CN207110279U - A kind of ecological, environmental protective roof pipeline structure - Google Patents

A kind of ecological, environmental protective roof pipeline structure Download PDF

Info

Publication number
CN207110279U
CN207110279U CN201720695986.8U CN201720695986U CN207110279U CN 207110279 U CN207110279 U CN 207110279U CN 201720695986 U CN201720695986 U CN 201720695986U CN 207110279 U CN207110279 U CN 207110279U
Authority
CN
China
Prior art keywords
plate
chute
fixture
water pipe
ecological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720695986.8U
Other languages
Chinese (zh)
Inventor
李伟志
黄荣辉
刘勇
王文文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Aodesi Landscape And Architecture Planning And Design Institute Co Ltd
Original Assignee
Shenzhen Aodesi Landscape And Architecture Planning And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Aodesi Landscape And Architecture Planning And Design Institute Co Ltd filed Critical Shenzhen Aodesi Landscape And Architecture Planning And Design Institute Co Ltd
Priority to CN201720695986.8U priority Critical patent/CN207110279U/en
Application granted granted Critical
Publication of CN207110279U publication Critical patent/CN207110279U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a kind of ecological, environmental protective roof pipeline structure, solve the problems, such as that the common water pipe dismounting fixed vertically is inconvenient, its drip irrigation device is, including water pipe, the water pipe is connected with clamping element, the clamping element includes the first plate and the second plate, it is engaged by clamping between first plate and the second plate to clamp water pipe, the clamping element is connected to fixture, the fixture is used for the outer surface for being fixed on wall, fixed between the clamping element and fixture by latch, reach the purpose of fast assembling-disassembling water pipe.

Description

A kind of ecological, environmental protective roof pipeline structure
Technical field
Environmental technology field is the utility model is related to, more particularly to a kind of ecological, environmental protective roof pipeline structure.
Background technology
Rain Garden is the scrobicula greenery patches of self-assembling formation or hand digging, be used to converge and absorbs from roof or ground The rainwater in face, rainwater is purified by the comprehensive function of plant, sandy soil, and is allowed to gradually penetrate into soil, recharging groundwater, Or be allowed to feed the urban waters such as landscape water, lavatory water, it is that a kind of rainwater management of ecological sustainability is set with rainwater utilization Apply.
The rainwater on roof is to be transported to by the water pipe being fixed on wall in scrobicula greenery patches.During fixed water pipe, first in wall A part for pipe clamp is fixed on wall with expansion bolt, then water pipe is placed on the part pipe clamp, followed by by other one It is in charge of card to be screwed on the part pipe clamp with screw.But need to come out screw disassembling when dismantling water pipe, it is very troublesome.
Utility model content
The purpose of this utility model is to provide a kind of ecological, environmental protective roof pipeline structure, has dismounting water pipe easily excellent Point.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of ecological, environmental protective roof Pipeline configuration, including water pipe, the water pipe are connected with clamping element, and the clamping element includes the first plate and the second plate, and described first It is engaged by clamping between plate and the second plate to clamp water pipe, the clamping element is connected to fixture, and the fixture is used to be fixed on The outer surface of wall, fixed between the clamping element and fixture by latch.
By using above-mentioned technical proposal, when installing water pipe on wall, first fixture is fixed on by expansion bolt On wall;Then water pipe is clamped by way of being connected together with the first plate and the second plate of clamping element;Followed by with latch Clamping element is fixed on to the outer surface of fixture, and then water pipe is connected to the outer surface of fixture, water pipe is suspended on wall It is not easily disconnected from.When dismantling water pipe, latch takes out from fixture, you can water pipe is taken out from wall, it is very convenient.
Of the present utility model further to set, first plate is provided with the first cambered surface, and second plate is provided with the second cambered surface, The first cambered surface and the second cambered surface form the space that water pipe passes through, first cambered surface after first plate and the second plate are engaged by clamping Saw blade is fixed with the intrados of the second cambered surface.
By using above-mentioned technical proposal, when installing water pipe, the first plate and the second plate clamp water pipe respectively, the first cambered surface and Second cambered surface is bonded the outer surface of water pipe, the first plate and the second plate is more bonded the shape of water pipe.First plate and the second plate folder After tight water pipe, the Saw blade between the first plate and the second plate adds frictional force of the water pipe inside clamping element, is not easy water pipe Slided between the first plate and the second plate, improve the fastness of fixed water pipe,
Of the present utility model further to set, the both ends of first plate are provided with T-slot, the second plate both ends it is close The outer surface of first plate is fixed with T-shaped plate, and the T-shaped plate is connected together in T-slot.
By using above-mentioned technical proposal, coordinated by T-slot and T-shaped plate, the first plate of clamping element and the connection of the second plate Together, make to be not easily disconnected between the first plate and the second plate.After first plate and the second plate link together, the first plate and the second plate Between water pipe be not easily disconnected from.Take apart if necessary to the first plate and the second plate, T-shaped plate need to be only slid out come i.e. from T-slot Can, it is very convenient.
Of the present utility model further to set, the outer surface at the first plate both ends is equipped with first through hole, and described second The outer surface at the both ends of plate is equipped with the second through hole, and the first through hole connects with the second through hole, the first through hole and second Through hole is through there is latch, and one end of the latch is provided with limited cap, and the latch is inserted in fixture.
By using above-mentioned technical proposal, T-shaped plate is connected together in T-slot, the second through hole of T-shaped plate and T-slot First through hole connects, and inserts latch between first through hole and the second through hole, makes to be not susceptible to slide between T-shaped plate and T-slot, enter And make to connect more stable between T-shaped plate and T-slot.One end of latch is provided with limited cap, and limited cap is convenient to exert a force, the same to time limit Latch processed passes through first through hole and the length of the second through hole.After part latch passes through first through hole and the second through hole, by limited cap Contradict in the outer surface of clamping element, clamping element is not easily disconnected from fixture.
Of the present utility model further to set, the latch is provided with projection away from one end of limited cap, the fixture Outer surface is provided with the first chute, and first chute is connected to the second chute, and second chute is located at the inside of fixture, institute State axial direction of first chute along fixture, circumferential direction of second chute along fixture.
By using above-mentioned technical proposal, when clamping element to be fixed on to the outer surface of fixture, latch is first passed through first Through hole and the second through hole, then latch is entered to the inside of fixture along the first chute.When the end of latch is contradicted to the During the bottom of one chute, rotating latch, the projection of latch is along the second slide, and then projection is limited in the second chute It is interior, latch is not easily disconnected from fixture.
Of the present utility model further to set, second chute is connected with the 3rd chute, is slided in the 3rd chute Jam plate is connected with, axially activity of the jam plate along the first chute, is connected between the jam plate and the inwall of the 3rd chute Spring.
By using above-mentioned technical proposal, when the end of latch is contradicted to the bottom of the first chute, latch is enforced, And then latch promotes jam plate, makes the spring-compressed between jam plate and the inwall of fixture.Latch rotates certain along the second chute After angle, latch is unclamped, jam plate is movable under the action of the spring, and then jam plate coordinates the inwall of the second chute to clamp projection, Projection is limited in the second chute, latch is not easily disconnected from fixture.
Of the present utility model further to set, the inwall of second chute is provided with the first rack, the appearance of the projection Face is provided with the second rack, the first rack and the second rack occlusion.
By using above-mentioned technical proposal, after the projection of latch rotates to an angle, latch is unclamped, jam plate is in spring The lower activity of effect, and then jam plate promotes latch;The first rack occlusion on the second rack and the second chute inwall on projection, makes Projection is not susceptible to rotate in the second chute.
Of the present utility model further to set, the water pipe is connected to roof, and the water pipe deviates from one end Jiang Shui on roof Lead to tank, be sequentially provided with aquifer, bark coating, planting soil layer, hand-stuff layer, layer of sand in the tank from top to bottom And gravel layer, the gravel layer is interior to be provided with punched collection pipe.
By using above-mentioned technical proposal, when rainy, the rainwater on roof leads in tank along water pipe, then by storing Water layer, bark coating, planting soil layer, hand-stuff layer, layer of sand and gravel layer, reduce rainfall runoff.Pass through punched collection Pipe, to the further collection of rainwater.
It is of the present utility model further to set, it is provided with overflow pipe by the tank.
By using above-mentioned technical proposal, when rainwater it is more when, handle the limited in one's ability of rainwater in tank, rainwater can be from Overflow to come in the aquifer of tank.By overflow pipe, rainwater is rapidly drained.
In summary, the utility model has the advantages that:It is convenient to dismount water pipe;The rainwater on roof is handled And collect.Generally speaking the utility model, energy-conserving and environment-protective are very useful.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is the installation diagram of clamping element and latch;
Fig. 3 is the structural representation of fixture;
Fig. 4 is the sectional view in A-A faces in Fig. 3.
Reference:1st, water pipe;2nd, clamping element;21st, the first plate;211st, the first cambered surface;212nd, Saw blade;213rd, T-slot; 214th, first through hole;22nd, the second plate;221st, the second cambered surface;222nd, T-shaped plate;223rd, the second through hole;3rd, fixture;31st, first slide Groove;32nd, the second chute;321st, the first rack;33rd, jam plate;331st, spring;34th, the 3rd chute;4th, latch;41st, limited cap;42、 Projection;421st, the second rack;5th, roof;51st, fence;52nd, limbers;55th, wall;6th, tank;61st, aquifer;62nd, bark covers Cap rock;63rd, planting soil layer;64th, hand-stuff layer;65th, layer of sand;66th, gravel layer;661st, punched collection pipe;7th, overflow pipe.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of ecological, environmental protective roof pipeline structure, it refer to Fig. 1, including water pipe 1, clamping element 2, fixture 3 and latch 4.Clamping element 2 is clamping water pipe 1.Fixture 3 is fixed on the outer surface of wall 55 by expansion bolt.Latch 4 is by clamping element 2 It is fixed on the outer surface of fixture 3.The edge on roof 5, which is built, fence 51, and fence 51 makes water be not easy to flow directly out from roof 5.Enclose The outer surface on column 51 is provided with limbers 52, and one end of water pipe 1 is bonded in limbers 52, then makes water pipe 1 solid along wall 55 It is fixed, lead to the tank 6 for being arranged on ground.Tank 6 is directly to excavate to be formed on the ground.Tank 6 is laid successively from the bottom up There are gravel layer 66, layer of sand 65, hand-stuff layer 64, planting soil layer 63, bark coating 62 and aquifer 61.In gravel layer 66 It is interior to be provided with punched collection pipe 661.Overflow pipe 7 is provided with the side of aquifer 61.
It refer to Fig. 2, the clamping element 2 in Fig. 1 includes the first plate 21 and the second plate 22.The center section of first plate 21 is provided with First cambered surface 211, the first plate 21 is set to form arch.Saw blade 212 is bonded with the intrados of the first cambered surface 211.First cambered surface 211 adjacent sides are welded with T-shaped plate 222.First through hole 214 is provided with T-slot 213.
Equally, the second cambered surface 221 is provided with the center section of the second plate 22, the second plate 22 is formed arch.In the second arc Saw blade 212 is bonded with the intrados in face 221.The both ends of second plate 22 are provided with T-slot 213, and T-slot 213 is along the second plate The direction extension of 21 short side.The second through hole 223 is provided with the outer surface of the second plate 22.The through hole 223 of first through hole 214 and second Aperture it is the same.
Latch 4 is cylindric, and one end of latch 4 is welded with columned limited cap 41, and limited cap 41 is than first through hole 214 Aperture is big.The other end of latch 4 is welded with projection 42.The second rack 421 is bonded with the outer surface of projection 42.Second rack 421 towards the direction of limited cap 41.
Incorporated by reference to Fig. 3 and Fig. 4, fixture 3 includes the first chute 31, the second chute 32 and jam plate 33.First chute 31 The outer surface of fixture 3 is opened in, the inside of fixture 3 is extended to from the outer surface of fixture 3.The shape and figure of first chute 31 The afterbody of latch 4 is adapted in 2.The second chute 32 is connected in one end that the first chute 31 is located inside fixture 3, second slides Groove 32 is in Fig. 2, the projection 42 of latch 4 enters line slip.The 3rd chute 34 is communicated with the second chute 32, the 3rd chute 34 is in T Font.3rd chute 34 slidably connects jam plate 33, and jam plate 33 enters line slip towards the first chute 31.In the second chute 32 and The side of second chute 32 of the junction of one chute 31 is protruding with the first rack 321.The outer surface of jam plate 33 and the 3rd chute Spring 331 is welded between 34.
In summary, water pipe 1 is placed on the first plate 21, then the T-shaped plate 222 of the second plate 22 is connected together in T In shape groove 213, the first plate 21 and the second plate 22 clamp water pipe 1, and first through hole 214 connects with the second through hole 223.Latch 4 is worn After crossing the through hole 223 of first through hole 214 and second, then latch 4 is plugged into the first chute 31;Arrived when the end of latch 4 contradicts During the bottom of the first chute 31, latch 4 is enforced, and then latch 4 promotes jam plate 33, makes the inwall of jam plate 33 and fixture 3 Between spring 331 compress.After the projection 42 of latch 4 rotates to an angle, latch 4, work of the jam plate 33 in spring 331 are unclamped With lower activity, and then jam plate 33 promotes latch 4;The first tooth on the second rack 421 and the inwall of the second chute 32 on projection 42 Bar 321 is engaged, and makes projection 42 be not susceptible to rotate in the second chute 32.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (9)

1. a kind of ecological, environmental protective roof pipeline structure, including water pipe (1), it is characterised in that the water pipe (1) is connected with clamping element (2), the clamping element (2) includes the first plate (21) and the second plate (22), blocks between first plate (21) and the second plate (22) Cooperation is connect to clamp water pipe (1), the clamping element (2) is connected to fixture (3), and the fixture (3) is used to be fixed on wall (55) outer surface, it is fixed by latch (4) between the clamping element (2) and fixture (3).
2. a kind of ecological, environmental protective roof pipeline structure according to claim 1, it is characterised in that first plate (21) sets There is the first cambered surface (211), second plate (22) is provided with the second cambered surface (221), first plate (21) and the second plate (22) card Connect the first cambered surface (211) and the second cambered surface (221) formation water pipe (1) space for passing through after coordinating, first cambered surface (211) and The intrados of second cambered surface (221) is fixed with Saw blade (212).
3. a kind of ecological, environmental protective roof pipeline structure according to claim 2, it is characterised in that first plate (21) Both ends are provided with T-slot (213), and the second plate (22) both ends are fixed with T-shaped plate close to the outer surface of the first plate (21) (222), the T-shaped plate (222) is connected together in T-slot (213).
A kind of 4. ecological, environmental protective roof pipeline structure according to claim 3, it is characterised in that first plate (21) two The outer surface at end is equipped with first through hole (214), and the outer surface at the both ends of second plate (22) is equipped with the second through hole (223), the first through hole (214) is connected with the second through hole (223), and the first through hole (214) and the second through hole (223) are worn Latch (4) is crossed, one end of the latch (4) is provided with limited cap (41), and the latch (4) is inserted in fixture (3).
5. a kind of ecological, environmental protective roof pipeline structure according to claim 4, it is characterised in that the latch (4) is deviated from One end of limited cap (41) is provided with projection (42), and the outer surface of the fixture (3) is provided with the first chute (31), and described first slides Groove (31) is connected to the second chute (32), and second chute (32) is located at the inside of fixture (3), first chute (31) Along the axial direction of fixture (3), circumferential direction of the second chute (32) along fixture (3).
A kind of 6. ecological, environmental protective roof pipeline structure according to claim 5, it is characterised in that second chute (32) It is connected with the 3rd chute (34), slidably connects jam plate (33) in the 3rd chute (34), the jam plate (33) is along first The axially activity of chute (31), spring (331) is connected between the jam plate (33) and the inwall of the 3rd chute (34).
A kind of 7. ecological, environmental protective roof pipeline structure according to claim 6, it is characterised in that second chute (32) Inwall be provided with the first rack (321), the outer surface of the projection (42) is provided with the second rack (421), first rack (321) it is engaged with the second rack (421).
A kind of 8. ecological, environmental protective roof pipeline structure according to claim 1, it is characterised in that water pipe (1) connection In roof (5), one end Jiang Shui of the water pipe (1) away from roof (5) leads to tank (6), in the tank (6) from top to bottom according to It is secondary to be provided with aquifer (61), bark coating (62), planting soil layer (63), hand-stuff layer (64), layer of sand (65) and gravel Layer (66), the gravel layer (66) is interior to be provided with punched collection pipe (661).
9. a kind of ecological, environmental protective roof pipeline structure according to claim 8, it is characterised in that set by the tank (6) There is overflow pipe (7).
CN201720695986.8U 2017-06-15 2017-06-15 A kind of ecological, environmental protective roof pipeline structure Expired - Fee Related CN207110279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720695986.8U CN207110279U (en) 2017-06-15 2017-06-15 A kind of ecological, environmental protective roof pipeline structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720695986.8U CN207110279U (en) 2017-06-15 2017-06-15 A kind of ecological, environmental protective roof pipeline structure

Publications (1)

Publication Number Publication Date
CN207110279U true CN207110279U (en) 2018-03-16

Family

ID=61593497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720695986.8U Expired - Fee Related CN207110279U (en) 2017-06-15 2017-06-15 A kind of ecological, environmental protective roof pipeline structure

Country Status (1)

Country Link
CN (1) CN207110279U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797900A (en) * 2018-05-08 2018-11-13 中国五冶集团有限公司 A kind of portable building roof lighting proof strip fixing piece, mounting structure and method
CN116045081A (en) * 2023-03-31 2023-05-02 江苏德丰建设集团有限公司 Auxiliary installation tool for building drainage pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797900A (en) * 2018-05-08 2018-11-13 中国五冶集团有限公司 A kind of portable building roof lighting proof strip fixing piece, mounting structure and method
CN116045081A (en) * 2023-03-31 2023-05-02 江苏德丰建设集团有限公司 Auxiliary installation tool for building drainage pipeline

Similar Documents

Publication Publication Date Title
CN106193259B (en) A kind of Rainwater collection system and construction method for sponge city
CN205124580U (en) Irrigation system is collected with rainwater in gardens
CN207110279U (en) A kind of ecological, environmental protective roof pipeline structure
CN201943173U (en) Sinking groove type permeable gutter inlet facility system
CN203795576U (en) Landscape depression for collecting stormwater runoff
CN104963705B (en) A kind of underground space tunneling construction method
CN204474499U (en) A kind of ecological multidimensional gaseous-waste holdup system for the treatment of bank, river course rain-water drainage
CN210827513U (en) Self-adaptation side slope drainage seepage prevention structure
CN203866895U (en) Ecological rainwater collecting system
CN205604096U (en) Husky system of roadlock says in husky district
CN106087648A (en) A kind of urban road special Quick drainage system
CN205557763U (en) A multistage baffling formula rainwater garden system for handling initial stage rainwater
CN208219672U (en) A kind of rainwater side slope based on mine reclamation
CN215329120U (en) Environment-friendly brick capable of being regenerated on garden pavement
CN202170652U (en) Antifouling rain channeling awning in drilling well site
CN205369281U (en) Radial precipitation structure
CN102678095A (en) Arbitrary reducing sand filtering pipe for special stainless steel net
CN208457434U (en) A kind of three-stage can draw closure and prick head
CN202298863U (en) Pipe network rainwater collecting cellar
CN207063038U (en) A kind of rainwater accumulating device for Landscape
CN207597741U (en) A kind of novel rainwater garden water structure
CN101982617B (en) Debris retaining structure for debris fields and construction method thereof
CN202899105U (en) Infiltration-filtering integral composite water drainage pipe used for farmland drainage
CN214301057U (en) Environment-friendly water permeable brick
CN209901918U (en) Landfill gas collecting system under membrane of refuse landfill

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20200615

CF01 Termination of patent right due to non-payment of annual fee