28 Isolation railings for road cement post process units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721080198.4U CN207128037U (en) 2017-08-28 2017-08-28 Isolation railings for road cement post process units

Publications (1)

Publication Number Publication Date
CN207128037U true CN207128037U (en) 2018-03-23

Family

ID=61636179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721080198.4U Active CN207128037U (en) 2017-08-28 2017-08-28 Isolation railings for road cement post process units

Country Status (1)

Country Link
CN (1) CN207128037U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110253728A (en) * 2019-06-06 2019-09-20 嘉兴望族实业有限公司 A kind of highway isolated fence concrete column mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110253728A (en) * 2019-06-06 2019-09-20 嘉兴望族实业有限公司 A kind of highway isolated fence concrete column mold

Similar Documents

Publication Publication Date Title
CN201891260U (en) Hanging template
CN207128037U (en) Isolation railings for road cement post process units
CN214834713U (en) Die carrier that side wall and bottom plate were pour simultaneously
CN206625559U (en) A kind of holding clamp suitable for concrete column structure
CN102493480A (en) Reusable die for equipment foundation reserved square hole
CN102465605A (en) Method for building bottom plate steel bar support
CN206810671U (en) A kind of sieve sand equipment for construction
CN206143916U (en) Fabricated frame structure post post connected node
CN206493404U (en) A kind of batch shaped device for building elevation concrete block
CN210256613U (en) Small-size concrete prefabricated part forming device that vibrates fast
CN201962948U (en) Concrete beam pouring template with embedded part at top
CN212105168U (en) Floor thickness control instrument
CN212602434U (en) Frivolous concrete prefabricated section vibration device
CN102561692A (en) Method and template for pouring concrete beam or column with embedded part at top
CN207003737U (en) A kind of assembling wall body structure with decorative plate of outer wall
CN208650519U (en) The flooring de-molding device of concrete surface is pried away from for internal corner formwork
CN105317056A (en) Reinforced inspection well cover plate
CN216465224U (en) Steel bar structure positioning tool
CN218431275U (en) A transport vechicle for vibratory hammer transports
CN215241692U (en) Prefabricated apron form removal instrument in highway escape canal
CN217759867U (en) Novel concrete placement manual operation platform
CN109653419A (en) A kind of detachable prepackage steel-concrete composite beam plate structure
CN201908437U (en) Concrete column casting die plate with embedded part at top
CN216096343U (en) Sub vehicle frame hits core shake sand machine
CN107605159A (en) Secondary structure vertical member concrete construction pours device and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant